![Page 1: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/1.jpg)
Pine Point Pilot ProjectScoping Session Technical
Presentation August 2006
![Page 2: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/2.jpg)
Introduction
• Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged in exploration and development in North America and Internationally.
– Ross Burns – President & CEO– David Swisher – Senior Project Manager– Graham Eacott – V.P. Investor Relations– Tom Thomson – Manager Investor Relations– Dan Broast – Senior Resource Geologist– Jerry DeMarco – Public Relations
![Page 3: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/3.jpg)
Introduction
• TAM proposes to construct and operate a Pb-Zn pilot plant to economically confirm:
– Full-Scale Underground Mining Potential– Extraction of 1 Million Tonne Bulk Sample– Perimeter Ground Freezing– Shaft Sinking– Vertical Conveyance– Dense Media Separation (DMS)
![Page 4: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/4.jpg)
Property History
• 1898– Claims staked on oxidized sulfide
outcrops
• 1929 – Northern Lead Zinc Co. conducted
work program
• 1948-1955 – Cominco Ltd. conducted major
exploration
• 1961-1964 – Government constructed railway
• 1961-1964 – Northern Canada Power builds 21
megawatt hydroelectric plant
![Page 5: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/5.jpg)
Property History
• 1964-1987 – Cominco Ltd. conducted mining &
milling• 1991
– Mill, town site & railroad removed• 2001
– Karst Investments LLC staked claims
• 2004 – Tamerlane Ventures Inc. acquired
60% interest• 2006
– Tamerlane Ventures Inc. acquired remaining 40% interest
![Page 6: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/6.jpg)
Property History-Present
• 52 Deposits Mined
• 64,259,570 Tonnes of Ore
• 3.1% Lead, 7.0% Zinc
• 34 Defined Deposits
• 70 Million Tonnes*(historic resource)
*Taken from historic records believed to be accurate. No current NI 43-101 compliant resource calculation has been completed on these deposits.
![Page 7: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/7.jpg)
Location Map
Great Slave Lake
![Page 8: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/8.jpg)
Key Pilot Project Components• No camp• No winter road• Temporary waste rock storage area• Infiltration basin
– Proposed as nearby quarry
• Freeze perimeter• Dense Media Separation & Additives• Sewage Treatment• Water Quality from Backfill & Explosives • Hazardous Wastes
![Page 9: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/9.jpg)
Pilot Project Site Plan
![Page 10: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/10.jpg)
Overview
![Page 11: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/11.jpg)
Waste Rock Storage
• All volumes returned U/G
• No historical Acid Rock Drainage (ARD) issues
• Limestone and dolomite-dominated geology mitigate potential ARD
Waste Generation EstimatedTonnage
Shaft Sinking 16,300
Development 32,430
Raisebore 2,000
SUBTOTAL 50,730
Bulk Sample Extracted 1,000,000
DMS Recovery @ 60% 600,000
DMS Gangue Reject @ 40% 400,000
SUBTOTAL 400,000
TOTAL 450,730
Assume 100% swell factor 450,730
Total Waste Returned U/G 901,460
Total Waste Required for fill 1,000,000
∆ (98,540)
![Page 12: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/12.jpg)
Infiltration Basin
• Shallow Impoundment• Natural filtering• Gradual exfiltration• Groundwater recharge
20 year old surface infiltration basin at Commerce Plaza, a business park near Allentown, Pennsylvania
![Page 13: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/13.jpg)
Freezing
Ore Zone
Ore
Freeze Perimeter wall
2” & 4” diameterFreeze Pipes
Section through Freeze Wall
![Page 14: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/14.jpg)
DMS Preliminary Layout
Primary Crusher VerticalConveyor
Stockpile Secondary crushing
Bulk Concentrate
Dense Media Circuit
WasteWaste
Sieve Bends
Centrifuge
Stockpile100,000 tonnes
Coarse Ore Screens
Secondary Crushers
Coarse Ore Bin
Lead
Floor sump
Magnetic Separator
DMS Cyclone
Heavy Media Return Pump
DMS CycloneFeed Pump
ProductCentrifuge
150 tpd modular
![Page 15: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/15.jpg)
DMS Defined
Pine Point Pilot Project
Milling
![Page 16: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/16.jpg)
DMS Additives
Ferrosilicon– Only known additive (Inert)
– Derived from natural ores (MSDS)
– No known adverse environmental effects (MSDS)
– Recycled through the DMS circuit
![Page 17: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/17.jpg)
Sewage Treatment
Options Considered• RBC sewage treatment facility
– Biodisk Corporation– Used throughout Canada
• Snap Lake, Travco, NWT• Diamond Mine, BHP, NWT• CNR, Alberta• Yellowknife, Barrick, NWT
• Self-contained mini-sewage treatment toilets U/G
• Port-a-Potties
![Page 18: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/18.jpg)
Water Quality
• Underground water will be monitored at the infiltration basin throughout the life of the project
• Historical groundwater reports and assays completed
• Existing groundwater quality strongly influenced by local geological conditions – sulfurous springs – salts-enriched hard water
• Tamerlane Ventures Inc. will continue groundwater monitoring until Regulators are satisfied
![Page 19: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/19.jpg)
Hazardous Wastes
• Hazardous Wastes and Disposal– Fuels (diesel and diesel additives)
• Will be consumed.– Used oils (motor and hydraulic)
• Reuse in oil heaters.– Used Batteries
• Dispose at Hay River hazardous waste disposal area.– Stored fuels and lubricants
• Contain in separate catchments.
