PIMPRI CHINCHWAD SMART CITY LIMITED · PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office:...

49
PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC, Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected] Response to Pre bid Queries for EXPRESSION OF INTEREST vide Ref Number- 02/2018-19 dated 10-01-2018 For Shortlisting of a. System Integrators for SITC and O&M of Smart City field infrastructure comprising of Passive Fibre Network, Poles and Gantries etc. on EPC / Revenue Sharing Model b. Concessionaires for SITC and O&M for Smart Poles, City Wi-Fi, Smart City Kiosk and Variable Message Display (VMD) etc. on Revenue Sharing Model Project 1: S.No. Name of Organization EOI Document Reference(s) (Clause number / page) Content of EOI requiring Clarification Points of clarification Response to Pre Bid Queries 1 ATC Timelines need to be extended, Page no. 5 End date of Submission of Bid (IFB): 30th January 2018 Technical presentation date: 2nd February 2018 Since the pre-bid meeting is held on 18th January and lot of clarity is expected to be provided during the meeting, and keeping into consideration the large scale of project, it requires good amount of time to fully prepare for effective participation. Therefore requesting to extend the end date by at least 4 weeks Technical presentation should be at least 10 days after the bid submission date. Bid submission end date: 28th Feb 2018 Technical Presentation date: 15th March 2018 Please refer Corrigendum

Transcript of PIMPRI CHINCHWAD SMART CITY LIMITED · PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office:...

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

Response to Pre bid Queries

for

EXPRESSION OF INTEREST vide Ref Number- 02/2018-19 dated 10-01-2018

For Shortlisting of

a. System Integrators for SITC and O&M of Smart City field infrastructure comprising of Passive Fibre Network, Poles and Gantries etc. on

EPC / Revenue Sharing Model

b. Concessionaires for SITC and O&M for Smart Poles, City Wi-Fi, Smart City Kiosk and Variable Message Display (VMD) etc. on Revenue

Sharing Model

Project 1:

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

1 ATC Timelines need to be extended, Page no. 5

End date of Submission of Bid (IFB): 30th January 2018 Technical presentation date: 2nd February 2018

Since the pre-bid meeting is held on 18th January and lot of clarity is expected to be provided during the meeting, and keeping into consideration the large scale of project, it requires good amount of time to fully prepare for effective participation. Therefore requesting to extend the end date by at least 4 weeks Technical presentation should be at least 10 days after the bid submission date. Bid submission end date: 28th Feb 2018 Technical Presentation date: 15th March 2018

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

2 ATC ROW charges Need clarity on exclusivity right with respect to OFC network

Exclusivity is required to make strong business case else it can disrupt the business model as well as aesthetics of the city in case fiber is laid time and again in the city by various operators/ end- customers Exclusive rights for minimum 10 years timeframe. No new permissions to be ranted for similar project in the region

Details shall be provided as part of the RFP document. However, you may please submit your propositions as part of your EOI response document

3 ATC ROW charges RoW charges specific to the area

OFC laying permission only on restoration basis The bidder to be allowed to lay OFC in the defined area without paying any RoW charges

Details shall be provided as part of the RFP document

4 ATC Qualification criteria: Financial, Page no. 24

Average annual turnover of Rs. 500 crs. : Extract from the audited balance sheet and P&L

Only the Balance sheet and P&L pages from the audited balance sheet to be provided We need not submit the full Directors report

Please refer Corrigendum

5 ATC

Qualification criteria: Technical Capability Page no. 24

One project of value not less than Rs. 100 cr. Or two projects of value not less than Rs. 80 cr. Or three projects of value not less than Rs. 50 cr.

IP-1 players do not carry out such kind of one time projects. They engage in long term contracts with various telecom service providers, Internet service providers etc. This should be redefined , in terms of total networth, assets on ground & annual project

Long terms contracts shall be considered but applicant to clearly certify, from the Statutory auditor, the cost of provisioning products and/or services in last 3 years as part of the contract

6 ATC

Qualification criteria: Certifications, Page no. 24

ISO 9001: 2009 ISO 20000:2011

Certifications depends on the sector to which the participants belongs. There are certain certification applicable to manufacturing industry may not be applicable to telecom infra providers Industry specific certifications may be provided

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

7 ATC Qualification criteria:Manpower StrengthPage 25

Applicant to have at least 1000resources on payroll at the time ofsubmission of E01 response

As an entity at National level, the organisation may have more than1000 resources on payroll but may be under different legalentities which have come together through merger andacquisition route but carrying out 1 common business of providing Telecom infrastructure services to customersAs long as undertaking is given by the entity at National level that under various legal entities they have more than 1000 resources on payroll, it should be fine with the authorities

Please refer Corrigendum

8 BSNL General Route details For carrying out survey for laying OFC, details of route & locations are required.

Details shall be provided as part of the RFP document

9 BSNL General Reinstatement charges Clarification required for reinstatement charges to be paid for PCMC for setting up of passive infra(OFC) to carry out trenching/HDD

Details shall be provided as part of the RFP document

10 BSNL EMD Exempt of EMD BSNL being 100% owned Govt. of India PSU, requested to exempt this clause for PSUs.

No change, as per EOI document

11 BSNL EMD EMD Whether EMD in the form of bank guarantee is acceptable?

As per EoI document

12 Indus Towers About the EoI Document, Page 7

Project 1 - Supply Installation, testing and Commissioning and O&M of Smart City field infrastructure comprising of Passive Fiber Network, Poles and Gantries etc. on EPC/PPP Model

We request to please clarify the engineering dimension of Poles and gantries to be installed as part of project.

Details shall be provided as part of the RFP document

13 Indus Towers Project 1, Page 8 To create a uniform Pole Infrastructure across the city for hosting various IoT, Smart City

We understand that the installation of IoT and Smart devices are not in the scope of Bidder.

Yes, the understanding is correct. As part of project 1,

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

& telecom devices like CCTV camera, traffic detectors, Wi-Fi access points, 4G, 5G BTSs etc. in a planned & structured manner, so as to avoid repeated digging and infrastructure laying work in the city.

applicant is only required to create Pole Infra

14 Indus Towers

We request Authority to allow Bidder to utilize the Uniform Pole infrastructure for monetization through telecom installations and advertisement. Further, Authority shall provide free RoW for additional space for Equipment installation as required.

The mentioned Pole Infrastructure are meant specific for hosting Smart City elements like CCTV camera, Access Points, environment sensors, traffic detectors etc.. However, please submit your propositions as part of your EOI response document

15 Indus Towers

Please confirm if concessionaire will have exclusive right of fiber monetization based on objective mentioned – to avoid repeated digging and infrastructure laying work in the city.

Details shall be provided as part of the RFP document. However, you may please submit your propositions as part of your EOI response document

16 Indus Towers

9.1 Project 1 Page 15

Route Survey & Network Design Preparation

We request the authorities to provide GIS map with road width & developments plan (current & future) which would help in fiber planning.

All the available details shall be provided to the selected applicant

17 Indus Towers Procure, Supply, Install & Commission of all Passive Infrastructure

It is assumed that 750Kms roll-out will happen is phase manner with mutually agreed plan based on priorities of PCMC & concessionaire. Request to please confirm.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

18 Indus Towers Procure, Supply, Install & Commission Pole Infrastructure

We request Authority to provide us a clarity on the following; a. Height of - 600 numbers of unipole mentioned for mounting CCTV? b. Height of - 30 numbers of unipole for large VMDs? c. Please provide the dimensions of Gantry structure? d. We understand it is only the pole structure for the above three mentioned and VMD is not under the Project 1 scope? e. We understand that all pole locations in project-1 will be allocated along with space for cabinet to establish Fiber PoP.

a. To be provided as part of RFP document b. To be provided as part of RFP document c. To be provided as part of RFP document d. Yes, the understanding is correct e. Yes, the understanding is correct

19 Indus Towers

SI shall be responsible for laying of 3 ducts (indicative) using Horizontal Directional Drilling (HDD) / Open Trenching (OT) Technique

We suggest that Bidder shall be allowed to define number of ducts basis requirement inclusive of deliverable of connecting all Authority designated locations, other possible locations for OFC connectivity.

