Pine and Mill Creek E. coli Stakeholder Meeting

25
Pine and Mill Creek Pine and Mill Creek E. coli E. coli Stakeholder Meeting Stakeholder Meeting Michigan Department of Environmental Quality, Water Bureau May 29, 2007

description

Pine and Mill Creek E. coli Stakeholder Meeting. Michigan Department of Environmental Quality, Water Bureau May 29, 2007. Meeting Objectives:. Introductions E. coli 101 Michigan’s Water Quality Standard 2005 E. coli sampling data review - PowerPoint PPT Presentation

Transcript of Pine and Mill Creek E. coli Stakeholder Meeting

Page 1: Pine and Mill Creek  E. coli Stakeholder Meeting

Pine and Mill Creek Pine and Mill Creek E. coliE. coli Stakeholder MeetingStakeholder Meeting

Michigan Department of Environmental Quality, Water BureauMay 29, 2007

Page 2: Pine and Mill Creek  E. coli Stakeholder Meeting

Meeting Objectives:Meeting Objectives: IntroductionsIntroductions

E. coliE. coli 101 101 Michigan’s Water Quality StandardMichigan’s Water Quality Standard

2005 2005 E. coliE. coli sampling data review sampling data review

Section 303(d) impaired listing for Pine and Mill Section 303(d) impaired listing for Pine and Mill CreeksCreeks TMDL development scheduleTMDL development schedule

Proposed DEQ sampling plan for Pine and Mill CreeksProposed DEQ sampling plan for Pine and Mill Creeks

Page 3: Pine and Mill Creek  E. coli Stakeholder Meeting

What is What is E. coliE. coli??

Page 4: Pine and Mill Creek  E. coli Stakeholder Meeting

The Basics…The Basics… Escherichia coli Escherichia coli is a sub-is a sub-

set of fecal coliforms set of fecal coliforms whose presence whose presence indicates fecal indicates fecal contamination.contamination.

It is associated with the It is associated with the fecal material of warm-fecal material of warm-blooded animals and is blooded animals and is an indicator organism an indicator organism used to predict the used to predict the presence of other presence of other harmful microorganisms.harmful microorganisms.

Page 5: Pine and Mill Creek  E. coli Stakeholder Meeting

What are the impacts What are the impacts associated with associated with E. coliE. coli??

E. coliE. coli and associated microorganisms when and associated microorganisms when taken into the body can cause severe sickness.taken into the body can cause severe sickness.

Bacterial infections - Cholera, salmonellosisBacterial infections - Cholera, salmonellosis Viral infections - hepatitits, gastoenteritisViral infections - hepatitits, gastoenteritis Protozoa infections – cryptosporidiosis, giardiasis Protozoa infections – cryptosporidiosis, giardiasis

Once these pathogens are in a stream or lake, Once these pathogens are in a stream or lake, they can infect humans through ingestion, skin they can infect humans through ingestion, skin contact or contaminated fish.contact or contaminated fish.

Page 6: Pine and Mill Creek  E. coli Stakeholder Meeting

How much is too much?How much is too much?

Michigan’s WQS for total body contact for Michigan’s WQS for total body contact for E. E. colicoli is is 130130 E. coliE. coli per 100 ml (as a 30-day per 100 ml (as a 30-day geometric mean) or geometric mean) or 300300 E. coliE. coli per 100 ml per 100 ml (during the same sampling event)(during the same sampling event)

Total body contact recreation May 1 to Total body contact recreation May 1 to October 31October 31

Risk based numberRisk based number

Page 7: Pine and Mill Creek  E. coli Stakeholder Meeting

What are the sources of What are the sources of EE. . colicoli??

Two major ones: Point and non-Two major ones: Point and non-point sources.point sources.

Point sources directly discharge to Point sources directly discharge to a waterbody via a pipe (WWTP or a waterbody via a pipe (WWTP or CSO).CSO).

Page 8: Pine and Mill Creek  E. coli Stakeholder Meeting

Non-point sources:Non-point sources:illicit connectionsillicit connections

Page 9: Pine and Mill Creek  E. coli Stakeholder Meeting

•Run-off

Page 10: Pine and Mill Creek  E. coli Stakeholder Meeting

•Agricultural inputs

Page 11: Pine and Mill Creek  E. coli Stakeholder Meeting

2005 Monitoring – Pine 2005 Monitoring – Pine CreekCreek

Sampled 5 locations weekly from July – Sampled 5 locations weekly from July – SeptemberSeptember

12 weeks of data12 weeks of data

Page 12: Pine and Mill Creek  E. coli Stakeholder Meeting

Figure 1. Pine Creek E. coli sampling locations, vicinity of Hartford, Michigan, 2005.

