56
PHPP-Energy balance calculation Building: Street: Postcode/City: 1291 Province/Country: Building type: Climate data set: ud---01-Ljubljana T1996-2005/J1981-2000 Climate zone: 3: Cool-temperate Altitude of location: 309 m Home owner / Client: Street: Postcode/City: 1291 Province/Country: Architecture: Mechanical engineer: Street: Street: Postcode/City: 2000 Postcode/City: 2000 Province/Country: Province/Country: Energy consultancy: Certification: Street: Street: Postcode/City: 3000 Postcode/City: Province/Country: Province/Country: Year of construction: 2019 Interior temperature winter [°C]: 20,0 Interior temp. summer [°C]: 25,0 No. of dwelling units: 1 Internal heat gains (IHG) heating case [W/m 2 ]: 2,7 IHG cooling case [W/m²]: 2,7 No. of occupants: 300,0 Specific capacity [Wh/K per m² TFA]: 204 Mechanical cooling: x Specific building characteristics with reference to the treated floor area Treated floor area m² 1493,3 Criteria Fullfilled? 2 Space heating Heating demand kWh/(m²a) 25,9 - - Heating demand kWh/(m 3 a) 5,77 Heating load W/m² 19,4 - - Space cooling Cooling & dehum. demand kWh/(m²a) 12,3 - - Cooling load W/m² 8,4 - - Frequency of overheating (> 25 °C) % - - - Frequency of excessively high humidity (> 12 g/kg) % 0,0 - - Airtightness Pressurization test result n 50 1/h 0,6 - - PE demand kWh/(m²a) 127 - - PER demand kWh/(m²a) 76 - - kWh/(m²a) 0,0 - - 2 Empty field: Data missing; '-': No requirement - Task: First name: Surname: Signature: Issued on: City: 10.12.18 Non-renewable Primary Energy (PE) Primary Energy Renewable (PER) Nejc I confirm that the values given herein have been determined following the PHPP methodology and based on the characteristic values of the building. The PHPP calculations are attached to this verification. - Generation of renewable energy (in relation to pro- jected building footprint area) SI-Slovenia SI-Slovenia Maribor Šmarska cesta 3 Škofljica Slovenija Klimada maks d.o.o. Partizanska cesta 3 Kidričeva ulica 24 Celje Slovenija OŠ LAVRICA - III. Faza parc.št.: 1841/1 itd., k.o. 1696-RUDNIK Škofljica Slovenija Občina Škofljica SI-Slovenia Osnovna šola STRYIA ARHITEKTURA Cankarjeva 6E Maribor Slovenija Eutrip, d.o.o. 2-User determined - - Alternative criteria SI-Slovenia SI-Slovenia Avguštin Celje Slovenija 0506 PHPP - OS Lavrica-faza III (1) 1

Transcript of PHPP-Energy balance calculation · 2019. 12. 3. · 02ud 7. 2VWDOLSURVWRUL UD]OLþQHWDOQHREORJH...

  • PHPP-Energy balance calculationBuilding:

    Street:

    Postcode/City: 1291

    Province/Country:

    Building type:

    Climate data set: ud---01-Ljubljana T1996-2005/J1981-2000

    Climate zone: 3: Cool-temperate Altitude of location: 309 m

    Home owner / Client:

    Street:

    Postcode/City: 1291

    Province/Country:

    Architecture: Mechanical engineer:

    Street: Street:

    Postcode/City: 2000 Postcode/City: 2000

    Province/Country: Province/Country:

    Energy consultancy: Certification:

    Street: Street:

    Postcode/City: 3000 Postcode/City:

    Province/Country: Province/Country:

    Year of construction: 2019 Interior temperature winter [°C]: 20,0 Interior temp. summer [°C]: 25,0

    No. of dwelling units: 1 Internal heat gains (IHG) heating case [W/m2]: 2,7 IHG cooling case [W/m²]: 2,7

    No. of occupants: 300,0 Specific capacity [Wh/K per m² TFA]: 204 Mechanical cooling: x

    Specific building characteristics with reference to the treated floor area

    Treated floor area m² 1493,3 Criteria Fullfilled?2

    Space heating Heating demand kWh/(m²a) 25,9 ≤ - -

    Heating demand kWh/(m3a) 5,77

    Heating load W/m² 19,4 ≤ - -

    Space cooling Cooling & dehum. demand kWh/(m²a) 12,3 ≤ - -

    Cooling load W/m² 8,4 ≤ - -

    Frequency of overheating (> 25 °C) % - ≤ - -

    Frequency of excessively high humidity (> 12 g/kg) % 0,0 ≤ - -

    Airtightness Pressurization test result n50 1/h 0,6 ≤ - -

    PE demand kWh/(m²a) 127 ≤ - -

    PER demand kWh/(m²a) 76 ≤ - -

    kWh/(m²a) 0,0 ≥ - -

    2 Empty f ield: Data missing; '-': No requirement

    -

    Task: First name: Surname: Signature:

    Issued on: City:

    10.12.18

    Non-renewable Primary Energy (PE)

    Primary Energy

    Renewable (PER)

    Nejc

    I confirm that the values given herein have been determined following the PHPP methodology and based on the characteristic

    values of the building. The PHPP calculations are attached to this verification.

    -Generation of renewable energy (in relation to pro-

    jected building footprint area)

    SI-Slovenia

    SI-Slovenia

    Maribor

    Šmarska cesta 3

    Škofljica

    Slovenija

    Klimada maks d.o.o.

    Partizanska cesta 3

    Kidričeva ulica 24

    Celje

    Slovenija

    OŠ LAVRICA - III. Faza

    parc.št.: 1841/1 itd., k.o. 1696-RUDNIK

    Škofljica

    Slovenija

    Občina Škofljica

    SI-Slovenia

    Osnovna šola

    STRYIA ARHITEKTURA

    Cankarjeva 6E

    Maribor

    Slovenija

    Eutrip, d.o.o.

    2-User determined

    -

    -

    Alternative

    criteria

    SI-Slovenia

    SI-Slovenia

    Avguštin

    Celje

    Slovenija

    0506 PHPP - OS Lavrica-faza III (1) 1

  • Cli

    mate

    data

    E

    nerg

    y b

    ala

    nce c

    alc

    ula

    tion w

    ith P

    HP

    P V

    ers

    ion 9

    .6a

    LA

    VR

    ICA

    - III.

