PIP Update Aug 6 th 2014. Agenda Summary Update – Current Activities/Updates – New Tuner Test...

6
PIP Update Aug 6 th 2014

Transcript of PIP Update Aug 6 th 2014. Agenda Summary Update – Current Activities/Updates – New Tuner Test...

PIP Update

PIP UpdateAug 6th 2014AgendaSummary UpdateCurrent Activities/UpdatesNew Tuner Test Result: Reid & SlabaughAnode Supplies: CrawfordUpdateLinac SBK: CDR payment made discussions and questions continue Linac LN: Internal Review yesterday preparing for shutdown install of vacuum mirror chamberLinac Modulator: EE Design: Preparing for 25 cell modulator procuring additional hardware Linac Utilities: Dual temp system preparing bid package for the air cooling unit and installation (signed PO for job)55 LCW pump preparing bid package for pipefitters part of installation. Other trades will proceed as T&MInjector: Running in dimpled cathode on source B looking at additional gas mixture studiesBooster Beam: Cogging Working on tying in additional functions/modulesBooster optics software still need to tune on higher intensity with new tunes and beta correctionsBooster Longitudinal dampers - Working on software beam lock and responseBooster RF:Booster RF5 waiting for a girdermost likely use the one from BRF12It needs new tuners. Waiting on cones (bottom neck at this point in time)Cavity 20 leak checked and now in test stand area when will HP testing begin?15 Hz testing of Station 2 started last week. Perpendicular Cavities testing of new ferrite material (using solenoid)Booster Anode Supplies still progressing tight schedule with long lead items (need update?_)Booster Bias supplies 4 ready to be shipped? 3 Ready for HP testing, 1 had some issues with high pulse ratesBooster Shielding: Safety Going over data.working on fixing spreadsheet, preparing for TLM installBooster BPM work : continue to make measurementsBooster Absorber/Kicker: Continuing to look at loss profile and ways to mitigate if possible, preparing for S12 work2 or 3 more short kickers will be ready by shutdownWorking on schedule and testing:15 Hz testing and shutdowns (this year and next)Need to verify 15 operations find unknown issuesFull 15 Hz system testing and operations can only begin when all installed cavities have been refurbished. 7/8/2014PIP PMG

Recent PIP Budget/NewsBudget Issues:Preparing for FY15Making sure we generate all necessary FY14 POs!!!Labor meetings for FY15 (TD meeting today)Meetings to discuss transition PIP to PIP-II startedUpdate of RLS Some Booster items remain

Upcoming TalksAugust 18: Shutdown Meeting

Future Meetings to be Scheduled:Kiyomi Seiya - CoggingBill Pellico - Loss Scans and Shielding AssessmentJohn Reid - Solid State Installation - Final ReportNathan Eddy / Alexei Semenov - Longitudinal Dampers Timofey Zolkin - Transverse Dampers