Please submit your propositions as part of your EOI response document

20 Indus Towers 9.1 Project 1 Page 16

Reinstatement and restoration

While SI will be responsible for R&R, no other charges like RoW, RI, annual rent will be levied on concessionary for entire concession period, in case of PPP model (revenue sharing)

Details shall be provided as part of the RFP document. However, you may please submit your propositions as part of your EOI response document

21 Indus Towers General We understand that Authority will provide Bidder with single window of clearance for any RoW permission for executing the project.

Yes, the understanding is correct for the approved route. Further, details shall be furnished as part of the RFP document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

22 Indus Towers General Project 1

Please clarify; a. What monetization proposition would RFP include if PPP model is selected? b. If the project is decided to be EPC, it is request to include monetization of 1-2 ducts by the bidder so as to bring the overall project cost down for the concessionaire and make it a win win proposition.c. If it is going to be an EPC model, could you share some light on the connectivity charges?

a. Please submit your propositions as part of your EOI response documentb. Please submit your propositions as part of your EOI response documentc. Please submit your propositions as part of your EOI response document

23 Indus Towers General Permission to use of land to erect smart poles

We understand that the Rights to provide RoW has been vested to PCSCL by PCMC

Selected applicant shall be granted requisite rights by the competent authority

24 Indus Towers General Permission for site allocation

We understand that the site will be allocated by the Authority within the agreed timelines as the same will have an impact on meeting the project implementation timelines and revenue generation thereafter.

Yes, the understanding is correct

25 Indus Towers 5. Control Sheet, Page 10

Last date for submission of EoI response

As the submission of response to EoI is on a stringent deadline, we request Authority to extend the submission by further 15 days

Please refer Corrigendum

26 Indus Towers 9.1 Project 1, Page 14

Optical Fiber

We request Authority to allow Concessionaire to connect its existing cellular towers/poles with the Optical Fiber which improves the overall telecom network in the city with 3G / 4G / 5G & WiFi and future technologies

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

27 Indus Towers

We request Authority to waive off any RoW, RR, RI or any other charges for installation of Optical Fiber (in case of PPP implementation). Further, we request Authority to waive-off any other charges, fee, property tax or any other payment payable to local body for setting up of project facility, associated infrastructure.

Please submit your propositions as part of your EOI response document

28 Indus Towers Page 20 PCSCL will release separate RFP for Project 1 and Project 2.

We suggest Authority to look for same partner for combined scope of both projects in order to have better synergy and options for revenue generation.

Please submit your propositions as part of your EOI response document

29 Indus Towers General Materially Adverse Government Action (MAGA)

“Materially Adverse Government Action (MAGA)” means any act or omission by the PCSCL or any relevant public authority, which occurs during the term of this project execution and which (i) renders the Concessionaire unable to comply with any of its obligations as per the Agreement and/or (ii) has a material adverse effect on the cost or the profits arising from such performance and/or (iii) any judgment or order of any court of competent jurisdiction or statutory authority in India made against the Concessionaire in any proceedings for reasons other than on account of breach thereof, or of any Agreement, or enforcement of the signed Agreement or exercise of any of its rights under the Agreement.We suggest the Authority to include the aforementioned clause while drafting the T&C of the RFP.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

30 Indus Towers

12.1 Qualification Criteria for shortlisting of System Integrator for Project 1, Page 24/25

Point 5 - Technical Capability

While we have vast experience related to provisioning of Telecom Infrastructure / Fibre cable, we request Authority to consider; -> We understand Telecom Infrastructure includes Telecom Towers as well. Please confirm? If not, we request you to please add Tower Infrastructure as well as qualification criteria -> Request for allowing another eligibility other than 100, 50 Cr projects, where in bidder has total telecom tower infrastructure in excess of 10,000 numbers or 1000 Cr Value -> Self Certification (on Bidder's letter head) for project completion with all the required project details (no Work Order)

Please refer Corrigendum

31 Indus Towers Point 6 - Certifications

We request you to modify the clause as per following;The applicant should possess any one of the below mentioned certification which are valid at the time of bidding:> ISO 9001:2008/TL 9000 certification> ISO 20000:2011 for IT Service Management> ISO 27001:2013 for Information Security Management SystemThe bidder shall possess all the licenses and shall comply with all the rules of the country that are required to provide telecom infrastructure and services throughout the period of contract.

Please refer Corrigendum

32 Inspira

Enterprise India Pvt Ltd

Page no.24 and Section no.12.1.3 Pre-Qualification Criteria

Extracts from the audited balance sheet and profit & loss; OR Certificate from the statutory auditor

Please change it to average annual turnover of at least INR 300 Cr from IT products and services in last 3

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

33 Inspira

Enterprise India Pvt Ltd

Page no.24 and Section no.12.1.8 Pre -Qualification Criteria

The applicant should have at least 1000 resources on payroll of the applicant’s organization at the time of

Request you to consider 150+ resource Please refer Corrigendum

34 L&T

Page 1 EXPRESSION OF INTEREST for Shortlisting of

a. System Integrators for SITC and O&M of Smart City field infrastructure comprising of Passive Fibre Network, Poles and Gantries etc. on EPC / Revenue Sharing Model

Request you to keep the Project 1 on only EPC model. Our understanding is there is no revenue sharing or PPP model for project 1. Please clarify.

Details shall be provided as part of the RFP document. However, you may please submit your propositions as part of your EOI response document

35 L&T

12. Qualification criteria Page 24 3. Financials

Extracts from the audited balance sheet and profit & loss; OR Certificate from the statutory auditor

Request you to modify this clause as: Extracts from the audited balance sheet and profit & loss; OR Certificate from the statutory auditor /independent chartered accountant

Please refer Corrigendum

36 L&T 12. Qualification criteriaPage 243. Financials

The applicant should have an average annual turnover of at least INR 500 Cr. from provision of Telecom Infrastructure / Fibre cable Infra supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last three financial years, i.e FY 14-15; FY 15-16 , FY 16-17.

Request you to modify this clause as below: The applicant should have an average annual turnover of at least INR 500 Cr. from provision of ICT /Telecom Infrastructure / Fibre cable Infra supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last three financial years, i.e FY 14-15; FY 15-16 , FY 16-17.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

37 L&T

12. Qualification criteria Page 24 4. Networth

Certificate from the statutory auditor

Request you to modify this clause as Certificate from the statutory auditor OR Certificate from the statutory auditor /independent chartered accountant

No change, as per EOI document

38 L&T

12. Qualification criteria Page 24 5. Technical capability

Certified copy of the relevant Work Order(s) and satisfactory implementation completion & satisfactory services completion certificate(s) (on the letterhead of the company issuing the certificate); OR Work Orders + Self certificate of completion (Certified by the statutory auditor);

Request you to modify this clause as Certified copy of the relevant Work Order(s) and satisfactory implementation completion & satisfactory services completion certificate(s) (on the letterhead of the company issuing the certificate); certificate(s) OR Work Orders + Self certificate of completion (Certified by the statutory auditor); OR Self certified Partial completion undertaking+ LOA/Purchase Order copies (Certified by the statutory auditor/ Independent Chartered Accountant)

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

39 L&T

12. Qualification criteriaPage 245. Technical capability

The applicant should have relevant experience related to provisioning of Telecom Infrastructure / Fibre cable supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last three financial years, i.e FY 14-15; FY 15-16, FY 16-17.· One project of value not less than INR 100 CrOR· Two projects each having value not less than INR 80 CrOR· Three projects each having value not less than INR 50 CrThe quoted project should be completed and shall be in operations for last two years at the time of submission of EoI response.

