A regulatory perspective on our efforts to control runoff from new construction in CA.
Greg Gearheart, PE
Storm Water Program / SWRCB
![Page 2: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/2.jpg)
I wish to acknowledge the hard work of my colleagues at the State Water Board in helping gather information used in this presentation:
• Eric Berntsen, PH, CFM, CPESC, CPSWQ• Bill Hereth• Laurel Warddrip
![Page 3: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/3.jpg)
![Page 4: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/4.jpg)
Dimples
![Page 5: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/5.jpg)
![Page 6: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/6.jpg)
![Page 7: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/7.jpg)
Regulating Symptoms vs. Causes
![Page 8: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/8.jpg)
The Tail (of the Dragon)
• The mission of the Water Boards is to preserve and enhance the quality of CA’s water resources, and ensure their proper allocation and efficient use for the benefit of present and future generations.
![Page 9: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/9.jpg)
Millions of Californians
1980 – 23.7 million
2005 – 37 million
2020 – 50 million (projected)
Where do we put everyone?
“The Californians”-SNL & Tumblr.com
![Page 10: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/10.jpg)
![Page 11: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/11.jpg)
Hydrologic Cycle
From Lake (2004)
![Page 12: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/12.jpg)
![Page 13: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/13.jpg)
Exurbanization in the Sierra Foothillsfrom “New Geographies of the American West” by William Travis
![Page 14: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/14.jpg)
Relict FanAbandoned
Active
Relict Fan
![Page 15: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/15.jpg)
Native Soil
From King County
![Page 16: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/16.jpg)
Disturbed Soil
From King County
![Page 17: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/17.jpg)
![Page 18: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/18.jpg)
Oki 2009
![Page 19: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/19.jpg)
From NOAA
Lawn is the largest irrigated “crop” in the US
![Page 20: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/20.jpg)
![Page 21: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/21.jpg)
Sources of Impairment (USEPA 2006)
![Page 22: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/22.jpg)
![Page 23: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/23.jpg)
New Construction Numbers
• In FY 2008-2009:~ 17,000 enrollees in our construction permit
~ 3,000 new enrollees• FY 2009-2010:–~10,000 enrollees/facilities–~150 new enrollees per month–~50 acres per facility = ~500,000 acres
• Today: ~5000 (new permit + economy)
![Page 24: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/24.jpg)
1950's – Sacramento Area2000's – Sacramento Area
![Page 25: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/25.jpg)
Driven by maintenance interests...
![Page 26: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/26.jpg)
![Page 27: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/27.jpg)
Water Boards nuts and bolts
Our regulatory actions (e.g., CWA401 Certs, WDRs, NPDES Permits, enforcement, etc.) require discharges to be protective of our water quality standards (WQS):– Water quality standard = beneficial uses + objectives
– Water Boards may “choose to prevent any degradation”
![Page 28: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/28.jpg)
CWA - Water Quality Standards
• Water Quality Standards are made up of:– Beneficial Uses (designated to specific
waterbodies), plus– water quality criteria; and– an antidegradation policy.
• Beneficial Uses (BUs) are:• often not directly related to key water resource
uses valued by communities (it might take a suite of them to protect wetlands and streams, for example)
![Page 29: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/29.jpg)
Beneficial Uses Used to Protect California Wetlands &
Streams• AGR – Agricultural Supply• FLD – Flood Peak
Attenuation/Flood Water Storage
• FRSH – Freshwater Replenishment
• GWR – Groundwater Recharge
• MAR – Marine Habitat• MUN – Municipal and
Domestic Supply• RARE – Preservation of Rare
and Endangered Species
• REC-1 – Water Contact Recreation
• REC-2 – Non-Water Contact Recreation
• SHELL – Shellfish Harvesting
• SPAWN – Fish Spawning
• WARM – Warm Freshwater Habitat
• WILD – Wildlife Habitat
• WQE – Water Quality Enhancement
![Page 30: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/30.jpg)
Functional Framework:Regulatory Tools
Landscape (laparoscopic?) and watershed tools:– Storm Water NPDES Permits– CEQA ?
Waterbody tools:– CWA 401 Certifications / Wetland program
Project tools:– Construction permit, CEQA, local
ordinances, building code?
