PhW / Palyja / June 07
Delivering Water to West JakartaPALYJA
Presentation to CCFBy Philippe Wind, Technical Director
PALYJAJUNE 2007
PhW / Palyja / June 07
PALYJA – Water Concession Company established in 1998 for west
Jakarta• Private company, 50% Suez Environnement, 50% Astra• Under concession contract with DKI, managed by PAM• Full scope of service:
– Water treatment, distribution pipes Network, customer– Deliver water to the people connected– Standard “air bersi”
• Money collected used to pay all water costs:– water resources– operating costs– Investments
PALYJA employs directly 1400 people, serve 380 000 accounts for around 2,5 million people. Produce 700 000 m3/day to deliver continuous supply at above 7,5 M of pressure. PALYJA invest around 20 mio USD/year.
PhW / Palyja / June 07
Areas - DKI
PhW / Palyja / June 07
West tarum catchments
PhW / Palyja / June 07
1
2
RAW WATERTREATED WATER SOURCES
Cawang = 5.4 m3/s (Average)4,7 m3/s (dry s.) Bekasi =
19 m3/s (ave~wet s.)17 m3/s (dry s.)
Cikarang = 26 m3/s (ave~wet s.~dry s.)
53 m3/s (Ave ~ wet s.)50 m3/s (dry s.)
Raw Water Supply from WTC
Target supply to PALYJA: 6.2 m3/s
Jatiluhur Dam
PhW / Palyja / June 07
West Tarum Canal–Bekasi River
PhW / Palyja / June 07
End of WTC at Cawang Offtake
PhW / Palyja / June 07
Water Resources & PALYJA WTPCurrent + options
WTP
PhW / Palyja / June 07
Pipe Network
Pipes and network
PhW / Palyja / June 07
Customers
PhW / Palyja / June 07
06.12.06 6-IGTERSGPALYJA
Not supplied in the peak hours
Supplied only few hours a day
Not supplied, no water
Water supply by Areas
Network Pressure by Areas
Low Pressure 0 – 0.3
Medium0.3 – 0.7
High Pressure 0.7 – 1.0
High Pressure> 1.0
Water Shortage in West Jakarta
PhW / Palyja / June 07
• Current Demand fo JKT : 1.500.000 m3/day
• Demand satisfaction : 79 %
• Unmeet demand : 21 %
• Physical Losses : 25 %
•Commercial losses : 23 %
• Population growth : 0.7 % per year
WATER DEMAND deficit and losses
PhW / Palyja / June 07
Current Situation of Water Supply
Description TPJ PALYJA DKI Jakarta
PAM 61,8% 53,7% 57,6%
Pumps 31,7% 37,9% 35,0%
Hydrants 6,5% 8,4% 7,5%
Total 100% 100% 100%
Water sources per Kotamadia year 2005
0%
20%
40%
60%
80%
100%
Selatan Timur Barat Pusat Utara DKI
PAM
Pumps
Hydrants
Water User in PALYJA and TPJ Area :
PhW / Palyja / June 07
Current Situation of Water SupplyPressure at House Connections :
Area Pressure (bar)
%
PALYJA North. - Western
0 – 0.3 32%
Central Jkt 0.3 – 0.7 26%
Southern Jkt 0.7 – 1.0 42%
TPJ Northern Jkt 0 – 0.3 44.6%
Central Jkt 0.3 – 0.7 25.7%
Middle – Part of Southern Jkt
0.7 – 1.0 29.7%
PhW / Palyja / June 07
Losses and continuity of service
• Commercial losses is a big part of total losses• Lack of continuity of service strongly degrade
commercial losses as:– Unhappy customer may seek for illegal connection– Customer may modify his installation to get more
water and affect or bypass metering– Management has more difficulties to differentiate
metering and bill anomalies from lack of supplyA minimum pressure above 7,5 M at connection level will lead to continuous supply and bring strong improvement in reduction of commercial losses.
PhW / Palyja / June 07
Water Quality and Drinking water objective
• Drinking water status cannot be fulfilled without the preliminary conditions :– Full time pressurized network– Decrease of physical losses– Sufficient production facilities in stand-by to
provide treatment process improvement
(All these conditions are related to avoid contamination of the network)
– Constant raw water quality
PhW / Palyja / June 07
Key issues for future
• estimated 20% water deficit between supply and demand.
• Reduction of physical losses not enough to cover the deficit, commercial losses represent water consumed.