Request you to modify this clause as;The applicant should have relevant experience related to provisioning of ICT/ Telecom Infrastructure / Fibre cable supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last Five financial years, i.e FY 12-13, FY 13-14, FY 14-15, FY 15-16, FY 16-17.· One project of value not less than INR 100 CrOR· Two projects each having value not less than INR 80 CrOR· Three projects each having value not less than INR 50 CrThe quoted project should be completed and shall be in completed and in operations for at least One Year at the time of submission of EoI response.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

40 L&T 6. Certifications Page 25

The applicant should possess below mentioned certification which are valid at the time of bidding: · ISO 9001:2008/TL 9000 certification · ISO 20000:2011 for IT Service Management

Request you to modify this clause as: The applicant or any of its majority shareholding subsidiary should possess below mentioned certification which are valid at the time of bidding: · ISO 9001:2015/TL 9000 certification OR · ISO 20000:2011 for IT Service Management / ISO 27001:2013 certificate

Please refer Corrigendum

41 L&T

7. Self - Declaration on Non BlacklistingPage 25

As per the Proforma 4 of this EoI document and to be counter signed by Applicant’s Country Head or the Company Secretary

Request you to modify this clause as As per the Proforma 4 of this EoI document and to be counter signed by Applicant’s Country Head or the Company Secretary OR Authorized Signatory.

No change, as per EOI document

42 L&T 8. Manpower Strength Page 25

Certificate from the Company Secretary

Request you to modify this clause as Certificate from the Company Secretary/ Self undertaking from HR Head

No change, as per EOI document

43 RailTel General Extension of Bid Submission Date till 12th feb

As the site locations are many and diverse, we need more time for feasibility check, we require more time for tie-ups with SI partner for the proper techno commercial solution

Please refer Corrigendum

44 RPG Infra Pg 24, Sec 12.1, S.No. 1

EoI Application/response is to be submitted by individual entities and consortiums are not allowed at this stage

If bidder is not qualifying on EOI for Project 1 currently but if at RFP stage consortium is allowed, can the bidder participate in the RFP?

RFP shall only be issued to the selected applicant

45 RPG Infra Will the RoW/RI charges be waived off for the selected bidder

Details shall be provided as part of the RFP document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

46 RPG Infra Pg 15, Sec 9.1 Procure, Supply, Installation & Commission of all the Passive Infrastructure

Please share the details of existing fiber availability around the PC area. Will this fiber be available to the bidder? Does all fiber need to be relaid? Does PCMC have any existing concessionaries for Fibers and Poles?

Details shall be provided as part of the RFP document

47 RPG Infra Pg 15, Sec 9.1

Reinstatement & Restoration: SI shall be responsible for performing the reinstatement and restoration of the sites back to the previous/normal conditions as per the RFP specifications at all the respective site locations.

Please share the details of existing assets and their locations which have to restored

Details shall be provided as part of the RFP document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

48 RPG Infra Pg 8, Sec 4, Key Objectives & Goals

Under Project 1, PCSCL intends to create passive infrastructure components, either through EPC model or PPP (revenue sharing) model, like laying of Optical Fibre based Network (City Network) and erection of Pole Infrastructure for mounting IoT & Smart City devices across the city; Fibre Network is planned to connect all the PCMC offices (Zone & Ward Offices), health & citizen facilitation centres, key areas like markets, religious places, bus stops etc. whereas the Pole Infrastructure shall be setup at various traffic junctions, key city places for hosting CCTV cameras, traffic detectors, variable message displays, public address system, WiFi access points etc.

Consider combining the scope for the Project 1 and Project 2 (as well as any future projects for ICCC) under single MSI to drive efficiency in project management. A divided MSI scope will create issues with SLA adherence as some activities can be in overlap or fall in no man's land. Furthermore O&M will be a challenge.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

49 RPG Infra Pg 24, Sec 12.1, S.No. 1

EoI Application/response is to be submitted by individual entities and consortiums are not allowed at this stage

Consortium must be allowed in Project 1 as well because some diverse capabilities of SI and service provider will be required.

No change, as per EOI

50 RPG Infra Pg 24, Sec 12.1, S.No. 3

The applicant should have an average annual turnover of at least INR 500 Cr. from provision of Telecom Infrastructure / Fibre cable Infra supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last three financial years, i.e FY 14-15; FY 15-16 , FY 16-17.

The PQ requirement on annual turnover of Rs. 500 cr is extremely high given the scope of the project. The fiber laying portion of the scope is relatively small and such a high number on revenue will restrict major players from participating.We suggest to keep qualifying criteria on turn over as Rs. 200 cr

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

51 Sterlite Pg. No. 7, Section 3

Supply, Installation, Testing & Commissioning and Operations & Maintenance of Smart City field infrastructure comprising of Passive Fibre Network, Poles and Gantries etc. under Engineering Procurement and Commissioning (EPC) / PPP mode (Revenue Sharing Model)

Please confirm whether any commitments are to be done by the MSI for revenue sharing.

Please submit your propositions as part of your EOI response document

52 Sterlite Page -7/3. About the EoI Document

Project 1 – Supply, Installation, Testing & Commissioning and Operations & Maintenance of Smart City field infrastructure comprising of Passive Fibre Network, Poles and Gantries etc. under Engineering Procurement and Commissioning (EPC) / PPP mode (Revenue Sharing Model)

Kindly confirm the Project-1 competition time line. Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

53 Sterlite Page -7/3. About the EoI Document

Project 1 – Supply, Installation, Testing & Commissioning and Operations & Maintenance of Smart City field infrastructure comprising of Passive Fibre Network, Poles and Gantries etc. under Engineering Procurement and Commissioning (EPC) / PPP mode (Revenue Sharing Model)

Kindly provide the Guidelines & Revenue sharing period time line

Please submit your propositions as part of your EOI response document

54 Sterlite

Page -15 / System Integrator Scope of Work:

System Integrator Scope of Work: SI shall be responsible for laying of 3 ducts (indicative) using Horizontal Directional Drilling (HDD) / Open Trenching (OT) Technique as per directions of PCSCL and blowing of fiber (96/48 core) basis on the finalized route plan and appropriate network topology to ensure adequate redundancy at each of the network node level

Being a city area, In Open Trench (OT) Techniques, suggest to keep trench depth of 1.2 meter only .

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

55 Sterlite Page -15. System Integrator Scope of Work:

System Integrator Scope of Work:Procure, Supply, Installation & Commission of all the Passive Infrastructure: SI shall be responsible for laying of 3 ducts (indicative) using Horizontal Directional Drilling (HDD) / Open Trenching (OT) Technique as per directions of PCSCL and blowing of fiber (96/48 core) basis on the finalized route plan and appropriate network topology to ensure adequate redundancy at each of the network node level. Indicative city wide fiber network route length is estimated to be 750 km, across the city, which shall be finalized after the detailed survey and route finalization activity,

We suggest to have single duct with high fiber count cable with ribbon design. This will help in ease of laying and maintenance of the Fiber optic network. Also, it will be beneficial to PCSCL in leasing out the ribbon cable to the probable tenants and have the revenue generated from day 1.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

56 Sterlite Page -15. System Integrator Scope of Work:

System Integrator Scope of Work: Procure, Supply, Installation & Commission of all the Passive Infrastructure: SI shall be responsible for laying of 3 ducts (indicative) using Horizontal Directional Drilling (HDD) / Open Trenching (OT) Technique as per directions of PCSCL and blowing of fiber (96/48 core) basis on the finalized route plan and appropriate network topology to ensure adequate redundancy at each of the network node level. Indicative city wide fiber network route length is estimated to be 750 km, across the city, which shall be finalized after the detailed survey and route finalization activity,

Request to clarify the uses of 3 ducts.