![Page 31: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/31.jpg)
Clean Water Act Permits
• CWA Section 402 – Point Sources– The National Pollutant Discharge Elimination
System (NPDES) – applies to all point sources of pollutants
– Storm water outfalls are considered “point sources” and these regulations apply to:• Industrial Sources (including Construction Activities)– BAT/BCT standard applies
• Municipal Sources (large and small communities)– MEP standard applies
![Page 32: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/32.jpg)
MS4s and MEP
Municipal Separate Storm Sewer System (MS4)– Local governments, Caltrans, and some
“non-traditionals” in Phase II Maximum Extent Practicable (MEP)– MS4s must reduce pollutants in their effluent
to the MEP– A hybrid standard – part performance-based
and level of effort ($)
![Page 33: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/33.jpg)
MS4Water Quality Standards (WQS) apply to receiving waters.
MS4 Permits are supposed to ensure WQS are met via MEP standard applied at “ends of pipes.”
LID
![Page 34: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/34.jpg)
MS4 requires project to use LID to reduce
pollutants to MEP to protect
WQS
WQS MEP
Receiving Water Limitations
Effluent Limitations
MS4 LID
Permittee Desired Practice (applied to project)
![Page 35: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/35.jpg)
Enforcing Post-construction Standards
via MS4 Permits City Y has an MS4 Permit that requires
all projects adding over 10,000 square feet of impervious area, etc., to do LID to meet the 5% EIA standard
Project X in City Y fails to comply (or worse, fakes compliance)
Project X is built w/o compliance → City Y is in violation
State/EPA must enforce against City Y
![Page 36: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/36.jpg)
NPDES Permit Drivers towards LID
1990's – MS4s had to have post-construction elements in their plans
~2000 – MS4s had to have Standard Urban Stormwater Management Plans (SUSMPs)– capture/treat 85 %ile, 24-hr runoff event– often resulted in regional basins – difficult to enforce
![Page 37: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/37.jpg)
Modern MS4 Tools
SUSMPs (the plan, not necessarily the standard)
Hydromodification Management Plans (HMPs)
Low Impact Development Additional post-construction
elements (e.g., water quality BMPs)
![Page 38: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/38.jpg)
Common Triggers for Projects Required to do
LID, etc. >10,000 square feet of
impervious “Priority projects” - varies
statewide Older permits may trigger at
20,000 square feet other thresholds
![Page 39: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/39.jpg)
Common Project Outcomes
Older permits– Large vaults, structural devices– Detention basins– Capture/treat approach
Newer permits– LID– Flow duration control– Hydromod/instream intervention in
some cases
![Page 40: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/40.jpg)
![Page 41: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/41.jpg)
Common Performance Criteria
Criteria (varies)– “Post equals pre-development” runoff
volume– Ranges of flows to control– (Effective) Impervious area threshold(s)
Method of analysis/calculation (varies)– Continuous simulation– Rational (modified) method– Not specified
![Page 42: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/42.jpg)
Specific LID Requirements
Construction General Permit requires “post equals pre” and uses LID-esque runoff credits (trees, cisterns, etc.)
LID Manuals (some developed, some in progress)
Vague “LID preferential” language in some cases
Some MS4 permits contain no LID language
![Page 43: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/43.jpg)
![Page 44: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/44.jpg)
Subdivision Example
![Page 45: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/45.jpg)
Pre-Development (Pre-Project)
Post-Developmen
t
(5% EIA)
Post-Development
(1% EIA)
Percent EIA 0 5 1
Precipitation (inch)
0.75 0.75 0.75
Runoff (inch) 0.002 0.04 0.007
Project Area (acres)
10 10 10
Runoff (acre-ft) 0.002 0.03 0.006
% Increase over Pre-Development
N/A 1,500 300
Subdivision Example
![Page 46: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/46.jpg)
Effective Impervious Area (EIA)
Concerns over using EIA as a surrogate for hydrologic performance
Treats the symptom (surface), not the cause (hydrology) of WQS impacts
Could be gamed (the “grassy moat” scenario)
Should use Runoff Volume, Time of Concentration, and other appropriate hydrologic metrics instead
![Page 47: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/47.jpg)
The importance of soil
Healthy soils are critical to watershed health and function
Engineers tend to focus on the plumbing more than the soils and biotic features
Infiltration and recharge do not always work – LID is flexible, why aren't we?
