8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 1/32
OMV Group
Vienna, 2013-06-04
Achim Kamelger, CIO ITStrategy & Architecture
The Value of an
IntegratedPipeline InformationManagement Systemfor OMV Group
PODS EMEA,
4th June 2013
Vienna, Austria
!"#$% '(%)*+), !"#$%&%'($ *%+,'#$+#
-./ 01- -2+$3 14 5#%6#$78 9 *%+,'#$+#:%$
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 2/32
2 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Agenda
OMV at a Glance !
Current Pipeline Management !
Vision: Integrated Pipeline Management !
RBI/PIM Initiative at OMV Petrom !
Design of an Integrated Solution !
Benefit & Summary !
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 3/32
3 | OMV Group, CIO Strategy & Architecture, June 4, 2013
OMV Business Segments
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 4/32
4 | OMV Group, CIO Strategy & Architecture, June 4, 2013
OMV at a Glance
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 5/32
5 | OMV Group, CIO Strategy & Architecture, June 4, 2013
OMV Key Figures
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 6/32
6 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Agenda
OMV at a Glance !
Current Pipeline Management !
Vision: Integrated Pipeline Management !
RBI/PIM Initiative at OMV Petrom !
Design of an integrated Solution !
Benefit & Summary !
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 7/32
7 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Selection:
!
Trans Austria Gas (TAG) ! 3x380 km
! West Austria GAS (WAG) ! ~ 350 km
!
PVS (~Distribution Network) ! ~ 400 km
! Produktenleitung West (PLW) ! ~ 170 km
!
Adria Wien Pipeline (AWP) ! 435 km
!
Planned: Bratislava Schwechat Pipeline (BSP)!
~ 60 km
! Planned: Nabucco!
Major Pipelines in Austria
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 8/32
8 | OMV Group, CIO Strategy & Architecture, June 4, 2013
! Currently several different Pipeline
Management Systems are in
place:
! Example:
! Autocad based (AT)
!
Valis (AT proprietary system)!
Smallworld GIS
(DE proprietary system)
Managing:
Gas pipelines: ~1.700 km
Oil pipelines: ~750 km
Power cables: ~980 km
Water pipelines: ~300 km
Current Pipeline Management Approaches AS IS Situation
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 9/32
9 | OMV Group, CIO Strategy & Architecture, June 4, 2013
! Currently several different Pipeline
Management Systems are in
place:
! Example:
! Esri ArcGIS based in OMV
Petrom and Austria!
Petrom started (digital) data
gathering for
Fixed Assets: ~160.000
Oil/Gas pipelines:~ 24.000km
Current Pipeline Management Approaches AS IS Situation
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 10/32
10 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Current Pipeline Management ApproachesExample: ArcGIS Austria
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 11/32
11 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Analysis Analysis
Current Pipeline ManagementExample: GAS CONNECT AUSTRIA GmbH
Data Entry Analysis Reporting
(Manfred Breit)
06#,;<'+ =%;#$+>;"
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 12/32
12 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Current Pipeline ManagementExample: GAS CONNECT AUSTRIA GmbH (Manfred Breit)
Analysis AnalysisData Entry Analysis Reporting
Classification of readings
Select the campaign
06#,;<'+ =%;#$+>;"
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 13/32
13 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Current Pipeline ManagementExample: GAS CONNECT AUSTRIA GmbH
Dialog for creating CP diagrams for the areaand campaign of interest. Directly from the
PODS tables.
(Manfred Breit)
Analysis AnalysisData Entry Analysis Reporting
06#,;<'+ =%;#$+>;"
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 14/32
14 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Current Pipeline ManagementExample: GAS CONNECT AUSTRIA GmbH (Manfred Breit)
Analysis AnalysisData Entry Analysis Reporting
06#,;<'+ =%;#$+>;"
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 15/32
15 | OMV Group, CIO Strategy & Architecture, June 4, 2013
!
Data gathering might be
different in each system
and performed differently
from contractors
!
!
with slightly differentinformation (+ formats)
! !different interfaces to
other systems (i.e. ERP)
! ! difficult to link withother systems
ERP (A)
ERP (B)
ERP (C)
CP 1
CP 2
CP 3
PIMSII.
Consequences of the differentPipeline Management Systems
PIMSIII.
Contractordata collection
MultiplePIMS
PIMSI.
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 16/32
16 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Agenda
OMV at a Glance !
Current Pipeline Management !
Vision: Integrated Pipeline Management !
RBI/PIM Initiative at OMV Petrom !
Design of an Integrated Solution !
Benefit & Summary !
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 17/32
17 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Integrated Pipeline Management SystemConceptual Architecture
GIS Client Desktop Web
Databasespatial enabled
ArcSDE
ArcGIS for Server
0101010101010101010101010101
010101010101010101010101010101010101010101010101010101010101010
Reporting
Integration
Spatial Integration
Data collection,QC and provision
Mobile
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 18/32
18 | OMV Group, CIO Strategy & Architecture, June 4, 2013
!
Location, Geographic Features
! Pipeline Facilities (ROW)
!
Intelligent In-line Inspections
! Physical Inspections
!
Maintenance
! Operation Measures
!
Cathodic Protection
!
Risk, Damage Offline Events
Vision of one Data Model forPipeline Management
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 19/32
19 | OMV Group, CIO Strategy & Architecture, June 4, 2013
!
Re-use of technical
solution and data model
!