Details shall be provided as part of the RFP document. However, you may please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

57 Sterlite Page -15. System Integrator Scope of Work:

System Integrator Scope of Work:Procure, Supply, Installation & Commission of all the Passive Infrastructure: SI shall be required to procure & supply all the passive components and accessories required for laying of duct and blowing of fibre including duct pipes, jointers, couplers, fibre cable, splicer, jointer etc. SI shall be responsible for laying of 3 ducts (indicative) using Horizontal Directional Drilling (HDD) / Open Trenching (OT) Technique as per directions of PCSCL and blowing of fiber (96/48 core) basis on the finalized route plan and appropriate network topology to ensure adequate redundancy at each of the network node level. Indicative city wide fiber network route length is estimated to be 750 km, across the city, which shall be finalized after the detailed survey and route finalization activity,

As per network Architecture kindly share the fiber Kms scope segregation i.e. how many km OFC in core, aggregate , access & Service layer network against estimated route length of 750 Km.

Details shall be provided as part of the RFP document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

58 Sterlite Page -16 /Reinstatement & Restoration

Reinstatement & Restoration: SI shall be responsible for performing the reinstatement and restoration of the sites back to the previous/normal conditions as per the RFP specifications at all the respective site locations.

Kindly confirm, who will pay the ROW (Right of Way) charges for PCMC area?

RoW charges will be waived off for the selected bidder

59 Sterlite Page -16 /Reinstatement & Restoration

Reinstatement & Restoration: SI shall be responsible for performing the reinstatement and restoration of the sites back to the previous/normal conditions as per the RFP specifications at all the respective site locations.

Kindly confirm, who will pay ROW charges for OFC route falling in other than PCMC area, viz. Railway Crossing, PWD, cantonment area etc.?

Details shall be provided as part of the RFP document

60 Sterlite

Page -16 /System Integrator Scope of Work:

System Integrator Scope of Work: Provide Operation & Maintenance Services for the Passive Infrastructure, OFC Network and Pole Infrastructure, for a contract period from the date of Commissioning of the system.

Kindly confirm the Time Frame for O&M.

Details shall be provided as part of the RFP document. However, you may please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

61 Sterlite Page-8/ 4. Intent

4. IntentTo lay the foundation of a Smart City, Under Project 1, PCSCL intends to create passive infrastructure components, either through EPC model or PPP (revenue sharing) model, like laying of Optical Fibre based Network (City Network) and erection of Pole Infrastructure for mounting IoT & Smart City devices across the city; Fibre Network is planned to connect all the PCMC offices (Zone & Ward Offices), health & citizen facilitation centres, key areas like markets, religious places, bus stops etc. whereas the Pole Infrastructure shall be setup at various traffic junctions, key city places for hosting CCTV cameras, traffic detectors, variable message displays, public address system, Wi-Fi access points etc.

Kindly share the locations details of Zonal Offices & Ward Offices, citizen facilitation centres, markets, religious places, bus stops, Traffic Junctions in the RFP so that OFC Network- Architecture with different layer can be worked out accordingly .

Details shall be provided as part of the RFP document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

62 Sterlite Page-16/System Integrator Scope of Work:

System Integrator Scope of Work:Note: All the active electronics like switch, UPS, power meter, power banks etc. at the centralized as well as at field level shall be out of scope of the SI.

Kindly share the OFC Network Architecture in RFP as OFC Network Architecture Viz. No. of Core Nodes, No. of Aggregates Nodes, No. of Access Nodes and their route path is derived based on active elements network topology /architecture.

Please submit your propositions as part of your EOI response document

63 Sterlite Pg. No. 8, Section 4

PCSCL is looking for partners to work with it, in PPP model (on revenue sharing basis), for study, design, engineer, supply, plan, construct, develop, install, commission, test, deploy, support, maintain and operate the end-to-end Smart Pole, City Wide Wi-Fi, VMD and Smart City Kiosk projects on Design, Build, Finance, Operate and Transfer (DBFOT) mode for a specified Concession Period.

We recommend to opt for an EPC based model looking at the trends in other smart city RFPs. Under PPP model, there is a possibility that the bid may get heavy on cost side. The reasons for increased cost under PPP model , apart from certain basic inputs required to be added to the cost, large amount of margins are made provision of, to cover project risk, operation risk, financial risk and political risk etc.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

64 Sterlite Pg. No. 11, Section 6.11

Shortlisting of interested applicants i.e. SIs for Project 1 and Concessionaires for Project 2; who shall further participate in the respective projects RFP stage.

We suggest to come up with a combined RFP for both the Projects looking at the trends of other Smart Cities RFPs. It will be in benefit to PCSCL in getting right partner for long term association (Design and O&M phase), cost competitive bid, ease in execution.

Please submit your propositions as part of your EOI response document

65 Sterlite

Clause 12 12. Qualification Criteria, EOI Page No. 24, Sl. No 3

Financials:The applicant should have an average annual turnover of at least INR 500 Cr. from provision of Telecom Infrastructure / Fibre cable Infra supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last three financial years, i.e. FY 14-15; FY 15-16 , FY 16-17.

We request you to modify the clause as:The applicant should have an average annual turnover of at least INR 200 Cr. from provision of Telecom Infrastructure / Fibre cable Infra supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last three financial years, i.e. FY 14-15; FY 15-16 , FY 16-17. This will help PCSCL to have more competent and competitive participation from the industry.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

66 Sterlite

Clause 12 12. Qualification Criteria, EOI Page No. 24, Sl. No 2

Board Resolution / Power of Attorney in favour of authorised signatory A Board Resolution or Power of Attorney in the name of the person executing the bid, authorizing the signatory to commit the Applicant

Please allow bidder's to submit Photostat copy of the general power of attorney duly notarized along with the copy of Board resolution who is providing power of attorney to the signing authority. However the Original power of Attorney as per RFP format shall be submitted by bidder during bid submission against RFP.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

67 Sterlite

Clause 12 12. Qualification Criteria, EOI Page No. 24, Sl. No 5

Technical Capability:The applicant should have relevant experience related to provisioning of Telecom Infrastructure / Fibre cable supply and services (fibre cable network implementation including trenching, ducting, cable laying, termination, other requisite activities and O&M of that network) in last three financial years, i.e. FY 14-15; FY 15-16, FY 16-17.· One project of value not less than INR 100 CrOR· Two projects each having value not less than INR 80 CrOR· Three projects each having value not less than INR 50 CrThe quoted project should be completed and shall be in operations for last two years at the time of submission of EoI response.

We request you to allow bidders to submit on-going projects also. For on-going Project, relevant work order(s) and certificate(s) (on the letterhead of the company issuing the certificate) with details from the client(s) stating that the minimum value of works executed is greater than a value of INR 100 Cr. and total payments done against the project as on the certificate date.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

68 Vikram

Teleinfra Pvt. Ltd.

9. Scope of Work, Page No. 14, Section No. 9.1

EPC Model / Public Private Partnership Model

Can we have OFC Network and Passive Infra on PPP and Poles and Gantries under EPC

Please submit your propositions as part of your EOI response document

69 Vikram

Teleinfra Pvt. Ltd.

Page No. 15, Procure, Supply, Installation

SI shall be responsible for laying of 3 ducts

We would like to lay 8 or more ducts keeping in mind the future requirement.

Please submit your propositions as part of your EOI response document

70 Vikram

Teleinfra Pvt. Ltd.

9. Scope of Work, Page No. 14, Section No. 9.1

EPC Model / Public Private Partnership Model

Can we have OFC Network and Passive Infra on PPP and Poles, Gantries & VMD under EPC

Please submit your propositions as part of your EOI response document

71 Vikram

Teleinfra Pvt. Ltd.

General Point not mentioned

Since we will do OFC Network on PPP Basis, we request exclusivity of ROW where no other operators would be given ROW other than us else it will be difficult on PPP model.

Details shall be provided as part of the RFP document. However, you may please submit your propositions as part of your EOI response document

72 Vikram

Teleinfra Pvt. Ltd.