    Faza

    / C

    limate

    : Lju

    blja

    na T

    1996-2

    005/J

    1981-2

    000 /

    TF

    A:

    1493 m

    ² /

    H

    eating:

    25,9

    kW

    h/(

    m²a

    ) /

    Coolin

    g:

    12,3

    kW

    h/(

    m²a

    ) /

    PE

    R:

    75,9

    kW

    h/(

    m²a

    )

    Da

    ta f

    or

    he

    ati

    ng

    Da

    ta f

    rom

    mo

    nth

    ly b

    ala

    nce

    Se

    lecti

    on

    of

    cli

    ma

    te d

    ata

    Re

    sult

    ove

    rvie

    wA

    nn

    ua

    l m

    eth

    od

    He

    ati

    ng

    Co

    oli

    ng

    Countr

    y:

    ud

    -Use

    r D

    ata

    Annual heating d

    em

    and

    25,9

    kW

    h/(

    m²a

    )H

    eating /

    coolin

    g p

    eriod

    188

    212

    183

    d/a

    Regio

    n:

    Heating load

    19,4

    W/m

    ²H

    eating /

    coolin

    g d

    egre

    e h

    ours

    71

    77

    -37

    kK

    h/a

    2-S

    ort

    ing

    : B

    Y I

    DF

    requency o

    f ove

    rheating

    -%

    Radia

    tion N

    ort

    h94

    119

    237

    kW

    h/(

    m²a

    )

    Clim

    ate

    data

    set:

    ud

    ---0

    1-L

    jub

    ljan

    a T1

    996-

    2005

    /J19

    81-2

    000

    Sensib

    le c

    oolin

    g2,6

    kW

    h/(

    m²a

    )R

    adia

    tion E

    ast

    201

    250

    505

    kW

    h/(

    m²a

    )

    Clim

    ate

    zone:

    3:

    Co

    ol-

    tem

    pe

    rate

    Late

    nt

    coolin

    g9,7

    kW

    h/(

    m²a

    )R

    adia

    tion S

    outh

    383

    458

    519

    kW

    h/(

    m²a

    )

    Coolin

    g load

    8,4

    W/m

    ²R

    adia

    tion W

    est

    215

    272

    505

    kW

    h/(

    m²a

    )

    Alt

    itu

    de

    PE

    R d

    em

    and

    75,9

    kW

    h/(

    m²a

    )H

    orizonta

    l ra

    dia

    tion

    322

    408

    856

    kW

    h/(

    m²a

    )

    Weath

    er

    sta

    tion:

    309,0

    m

    Build

    ing location:

    309

    m

    Month

    12

    34

    56

    78

    910

    11

    12

    Heating load

    Coolin

    g load

    PE

    R

    Days

    31

    28

    31

    30

    31

    30

    31

    31

    30

    31

    30

    31

    Weath

    er

    1W

    eath

    er

    2W

    eath

    er

    1W

    eath

    er

    2fa

    cto

    rs

    ud--

    -01-L

    jublja

    na T

    1996-2

    005/J

    1981-2

    000

    Latitu

    de

    °46,1

    Longitude °

    14,5

    Altitude [

    m]

    309

    Daily

    tem

    pera

    ture

    sw

    ing S

    um

    mer

    [K]

    9,9

    Radia

    tion:

    [W/m

    ²]R

    adia

    tion:

    [W/m

    ²]

    ° C

    Exte

    rior

    tem

    pera

    ture

    0,1

    2,1

    6,5

    10,5

    16,2

    19,7

    20,7

    20,8

    15,4

    11,4

    5,8

    0,7

    -6,8

    -5,9

    25,9

    25,9

    1,3

    0H

    ousehold

    ele

    ctr

    icity

    kW

    h/(

    m²m

    onth

    )R

    adia

    tion N

    ort

    h9

    15

    26

    34

    46

    47

    47

    38

    25

    18

    10

    711

    847

    47

    1,3

    0D

    om

    estic h

    ot

    wate

    r

    kW

    h/(

    m²m

    onth

    )R

    adia

    tion E

    ast

    23

    32

    57

    69

    92

    93

    103

    86

    62

    35

    19

    15

    29

    9114

    114

    1,8

    5H

    eating

    kW

    h/(

    m²m

    onth

    )R

    adia

    tion S

    outh

    61

    65

    86

    83

    87

    80

    89

    92

    88

    71

    51

    41

    88

    39

    131

    131

    1,1

    5C

    oolin

    g

    kW

    h/(

    m²m

    onth

    )R

    adia

    tion W

    est

    24

    34

    54

    75

    88

    91

    96

    90

    65

    44

    24

    17

    32

    29

    124

    124

    1,4

    0D

    ehum

    idifi

    cation

    kW

    h/(

    m²m

    onth

    )H

    orizonta

    l ra

    dia

    tion

    32

    50

    90

    119

    155

    162

    173

    146

    101

    62

    32

    23

    41

    23

    203

    203

    ° C

    Dew

    poin

    t te

    mpera

    ture

    -2,8

    -2,5

    0,6

    4,3

    9,4

    12,5

    13,8

    14,6

    10,8

    8,1

    3,1

    -1,7

    17,6

    17,6

    ° C

    Sky t

    em

    pera

    ture

    -11,2

    -10,4

    -6,4

    -1,9

    4,0

    8,2

    9,2

    9,9

    5,4

    2,6

    -3,3

    -9,4

    15,2

    17,6

    ° C

    Gro

    und t

    em

    pera

    ture

    13,3

    13,0

    13,1

    13,4

    15,4

    16,1

    16,6

    16,9

    16,9

    15,1

    14,5

    13,8

    13,0

    13,0

    16,9

    16,9

    Com

    ment:

    -50510

    15

    20

    25

    0

    20

    40

    60

    80

    10

    0

    12

    0

    14

    0

    16

    0

    18

    0

    20

    0

    12

    34

    56

    78

    91

    01

    11

    2

    kWh/(m²month)

    Radia

    tion N

    orth

    Radia

    tion E

    ast

    Radia

    tion S

    outh

    Radia

    tion W

    est

    Horizo

    nta

    l rad

    iatio

    n

    Ext

    erior

    tem

    pera

    ture

    C

    0506 PHPP - OS Lavrica-faza III (1) 2

  • U-value of building assembliesEnergy balance calculation with PHPP Version 9.6a

    OŠ LAVRICA - III. Faza / Climate: Ljubljana T1996-2005/J1981-2000 / TFA: 1493 m² / Heating: 25,9 kWh/(m²a) / Cooling: 12,3 kWh/(m²a) / PER: 75,9 kWh/(m²a)

    Secondary calculation: Equivalent thermal conductivity of still air spaces -> (on the right)

    Wedge-shaped assembly layer -> (on the right)

    Unheated / uncooled attic -> (on the right)

    Assembly no. Building assembly description Interior insulation?

    01ud TK-01.1 = Tla telovadnica

    Heat transmission resistance [m²K/W]

    Orientation of building element 3-Floor interior Rsi 0,17

    Adjacent to 2-Ground exterior Rse: 0,00

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    dvoranski parket 0,210 18

    zračni sloj 0,120 22

    cementni estrih 1,400 70

    EPS 0,034 npr. sist. plošča 30

    folija 0,190 1

    talne lesne plošče 0,046 npr. PAVABOARD 240

    hidroizolacija 0,190 10

    AB plošča 2,200 300

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 69,1 cm

    U-value supplement W/(m²K) U-value: 0,147 W/(m²K)

    Assembly no. Interior insulation?

    02ud TK-01 = Ostali prostori (različne talne obloge)

    Heat transmission resistance [m²K/W]

    Orientation of building element 3-Floor interior Rsi 0,17

    Adjacent to 2-Ground exterior Rse: 0,00

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Talna obloga 1,280keramika, epoksi,

    teraco, parket5

    cementni estrih 1,400 75

    EPS 0,034 npr. sist. plošča 30

    folija 0,190 1

    talne lesne plošče 0,046 npr. PAVABOARD 240

    hidroizolacija 0,190 10

    AB plošča 2,200 300

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 66,1 cm

    U-value supplement W/(m²K) U-value: 0,153 W/(m²K)

    Assembly no. Interior insulation?