![Page 48: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/48.jpg)
Native Soil
From King County
![Page 49: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/49.jpg)
Disturbed Soil
From King County
![Page 50: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/50.jpg)
From Soil Food Web, Inc
![Page 51: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/51.jpg)
State Water Board’s Watershed Management Initiative (1996)
“water quality and ecosystem problems are best prioritized, addressed, and solved at the local watershed level rather than at the individual discharger, waterbody, or state agency level……”
![Page 52: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/52.jpg)
![Page 53: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/53.jpg)
![Page 54: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/54.jpg)
Watershed Management Zones
•Allow us to identify the most appropriate criteria to protect dominant watershed processes.
• Examples: No channel protection criteria in subwatersheds without streams
• Prescribe higher infiltration volume for areas that can handle it
• Limit development on areas that supply coarse sediment
![Page 55: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/55.jpg)
Social well-beingSustainabilityPersonal Health
Leadership & demonstrationEfficiency ethicEnvironmental awareness Minimal impact
Public acceptance & demandProduct & service availabilityProfessional competency
StewardshipStewardship
Reduce Runoff
Soil Conservation & HealthWater Quality
Habitat Urban environment
Water Energy
Air (carbon / GHG)Biomass (green waste
reduction)
Resource Efficiency & Protection
Watershed Efficiency & Protection
Market Transformatio
n
Market Transformatio
n
Quality of Life
Quality of Life
Watershed Approach – The New Norm (CA Urban Water Conservation Council)
![Page 56: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/56.jpg)
![Page 57: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/57.jpg)
BUILD “LIVING SOIL”
• Healthy soil biology, full of micro-organisms forms the foundation for the entire site ecology
• Similar to the role of plankton in the ocean
· Creates soil structure
· Stores and cycles nutrients · protect plants from pests
· Improves water infiltration and storage
· Filters out urban pollutants
![Page 58: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/58.jpg)
![Page 59: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/59.jpg)
UTILIZE MULCH
• Apply minimum 2” layer mulch over all planting beds
• Utilize local, recycled, organic mulch from tree trimmings
• Avoid forest product mulches
• Reapply as needed
• Keep away from root crowns and trunks
![Page 60: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/60.jpg)
![Page 61: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/61.jpg)
![Page 62: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/62.jpg)
![Page 63: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/63.jpg)
![Page 64: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/64.jpg)
![Page 65: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/65.jpg)
![Page 66: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/66.jpg)
From Eric’s Front Yard
![Page 67: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/67.jpg)
From Ann Riley
![Page 68: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/68.jpg)
![Page 69: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/69.jpg)
Risks of over-engineered LID
Engineered boxes often require engineered soils
Devices buried in corners of commercial lots
Site runoff performance may meet goals, but overall watershed goals and sustainability of project is questionable
![Page 70: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/70.jpg)
Challenges Ahead for LID
Regulating LID– Retrofits, hydrologic criteria, performance
measurement, over-engineering, enforcement, linking to WQS and outcomes
Legislating LID– Diverse interests, oversimplification of CA
hydrology, promises of global savior Mother Nature
![Page 71: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/71.jpg)
Sustainability Tests
• Resource – protection to enhancement and reuse (“runoff is a resource”)
• Technical – complex, technological standard-based to simple, natural, performance-based solutions
• Institutional – centralized, subsidized approaches to decentralized, self-supporting approaches
• Community – healthy individual, societal cost driven equations to healthy community, community opportunity equations
![Page 72: Pimple dimples eureka2013](https://reader036.fdocuments.us/reader036/viewer/2022062419/557c6a5ed8b42a855d8b4b89/html5/thumbnails/72.jpg)
My Recommendations
Water Board/USEPA should develop numeric criteria and objectives that address hydromod impacts using LID, instream, and other techniques – in support of beneficial uses and WQS
Wherever feasible, directly regulate those responsible for constructing projects (and maintaining BMPs), discharging storm water
Open source model → performance-based standards with flexibility to adapt/learn
Promote sustainable approaches to water management wherever feasible (soils, irrigation, gray water, everything)