12.1 Qualification criteria for shortlisting of SI for Project 1 Page no 24 point no 1. Legal Entity:

Consortiums are not allowed at this stage

Request for Consortium as project 2 Already has this policy and will help even other specialised SI other than telecom operators and increase competition and an opportunity for many to participate

No change, as per EOI document

73 Vikram

Teleinfra Pvt. Ltd.

12.1 Qualification criteria for shortlisting of SI for Project 1 Page no 24 point no 3. Financials

The applicant should have an average annual turnover of at least INR 500 Cr

Considering the Project Cost Annual Turnover should not be more than 20 Cr, Annual Turnover of consortium of SI and Sister Concerns (if any) to be at least 25 Cr

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

74 Vikram

Teleinfra Pvt. Ltd.

12.1 Qualification criteria for shortlisting of SI for Project 1 Page no 25 point no 5. Technical Capability

* One project of value not less than INR 100 Cr - One Project with Length of Trenching, Ducting and Cable Laying not less than 150 Kms OR * Two projects each having value not less than INR 80 Cr - Two Projects with length of Trenching, Ducting and Cable Laying not less than 40 Kms. OR *Three projects each having value not less than INR 50 Cr - Three Projects having length not less than 35 Kms

Criteria for Total distance ( in Kms) over Total Value( in Rs) is suggested as the cost for laying OFC and Duct varies as per methodology (HDD, Open Trenching, Aerial), Protection (DWC, GI, Concrete) Ranges from Rs. 3 Lakhs to 35 Lakhs per KM and most of the times material is Free Issue Material. Thus cost and rates will change and small lengths may have very high value ... so length will be a proper criteria in terms of capacity to execute.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Pre Bid

Queries

75 Vikram

Teleinfra Pvt. Ltd.

12.1 Qualification criteria for shortlisting of SI for Project 1 Page no 25 point no 6. Certifications

The applicant should possess below mentioned certification which are valid at the time of bidding:* ISO 9001:2008/TL 9000 certification* ISO 20000:2011 for IT Service ManagementThe bidder shall possess all the licenses and shall comply with all the rules of the country that are required to provide telecom infrastructure and services throughout the period of contract.

Either ISO 9001 : 2008 or ISO 20000:2011 for IT Service Management The Bidder should possess IP 1 License and ISP License for Pune District

Please refer Corrigendum

76 Vikram

Teleinfra Pvt. Ltd.

12.1 Qualification criteria for shortlisting of SI for Project 1 Page no 25 point no 8. Manpower Strength

The applicant should have at least 1000 resources on payroll of the applicant’s organization at the time of submission of EoI response

The Applicant should have atleast 100 resources on payroll / contract / outsource. As this is the Infrastructure work and not software development. As the most of infrastructure industries runs on contractual labour / subcontractor and one Engineer is required for 80 kms of route length.

Please refer Corrigendum

77 Vikram

Teleinfra Pvt. Ltd.

12.1 Qualification criteria for shortlisting of SI for Project 1 Page no 24 point no 3. Financials

The applicant should have an average annual turnover of at least INR 500 Cr

Considering the Project Cost Annual Turnover should not be more than 20 Cr considering 35 Pc of work done. Request for Annual Turnover of consortium of SI and or Sister Concerns (if any) to be at least 25 Cr

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

Project 2:

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

1 ATC Speed of WI Fl Page no. 19

2 Mbps speed for first 60 mins and thereafter downgraded to 1Mbps

Very high speed is expected which could be difficult from implementation perspective and network constraints Speed could be 1 Mbps for 1st 30 mins. Thereafter speed of 512 kbps

Please submit your propositions as part of your EOI response document

2 ATC Smart kiosk, Page no. 17

List of components is very high in no.s

The list of components expected in Smart kiosk is very high and could be deterrent in successful implementation of the same There could be 2 lists, Mandatory list to capture top 4-5 components and an optional list for remaining components

Please submit your propositions as part of your EOI response document

3 ATC Monetizing models

Not very clearly articulated

Needs more clarity on monetization model post submission of Bid and before participation in the RFP to be released, Scope and responsibility needs to be transparently defined

Please submit your propositions as part of your EOI response document

4 ATC

Connecting last mile with existing Telecom tower present

Current EOI does not talk about whether the existing telecom towers in the city can be connected with OFC being planned to be laid

Connecting existing telecom infrastructure with OFC as per envisaged project can add value to the society/public of the smart city IP-1 should be allowed to stretch last mile connectivity with their existing infrastructure in the rekon

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

5 Cisco Page No. 16, 9.2 Project 2:

Please add “City Wide Transport Network with support of IP/MPLS, 6PE and 6VPE mode for IPV6 transport over IPV4, ECMP, LDP, BGP Prefix independent control for IPV4 and IPV6, RSVP, Loop free alternate FRR (IPFRR) and MPLS-TE with FRR for sub 50 msec node and link protection. Network shall support IPSLA and Y.1731 for performance monitoring. Network shall support MEF for Ethernet based services like PW, VPLS or ATOM."

As mentioned in EOI, PCSCL is looking for services like Smart Pole, CCTV Camera, Wi-Fi, Smart Lighting, Traffic and Whether Sensors, Variable message display units along with numerous IOT and Smart City Devices. In case of smart cities there is always a requirement to provide dedicated internet or MPLS WAN connectivity to tenants. To successfully implement and run various smart city services and tenants connectivity, IP MPLS based transport network uses dynamic protocols to ease the operational burden and ensure self-healing of network and plays very crucial role. IP MPLS based network are enabled with features like faster convergence and industry wide accepted technology for critical applications and scalability. It provides simplification with optimal utilization of resources and readiness for all future traffic and connectivity requirements. IP MPLS based network will provide reliable, robust and scalable network platform to ensure isolated/dedicated routing and forwarding policies, QoS policies and traffic engineering policies for each smart city service and tenants connectivity. So we hereby request you to add requirement of reliable, robust and scalable city wide transport network requirement as part of EoI.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

6 Cisco Page No. 16, 9.2 Project 2:

Please add "City Wide Transport Network with support of IP/MPLS, 6PE and 6VPE mode for IPV6 transport over IPV4, ECMP,LDP, BGP Prefix independent control for IPV4 and IPV6, RSVP, Loop free alternate FRR (IPFRR) and MPLS-TE with FRR for sub 50 msec node and link protection. Network shall support IPSLA and Y.1731 for performance monitoring. Network shall support MEF for Ethernet based services like PW, VPLS or ATOM."

It was understood during the prebid meeting that the project 2 requires the SI to install the active components such as Wifi APs, Switches, UPS, etc. at the junction/smart pole. However, this approach is incomplete as these junctions/poles/edge locations will require an active network to connect to which is not mentioned in the EoI. How is that being met? Where would this ring/junctions terminate? Also, the EoI reads PCSCL would provide the connectivity to the SI in project 2. Understanding is: Scenario1: Connectivity from project 1, but this is only passive infra which cannot be used for directly connecting these devices/poles unless there is a core network. Scenario 2: Connectivity from Service provider - This also requires a core network to be establish for the ring/edge locations to converge and terminate. The entire vision of the smart city should be to have a common wired network which can be segregated into multiple different secure private (virtual) networks as per the b/w or fibre cores required, for multiple use cases as the citizen service deliveries grow - e.g Smart City, FTTx, CCTV, network for PCMC offices, etc. However, the current scope could result into a fragmented approach where multiple players would create their own network on the passive network - thus leading to huge costs in future as well as major manageability, O&M, security issues. This would also lead to lower monetization for each of the use cases as the capex investment would be required every time. It is desired that PCSCL provides a ready intelligent smart network for players/ businesses, citizens to leverage. We would be glad to discuss our thoughts on this.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

7 Forbes

Technosys 18/ Concessionaire

Concessionaire shall also be responsible to procure, supply, install and manage all the active devices/equipment’s like network switch, power meter, UPS, battery banks etc. required for the operations of Telecom and other Smart City components that would be installed on Smart Poles and provide Operations & Maintenance services during the contract/concession period.

power back up to be clearly mentioned The same shall be shared as part of the RFP document

8 Forbes

Technosys 17/ Smart Kiosk

PCSCL intends to deploy Smart City Kiosk Terminal at key locations across the city

PCSCL to confirm whether the kiosk to be installed will be in Indoor or Outdoor (open to air) environment. PCSCL to confirm whether the Kiosk will be installed inside the cabin if getting installed in outdoor environment? PCSCL to confirm whether the cabin needs to be provided by bidder or PCSPL will provide the same?