    03ud TK 03 ali TL 03.1 = Plošča nad odprtim prostorom - nadstropje

    Heat transmission resistance [m²K/W]

    Orientation of building element 3-Floor interior Rsi 0,17

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    talna obloga 0,210 parket 10

    cementni estrih 1,400 80

    Izolacija EPS 0,035 npr. sist. plošča 30

    talne lesne plošče 0,046 npr. PAVABOARD 30

    KLH 0,130 250

    Lesena vlakna 0,046 240

    fasadni omet 0,190 1

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 64,1 cm

    U-value supplement W/(m²K) U-value: 0,111 W/(m²K)

    0506 PHPP - OS Lavrica-faza III (1) 3

  • Assembly no. Interior insulation?

    04ud TK 04 = Plošča nad odprtim prostorom - nad vetrolovom

    Heat transmission resistance [m²K/W]

    Orientation of building element 3-Floor interior Rsi 0,17

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    talna obloga 0,210 parket 30

    cementni estrih 1,400 55

    Izolacija EPS 0,035 npr. sist. plošča 30

    talne lesne plošče 0,046 npr. PAVABOARD 30

    AB plošča 2,200 250

    lesne izol. plošče 0,046 240

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 63,5 cm

    U-value supplement W/(m²K) U-value: 0,138 W/(m²K)

    Assembly no. Interior insulation?

    05ud ST-01 = Streha šole na jeklenih nosilcih

    Heat transmission resistance [m²K/W]

    Orientation of building element 1-Roof interior Rsi 0,10

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    OSB plošča 0,080 20

    PVC folija 0,190 1

    Izolacija celuloza 0,037 Lesena podkonst. 0,130 npr. ISOCELL 360

    Lesne izol. plošče 0,090 AGEPAN DWD 20

    folija 0,190 1

    zračni prostor 0,540 100

    OSB plošča 0,130 15

    PVC kritina, gotekstil 0,190 10

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    85% 15,0% 52,7 cm

    U-value supplement W/(m²K) U-value: 0,122 W/(m²K)

    Assembly no. Interior insulation?

    06ud ST 01.1 = Streha telovadnice na lesenih nosilcih

    Heat transmission resistance [m²K/W]

    Orientation of building element 1-Roof interior Rsi 0,10

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Akustične plošče 0,080 30

    Lesna vlakna 0,039 AGEPAN FLEX 80

    OSB plošča 0,130 20

    Izolacija celuloza 0,037 Leseni stropniki 0,130 npr. ISOCELL 280

    Lesne izol. plošče 0,090 AGEPAN DWD 20

    folija 0,190 1

    zračni prostor 0,540 100

    OSB plošča 0,130 20

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    85% 15,0% 55,1 cm

    U-value supplement W/(m²K) U-value: 0,110 W/(m²K)

    0506 PHPP - OS Lavrica-faza III (1) 4

  • Assembly no. Interior insulation?

    07ud ST 02 = AB Strešna plošča

    Heat transmission resistance [m²K/W]

    Orientation of building element 1-Roof interior Rsi 0,10

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Plinobeton 0,043 140

    AB plošča 2,200 250

    Hidroizolacija 0,190 10

    Izolacija XPS 0,036 200

    Izolacija XPS 0,036 50

    PVC kritina 0,190 5

    Prodniki 1,600 50

    betonski tlakovci 1,400 50

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 75,5 cm

    U-value supplement W/(m²K) U-value: 0,094 W/(m²K)

    Assembly no. Interior insulation?

    08ud FZ 03 = Fasadna montažna obloga na AB steni - vetrolov

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Omet 0,700 20

    Lesne izol. plošče 0,040 40

    AB stena 1,510 300

    Celulzna vlakna 0,037 Leseni I nosilci 0,130 160

    Lesne izol. plošče 0,040 60

    fasadni omet 0,700 7

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    95% 5,0% 58,7 cm

    U-value supplement W/(m²K) U-value: 0,146 W/(m²K)

    Assembly no. Interior insulation?

    09ud FZ 03.1 = Fasadna stena telovadnice

    Heat transmission resistance [m²K/W]

    Orientation of building element 1-Roof interior Rsi 0,10

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    lepljen les 0,130 24

    zračni prostor 0,120 Les nosilci 0,130 20

    mavčne plošče 0,210 20

    zračni prostor 0,120 Les nosilci 0,130 20

    lesne izol. plošče 0,046 Les nosilci 0,130 40

    OSB plošče 0,130 20

    Izolacija celuloza 0,037 Les nosilci 0,130 360

    lesne izol. plošče 0,046 Les nosilci 0,130 60

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    80% 20,0% 56,4 cm

    U-value supplement W/(m²K) U-value: 0,110 W/(m²K)

    0506 PHPP - OS Lavrica-faza III (1) 5

  • Assembly no. Interior insulation?

    10ud FZ 03.1 = Fasadna stena telovadnice - AB nosilec

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    lepljen les 0,130 20

    AB nosilec 1,510 300

    lesne izol. plošče 0,038 170

    lesne izol. plošče 0,038 60

    omet 0,700 7

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 55,7 cm

    U-value supplement W/(m²K) U-value: 0,152 W/(m²K)

    Assembly no. Interior insulation?

    11ud FZ 03.1 = Fasadna stena telovadnice - Strešni leseni nosilec in zasteklitev

    Heat transmission resistance [m²K/W]

    Orientation of building element 1-Roof interior Rsi 0,10

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Lepljen nosilec 0,130 280

    Weber ultra plus 0,020 120

    folija 0,190 5

    zračni sloj

    tonirana zasteklitev

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 40,5 cm

    U-value supplement W/(m²K) U-value: 0,120 W/(m²K)

    Assembly no. Interior insulation?

    12ud FZ 01.1 = Lesena fasadna montažna stena - 45 cm

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    mavčne plošče 0,210 20

    zračni prostor 0,120 Les nosilci 0,130 20

    lesne izol. plošče 0,046 Les nosilci 0,130 40

    OSB plošča 0,130 20

    Izolacija celuloza 0,037 Les nosilci 0,130 280

    lesne izol. plošče 0,046 Les nosilci 0,130 60

    zaključni omet 0,700 7

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    85% 15,0% 44,7 cm

    U-value supplement W/(m²K) U-value: 0,127 W/(m²K)

    0506 PHPP - OS Lavrica-faza III (1) 6

  • Assembly no. Interior insulation?

    13ud FZ 03.3 = Fasada AB30 XPS - Cokel telovadnica

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Mineralni omet 0,700 10

    AB stena 1,510 300

    XPS 0,035 220

    Fasadni omet 0,700 10

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 54,0 cm

    U-value supplement W/(m²K) U-value: 0,150 W/(m²K)

    Assembly no. Interior insulation?

