Transcript of Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd...REQUEST… Restore Interchange to...
Williamson Blvd Extension
(Funded $9.8 million)
Pioneer Trail
I-95/Pioneer Trail Interchange
Turn
bull B
ay R
d
...REQUEST…Restore Interchange to TPO’s “unfunded” LRTP Formal Support by : Volusia County Council
Port Orange City Council New Smyrna Bch City Commission
Required Future Steps…..
Proposed Interchange
IJRInterchange Justification
ReportLRTP ETDM
Environmental Screening
PD&E
son
Blvd
S W
illia
m
Pioneer Trail
Public Input Opportunities
I-95/Pioneer Trail Interchange
Pioneer Trail
Turn
bull B
ay R
d
Historical RecapWilliamson Blvd (east of I-95)• 2010 LRTP (VCATS) Highway Needs Plan (Mar ‘83)
• 2015 LRTP MPO Transportation Study (Nov ‘94)
• 2020 LRTP MPO Transportation Plan (May ‘96)
Williamson Blvd revised (west of I-95)• 2025 LRTP MPO Transportation Plan (Nov ‘05)
FDOT Studies:• I-95 Systems Operational Analysis Report - SOAR (Nov ‘05) - Pioneer Trail interchange meets minimum spacing requirements
• I-95 Sketch Interstate Plan - SIP (Mar 2010) - Pioneer Trail interchange included as “new” designated future roadway project
Proposed Interchange
son
Blvd
S W
illia
m
Severe Environmental
Concerns
…Need for Interchange…1. Relieves existing congestion @
Dunlawton/I-952. Relief for future congestion @
SR44/I-953. Enhances hurricane evacuation4. Supports Comprehensive Plans5. Economic Development
The Interchange Justification Report (IJR) is a technical evaluation documenting the need for the project and requires approval from FDOT & Federal Highway Administration
Dunlawton Av
State Road 44
I-95/Pioneer Trail Interchange
Proposed Interchange
Pioneer Trail
Williamson Blvd Extension
Williamson Blvd Extension
(Funded $9.8 million)
Pioneer Trail
I-95/Pioneer Trail Interchange
Turn
bull B
ay R
d
…Why Restore to LRTP Now…• S. Williamson Blvd Ext will be
completed in 2014• Allows IJR to proceed rather than
delaying 2-3 years• Opportunity to tout $9.8 million
local investment in pursuing federal grants
• Validate Comprehensive Plans• Economic Stimulus
Proposed Interchange
IJRInterchange Justification
ReportLRTP ETDM
Environmental Screening
PD&E
son
Blvd
S W
illia
m
Pioneer Trail
Public Involvement