Smart Kiosk are planned to be deployed in both the indoor and outdoor environment. Further, details on the same shall be shared as part of the RFP document

9 Forbes

Technosys 17/ Smart Kiosk

Panic Button and Phone Handset

PCSCL to confirm the working of Panic Button and Phone Handset? Whether a Video conferencing needs to be done after panic button is pressed? How it will integrate with controller system.

The same shall be shared as part of the RFP document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

10 Forbes

Technosys 17/ Smart Kiosk

PCMC Smart City Kiosk

PCSCL to confirm whether the kiosk software needs to be supplied by the bidder along with the kiosk?

The same shall be shared as part of the RFP document

11 Forbes

Technosys 17/ Smart Kiosk

MIFARE Card Reader / Writer Credit card / debit card / NFC interface

PCSCL to confirm the working application on the kiosk of MIFARE Card Reader / Writer and Credit card / debit card / NFC interface

The same shall be shared as part of the RFP document

12 Forbes

Technosys 17/ Smart Kiosk PCMC Smart CityKiosk No specifications mentioned for components

The same shall be shared as part of the RFP document

13 Forbes

Technosys 17/ Smart Kiosk transactional

We request PCSCL to confirm the type of transaction

The same shall be shared as part of the RFP document

14 Forbes

Technosys 17/ Smart Kiosk navigational

PCSCL need to confirm who will provide for navigation.

The same shall be shared as part of the RFP document

15 Forbes

Technosys 17/ Smart Kiosk G2C services

PCSCL Need to confirm the type of G2C services and their API for different services.

The same shall be shared as part of the RFP document

16 Forbes

Technosys Smart Kiosk Central server

PCSCL need to confirm if there is any middleware/central server involved in the system

The same shall be shared as part of the RFP document

17 Forbes

Technosys

26/Qualification Criteria for Shortlisting of Concessionaire for Project 2:

Financials We request PCSCL to keep an annual turnover atleast INR 250 Cr

Please refer Corrigendum

18 Forbes

Technosys

26/Qualification Criteria for Shortlisting of Concessionaire for Project 2:

Networth We request PCSCL to consider the positive networth of our parent company as we are own and full subsidiary of Forbes and Company Limited

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

19 Forbes

Technosys General Point not mentioned

(As confirmed by the by Mr. Vikas of E &Y (the consultant) and towards the end of the meeting the same thing is also confirmed by Mr. Shravan Hardikar IAS –(CEO & Director PCSCL) that the association between bidder and OEM should be build at the stage of EOI and it can’t be changed at RFP stage. Our submission: Request to introduce a clause covering the above point at the EOI stage to avoid any confusion or ambiguity on “association between the OEM & Bidder”.)

No change, as per EOI

20 Forbes

Technosys General Point not mentioned

We request you to mention a clause where it states that the bidder has to mention the name of the OEM of the components they would quote during the EOI and RFP stage.

No change, as per EOI

21 IBM General Extension of Bid Submission Date by 1 week atleast

There are multiple legal processes that we have to complete within our organization before responding to the EOI, this will take some time and hence the request of extension.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

22 Indus Tower 3. About the EoI Document, Page 7

Project 2 - Study, design, engineer, supply, installation, testing & commissioning and Operations & Maintenance of Smart Poles, City wide WiFi, Smart City Kiosk and Variable Message Display (VMD) etc. on end-to-end basis in Design, Build, Finance, Operate and Transfer (DBFOT) mode for a specified Concession Period on PPP Mode (Revenue Sharing Model)

We understand that the end of the Concession period the project assets needs has to be transferred to the Authoritcy. However, Monetization of the smart poles would be done through the use of these poles by Telecom operators. As a UASL/UAL license holder from DOT, telecom operators are abided by the regulations which mandates them to provide telecom coverage continuity. In absence of this continuity / disruption of telecom network, they would be in breach of regulation. Hence, we suggest that the project shall be implemented on Built-Own-Operate (BOO) basis. Requesting for a concession period of 20 years. Post concession period Concessionaire shall be allowed to use the telecom poles for the purpose of servicing the telecom customers at a mutually agreed consideration. At the same time, Authorities can use the same poles for hosting smart services or the rest of the assets other than smart poles can be transferred to the Authority. This creates a win win situation.

Please submit your propositions as part of your EOI response document

23 Indus Tower 5. Control Sheet, Page 10

Last date for submission of EoI response

As the submission of response to EoI is on a stringent deadline, we request Authority to extend the submission by further 15 days

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

24 Indus Tower Concessionaire Scope of Work, Page 18

Also, applicant shall be responsible for provisioning & managing the centralised IT Infra like server, storage, security etc. at its own end and as per the RFP specifications.

We request you to confirm whether the location & space for setting up the centralised IT infra for project 2 will be provided by the Authority?

Yes, the understanding is correct. Further details shall be furnished as part of the RFP document

25 Indus Tower 9.2 Project 2, Page 16

We understand that the cost of the electricity for non-revenue generating components like Public Wi-Fi, VMD and Smart Kiosk will be borne by the Authority.

All the components of Project 2 has revenue generating capabilities. The cost of electricity to be borne by the selected bidder for all the components mentioned in the Project 2.

26 Indus Tower 9.2 Project 2, Page 16

> 12-15 meter Smart Pole > 25-30 meter Smart Pole

Please let us know the mechanism for identifying the number of Smart Poles. Does the bidder have an option to choose the split of the number of poles? Also, are the locations finalized or Concessionaire will be allowed to do a site survey for finalization. Further, please share the locations if finalized by the Authority. We also request for allowing advertisement by installing VMD on the 300 numbers of Smart Poles envisaged.

1. Please submit your propositions as part of your EOI response document 2. Locations shall be mutually finalised by the purchaser and the selected bidder 3. Please submit your preferred locations list as part of your EOI response document 4. Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

27 Indus Tower 9.1, Project 2, Page 17

Smart Kiosk

Requesting the Smart Kiosk to be a one time ask from the RFP and subsequent O&M scope should rest with the Authority. Also request the number of Kiosk should be reduced from 210. It seems on the higher side considering 181 sq. km. of area in PCMC - which probably could be at important locations with higher footfall.

No change, as per EOI

28 Indus Tower 9.2 Project 2: Page 18

Procure, Supply, Installation & Commissioning of Smart Pole, Smart City Kiosk, VaMS and City Wi-Fi Infrastructure

Please clarify if total pole structures to be installed as part of project 1 and Project 2 are not overlapping. Project 1 has 600 number of unipoles & Project 2 has 300 Smart poles – which means the total is 900 poles.Requesting for providing space at the base of the Smart Poles with an area of 4x4 meter to install battery backup and other equipment’s.

Yes, the understanding is correct. However, the mentioned numbers are only indicative. For the requisite space for infra installation, please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

29 Indus Tower 9.2 Project 2, Page 18

4. Variable Message Display (VMD) Further, it is planned to monetize the VMD for revenue generation while offering fixed Air Time for PCSCL for city related campaigns and information

While a specific time during the day will be reserved for city specific information/campaigns. We request Authority to allow Concessionaire to monetize it through advertisement. Further, Concessionaire shall be allowed to install Digital/Conventional billboards on Smart Poles for advertisement. Requesting VMD numbers to be reviewed and reduced. It seems on the higher side considering 750 Km of route length in the PCMC area. Normally VMDs are deployed on the important locations.