    14ud FZ 02 = Lesena fasadna montažna obloga na AB steni

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Omet 0,700 20

    lesne izol. plošče 0,046 40

    AB stena 1,510 200

    lesne izol. plošče 0,040 220

    Fasadni omet 0,700 7

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 48,7 cm

    U-value supplement W/(m²K) U-value: 0,149 W/(m²K)

    Assembly no. Interior insulation?

    15ud FZ 01 = Lesena fasadna montažna stena - 32 cm x

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 3-Ventilated exterior Rse: 0,13

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    MK plošče 0,210 15

    lesne izol. plošče 0,046 Les nosilci 0,130 60

    OSB plošča 0,130 20

    Izolacija celuloza 0,037 Les nosilci 0,130 160

    lesne trde izol. plošče 0,046 60

    Fasadni omet 0,700 7

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    90% 10,0% 32,2 cm

    U-value supplement W/(m²K) U-value: 0,153 W/(m²K)

    0506 PHPP - OS Lavrica-faza III (1) 7

  • Assembly no. Interior insulation?

    16ud N1 = Stena proti objektu

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 3-Ventilated exterior Rse: 0,13

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    Omet 0,700 20

    AB stena 1,510 200

    XPS 0,035 100

    AB stena 1,510 200

    Omet 0,700 20

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 54,0 cm

    U-value supplement W/(m²K) U-value: 0,291 W/(m²K)

    Assembly no. Interior insulation?

    17ud FZ 02.3 = Fasada AB20 XPS - Cokel šola

    Heat transmission resistance [m²K/W]

    Orientation of building element 2-Wall interior Rsi 0,13

    Adjacent to 1-Outdoor air exterior Rse: 0,04

    Area section 1 l [W/(mK)] Area section 2 (optional) l [W/(mK)] Area section 3 (optional) l [W/(mK)] Thickness [mm]

    omet 0,700 20

    AB stena 1,510 200

    Izolacija XPS 0,035 220

    Zunanja membrana 0,190 10

    Fasadni omet 0,700 7

    Percentage of sec. 1 Percentage of sec. 2 Percentage of sec. 3 Total

    100% 45,7 cm

    U-value supplement W/(m²K) U-value: 0,150 W/(m²K)

    0506 PHPP - OS Lavrica-faza III (1) 8

  • Areas determinationEnergy balance calculation with PHPP Version 9.6a

    OŠ LAVRICA - III. Faza / Climate: Ljubljana T1996-2005/J1981-2000 / TFA: 1493 m² / Heating: 25,9 kWh/(m²a) / Cooling: 12,3 kWh/(m²a) / PER: 75,9 kWh/(m²a)

    Summary Building assembly overviewAverage U-

    value

    Temp.-

    zoneArea group

    Group

    no. Area / Length Unit Comment [W/(m²K)]

    Treated floor area 1 1493,33 m² Treated floor area according to PHPP manual 7 Months 6 Months

    A North windows 2 127,42 m² North windows 0,792 5911 7570

    A East windows 3 114,56 m² Results come from the 'Windows' worksheet. East windows 0,761 11364 15062

    A South windows 4 74,57 m² Window areas are subtracted from individual opaque areas. South windows 0,818 13293 8066

    A West windows 5 80,19 m² which is displayed in the 'Windows' worksheet. West windows 0,725 8349 10122

    A Horizontal windows 6 13,75 m² Horizontal windows 1,201 1385 3771

    A Exterior door 7 14,75 m² Please subtract area of door from respective building assembly Exterior door 0,900

    A External wall - Ambient 8 883,66 m² Temperature zone "A" is ambient air External wall - Ambient 0,126 42 532

    B External wall - Ground 9 0,00 m² Temperature zone "B" is the ground External wall - Ground

    A Roof/Ceiling - Ambient 10 1142,63 m² Roof/Ceiling - Ambient 0,112 -291 1290

    B Floor slab / Basement ceiling 11 1077,97 m² Floor slab / Basement ceiling 0,150

    12 0,00 m² Temperature zones "A", "B","P" and "X" may be used. NOT "I"

    13 0,00 m² Temperature zones "A", "B","P" and "X" may be used. NOT "I" Factor for X

    X 14 0,00 m² Temperature zone "X": Please provide user-defined reduction factor ( 0 < ft < 1):

    Thermal bridges - Overview Y [W/(mK)]

    A Thermal bridges Ambient 15 273,79 m Units in m Thermal bridges Ambient -0,029

    P Perimeter thermal bridges 16 157,74 m Units in m; temperature zone "P" is perimeter (see 'Ground' worksheet) Perimeter thermal bridges 0,600

    B Thermal bridges FS/BC 17 0,00 m Units in m Thermal bridges FS/BC

    I Building element towards neighbour18 0,00 m² No heat losses, only considered for the heating load calculation Building element towards neighbour

    Total thermal envelope 3529,51 m² Average therm. envelope 0,234

    Radiation-

    gains heating

    season

    [kWh/a]

    Radiation-

    load cooling

    period

    [kWh/a]

    0506 PHPP - OS Lavrica-faza III (1) 9

  • Area input 1-Sorting: AS LIST

    Area no. Building assembly descriptionTo

    group No.Assigned to group

    Quan-

    tityx (

    a

    [m]x

    b

    [m]+

    User deter-

    mined [m²]-

    User sub-

    traction

    [m²]

    -

    Subtraction

    window areas

    [m²]

    ) =Area

    [m²]

    Selection building assembly /

    Building system

    U-Value

    [W/(m²K)]

    Projected building footprint 0 Projected building footprint 1 x ( x + 1077,97 - ) = 1078,0

