Transcript of Pikangikum First Nation School Capital Planning Study Community Information Presentation.
![Page 1: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/1.jpg)
Pikangikum First NationSchool Capital Planning
Study
Community Information Presentation
![Page 2: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/2.jpg)
Community’s New School …… Moving Fast Forward
Pikangikum First Nation’s NEW SCHOOL
Funding Commitment From Aboriginal Affairs and Northern Development
![Page 3: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/3.jpg)
Project Overview
What Grades Levels Will Be Taught At The New School?• Kindergarten K4 & K5• Elementary Grades 1 to 8• High School Grades 9 to 12
How Many Students Will the New School Accommodate?• The New School will Accommodate Over 900 Students and will have provisions for future expansion.
![Page 4: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/4.jpg)
Project Overview
What Will Be the Size of The New School?• The New School Will Be Over 90,000 square feet. That is equivalent to 5 NHL Hockey Rinks
+ + + + = NEW SCHOOL
How Much Will It Cost to Build?• The New School will cost over $50 Million
![Page 5: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/5.jpg)
Project Overview
What will be Included in the New School?
8 – Kindergarten Rooms 14 – Grades 1-3 Classrooms
10 – Grades 4-6 Classrooms 4 – Grades 7-8 Classrooms
6 – Grades 9-12 Classrooms Aboriginal Studies Room
Religious Studies Room 2 – Science Laboratories
Library / Resource Computer Lab
Music & Drama Room Art Room
Two Cafeterias (Elementary + Senior) Two Gymnasiums (Elementary + Senior)
Family Studies / Food & Fashion Room Manufacturing Shop
Construction Shop Special Needs Room
Health Room Staff Room
Native Language Coordinator Office Guidance Counsellor Office
Administration Offices Education Storage
![Page 6: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/6.jpg)
Project Overview – Site Location
New School Site
![Page 7: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/7.jpg)
Project Overview
School Site Fly-By…
![Page 8: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/8.jpg)
School Development Schedule
• Performance Specifications for New School
• Nov 4 to Jan 20, 2014
• Design-Builder Selection Competition
• Jan 21 to Apr 30, 2014
• New School Design and Construction
• May 1, 2014 to Aug, 2016
• New School Open• September 2016
![Page 9: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/9.jpg)
K-12 School Site Plan
![Page 10: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/10.jpg)
NOTESECOND GYM
and CAFETERIA NOT SHOWN
![Page 11: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/11.jpg)
![Page 12: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/12.jpg)
Next Steps
• The School Study Which is Now Being Finalized Has Triggered the Design and Construction Stages
Finalize Study
• Owner’s Consultant Coordinates Retaining a Design-Build Firm
• Manages Quality Control For Design and Construction
Owner’s Consultant
• Detailed Design• Construction
Hire Design Builder
![Page 13: Pikangikum First Nation School Capital Planning Study Community Information Presentation.](https://reader036.fdocuments.us/reader036/viewer/2022062511/5517c24b5503461b658b480b/html5/thumbnails/13.jpg)
Chief & Council welcome your input
on theNEW SCHOOL
PROJECT
Thank You For Your Participation