PHYSICAL CONNECTIVITY EPBUENSUCESO (the Philippines)
description
Transcript of PHYSICAL CONNECTIVITY EPBUENSUCESO (the Philippines)
PHYSICAL CONNECTIVITYEPBUENSUCESO(the Philippines)
ASEAN- EUROPE’S PARTNER IN ECONOMIC GROWTH
●ASEAN as a single, integrated entity: –Population: 605 million –GDP: US$ 2.31 trillion –Trade: US$2.48 trillion -- Average Growth rate 2012- 5.86
Existing infrastructure: –Total length of AHN: 38,400 km –Total length of SKRL: 6,890 km - Over 47 international airports- over 1000 km of tracks for railways- 2300 km of gas pipeline
PHYSICAL CONNECTIVITY PRIORITY AREAS
1. ASEAN HIGHWAY NETWORK (AHN)2. SINGAPORE-KUNMING RAILWAY LINK3. MARITIME TRANSPORT4. AIR TRANSPORT5. INLAND WATERWAYS6. TRANS ASEAN GAS PIPELINE7. ICT INFRASTRUCTURES
MPAC PHYSICAL CONNECTIVITY IMPLEMENTATION
Out of 125 measures, 96 are due by 2015; 9 beyond Physical connectivity- 55 measures implemented AHN- progressing wellSKRL- on scheduleMaritime Transport- Roro
SKRLConnecting mainland SEA from Kunming to Singapore covering 6 AMS
Missing links- 4
ASEAN Power Grid •Implement the Melaka-Pekan Baru Interconnection •MOU signed by Indonesia and Malaysia in September 2012, expected COD in 2019 •Implement the West Kalimantan-Sarawak Interconnection •Ongoing, expected COD in 2015
Maritime Transport • JICA finished FS on the establishment of an ASEAN Roll-on/Roll-off (RO-RO) Network and Short-Sea Shipping –PHL-IndonesiaRecommendations on implementation of RO-RO implemented or studied further
Official launch being prepared
FINANCING:1.OWN FUNDS2. PRIVATE SECTOR3. INSITUTIONAL- ADB, WB4. ASEAN INFRASTRUCTURE FUND ( AIF)5. PPP
PPP FOCAL POINTS IN ASEAN
PPP CENTER PHILIPPINESPPP UNIT MALAYSIABAPPENAS- INDONESIASTATE ENT. POLICY OFFICE-THAILANDMINISTRY OF PLANNING- VIETNAM-SINGAPORE
PHILIPPINE PPP PROJECTS: AIRPORTS, SEAPORTS, RAILWAYS, ROADS, SCHOOLROOMS, ETC. 76 PROJECTS FOR A TOTAL OF $12B:
AWARDED- 6 PROJ ( $ 1 B)PROCUREMENT STAGE- 4 PROJ ( $ 2.67B)ROLL OUT – INVITATION TO BID SENT- 2 PROJ ($657.78M)EVALUATION AND APPROVAL- 4 PROJ ($825M)FINALIZATION OF PROJECT STUDY- 1 ($397M)ON-GOING FEASIBILITY STUDY- 11 PROJ ( $4B )PROCUREMENT OF CONSULTANTS FOR PFS- 5 PROJECTSPROJECT DEVELOPMENT STAGE- 13-AWAITING COSTING- 27 PROJECTS
NEDA sa QCEDSA, Diliman1103 Quezon CityPhilippines Contact Numbers:Trunk Line: (632) 990-0721(632) 929.8593(632) 929.8594(632) 929.8630(632) 929.9251
Merci beaucoup !Thank you!Salamat po!