N

Watervliet

Hartford

VAN

BU

REN

CO

BER

RIE

N C

O

County Rd 372

56th Ave

Hagar Shore Rd

Dwight Boyer Rd

67 ½

St

66th

St

63rd

St

68th Ave

66th Ave

74th Ave

67th

St

County Rd 362

Cou

nty

Rd

687

62nd

St

60th

St

68th

St

77th Ave

76th Ave

Dan Smith Rd

11

1

2

3

4

55

Page 13: Pine and Mill Creek  E. coli Stakeholder Meeting

Data SummaryData Summary

Pine CreekPine Creek With exception of one day, With exception of one day, E. coliE. coli concentrations concentrations

exceeded daily maximum and 30-geometric mean 100% exceeded daily maximum and 30-geometric mean 100% of the time of the time

Daily maximums ranged from 290 Daily maximums ranged from 290 E. coliE. coli per 100 ml at per 100 ml at 6464thth St. to > 3 million St. to > 3 million E. coliE. coli per 100 ml at Red Arrow Hwy. per 100 ml at Red Arrow Hwy.

30-day geometric mean 30-day geometric mean E. coliE. coli concentrations ranged concentrations ranged from 386 from 386 E. coliE. coli per 100 ml at 64 per 100 ml at 64thth St. to >6,000 St. to >6,000 E. coliE. coli per 100 ml at Red Arrow Hwy.per 100 ml at Red Arrow Hwy.

Page 14: Pine and Mill Creek  E. coli Stakeholder Meeting

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

7/7/2005 7/14/2005 7/21/2005 7/28/2005 8/4/2005 8/11/2005 8/18/2005 8/25/2005 9/1/2005 9/8/2005 9/14/2005 9/16/2005

Pine Cr. @ 72nd Pine Cr. @ 64th Pine Cr. @ Private Rd. Pine Cr. @ 66th Pine Cr. @ Red Arrow WQS

E. c

oli/1

00 m

l

Figure 2. Daily maximum E. coli in Pine Creek, Van Buren County, Michigan, 2005.

Page 15: Pine and Mill Creek  E. coli Stakeholder Meeting

0

1000

2000

3000

4000

5000

6000

7000

8/4/2005 8/11/2005 8/18/2005 8/25/2005 9/1/2005 9/8/2005 9/14/2005 9/16/2005

Pine Cr. @ 72nd Pine Cr. @ 64th Pine Cr. @ Private Rd. Pine Cr. @ 66th Pine Cr. @ Red Arrow WQS

E. c

oli/1

00 m

l

Figure 3. 30-day Geometric mean E. coli Pine Creek, Van Buren County, Michigan, 2005.

Page 16: Pine and Mill Creek  E. coli Stakeholder Meeting

Figure 4. Mill Creek E. coli sampling locations, vicinity of Watervliet, Michigan, 2005.

N

Watervliet

Hartford

VAN

BU

REN

CO

BER

RIE

N C

O

Paw Paw

River

Mill

Creek

I-94

Red Arrow Hwy

Dan Smith Rd 68th Ave

John

Gof

f Rd

Carmody Rd

Angling Rd

67 ½

St

66th

St

Cou

nty

Rd

687

County Rd 362

Wat

ervl

iet R

dDanneffel Rd

Hill Rd

N Branch Rd

Bai

nbrid

ge C

ente

r Rd

Territorial Rd

80th Ave

76th Ave

67th

St

84th Ave

68th

St

77th Ave

6

78

Page 17: Pine and Mill Creek  E. coli Stakeholder Meeting

Data SummaryData Summary

Mill CreekMill Creek E. coliE. coli concentrations exceeded the daily maximum and concentrations exceeded the daily maximum and

30-geometric means 100% of the time30-geometric means 100% of the time

Daily maximums ranged from 576 Daily maximums ranged from 576 E. coliE. coli per 100 ml at per 100 ml at Hill Rd. to > 17,000 Hill Rd. to > 17,000 E. coliE. coli per 100 ml at 67 per 100 ml at 67thth Ave. Ave.