• Spills – Containment and Clean-Up Process
• Hazardous Materials Spill Contingency Plan• Appendix D in Project Description Report.
![Page 20: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/20.jpg)
Estimated Schedule
TaskJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Freeze Perimeter Drilling
Power Infrastructure
Freeze Infrastructure
Freeze Operation
Main Infrastructure
Shaft Infrastructure
Shaft Sinking
U/G Drift Development
Vertical Conveyor Installation
U/G Ramp Development
Raisbor Development
U/G Utilities
DMS & Support Infrastructure
Backfill Plant
U/G Stope Development
Bulk Sample Extraction
2007 2008 2009
![Page 21: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/21.jpg)
Questions?
![Page 22: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/22.jpg)
Pine Point Pilot ProjectEnvironmental Assessment
August 2006
![Page 23: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/23.jpg)
Environmental Assessment
Pilot Plant Project AreaPilot Plant Project Area
![Page 24: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/24.jpg)
Environmental Baseline Work
Initial EBA Baseline Studies– Wildlife
• Conducted: September, 2005
– Stream Assessment and Water Quality• Conducted: September, 2005
– Vegetation• Conducted: September, 2005
![Page 25: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/25.jpg)
Environmental Baseline Work
EBA R190 Follow-Up Studies – Owl Surveys
• Conducted: April, May, 2006 – Amphibian Surveys
• Conducted: May & June, 2006– Breeding Bird Surveys
• Conducted: June, 2006– Rare Plant Surveys
• Conducted: Late June/July & Early/Mid-August, 2006– Water Quality Surveys
• Conducted: May, June, July & August, 2006
![Page 26: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/26.jpg)
Tamerlane Study Area
Local Study AreaLocal Study Area
![Page 27: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/27.jpg)
Valued Ecosystem Components
VEC Grouping VEC’sAir Quality Air Quality (indicators)
Water Quality Surface / Groundwater Quality (indicators)
Terrestrial Vegetation Traditional Use Plants / Rare Plants
Wildlife (SARA listed species) Whooping CranePeregrine FalconShort-Eared OwlWood BisonWoodland Caribou
![Page 28: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/28.jpg)
Impact Matrix
Project Component Air Quality Water Quality Wildlife VegetationSite Preparation and Construction X X X XPilot Plant Site X X X XProcess Waste Storage (Temp) XUnderground Mining X X
![Page 29: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/29.jpg)
Air Quality
![Page 30: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/30.jpg)
Project Component Potential Impact MitigationSite Preparation and Construction
Temporary localized dust generation from clearing /surface construction activities
Dust suppression GNWT Guideline for Dust Suppression
Underground Mining Limited air emissions CO, SO2 and NOx, particulates
GNWT, WCB standards for mine air quality
Processing Negligible particulate emissions Guideline for Ambient Air Quality Standards in the Northwest Territories
Other Infrastructure (e.g. access road)
Temporary localized dust generation
GNWT Guideline for Dust Suppression
Air Quality
![Page 31: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/31.jpg)
Water Quality
![Page 32: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/32.jpg)
Groundwater Flow
![Page 33: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/33.jpg)
Project Component Potential Impact MitigationSite Preparation and Construction
Localized sedimentation Silt barriers in construction activities – no streams or lakes present in local study area
Underground Mining Discharged mine water Mine water used in DMS plant directed to infiltration basin
Processed Waste Water Suspended solids Inert process waste water directed to former gravel quarry (infiltration basin)
Sewage Nutrients and bacteria to groundwater
Treated using a packaged RBC plant or port-a-potties. RBC will meet the Camp Sanitation Regulations, R.R. N.W.T. 1990, c. P-12, Public Health Act, R.S.N.W.T. 1998, c. P-12
Water Consumption Process water sourced from groundwater. Potable water transported to site
Excess water directed to infiltration basin, returned to groundwater
Hazardous Materials Impacts on water quality Management Plan covering the transportation, use, disposal, and emergency response
Water Quality
![Page 34: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/34.jpg)
Questions?
