UK PACS & Teleradiology Group Newquay, March 30th 2007
Roger Irish, Maggie Nicholls
March 2007
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Contents
• Introduction• Overview of Millennium integration with PACS and RIS• Order Communications Project Issues• Order Communications in other Clusters• Questions
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Introduction
• Overview of the integration between Cerner Millennium and GE PACS and HSS CRIS in the South
• Focus is primarily upon Order Communications, but encompasses all integration points
• Provides an update on the Order Communications Project and its findings
• Concludes with a brief overview of Order Communications support in other regions
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Interface Overview
• Basis for Order Communications in the South is the Cerner Millennium interface deployed at Newham & Homerton (East London)
• Overview focuses primarily on the scope of this interface
• Overview covers Demographic Changes (via ADT messages) and Orders (Requests) (via the Order Communications interface
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Integration Architecture between CRS and RIS
RIS Domain B
RIS Domain A
RIS Entity P
RIS Entity Q
RIS Entity R
RIS Entity S
RIS Entity T
RIS Entity U
RIS Entity V
CRS Domain 2
CRS Domain 1
CRS Entity P
CRS Entity Q
CRS Entity R
CRS Entity S
CRS Entity T
CRS Entity U
CRS Entity V
CRS to RIS Communication • Each entity / Deployment family in CRS communicates to its equivalent entity in RIS
• Communication is not at the domain level
• This is true for demographics (ADT) and orders (ORM)
• There are:– 10 CRS domains– 7 RIS domains
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Overview of Demographic Propagation
RIS Domain B
RIS Domain A
RIS Entity P
RIS Entity Q
RIS Entity R
RIS Entity S
RIS Entity T
RIS Entity U
RIS Entity V
CRS Domain 2
CRS Domain 1
CRS Entity P
CRS Entity Q
CRS Entity R
CRS Entity S
CRS Entity T
CRS Entity U
CRS Entity V
CRS to RIS Communication
• Demographic changes are sent from CRS to departmental systems using messages in the ADT interface set
• Communication is not at the domain level
• Each entity in CRS communicates to its equivalent entity in RIS
ADT
ADT
ADT
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Order communication data flow
EventEventEventEvent
• Place request on CRS• Request processed on RIS• Appointment is scheduled• Patient presents• Imaging carried out• Imaging verified• Imaging Reported• Report Verified
CRS
Ordered
RIS
Complete
AcceptedAttended
Requested
ProvisionalComplete
Ordered (Complete)
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Image Viewing in Cerner Millennium R2
• The Order Communications results feed from CRIS to Millennium serves a dual purpose:– Passes report in support of the longitudinal patient history held
in CRS– Passes a link to the associated imaging in the cluster data store
• Cerner Millennium Release 2 will include functionality to invoke the Centricity Enterprise Web Viewer from within PowerChart / PowerChart Outreach
• This will allow the viewing of relevant PACS images from within Millennium
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
The Southern Cluster Order Communications Project
• This was initiated in January 2007 in response to concerns raised by the Southern Cluster RIS/PACS clinicians, that the Order Communications functionality being offered as part of the R0/R1 releases of Cerner Millennium, may not fully meet the clinical and business requirements of Pathology and Radiology departments.
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S) Summary of Findings
Priority for Resolution
Clinical Priority
High 4 5 24
Medium 4 2 1
Low 9 - -
Yes – Long Term/No workaround required
Yes – Short Term No
Acceptable Workaround Available?
• Issues have not been assessed against requirements to determine if they are defects or change requests
• Cerner resource enabled several issues to be closed
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Summary of Issue Progression Route
Route Number of Issues
Refer to Requirements Definition Group 18
Design Requirements Authority Action 7
Refer to R2 Design Groups 5
Review by Technical Architects 4
Deployment Team Action 6
Change Board Action 1
Orderables Project Action 4
None Required 8
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Unsolicited Results
• Unsolicited Results are required to support:– GP Requests
– Paper requests from downtime
– Independent Sector requests where results are transcribed into the CRIS, but where the request may not have originated in Cerner Millennium
• CCN written due to be submitted to Requirements Group 21.03.07 with view to submission to Change Board within next week. (This covers 6 scenarios which require unsolicited results)
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Status Update
• Required to indicate to the end user that a request has been scheduled inc. date & time of appt (i.e. an update to the request status showing when an appointment has been scheduled in the Radiology System)
• Raise through Requirements Definition Group for assessment with view to supporting receipt of a status update against a radiology request in Millennium to indicate the request has been 'Scheduled' , with the ability to display appointment date & time
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Cancellation of Radiology Appointments
• Once Radiology requests are submitted by the user (signed) they can only be cancelled via the RIS system
• Short Term workaround is for users to contact the Radiology Department to request the item be cancelled
• Could result in unnecessary exposure to radiation if requests are performed before the user can be contacted to cancel
• There is also no audit trail available by this method to indicate who requested the cancellation
• Raise through Requirements Definition Group for assessment
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Imaging Request Routing
• Current thinking regarding interface design does not take into account the level of flexibility needed to route groups of orders to different services within a single trust or between trusts within the same domain
• This issue has already been raised at the DRA. This issue needs further discussion
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
PowerChart Inbox Proxy Settings
• Requestor is not available to sign off a result• Workaround to proxy access to inbox was deemed
acceptable short term• For the longer term, work is required to ensure future
design considers the concept of teams sending notification to all team members and the concept of deferring inbox contents e.g. when on leave
• Raise for inclusion in future design (R2) to support team working and inbox deferral
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Other Clusters – North West and West Midlands
• iSoft LE 2.1 and HSS CRIS• iSoft i.CM supports all the Order Communications
messages that HSS CRIS can process• iSoft i.PM supports the patient demographics and
admit / discharge messages• i.CM Results Reporting supports unsolicited results
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Other Clusters – North East and East Midlands
• Have same NCRS solution as NWWM, namely iSoft• There is no contracted / LSP RIS solution, so trusts are
at liberty to choose their own• There have been trust implementations of HSS CRIS
(standalone)• Order Communications functionality is similar to that in
the NWWM
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Other Clusters – London
• Are taking Cerner Millennium, initially based on the Southern Region solution (R0)
• Have a tactical RIS solution (iSoft RadCentre), no strategic RIS
• Order Communications functionality is not yet fully agreed
Pic
ture
Arc
hiv
ing
an
d C
om
mu
nic
atio
ns
Sys
tem
(P
AC
S)
Questions