• strong need to bring additional water resources to meet water demand
• Increase in resources will lead to better continuous supply that will improve quality and reduce losses
• several possibilities to get additional resources to improve water service and meet demand for Jakarta
PhW / Palyja / June 07
Domestic connectionOfficial figure
Illegal users
Hydrants
+ p - Z%/year+ LPCD
+ p+ LPCD
+ p - X%/year
+ Z%/year
+ X%/year
Pumps + p - Y%/year
+ Y%/year
Population demandPopulation demand
Demand satisfied
PhW / Palyja / June 07
Water Demand
2005 Demand Pattern (m3/d) 2012 Demand Pattern (m3/d) 2022 Demand Pattern(m3/d)
PhW / Palyja / June 07
1
2
3
5
4
8
6
7
9
10 11
TRANS.PIPA
8 WTP
1.Cisadane Ext 300lps2.Cikokol Ext 300lps3.Teluk Naga 300 lps4.Buaran+P.Gadung Ext 750lps5.Buaran III 2500 lps6.North WTP 1000 lps7.Bogor Spring 1000 lps8.Ciawi Dam 3000 lps9.Extension WTC 2500 lps10.Cisadane II 3000 lps11. Jatiluhur 7000 lps
Water Resources potential projects
PhW / Palyja / June 07
Present and Future WTC Raw Water
Abstractions for PAM
Jakarta (m3)
20.85Bekasi
Prese nt(2007)
L onge r Term(2012 > )
BuaranPulogadungPejompongan
Ciliwung5
6.4
4.2
5.25
M id Term2008- 2010
N ote : E x is t ing W T P c apacit ies increase d
Ciliwung5
24.6Bekasi
7.5
5.3
6.8
Ciliwung5
29.8
Bekasi
7.5
5.3
12.0*
Ciliwung Bekasi
* N o te : A ssum e s B uaran II I W T P I m plem e n ted
PhW / Palyja / June 07
END
Ciliwung Bekasi Cikarang Cibeet
Citarum
WTP Pejompongan6.2 m3/s
WTP Buaran5.5 m3/s
WTP Pulogadung4.4 m3/s
BendungBekasi
Projected siphon
Cap. 30m3/s
BendungCikarang
BendungCibeet
BendungCurug
ETCCurug Hydraulic Pumping StationDesign Capacity
17 x 5.5 m3/sPresent Capacity
17 x 3.1 m3/s
Projected siphon
Projected Separation
JAKARTAWTC Cap.21.1 m3/s
DesignCapacity 82m3/s
Existing Cibeetsiphons
ProjectedSeparation Wall
Irrigation Area17,477 ha
Irrigation Area7,250 ha
WEST TARUM CANAL
WTC
Pipelines
ProjectedSeparation wall
ProjectedSeparation Wall
PhW / Palyja / June 07
Long term
PhW / Palyja / June 07
Tenjo
Alternative to study
WTP to locate
PhW / Palyja / June 07
WATER SUPPLY PLAN FROM KARIAN DAM
SERANG and CILEGON
Karian Dam (14.6)
Karian Dam (14.6)
TENJO P. PANJANG
SERPONG
TANGERANG
KSCS 1 : 9.1
6.22.9
6.2
Ciuyah Tunnel
9.1
Ciu
jun
g
Riv
er
(Unit : ㎥ /s )
5.5
※
※
PhW / Palyja / June 07
Investment , legal and economics
Contractual Relationship
DKI Jakarta
Administration
PAM JAYA
Customers
Regulatory
Body
Independent
Transparent
Accountable
PALYJA
Co-operation Agreement
DPRD
Legislative
Economics and Tariff
OPEX
CAPEX
Financing(OPEX & CAPEX)
TagihanAir
(Cashflow)
Costs Full-cost recovery
General costs
General costs • Water Charge
Indexation• Tariff Adjustment
based on Governor DKI Jakarta Decree
T
FPPR :PAM Jaya, RB, MOF, DKI
(PALYJA’s Revenues)
C
K
R
T = C + K + R
Water Charge
PhW / Palyja / June 07
PALYJA InvestmentsPALYJA CAPEX BUDGET YEAR 2007
MIS 2%
Studies 3% Buildings 2%
Vehicle 0.2 %Office Equipment
0.4 %
Meters 7%
Connections 14%
NRW Action 4%
Distribution Network 15%
Primary Network 20%
Production 33%
PhW / Palyja / June 07
PALYJA : Potential & constraints
Investment
Financing cash flows
Inflation
Tariff
Get more Raw Water
Build pipes, connections, treatment
Operate and maintain
Employees, knowledge
Provide more water, increase coverage
Improve service, customers satisfaction
Reduce losses
Manage costs
PhW / Palyja / June 07
Conclusion
PALYJA is planning and implementing necessary actions to improve service,
quality and coverage for west Jakarta.
Additional water resources are necessary but are possible with
involvement of all partiesContinuation of investment is needed
Impact on medium term will be significant for population health and
well beingThank You !