    Treated floor area 1 Treated floor area 1 x ( x + 1493,33 - ) = 1493,3

    Exterior door 7 Exterior door 1 x ( x + 14,75 - ) - = 14,75 Exterior door 0,90

    1 x ( x + - ) - 0,0 =

    2 x ( x + - ) - 0,0 =

    3 x ( x + - ) - 0,0 =

    4 x ( x + - ) - 0,0 =

    5 x ( x + - ) - 0,0 =

    6 Fasada AB šola - Jug 8 External wall - Ambient 1 x ( x + 3,38 - ) - 0,0 = 3,414ud-FZ 02 = Lesena fasadna

    montažna obloga na AB steni0,149

    7 Fasada AB šola - Zahod 8 External wall - Ambient 1 x ( x + 69,66 - ) - 0,0 = 69,714ud-FZ 02 = Lesena fasadna

    montažna obloga na AB steni0,149

    8 x ( x + - ) - 0,0 =

    9 Fasada šola - Sever 8 External wall - Ambient 1 x ( x + 20,16 - ) - 8,7 = 11,512ud-FZ 01.1 = Lesena fasadna

    montažna stena - 45 cm0,127

    10 Fasada šola - Vzhod 8 External wall - Ambient 1 x ( x + 121,07 - ) - 64,1 = 56,912ud-FZ 01.1 = Lesena fasadna

    montažna stena - 45 cm0,127

    11 Fasada šola - Zahod 8 External wall - Ambient 1 x ( x + 219,63 - ) - 80,2 = 139,412ud-FZ 01.1 = Lesena fasadna

    montažna stena - 45 cm0,127

    12 x ( x + - ) - 0,0 =

    13 Fasada telovadnica - Sever 8 External wall - Ambient 1 x ( x + 312,93 - ) - 118,8 = 194,209ud-FZ 03.1 = Fasadna stena

    telovadnice0,110

    14 Fasada telovadnica - jug 8 External wall - Ambient 1 x ( + 166,58 - ) - 60,2 = 106,309ud-FZ 03.1 = Fasadna stena

    telovadnice0,110

    15 Fasada telovadnica - Vzhod 8 External wall - Ambient 1 x ( + 174,42 - ) - 63,5 = 110,909ud-FZ 03.1 = Fasadna stena

    telovadnice0,110

    16 x ( + - ) - 0,0 =

    17 Cokel telovadnica 8 External wall - Ambient 1 x ( + 21,93 - ) - 0,0 = 21,913ud-FZ 03.3 = Fasada AB30 XPS -

    Cokel telovadnica0,150

    18 Cokel telovadnica 8 External wall - Ambient 1 x ( + 20,78 - ) - 0,0 = 20,813ud-FZ 03.3 = Fasada AB30 XPS -

    Cokel telovadnica0,150

    19 Cokel telovadnica 8 External wall - Ambient 1 x ( + 36,58 - ) - 0,0 = 36,613ud-FZ 03.3 = Fasada AB30 XPS -

    Cokel telovadnica0,150

    20 x ( + - ) - 0,0 =

    21 FZ-04 - Stopnišče - Sever 8 External wall - Ambient 1 x ( + 14,40 - ) - 0,0 = 14,415ud-FZ 01 = Lesena fasadna

    montažna stena - 32 cm0,153

    22 FZ-04 - Stopnišče - Jug 8 External wall - Ambient 1 x ( + 17,27 - ) - 1,3 = 16,015ud-FZ 01 = Lesena fasadna

    montažna stena - 32 cm0,153

    23 FZ-04 - Stopnišče - Vzhod 8 External wall - Ambient 1 x ( + 9,86 - ) - 0,0 = 9,915ud-FZ 01 = Lesena fasadna

    montažna stena - 32 cm0,153

    24 FZ-04 - Stopnišče - Zahod 8 External wall - Ambient 1 x ( + 11,18 - ) - 0,0 = 11,215ud-FZ 01 = Lesena fasadna

    montažna stena - 32 cm0,153

    25 x ( + - ) - 0,0 =

    26 x ( x + - ) - 0,0 =

    27 x ( x + - ) - 0,0 =

    28 x ( x + - ) - 0,0 =

    29 TK-01.1 = Tla telovadnica 11 Floor slab / Basement ceiling 1 x ( x + 580,14 - ) - 0,0 = 580,1 01ud-Tla telovadnica = TK-01.1 0,147

    30TK-01 = Ostali prostori

    (različne talne obloge)11 Floor slab / Basement ceiling 1 x ( x + 497,83 - ) - 0,0 = 497,8 02ud-Tla ostalo= TK-01 0,153

    31 x ( x + - ) - 0,0 =

    32 Previs zahod 10 Roof/Ceiling - Ambient 1 x ( x + 29,35 - ) - 0,0 = 29,403ud-TK 03 ali TL 03.1 = Plošča nad

    odprtim prostorom - nadstropje0,111

    33 Previs vhod-vetrolov 10 Roof/Ceiling - Ambient 1 x ( x + 9,66 - ) - 0,0 = 9,704ud-TK 04 = Plošča nad odprtim

    prostorom - nad vetrolovom0,138

    34 x ( x + - ) - 0,0 =

    35 Cokel šola 8 External wall - Ambient 1 x ( x + 4,58 - ) - 0,0 = 4,617ud-FZ 02.3 = Fasada AB20 XPS -

    Cokel šola0,120

    36 Cokel šola 8 External wall - Ambient 1 x ( x + 14,49 - ) - 0,0 = 14,517ud-FZ 02.3 = Fasada AB20 XPS -

    Cokel šola0,150

    37 Cokel šola 8 External wall - Ambient 1 x ( x + 31,24 - ) - 0,0 = 31,217ud-FZ 02.3 = Fasada AB20 XPS -

    Cokel šola0,150

    38 Streha šola 10 Roof/Ceiling - Ambient 1 x ( x + 281,82 - ) - 2,6 = 279,305ud-ST-01 = Streha šole na jeklenih

    nosilcih0,122

    39 Streha telovadnica 10 Roof/Ceiling - Ambient 1 x ( x + 799,09 - ) - 11,2 = 787,906ud-ST 01.1 = Streha telovadnice

    na lesenih nosilcih0,110

    40 Streha AB 10 Roof/Ceiling - Ambient 1 x ( x + 36,46 - ) - 0,0 = 36,5 07ud-ST 02 = AB Strešna plošča 0,094

    41 Vetrolov fasada 8 External wall - Ambient 1 x ( x + 10,27 - ) - 0,0 = 10,308ud-FZ 03 = Fasadna montažna

    obloga na AB steni - vetrolov0,146

    0506 PHPP - OS Lavrica-faza III (1) 10

  • Windows

    OŠ LAVRICA - III. Faza / Climate: Ljubljana T1996-2005/J1981-2000 / TFA: 1493 m² / Heating: 25,9 kWh/(m²a) / Cooling: 12,3 kWh/(m²a) / PER: 75,9 kWh/(m²a)

    Window area

    orientation

    Global

    radiation (main orientations)

    Shading Dirt

    Non-vertical

    radiation

    incidence

    Glazing

    fractiong-Value

    Solar irradiation

    reduction factorWindow area

    Window

    U-Value

    Glazing

    area

    Average

    global

    radiation

    Standard values → kWh/(m²a) 0,75 0,95 0,85 m2 W/(m2K) m2 kWh/(m2a)

    North 94 0,96 0,95 0,85 0,94 0,54 0,73 127,42 0,79 119,28 94

    East 201 0,95 0,95 0,85 0,91 0,57 0,70 114,56 0,76 104,27 201

    South 383 0,97 0,95 0,85 0,93 0,53 0,73 74,57 0,82 69,44 383

    West 215 0,96 0,95 0,85 0,91 0,55 0,70 80,19 0,73 72,84 215

    Horizontal 322 0,82 0,95 0,85 0,88 0,42 0,58 13,75 1,20 12,14 322

    Total or average value for all windows. 0,54 0,71 410,50 0,79 377,97

    Heating degree

    hours [kKh/a]:71,4

    Window rough

    openingsInstalled in Glazing Frame g-Value U-Value

    Y

    Glazing

    edge

    Qua

    n-

    tity

    DescriptionDeviation from

    north

    Angle of

    inclination

    from the

    horizontal

    Orien-

    tationWidth Height Selection from 'Areas' worksheet

    Selection from 'Components'

    worksheet

    Selection from 'Components'

    worksheet

    Perpen-

    dicular

    radiation

    GlazingFrames

    (avg.)

    YGlazing edge

    (Avg.)

