![Page 1: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/1.jpg)
Pine Valley Country Club Stream Restoration:Phase 2 Proposal
Presented March 17, 2003
Greg Jennings, NC State UnivBarbara Doll, NC Sea GrantDave Bidelspach, NC State UnivDan Clinton, NC State UnivMac Haupt, NC WRPDave Mayes, City of Wilmington
![Page 2: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/2.jpg)
Overview Goal: Improve the water quality, stability,
ecological function, and aesthetics of streams flowing through the Pine Valley Country Club
Location: Middle Branch of Hewletts Creek including approximately 3,300 feet of perennial stream channel
Purpose of Presentation:Describe proposed stream restoration projectSeek feedback on proposed stream
restoration, vegetated buffer enhancement, and stormwater management
![Page 3: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/3.jpg)
NC Wetlands Restoration Program Established in 1996 to restore wetlands, streams and
riparian buffer areas for the purposes of improving: Water Quality Aquatic and Terrestrial Habitat Floodwater Prevention Pollution Prevention Overall Watershed Function
Through State resources the NCWRP can fund: design, permit acquisition, construction and long term management of the site.
![Page 4: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/4.jpg)
Defining the Problem Watershed Issues:
Closed and impaired shellfish watersUrban stormwater runoffNutrient inputs resulting in algal bloomsSediment inputs Growth and developmentChannelized streams
Land Based Physical Impacts: Eroding stream channel = loss of golf course
property and loss of aesthetic values
![Page 5: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/5.jpg)
Existing Stream Conditions Unstable eroding streambanks Poor water quality Poor vegetation (exotic species)
![Page 6: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/6.jpg)
![Page 7: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/7.jpg)
Project Objectives & Benefits
Stabilize streams on PVCC property Improve water quality in Hewletts Creek and
downstream shellfish waters Improve natural stream & floodplain functions Improve stormwater management & provide
additional water source for PVCC Establish native vegetation Improve stream crossings (culverts & bridges) Improve aesthetics of stream corridor
![Page 8: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/8.jpg)
Stream Restoration
Adjust stream conditions based on reference reaches such that natural stream functions are improved:
Channel geometry modificationInstream structuresBank stabilizationRiparian vegetation
![Page 9: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/9.jpg)
transports the water and sediment produced by its watershed
maintains its dimension, pattern, and profile while neither degrading nor aggrading
Rosgen, 1994
Stable Stream
![Page 10: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/10.jpg)
Problems Water quality Habitat loss Floodplain functions Land degradation
Causes Channelization Land use changes Loss of buffer
Unstable Streams
![Page 11: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/11.jpg)
BKF
Not Incised BHR = 1.0 ER > 2.2
Water Table
Stable Stream
![Page 12: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/12.jpg)
BKF
BHR > 1.0 ER < 1.4
Incised Channel
Water Table
![Page 13: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/13.jpg)
Priority 2 RestorationNew Stable Channel with Lower Floodplain
Bankfull BenchBKF
Incised Channel
![Page 14: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/14.jpg)
Priority 2 RestorationPlan View
Top of Bank
New Excavated Channel & Floodplain
Top of Bank
Replace Old Channel Incised Channel
![Page 15: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/15.jpg)
Pine Valley Golf Course Phase 1
Length = 1000 ft Construction Cost = $125,000 Completed May 2001
![Page 16: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/16.jpg)
![Page 17: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/17.jpg)
![Page 18: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/18.jpg)
![Page 19: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/19.jpg)
Proposed Schedule
Spring 2003: Complete design & permit applications
Summer 2003: Hire construction firm November 1, 2003: Begin construction January 2004: Complete construction February 2004: Plant streambanks & floodplain
![Page 20: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/20.jpg)
What Can the Project Provide for PVCC? New stormwater pond can be used for irrigation New culvert replacements will provide vehicle
crossings New footbridge replacements Cart path relocations Fill soil used to enhance driving range drainage Ornamental plants (large trees & shrubs)
![Page 21: Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,](https://reader034.fdocuments.us/reader034/viewer/2022042821/56649cff5503460f949d03ec/html5/thumbnails/21.jpg)
City of Wilmington Perspectives If NCWRP constructs this project:
Technique – stream restoration for mitigation credits Schedule – now Cost – paid by State (8,000,000 population)
If City constructs this project: Technique – stream restoration or other environmentally friendly
method Schedule – Council approval of Capital Improvement Budget;
$70+ M of identified needs; $500,000/yr of new projects Cost – paid by City (92,000 population)
If PVCC constructs this project: Technique – your choice as long it is permittable Schedule – based on priorities of the Country Club Cost – paid by members of the club (400 members -
$1500/member)