![Page 35: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/35.jpg)
Vegetation
![Page 36: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/36.jpg)
Vegetation
![Page 37: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/37.jpg)
Project Component Potential Impact Mitigation
Site Preparation and ConstructionPlant Site & associated infrastructure
Minor loss of vegetation; increase in ecosystem fragmentation; Localized soil compaction
Minimize footprint – maximize use of existing disturbed terrainMinimize off-site activities; implement erosion control measures Use of dust suppressants; Dispose of all hazardous wastes in approved manner.Progressive site reclamation
Vegetation
![Page 38: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/38.jpg)
Questions?
![Page 39: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/39.jpg)
Wildlife
![Page 40: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/40.jpg)
Wildlife
![Page 41: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/41.jpg)
Nearest known Whooping Crane Nest Sites ~60 km
Nearest known Whooping Crane Nest Sites ~60 km
Proposed Pilot Project
Wildlife: Whooping Crane
![Page 42: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/42.jpg)
Approximate Nesting Range of Peregrine FalconsApproximate Nesting Range of Peregrine Falcons
Proposed Pilot Project
Wildlife: Peregrine Falcon
![Page 43: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/43.jpg)
Wildlife: Short-Eared Owl
• No suitable habitat in local study area
• None found in local study area
• Nearest suitable habitat for nesting ~3km south of highway
![Page 44: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/44.jpg)
Project Located in Bison Control AreaProject Located in Bison Control Area
Wildlife: Wood Bison
![Page 45: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/45.jpg)
Wildlife: Woodland Caribou
• Woodland Caribou occur in low numbers in Project area year-round
• Calve in upland wooded areas not present in Project area
![Page 46: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/46.jpg)
Project Component Potential Impact MitigationSite Preparation and Construction
Disturbance and removal of wildlife habitat
Minimize footprint, maximize use of existing disturbed terrain, avoid sensitive areas
Plant Site Disturbance and removal of wildlife habitat
Minimize footprint, maximize use of existing disturbed terrain, avoid sensitive areas
Underground Mining No impacts anticipated None required
Process Waste Water Potential consumption by local wildlife
Inert process waste water directed to former gravel quarry (infiltration basin)
Domestic Wastes Domestic waste can attract wildlife, and become a safety hazard
Domestic will be temporarily contained on site & disposed of in an approved local area landfill
Other Infrastructure Temporary, rapidly reversible disturbance
Traffic controls – wildlife has the right-of-way
Wildlife
![Page 47: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/47.jpg)
Questions?
![Page 48: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/48.jpg)
Environmental Considerations
• The general area has experienced major exploration and mining activities for more than 100 years.
• The R-190 area has already been disturbed by historical exploration activities.
• The R-190 area is located immediately adjacent to an existing highway and power line infrastructure.
• The R-190 area has already and continues to experience quarrying activities.
• No significant effects on wildlife, including SARA-listed species are expected to occur.
![Page 49: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/49.jpg)
• Application of Least Intrusive Method for Stabilizing Wet Ground– Freeze Curtain– Primarily Underground Operation
• Project Footprint Minimization– Installation of Project Infrastructure on Previously Altered Terrain
• No Streams or Lakes in Immediate Project Area– No Potential to Affect Streams, Lakes or Fisheries Resources
• Compliance with Water License Criteria– Process Waste Water Recycling, Treatment (if necessary) and
Discharge to Ground / Groundwater
Mitigation Measures
![Page 50: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/50.jpg)
• Airborne Noise Minimization– Minimal Airborne Noise Due to Primarily Underground Operation
• Access Road Dust Suppression
• Access Road Traffic Controls– Wildlife will have the Right-of-Way
• Effective Waste Management and Spill Prevention / Response
Mitigation Measures Cont.
![Page 51: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/51.jpg)
Cumulative Impacts
No Significant Cumulative Impacts Expected to Occur*
– Pine Point 1965 – 1987– Limited Scope and Scale– Current Operating Quarries– Minimal Intervention – Freeze Curtain - Underground– No Nearby Waterways– Progressive Reclamation
*Review sections 5.0 & 6.0 pgs 65-66, project description report
![Page 52: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/52.jpg)
Summary
• Confirm Viability and Economics for Underground Mining
• Obtain Bulk Sample
• Adhere to High Level of Environmental and Safety Standards
• Compliance with Regulatory Requirements and Conditions
• Create Jobs and Business Opportunities• Improve Local Economy
![Page 53: Pine Point Pilot Project - Review Boardreviewboard.ca/upload/project_document/EA0607-002... · Introduction • Tamerlane Ventures Inc. (TAM) is a publicly traded mining company engaged](https://reader034.fdocuments.us/reader034/viewer/2022042419/5f35336cd4cac83e73155583/html5/thumbnails/53.jpg)
Questions?