Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with...

39
Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at Austin Katherine Dombrowski (PM), AECOM Andrew Sexton (TE), Trimeric Bruce Lani, DOE PM 1

Transcript of Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with...

Page 1: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Pilot Plant Testing of Piperazine(PZ) with High T Regeneration

Gary T. Rochelle (PI) & Eric ChenThe University of Texas at Austin

Katherine Dombrowski (PM), AECOM

Andrew Sexton (TE), Trimeric

Bruce Lani, DOE PM 1

Page 2: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Budget Period 1

$ 1.65 M Federal Share$ 0.92 M Cost Share

$ 2.57 M Total BP1

2

Cost share by CO2 Capture Pilot Plant Project (C2P3)

Page 3: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Objective is to develop PZ with advanced regeneration at 150°C

• Optimize solvent (8m vs 5m)• Demonstrate solvent robustnessPZ

• Two stage flash (2SF)• Advanced flash stripper (AFS)Regeneration

• Formation and control• CharacterizationAerosols

3

Page 4: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Phased testing at UT SRP and NCCC to optimize PZ absorption/regeneration

• 2SF• 8m PZSRP

2011

• 1SF• 5m PZ• Aerosol

SRP 2013

• AFS• 5 vs 8m• Aerosol

SRP 2015

• AFS• 5m PZ• Aerosol

NCCC 2017

4

Completed Completed Completed Pending NETL Approval

0.1 MW 0.5 MWCO2 in air Flue gas

BP1 BP2

Page 5: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

The Lessons

• 5m PZ is a superior solvent

• AFS minimizes energy use for regeneration

• 5m PZ + AFS decreases cost of CO2 capture

• Amine aerosols can be measured with FTIR and PDI

Page 6: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m Piperazine is a superior solvent

6

Page 7: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

PZ solvent properties• Fast kinetics• High capacity• Low volatility• Resistant to Degradation

– Thermal (stable to 150°C)– Oxidation (4x more stable than MEA)– Nitrosation (MNPZ decomposes at 150°C)

• Solid solubility limits its application

Page 8: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ: optimizes advantages of PZ

Wider solubility• Can be used at lower lean loading without solids ppt

• No solids precipitation at rich loading

8

Page 9: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ has a wider solubility window

0

10

20

30

40

50

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45

Tra

nsit

ion

T (

°C)

CO2 loading (mol/mol alkalinity)

5 m PZ 8 m PZ

Solution

PZ∙6H2O (s)

Operating RangeOverstrip Saturation

9

0.22 0.26

Page 10: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ: optimizes advantages of PZWider solubility• Can be used at lower lean loading without solids ppt

• No solids precipitation at rich loading

Faster kinetics

• 33% faster absorption kinetics vs. 8m PZ

10

Page 11: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ improved CO2 removal at SRP

11

Page 12: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ: optimizes advantages of PZWider solubility

• Can be used at lower lean loading without solids ppt

• No solids precipitation at rich loading

Faster kinetics

• 33% faster absorption kinetics vs. 8m PZ

Lower viscosity• Higher heat transfer coefficients for cross exchangers,

trim cooler, absorber intercooler

12

Page 13: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ improved cross exchanger performance and reduced heat duty

13

Page 14: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

The Advanced Flash Stripper (AFS) minimizes energy use

14

Page 15: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Advanced Flash Stripper with 5m PZ

Page 16: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

16

AFS Skid

Reboiler

18” Simple Stripper18” Absorber

Page 17: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

17

6” AFS Column

Page 18: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

AFS has lower Weq than SS

Page 19: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Cold-rich bypass reduced energy requirement of 2SF

Page 20: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

AFS reduced energy requirement by 25%

Page 21: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ + AFSdecreases cost of CO2 capture

21

Page 22: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ/AFS has lowest costs of configurations modeled by UT • PZ/AFS = $39.03/tonne (no TS&M)• Econamine = $56.47/ton (no TS&M)

Page 23: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Amine Aerosols can be measured by FTIR and

Phase Doppler Interferometer (PDI)

23

Page 24: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Amine aerosols cause high amine emissions