Please submit your propositions as part of your EOI response document

30 Indus Tower Monetization & Revenue Sharing of Smart Poles, Smart City Kiosk, VMD and City Wi-Fi, Page 19

Smart Pole fibre termination, interconnect links and space shall be leased from PSSCL on fixed rental basis.

While the cost of the project execution is to be borne by the Concessionaire, we request Authority to waive off RoW & RR charges, wherever applicable, for installation of smart components. Further, we request Authority to waive-off any charges, fee, property tax or any other payment payable to local body for setting up of project facility, associated infrastructure and poles.

The details shall be provided as part of the RFP document. However, you may please submit your propositions as part of response to EOI document

31 Indus Tower We understand that Authority will provide the necessary RoW (without any charge) for laying incremental OFC up to the nearest PoP.

The details shall be provided as part of the RFP document. However, you may please submit your

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

propositions as part of your EOI response document

32 Indus Tower

Provisioning of Internet Bandwidth, Page 19

Currently it is planned to provide unlimited City wide free Wi-Fi service to the citizens, without time limit, at 2 Mbps speed for first 60 mins and thereafter downgraded to 1Mbps.

We would like to bring to your notice that this is a big deterrent for business model for telecom service providers and currently not a norm in the industry either locally or internationally. We request Authority to reduce the same to 30 min / 1 GB per month per user along with a minimum throughput of 512kbps per user

Please submit your propositions as part of your EOI response document

33 Indus Tower Page 20 PCSCL will release separate RFP for Project 1 and Project 2.

We suggest Authority to look for same partner for combined scope of both projects in order to have better synergy and options for revenue generation.

Please submit your propositions as part of your EOI response document

34 Indus Tower General We understand that Authority will provide Bidder with single window of clearance for any RoW permission for executing the project.

The details shall be provided as part of the RFP document.

35 Indus Tower General Permission to use of land to erect smart poles

We understand that the Rights to provide RoW has been vested to PCSCL by PCMC

Selected applicant shall be granted requisite rights by the competent authority

36 Indus Tower General Permission for site allocation

We understand that the site will be allocated by the Authority within the agreed timelines as the same will have an impact on meeting the project implementation timelines and revenue generation thereafter.

Yes, the understanding is correct

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

37 Indus Tower General Project 2: Allocation of alternate site

We understand that if due to any unavoidable reasons the Authority is not able to approve any Smart Pole site location, the Authority shall provide an alternate location within 100 meter radius

All the locations pertaining to specific solution components need purchaser approval and the same/alternate location shall be made available to the applicant.

38 Indus Tower General Materially Adverse Government Action (MAGA)

“Materially Adverse Government Action (MAGA)” means any act or omission by the PCSCL or any relevant public authority, which occurs during the term of this project execution and which (i) renders the Concessionaire unable to comply with any of its obligations as per the Agreement and/or (ii) has a material adverse effect on the cost or the profits arising from such performance and/or (iii) any judgment or order of any court of competent jurisdiction or statutory authority in India made against the Concessionaire in any proceedings for reasons other than on account of breach thereof, or of any Agreement, or enforcement of the signed Agreement or exercise of any of its rights under the Agreement.We suggest the Authority to include the aforementioned clause while drafting the T&C of the RFP.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

39 Indus Tower

12.2 Qualification Criteria for shortlisting of Concessionaire for Project 2, Page 26

Point 6 - Technical Capability

We request to delete the additional qualification for experience in 3 specific business areas mentioned (Wi-Fi, Kiosk & VMD) or replace the same with an ÖR instead of an AND. Or we request you to consider O&M of more than 5000 Telecom Towers as one of the Specific business area in addition to Wi-Fi, Kiosk, and Variable Message Display.

Please refer Corrigendum

40 Indus Tower

The implementation of Smart Poles and IoTs have taken a kick start within last few months. Most of the projects have been awarded during the year 2017-18.Hence we request you to consider the experience of fy 2017-18 as well.

Please refer Corrigendum

41 Indus Tower

While we have vast experience related to provisioning of Telecom Infrastructure, we request Authority to consider LoI/ LoA/ WO/Contract Agreement / Self Certificate for completion for showcased project.

Please refer Corrigendum

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

42 Indus Tower

The Sole applicant or any member of the consortium, in case of consortium, should possess below mentioned certification which are valid at the time of bidding: · ISO 9001:2008/TL 9000 certification · ISO 20000:2011 for IT Service Management The bidder shall possess all the licenses and shall comply with all the rules of the country that are required to provide telecom infrastructure and services throughout the period of contract.

We request you to modify the clause as per following; The applicant should possess any one of the below mentioned certification which are valid at the time of bidding: > ISO 9001:2008/TL 9000 certification > ISO 20000:2011 for IT Service Management > ISO 27001:2013 for Information Security Management System The bidder shall possess all the licenses and shall comply with all the rules of the country that are required to provide telecom infrastructure and services throughout the period of contract.

Please refer Corrigendum

43 L&T

6.1 Stage 1 – Expression of Interest6.1.1 PurposePage 11

6.1 Stage 1 – Expression of Interest6.1.1 Purpose· Shortlisting of interested applicants i.e. SIs for Project 1 and Concessionaires for Project 2; who shall further participate in the respective projects RFP stage.

As per current scenario, PPP Model / Revenue Sharing Model is not successful for other infrastructure projects. Hence, we feel that for smart city projects also, the proposed PPP model would not be successful. We will have a detailed presentation on the business model and challenges in this model during our presentation stage. Hence, we kindly request you to keep the same EPC model for project 2 also, i.e. on EPC model rather than going for PPP Model / Revenue Sharing Model.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

44 L&T 3. About the EoI Document Page 7

Project 1 – Supply, Installation, Testing & Commissioning and Operations & Maintenance of Smart City field infrastructure comprising of Passive Fibre Network, Poles and Gantries etc. under Engineering Procurement and Commissioning (EPC) / PPP mode (Revenue Sharing Model) Project 2 - Study, design, engineer, supply, installation, testing & commissioning and Operations & Maintenance of Smart Poles, City wide WiFi, Smart City Kiosk and Variable Message Display (VMD) etc. on end-to-end basis in Design, Build, Finance, Operate and Transfer (DBFOT) mode for a specified Concession Period on PPP Mode (Revenue Sharing Model)

As per current scenario, PPP Model / Revenue Sharing Model is not successful for other infrastructure projects. Hence, we feel that for smart city projects also, the proposed PPP model would not be successful. We will have a detailed presentation on the business model and challenges in this model during our presentation stage. Hence, we kindly request you to combine both Project 1 & Project 2 and release EOI on EPC model.

Please submit your propositions as part of your EOI response document

45 L&T Addendum Earnest Money Deposit

General Please provide EMD format.

EMD shall be deposited through PCMC’s e-Procurement portal i.e. https://www.pcmcindia.gov.in and a scanned copy of the same should also be uploaded as part of response to EoI document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

46 Microfocus General Suggested for EMS with a PPT (HPE Software Write-up) and Analyst report for reference

There is a need to have elaborated technical specifications towards Enterprise Management System (EMS) and Performance load testing – Not just a mention of the same in the RFP.

The same shall be shared as part of the RFP document

47 RPG Infra Pg 16, Sec 9.2

The design of the Smart Pole shall be such that it can host multiple equipment and services. Below are the two variants of poles with internal power backup that are planned to be developed: 12-15 meter Smart Pole 25-30 meter Smart Pole

Are the poles of height 25-30 m required only from Telecom perspective or they will have Smart functionalities as well? Considering RoW and space issues can we keep a Smart Pole design where the maintenance/junction boxes are mounted on the Pole and no other on-ground erection is required.