    ° ° m m 1-Sorting: AS LIST 1-Sorting: AS LIST - W/(m2K) W/(m2K) W/(mK)

    1 Schueco O-06 90 90 East 10,800 1,900 10-Fasada šola - Vzhod 01ud-Schueco O-06 01ud-Schueco O-06 0,62 0,50 1,20 0,051

    1 Schueco O-10 90 90 East 10,900 1,900 10-Fasada šola - Vzhod 02ud-Schueco O-10 02ud-Schueco O-10 0,62 0,50 1,20 0,051

    1 Schueco O-11 270 90 West 7,630 1,900 11-Fasada šola - Zahod 03ud-Schueco O-11 03ud-Schueco O-11 0,62 0,50 1,20 0,050

    1 Schueco O-20 180 90 South 1,200 1,050 22-FZ-04 - Stopnišče - Jug 04ud-Schueco O-20 04ud-Schueco O-20 0,62 0,50 1,20 0,044

    1 Schueco Sde-04-1 90 90 East 3,390 2,895 10-Fasada šola - Vzhod 05ud-Schueco Sde-04-1 05ud-Schueco Sde-04-1 0,62 0,50 1,30 0,049

    1 Schueco Sde-04-2 0 90 North 2,995 2,895 9-Fasada šola - Sever 06ud-Schueco Sde-04-2 06ud-Schueco Sde-04-2 0,62 0,50 0,94 0,061

    1 Schueco Sde-05-1 270 90 West 20,530 3,200 11-Fasada šola - Zahod 07ud-Schueco Sde-05-1 07ud-Schueco Sde-05-1 0,53 0,60 1,10 0,080

    1 Schueco Sde-07 180 90 South 3,125 4,185 10-Fasada šola - Vzhod 08ud-Schueco Sde-07 08ud-Schueco Sde-07 0,53 0,70 0,94 0,080

    1 Schueco Sde-08 180 90 South 19,275 3,125 14-Fasada telovadnica - jug 09ud-Schueco Sde-08 09ud-Schueco Sde-08 0,53 0,70 0,94 0,080

    1 Schueco Sde-09 90 90 East 20,325 3,125 15-Fasada telovadnica - Vzhod 10ud-Schueco Sde-09 10ud-Schueco Sde-09 0,53 0,70 0,94 0,080

    1 Schueco Sde-10 0 90 North 38,000 3,125 13-Fasada telovadnica - Sever 11ud-Schueco Sde-10 11ud-Schueco Sde-10 0,53 0,70 0,94 0,080

    1 Schueco Sde-11 0 0 Horizontal 3,000 0,850 38-Streha šola 12ud-Schueco Sde-11 12ud-Schueco Sde-11 0,30 0,70 1,30 0,080

    8 Kupole 0 0 Horizontal 1,000 1,400 39-Streha telovadnica 13ud-svetlobnik 13ud-svetlobnik 0,45 0,90 1,30 0,040

    0506 PHPP - OS Lavrica-faza III (1) 11

  • Specific energy for heating (annual method)Energy balance calculation with PHPP Version 9.6a

    OŠ LAVRICA - III. Faza / Climate: Ljubljana T1996-2005/J1981-2000 / TFA: 1493 m² / Heating: 25,9 kWh/(m²a) / Cooling: 12,3 kWh/(m²a) / PER: 75,9 kWh/(m²a)

    Interior temperature: 20,0 °C

    Building type: Osnovna šola

    Treated floor area ATFA: 1493,3 m²

    Per m²

    Area U-Value Temp. factor ft Gt of treated

    Building assembly Temperature zone m² W/(m²K) kKh/a kWh/a floor area

    External wall - Ambient A 883,7 * 0,126 * 1,00 * 71,4 = 7918 5,30

    External wall - Ground B * * 0,40 * =

    Roof/Ceiling - Ambient A 1142,6 * 0,112 * 1,00 * 71,4 = 9173 6,14

    Floor slab / Basement ceiling B 1078,0 * 0,150 * 0,40 * 71,4 = 4618 3,09

    A * * 1,00 * =

    A * * 1,00 * =

    X * * 0,00 * =

    Windows A 410,5 * 0,789 * 1,00 * 71,4 = 23101 15,47

    Exterior door A 14,8 * 0,900 * 1,00 * 71,4 = 947 0,63

    Exterior TB (length/m) A 273,8 * -0,029 * 1,00 * 71,4 = -566 -0,38

    Perimeter TB (length/m) P 157,7 * 0,600 * 0,40 * 71,4 = 2700 1,81

    Ground TB (length/m) B * * 0,40 * = 0,00

    Total of all building envelope areas 3529,5 ––––––––––– kWh/(m²a)

    Transmission heat losses QT Total 47892 32,1

    ATFA Clear room height

    m² m m³

    Ventilation system: Effective air volume, VV 1493,3 * 4,50 = 6718,3

    Effective heat recovery eff iciency hef f 80%Efficiency of subsoil heat exchanger

    Heat recovery eff iciency of SHX hSHX 0% nV,sy stem hHR nV,Res1/h 1/h 1/h

    Energetically effective air changes nV 1,116 * (1 - 0,80 ) + 0,042 = 0,262

    VV nV cAir Gt

    m³ 1/h Wh/(m³K) kKh/a kWh/a kWh/(m²a)

    Ventilation heat losses QV 6718,3 * 0,262 * 0,33 * 71,4 = 41505 27,8

    Reduction factor

    QT QV night/weekend

    kWh/a kWh/a Saving kWh/a kWh/(m²a)

    Total heat losses QL ( 47892 + 41505 ) * 1,0 = 89397 59,9

    Orientation Reduction factor g-Value Area Radiation HP

    of the area See 'Windows' sheet (perp. radiation)

    m² kWh/(m²a) kWh/a

    North 0,73 * 0,54 * 127,42 * 94 = 4679

    East 0,70 * 0,57 * 114,56 * 201 = 9115

    South 0,73 * 0,53 * 74,57 * 383 = 11105

    West 0,70 * 0,55 * 80,19 * 215 = 6598

    Horizontal 0,58 * 0,42 * 13,75 * 322 = 1092

    ––––––––––– kWh/(m²a)

    Available solar heat gains QS Total 32588 21,8

    Length heating period Spec. power qI ATFA

    kh/d d/a W/m² m² kWh/a kWh/(m²a)

    Internal heat gains QI 0,024 * 188 * 2,70 * 1493,3 = 18155 12,2

    kWh/a kWh/(m²a)

    Free heat QF QS + QI = 50743 34,0

    Ratio of free heat to losses QF / QV = 0,57

    Utilisation factor heat gains hG (1 - ( QF / QL )5 ) / (1 - ( QF / QL )

    6 ) = 97%

    kWh/a kWh/(m²a)

    Heat gains QG hG * QF = 49405 33,1

    kWh/a kWh/(m²a)

    Annual heating demand QH QL - QG = 39992 27

    kWh/(m²a) (Yes/No)

    Limiting value - Requirement met? -

    0506 PHPP - OS Lavrica-faza III (1) 12

  • Specific energy for heating (monthly method)Energy balance calculation with PHPP Version 9.6a

    OŠ LAVRICA - III. Faza / Climate: Ljubljana T1996-2005/J1981-2000 / TFA: 1493 m² / Heating: 25,9 kWh/(m²a) / Cooling: 12,3 kWh/(m²a) / PER: 75,9 kWh/(m²a)

    The sum of the heating periods calculated through the monthly method will be presented on this side.