Nucleation sites in flue gas SO3/H2SO4 Submicron fly ash SO2/amine

+ Amine condensation Amine/CO2/H2O from solvent to aerosol

+ Poor collection of small drops in water wash

24

= Unacceptable amine emissions

Page 25: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

PDI, FTIR measurements at SRP

25

Page 26: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

PDI, FTIR measurements at SRP

26

• Aerosol (size/count/velocity)PDI• Vapor + AerosolFTIR• Total SOx contentEPA 8• PM Collection + AminesEPA 5• CO2 probesVAISALA

Page 27: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

PDI, FTIR measurements at SRP

27

• Aerosol (size/count/velocity)PDI• Vapor + AerosolFTIR• Total SOx contentEPA 8• PM Collection + AminesEPA 5• CO2 probesVAISALA

EPA5 OUT KO

EPA8INVIN

VOUTPDI

Page 28: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

FTIR Sampling

28Field Sampling Select Sample Point FTIR Analysis

Page 29: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

FTIR Sampling

29

Sample Probe

Heated Pad

CPU

FTIRMonitor/Keyboard

T ControllersHeated Pump

VSD

Heated FilterCooling Fans

Power Distribution

Field Sampling Select Sample Point FTIR Analysis

Heated Sample Manifold

Cascade Solenoid + Pneumatic

Valves

Page 30: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

0

20

40

60

80

100

120

140

160

180

200

0

2

4

6

8

10

12

14

16

9:50 10:19 10:48 11:16 11:45 12:14 12:43

ppm

PZ

, NH

3, an

d SO

2

Vol%

H2O

and

CO

2

Time (hh:mm)

Outlet

H2O

CO2

PZ

NH3

Outlet Outlet

40 ppm PZ baseline without intercooling

50 ppm PZ after KO

KO

Inlet KO

Inlet

100-200 ppm PZ at outlet

PZ emissions increase with 10 ppm H2SO4

Page 31: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

• In-situ analysis for aqueous aerosols• Measure 0.1 – 10 μm at high (106 part/cm3) concentrations• Eliminate extractive sampling errors

– Sampling: isokinetic– Dilution: concentration limitations, RH– State: P/T –

Condensation/Evaporation– Transmission: impingement,

diffusion, settling, deposition

PDI with bypass sampling provided high quality aerosol measurements

31

Page 32: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

32

PDI Development

PDI Gen. 1

PDI Gen3:• Custom PDI on 1” Duct (25 mm TX, 39º Cross, 50 →17.8 μm laser)

• 0.1 μm lower detection limit, 106 #/cm3 estimate

PDI Gen. 2 PDI Gen. 3

ReceiverTransmitterN2 Purge

Page 33: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

Gen3 PDI detected 0.1 µm particles

33

Quantified to 106

particles/cm3

Page 34: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

34

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0 0.5 1.0 1.5 2.0 2.5 3.0

CD

F

Diameter (μm)

Cumulative Distributions (CDF)

DiameterD10 = 0.35

AreaD32 = 0.97

VolumeD43 = 1.13

Total emissions are captured by volume

average (mass)

Page 35: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

BP2 test at NCCC pending NETL approval

• 2SF• 8m PZ

SRP 2011

• 1SF• 5m PZ• Aerosol

SRP 2013

• AFS• 5 vs 8m• Aerosol

SRP 2015

• AFS• 5m PZ• Aerosol

NCCC 2017

35

Completed Completed Completed Pending

0.1 MW 0.5 MWCO2 in air Flue gas

BP1 BP2

Page 36: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

BP2 Test Objectives for NCCC

• Demonstrate energy performance & operability at 0.5-MW scale on coal-fired flue gas– 5 m PZ – AFS

• Confirm economic advantage of 5m PZ + AFS

• Continue study of aerosol formation and measurement

36

Page 37: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

BP2 Schedule

Date ActivityOctober 2015 Authorization to begin BP2January 2016 Process Design Package

completedApril 2016 AFS Skid PO issuedNovember 2016 AFS Skid delivered to NCCCMay – August2017

NCCC Test Program

37

Page 38: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

• Acknowledgement: “This material is based on work supported in part by the Department of Energy under Award Number DE-FE0005654.”

• Disclaimer: “This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.”

38

Page 39: Pilot Plant Testing of Piperazine (PZ) with High T ......Pilot Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at

5m PZ has advantage at SRP with packing area is limited

39