Smart Pole shall also be required to deploy other Smart City elements. Please submit your propositions as part of your EOI response document

48 RPG Infra Pg 18, Sec 9.2

Concessionaire Scope of Work: Also, applicant shall be responsible for provisioning & managing the centralised IT Infra like server, storage, security etc. at its own end and as per the RFP specifications

Has PCMC identified specific needs for IT Infra required?

The same shall be shared as part of the RFP document

49 RPG Infra Pg 19, Sec 9.2

As part of EoI response, concessionaire to suggest on managing the City wide WiFi Internet bandwidth operational cost during the period of contract

As per EoI bandwidth to be made available (free) for public usage is already mentioned. Can this be altered / charged?

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

50 RPG Infra Pg 16, Sec 9.2

Study, design, engineer, supply, installation, testing & commissioning and Operations & Management of Smart Poles, City wide WiFi, Smart City Kiosk and Variable Message Display (VMD) etc. on end-to-end basis in Design, Build, Finance, Operate and Transfer (DBFOT) mode for a specified Concession Period on revenue sharing Model

Consider changing the model for Project 2 to an EPC model. Revenue sharing / PPP model has not been successful in various other cities (Bhopal, Jabalpur, Indore) leading to very few/no bidders

Please submit your propositions as part of your EOI response document

51 RPG Infra Pg 8, Sec 4, Key Objectives & Goals

Under Project 2, PCSCL is looking for partners to work with it, in PPP model (on revenue sharing basis), for study, design, engineer, supply, plan, construct, develop, install, commission, test, deploy, support, maintain and operate the end-to-end Smart Pole, City Wide Wi-Fi, VMD and Smart City Kiosk projects on Design, Build, Finance, Operate and Transfer (DBFOT) mode for a specified Concession Period.

Consider combining the scope for the Project 1 and Project 2 (as well as any future projects for ICCC) under single MSI to drive efficiency in project management. A divided MSI scope will create issues with SLA adherence as some activities can be in overlap or fall in no man's land. Furthermore O&M will be a challenge.

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

52 RPG Infra Pg 26, Sec 12.2, S No. 4

The sole applicant or any member of consortium, in case of consortium, should have an annual turnover of at least INR 1000 Cr. from providing Shared Telecom Towers Services to Telecom Operators in last three financial years, i.e FY 14-15; FY 15-16 , FY 16-17.

The PQ criteria for lead bidder for Project 2 is not in sync with the scope of the project. The experience in commissioning telecom towers is not suitable for Smart Pole design and/or commissioning. Request you to allow same PQ as Project 1 in Project 2 as an alternate option.

Please refer Corrigendum

53 Sterlite Pg. No. 17 Section 9.2

City Wi-Fi

Will there be any segregation for free and premium Wi-Fi usage. Ideally, in most of the smart cities, it is observed that 30 minutes of free Wi-Fi with 1Mbps bandwidth per day is given. After exhausting 30 minutes of free Wi-Fi, customer can buy premium Wi-Fi package.

Please submit your propositions as part of your EOI response document

54 Sterlite Pg. No. 17 Section 9.2

City Wi-Fi Is there any requirement for Wi-Fi Mobile App. A Mobile App (iOS and Android) will help citizens to seamlessly login to City Wi-Fi

Please submit your propositions as part of your EOI response document

55 Sterlite Pg. No. 17 Section 9.2

City Wi-Fi What will be the O&M/AMC/Warranty period for the Project-1 & Project

Please submit your propositions as part of your EOI response document

56 Sterlite Page no 17, Smart Kiosk

Smart Kiosk Is it Indoor Kiosk or Outdoor Kiosk? And who will provide the Shelter for the Kiosk

The same shall be shared as part of the RFP document

57 Sterlite

Page no 15, System Integrator Scope of Work

Approx. 600 Unipole with cantilevers for mounting CCTV cameras, traffic sensors, IoT devices etc.

Bird spikes should be consider for CCTV camera/other Smart element

Please submit your propositions as part of your EOI response document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

58 Sterlite

Page -8/Project-1. About the EoI Document /Key Objective & goals

To create a uniform Pole Infrastructure across the city for hosting various IoT & Smart City devices like CCTV camera, traffic detectors, Wi-Fi access points etc. in a planned & structured manner, so as to avoid repeated digging and infrastructure laying work in the city.

Kindly confirm the maximum and minimum height of pole and Pole specifications. Kindly confirm the devises such as CCTV, Wi-Fi and traffic detectors may place on one pole. If yes then how may locations

The same shall be shared as part of the RFP document

59 Sterlite

Page -8/Project-1. About the EoI Document /Key Objective & goals

To create a uniform Pole Infrastructure across the city for hosting various IoT & Smart City devices like CCTV camera, traffic detectors, Wi-Fi access points etc. in a planned & structured manner, so as to avoid repeated digging and infrastructure laying work in the city.

Kindly confirm the Lightening arrester requirement and earth pit for the same on each pole

The same shall be shared as part of the RFP document

60 Sterlite Page -18/ EoI Document

Concessionaire shall also be responsible to procure, supply, install and manage all the active devices/equipment’s like network switch, power meter, UPS, battery banks etc.

Kindly confirm scope of SI for the provisioning of power for the field elements from the state electricity board. And how far power connection from the poles. Power backup required

The same shall be shared as part of the RFP document

61 Sterlite Page -16/ About the EoI Document

Note: All the active electronics like switch, UPS, power meter, power banks etc. at the centralized as well as at field level shall be out of scope of the SI.

Kindly confirm the field rack specifications. Weather UPS be place in same field rack or UPS will have separate rack

The same shall be shared as part of the RFP document

62 Sterlite Page -16/9.2 Project 2

Smart Pole: 25-30 meter Smart Pole

What are the smart elements to be installed on this pole as height of the pole is too high.

The same shall be shared as part of the RFP document

PIMPRI CHINCHWAD SMART CITY LIMITED Registered Office: Administrative Building, PCMC,

Mumbai Pune Road, Pimpri, Pune- 411018 e-mail: [email protected]

S.No. Name of

Organization

EOI Document Reference(s)

(Clause number / page)

Content of EOI requiring Clarification

Points of clarification Response to Queries

63 Vikram

Teleinfra Pvt. Ltd.

Page No. 16, Section No. 9.2, Study Design Engineer ….

Smart Pole Can we have this on EPC Please submit your propositions as part of your EOI response document

64 Wipro Limited

EOI PCMC, Page

No. 9, Section No. 3

End-to-end basis in Design, Build, Finance, Operate and Transfer (DBFOT) mode for a specified Concession Period on PPP Mode (Revenue Sharing Model)

We strongly prefer to have Capex and Opex Model on both the porjects. Esp. Project 2

Please submit your propositions as part of your EOI response document

65

Wipro Limited

EOI PCMC, Page No. 29, Section No. 12.2

Supply, Installation, Commissioning and Operations & Maintenance Services for Smart Poles / Telecom Tower / BTS / GBM(s) Infrastructure & services in last 3 years i.e FY 13-14,

We would like amend the clause as below "Supply, Installation, Commissioning and Operations or Maintenance Services for Smart Poles / Telecom Tower / BTS / GBM(s) Infrastructure & services in last 3 years i.e FY 13-14, FY 14-15, FY 15-16, FY 16-17 and currently having at least 3000 such Smart Poles / Telecom Tower / BTS / GBM(s) operational, as on date of submission of EoI, with minimum operational annual revenue of 200 cr.

Please refer Corrigendum

Wipro Limited

FY 14-15, FY 15-16, FY 16-17 and currently having at least 5000 such Smart Poles / Telecom Tower / BTS / GBM(s) operational, as on date of submission of EoI, with minimum operational annual revenue of 200 cr.

sd/-

(Shravan Hardikar, IAS)

CEO & Director,

Pimpri Chinchwad Smart City Limited (PCSCL)