    Interior temperature: 20 °C

    Building type: Osnovna šola

    Treated floor area ATFA: 1493,3 m²

    Spec. Capacity: 204 Wh/(m²K)

    Per m²

    Temperature zone Area U-Value Month. red. fac. Gt of treated

    Building assembly m² W/(m²K) kKh/a kWh/a floor area

    External wall - Ambient A 883,7 * 0,126 * 1,00 * 77 = 8496 5,69

    External wall - Ground B * * 1,00 * =

    Roof/Ceiling - Ambient A 1142,6 * 0,112 * 1,00 * 77 = 9844 6,59

    Floor slab / Basement ceiling B 1078,0 * 0,150 * 1,00 * 32 = 5150 3,45

    A * * 1,00 * =

    A * * 1,00 * =

    X * * 0,00 * =

    Windows A 410,5 * 0,789 * 1,00 * 77 = 24790 16,60

    Exterior door A 14,8 * 0,900 * 1,00 * 77 = 1017 0,68

    Exterior TB (length/m) A 273,8 * -0,029 * 1,00 * 77 = -607 -0,41

    Perimeter TB (length/m) P 157,7 * 0,600 * 1,00 * 32 = 3012 2,02

    Ground TB (length/m) B * * 1,00 * = 0,00 ––––––––––– kWh/(m²a)

    Transmission heat losses QT Total 51702 34,6

    ATFA Clear room height

    Effective m² m m³

    air volume VV 1493 * 4,50 = 6718

    nV,sy stem h*SHX hHR nV,Res nV,equi,f raction

    1/h 1/h 1/h

    Effective air change rate Ambient nV,e 1,116 *(1- 0% )*(1- 0,80 )+ 0,042 = 0,262Effective air change rate Ground nV,g 1,116 * 0% *(1- 0,80 ) = 0,000

    VV nV,equi,f raction cAir Gt

    m³ 1/h Wh/(m³K) kKh/a kWh/a kWh/(m²a)

    Ventilation losses ambient QV 6718 * 0,262 * 0,33 * 77 = 44540 29,8

    Ventilation losses ground QV,e 6718 * 0,000 * 0,33 * 42 = 0 0,0

    –––––––––––

    Ventilation heat losses QV Total 44540 29,8

    Reduction factor

    QT QV night/weekend

    kWh/a kWh/a saving kWh/a kWh/(m²a)

    Total heat losses QL ( 51702 + 44540 ) * 1,0 = 96242 64,4

    Orientation Reduction factor g-Value Area Global radiation

    of the area see 'Windows' worksheet (perp. radiation)

    m² kWh/(m²a) kWh/a

    North 0,73 * 0,54 * 127,4 * 119 = 5911

    East 0,70 * 0,57 * 114,6 * 250 = 11364

    South 0,73 * 0,53 * 74,6 * 458 = 13293

    West 0,70 * 0,55 * 80,2 * 272 = 8349

    Horizontal 0,58 * 0,42 * 13,8 * 408 = 1385

    Sum opaque areas 1922 ––––––––––– kWh/(m²a)

    Available solar heat gains QS Total 42224 28,3

    Length Heat. Period Spec. Power qI ATFA

    kh/d d/a W/m² m² kWh/a kWh/(m²a)

    Internal heat gains QI 0,024 * 212 * 2,7 * 1493,3 = 20515 13,7

    kWh/a kWh/(m²a)

    Free heat QF QS + QI = 62739 42,0

    Ratio free heat to losses QF / QL = 0,65

    Utilisation factor heat gains hG = 92%

    kWh/a kWh/(m²a)

    Heat gains QG hG * QF = 57506 38,5

    kWh/a kWh/(m²a)

    Annual heating demand QH QL - QG = 38736 26

    kWh/(m²*a) (Yes/No)

    Limiting value - Requirement met? -

    0506 PHPP - OS Lavrica-faza III (1) 13

  • GSPublisherVersion 246.0.96.2

    projektantBIMcloud: S-TEAM - BIMcloud Basic for ARCHICAD 22/JAVNI OBJEKTI/OS Lavrica PZI SP 3F - 20. 09. 2019

    odgovorni projektant David MIŠIČ, Mag.Arch.odgovorni vodja projekta

    merilo list št.

    datum

    risba

    12/17

    Boštjan ŠVENT, inž.grad., Sašo ŽOLEK, mag.ing.arh., Jernej METEŽ dipl.ing.grad.

    štev. projekta

    PZI - 3. FAZA

    David MIŠIČ, Mag.Arch. ZAPS 1211

    ZAPS 1211

    1:50

    JANUAR 2019

    projekt ID

    FASADI SEVER in JUG

    A.2.08

    projekt

    lokacija

    naročnik

    Parc. št.: 1843/4, 1843/10, 1843/19 (del), 1843/21 (del), 1843/22, 1843/26, 1844/1, 1844/2, 1844/3, 1844/4, 1844/5, 1844/7,1844/8 in1844/26

    Šmarska cesta 3 Škofljica SI-1291 Slovenija

    OSNOVNA ŠOLA LAVRICA

    OBČINA ŠKOFLJICA

    vrsta načrta

    Absolutna kota objekta: +-0,00 = +298,30

    Parapeti okenskih odprtin so označeni v cm od finalne kote AB konstrukcije!Kotirane mere odprtin so vgradne in nimajo všteto višino estriha!

    objekt

    TLORISI - PREREZI - FASADE

    k.o. 1696 RUDNIK

    A B' B C D E J K L M

    95,72 m2

    +8,77+8,75

    +10,70

    +8,75

    +0,00±0,00

    +9,38

    Emajlirano enoslojno ESG steklo

    Kontaktna fasadaKontaktna fasada

    Kontaktna fasada ALU vrata VE09 Tehnični prostor

    Zunanji vhod telovadniceVrata VE 02

    Fasadna zasteklitev,kot npr. Schuco AOC 50 SI

    Končni fasadni sloj ekvivalentenin enak v strukturi ter izgledu kotže izveden

    ID O-20

    Končni fasadni sloj ekvivalentenin enak v strukturi ter izgledu kotže izveden

    ID VE08

    ID SK ID SDe-08

    ID O-06

    ID O-10

    Fiksna zasteklitevVSG - steklo znotrajESG - steklo zunaj

    Ograja strešne lestve

    M L K J E D C B B' A

    139,92 m2

    188,50 m2

    +3,20

    +8,77

    +9,38

    +10,70

    +9,21

    0,75

    0,75

    0,75

    0,75

    0,75

    Emajlirano enoslojno VSG steklo

    Obešena fasada - betonske plošče

    Fasadna zasteklitev,kot npr. Schuco AOC 50

    Tehnični prostor Kontaktna fasada Fasadna zasteklitev,kot npr. Schuco AOC 50

    ID SDe-05ID SDe-10 ID SK ID SK

    Fiksna zasteklitevVSG - steklo

    Fiksna zasteklitevVSG - steklo

    Fiksna zasteklitevVSG - steklo

    Fiksna zasteklitevVSG - steklo

    Vrata - zasteklitevVSG

    Fiksna zasteklitevVSG - steklo

    Fiksna zasteklitevVSG - steklozunaj in znotraj

    Ograja strešne lestve

    3F - JUG Fasada 1:50

    3F - SEVER Fasada 1:50

    0506 PHPP - OS Lavrica-faza III (2) 15

  • GSPublisherVersion 246.0.96.2

    projektantBIMcloud: S-TEAM - BIMcloud Basic for ARCHICAD 22/JAVNI OBJEKTI/OS Lavrica PZI SP 3F - 20. 09. 2019

    odgovorni projektant David MIŠIČ, Mag.Arch.odgovorni vodja projekta

    merilo list št.

    datum

    risba

    12/17

    Boštjan ŠVENT, inž.grad., Sašo ŽOLEK, mag.ing.arh., Jernej METEŽ dipl.ing.grad.