30-day geometric mean 30-day geometric mean E. coliE. coli concentrations ranged concentrations ranged from 845 from 845 E. coliE. coli per 100 ml at Hill Rd. to 4,480 per 100 ml at Hill Rd. to 4,480 E. coliE. coli per 100 ml at 77per 100 ml at 77thth Ave.. Ave..

Page 18: Pine and Mill Creek  E. coli Stakeholder Meeting

Figure 5. Daily Maximum E. coli in Mill Creek, Van Buren/Berrien Counties, Michigan, 2005.

E. c

oli/1

00 m

l

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

7/7/2005 7/14/2005 7/21/2005 7/28/2005 8/4/2005 8/11/2005 8/18/2005 8/25/2005 9/1/2005 9/8/2005 9/14/2005 9/16/2005

Mill Cr. @ 77th Mill Cr. @ 67th Mill Cr. @ Hill WQS

Page 19: Pine and Mill Creek  E. coli Stakeholder Meeting

Figure 6. 30-day Geometric mean E. coli in Mill Creek, Van Buren/Berrien Counties, Michigan, 2005.

E. c

oli/1

00 m

l

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

8/4/2005 8/11/2005 8/18/2005 8/25/2005 9/1/2005 9/8/2005 9/14/2005 9/16/2005

Mill Cr. @ 77th Mill Cr. @ 67th Mill Cr. @ Hill WQS

Page 20: Pine and Mill Creek  E. coli Stakeholder Meeting

Section 303(d) listingSection 303(d) listing DEQ determined there was enough data DEQ determined there was enough data

to justify listing both water bodies as to justify listing both water bodies as impaired for total body contactimpaired for total body contact Requires the development of a Total Requires the development of a Total

Maximum Daily LoadMaximum Daily Load

TMDL currently scheduled for TMDL currently scheduled for development in 2008 development in 2008 Schedule may be adjusted due to budget Schedule may be adjusted due to budget

situationsituation

Page 21: Pine and Mill Creek  E. coli Stakeholder Meeting

What is a Total Maximum Daily What is a Total Maximum Daily Load (TMDL)?Load (TMDL)?

Section 303(d) of the Section 303(d) of the Clean Water Act requires Clean Water Act requires development of TMDLs for development of TMDLs for waterbodies that are not waterbodies that are not meeting designated uses.meeting designated uses.

TMDLs can cover variety TMDLs can cover variety of pollutants.of pollutants.

Page 22: Pine and Mill Creek  E. coli Stakeholder Meeting

How will the TMDL process How will the TMDL process work?work?

The TMDL establishes allowable The TMDL establishes allowable loading of pollutants to meet loading of pollutants to meet WQS based on pollution sources WQS based on pollution sources and in-stream conditions.and in-stream conditions.

The process allows the DEQ to The process allows the DEQ to establish controls to reduce establish controls to reduce pollution and restore the quality pollution and restore the quality of the resource.of the resource.

Page 23: Pine and Mill Creek  E. coli Stakeholder Meeting

Proposed DEQ study Proposed DEQ study Extensive field reconnaissance of watershedsExtensive field reconnaissance of watersheds

Recognized multiple sources of Recognized multiple sources of E. coliE. coli Use field information to aid in sampling location IDUse field information to aid in sampling location ID

E. coliE. coli sampling sampling ambient (routine) monitoringambient (routine) monitoring wet weather wet weather TMDL TMDL

Bacterial source tracking samplingBacterial source tracking sampling collecting continuous flow datacollecting continuous flow data

Page 24: Pine and Mill Creek  E. coli Stakeholder Meeting

Status of the StudyStatus of the Study On hold due to State budget On hold due to State budget

problemsproblems

Study design may change depending Study design may change depending on financial resources availableon financial resources available

Page 25: Pine and Mill Creek  E. coli Stakeholder Meeting

MDEQ InformationMDEQ Information

District contact: District contact: Scott Miller Scott Miller 269.567.3510 or 269.567.3510 or

[email protected]@michigan.govv

TMDL contact: TMDL contact: Christine AlexanderChristine Alexander 517.373.6794 or 517.373.6794 or

[email protected]@michigan.govv