One single source of data(MDM) leads to faster
availability of information
!
Reduced complexity
! Introduce efficient process
and operational workflows
! Assign roles and
responsibilities (ownership)
!
Contractors provide data inone (or two) formats
Benefits from one IntegratedPipeline Management System
PIMSI.
ERP (A)
ERP (B)
ERP (C)
CP 1
CP 2
CP 3
PIMSII.
PIMSIII.
Contractordata collection
MultiplePIMS
ERP (A)
CP 3
PIMS
DefineStandard for
data gathering
Establish onePIMS utilizing
best of practice
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 20/32
20 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Agenda
OMV at a Glance !
Current Pipeline Management !
Vision: Integrated Pipeline Management !
RBI/PIM Initiative at OMV Petrom !
Design of an Integrated Solution !
Benefit & Summary !
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 21/32
21 | OMV Group, CIO Strategy & Architecture, June 4, 2013
! Introduce a risk-based management
system, for planning optimum cost
maintenance over the lifetime of an
asset (of pipeline system and static
equipment)
Petrom: Risk based InspectionPipeline Integrity Management
! Unreliable safety and operation
condition which conduct to unplanned
shutdowns and subsequently to loss of
production and maintenance high
costs.!
High frequency failures of pipeline
network due to the, corrosive producedfluids, poor quality of previous repairs
Current situation (As Is)
~160000 fix assets & 24.000km pipelineScope
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 22/32
22 | OMV Group, CIO Strategy & Architecture, June 4, 2013
POSITIVE•
Piloting data acquisition by
business initiative in selected
assets
Negative
•
Isolated data gathering withoutany system integration nor simple
connection to other repository
•
Missing functionality
Negative•
SAP PM contains mostly outdated
information (DQ)
• No data quality assurance process in
place
•
Very limited attributes – inadequate forany RBI calculation are available
•
No process and workflows are in place
•
Roles and responsibilities are not clearly
defined
No connection
Data Gathering Maintenance
!
Business Challenge: Looking for an integrated solution
Risk based InspectionPipeline Integrity Management
?
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 23/32
23 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Agenda
OMV at a Glance !
Current Pipeline Management !
Vision: Integrated Pipeline Management !
RBI/PIM Initiative at OMV Petrom !
Design of an Integrated Solution !
Benefit & Summary !
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 24/32
24 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Defining the High Level Workflows foran RBI/PIM System
Agreement on" Business Processes & Roles
" Information Flow (ILM) and Information Governance #
Business Architecture &IT Architecture
BusinessProcesses &
Workflow
InformationSystem
Informationflow &
Integration
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 25/32
25 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Defining the High Level Concept Architecture foran RBI/PIM System
#
#
" Agreement on Information flow" Reuse if existing technology #
Business Architecture &IT Architecture
BusinessProcesses &
Workflow
InformationSystem
Informationflow &
Integration
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 26/32
26 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Designing System Dependencies and Integration foran RBI/PIM System
Business Architecture &IT Architecture
BusinessProcesses &
Workflow
InformationSystem
Informationflow &
Integration
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 27/32
27 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Designing Information Model/Flow and Interfaces foran RBI/PIM System
Business Architecture &IT Architecture
BusinessProcesses &
Workflow
InformationSystem
Informationflow &
Integration
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 28/32
28 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Preparation for the RFI/RFP Process
BusinessRequirements
TechnologyRequirements
Business Architecture &IT Architecture
BusinessProcesses &
Workflow
InformationSystem
Informationflow &
Integration
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 29/32
29 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Agenda
OMV at a Glance !
Current Pipeline Management !
Vision: Integrated Pipeline Management !
RBI/PIM Initiative at OMV Petrom !
Design of an Integrated Solution !
Benefit & Summary !
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 30/32
30 | OMV Group, CIO Strategy & Architecture, June 4, 2013
! Increased availability, sharing and re-usability of pipeline related data
within the enterprise
!
Increased data quality
! Efficient information workflows that are accessible for different asset
teams
!
Support of technical- and business workflows
! Supporting pipeline risk & -integrity tasks
!
Optimized decision support
!
Supporting maintenance and inspection workflows
! The data model is spatially-enabled and allows a seamless
integration in OMV´s existing systems such as WebGIS, SAP, eDMS,collaboration platform.
!
Reduction of paper archives
Benefits of implementing PODS based on anEnterprise GIS
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 31/32
31 | OMV Group, CIO Strategy & Architecture, June 4, 2013
!
Since April OMV is PODS Member and can benefit from their bestpractices, standards and state-of-the-art data model for pipeline data
management
! All members of OMV Group have access to OMV´s GIS standard based
on Esri Technology (Enterprise License Agreement (ELA))
! Re-use of infrastructure (2 Existing Systems – Vienna, Petrom)
ArcGIS Server based WebGIS/WebOffice Technology (SynerGIS)
!
Full Spatial Enabled PODS
! Capability for PIMS
! Ready for adapting emerging technologies, such as smart devices for
on/offline data gathering and data monitoring
!
OMV Group would clearly benefit from one single, integrated PipelineInformation Management System
! Meeting with OMV´s Pipeline Stakeholder will be scheduled
Summary
8/11/2019 Pipeline Information Management
http://slidepdf.com/reader/full/pipeline-information-management 32/32
32 | OMV Group, CIO Strategy & Architecture, June 4, 2013
Thank you