    štev. projekta

    PZI - 3. FAZA

    David MIŠIČ, Mag.Arch. ZAPS 1211

    ZAPS 1211

    1:50

    JANUAR 2019

    projekt ID

    FASADI VZHOD in ZAHOD

    A.2.09

    projekt

    lokacija

    naročnik

    Parc. št.: 1843/4, 1843/10, 1843/19 (del), 1843/21 (del), 1843/22, 1843/26, 1844/1, 1844/2, 1844/3, 1844/4, 1844/5, 1844/7,1844/8 in1844/26

    Šmarska cesta 3 Škofljica SI-1291 Slovenija

    OSNOVNA ŠOLA LAVRICA

    OBČINA ŠKOFLJICA

    vrsta načrta

    Absolutna kota objekta: +-0,00 = +298,30

    Parapeti okenskih odprtin so označeni v cm od finalne kote AB konstrukcije!Kotirane mere odprtin so vgradne in nimajo všteto višino estriha!

    objekt

    TLORISI - PREREZI - FASADE

    k.o. 1696 RUDNIK

    1011 12 13 14 15 16

    118,57 m2

    +8,87+8,75

    +10,70

    +9,21+9,38

    +8,77

    +2,79

    +10,75

    ID O-06

    ID O-10

    ID SDe-09ID SKID SK

    ID SDe-07

    ID SDe-04

    Končni fasadni sloj ekvivalentenin enak v strukturi ter izgledu kotže izveden

    Emajlirano enoslojno ESG steklo

    Emajlirano enoslojno ESG steklo

    Kontaktna fasada

    Kontaktna fasadaALU vrata VE09 Tehnični prostor

    Fasadna zasteklitev,kot npr. Schuco AOC 50

    Fiksna zasteklitevVSG - steklo znotrajESG - steklo zunaj

    Emajlirano stekloESG - steklo +izolativni panel

    Fiksna zasteklitevVSG - steklo

    Vrata - zasteklitev VSGFiksna zasteklitevVSG - steklo

    Fiksna zasteklitevVSG - steklo

    Fiksna zasteklitevVSG - steklo znotrajESG - steklo zunaj

    DEFLEX 318-030

    Ograja strešne lestve Ograja strešne lestve

    16 15 14 13 12 1110

    +8,77

    +9,21+9,38

    +10,70

    +8,87

    +3,20 +3,21

    ID SDe-05 ID SK ID SK

    ID O-11

    ID VE03 ID VE03

    ID KD

    ID VE09

    Končni fasadni sloj ekvivalentenin enak v strukturi ter izgledu kotže izveden

    Kontaktna fasadaKontaktna fasada

    Kontaktna fasada

    ALU vrata VE09

    Fasadna zasteklitev,kot npr. Schuco AOC 50

    Fiksna zasteklitevVSG - steklo

    Fiksna zasteklitevVSG - steklo

    Ograja strešne lestveOgraja strešne lestve

    3F - VZHOD Fasada 1:50

    3F - ZAHOD Fasada 1:50

    0506 PHPP - OS Lavrica-faza III (3) 17

  • GSPublisherVersion 175.0.96.2

    projektantBIMcloud: S-TEAM - BIMcloud Basic for ARCHICAD 22/JAVNI OBJEKTI/OS Lavrica PZI SP 3F - 14. 05. 2019

    odgovorni projektant David MIŠIČ, Mag.Arch.odgovorni vodja projekta

    merilo list št.

    datum

    risba

    12/17

    Boštjan ŠVENT, inž.grad., Sašo ŽOLEK, mag.ing.arh., Jernej METEŽ dipl.ing.grad.

    štev. projekta

    PZI - 3. FAZA

    David MIŠIČ, Mag.Arch. ZAPS 1211

    ZAPS 1211

    1:20, 1:25, 1:10

    JANUAR 2019

    projekt ID

    SENČENJE STREŠNE ZASTEKLITVE - 1. faza

    A.5.13

    projekt

    lokacija

    naročnik

    k.o. 1696 RUDNIKParc. št.: 1843/4, 1843/10, 1843/19 (del), 1843/21 (del), 1843/22, 1843/26, 1844/1,1844/2, 1844/3, 1844/4, 1844/5, 1844/7,1844/8 in 1844/26

    Šmarska cesta 3 Škofljica SI-1291 Slovenija

    OSNOVNA ŠOLA LAVRICA

    OBČINA ŠKOFLJICA

    vrsta načrta SD - STEKLARSKI DETAJLI

    Absolutna kota objekta: +-0,00 = +298,30

    objekt

    cca 2400cca 2400 cca 2400

    A

    3224

    20

    204533

    2248

    12

    2058

    35

    3224

    20

    204533

    2283

    94

    2248

    12

    2058

    35

    288047

    +6.960

    D6

    D5S5

    S4S7

    D4

    S3

    S2

    S6S8 +7.378

    vrh sidra

    +7.526rob profila

    204

    +8.730?

    +7.780

    Samovrtalni vijakDIN 7504 3,9x25

    Samovrtalni vijakDIN 7504 3,9x25

    Samovrtalni vijakDIN 7504 3,9x25

    Sam

    ovrta

    lni v

    ijak

    DIN

    750

    4 3,

    9x25

    Sam

    ovrta

    lni v

    ijak

    DIN

    750

    4 3,

    9x25

    Sam

    ovrta

    lni v

    ijak

    DIN

    750

    4 3,

    9x25

    0,14

    0,11

    3,23

    0,25

    0,25

    0,15

    0,24

    0,11

    3,23

    0,25

    0,25

    0,15

    0,25

    3,23

    0,25

    0,25

    0,15

    0,30

    0,10

    0,25

    3,23

    0,25

    0,40

    0,40

    0,35

    3,23

    0,65

    3,88

    -0,38

    ±0,00

    +2,13

    +3,10

    +3,45

    +3,70+3,85

    0,17

    0,14

    3,10

    0,35

    0,25

    0,15

    0,30

    3,10

    0,35

    0,40

    0,30

    3,45

    0,40

    0,22

    0,24

    0,08

    SCREEN SENČILO-Notranje screen senčilo, barva po izboru arhitekta

    VGRADNJA ZUNANJEGA SENČILAODSTRANJEVANJE OBSTOJEČE TI IZOLACIJE

    TI slojWEBER ultra plus 022; 8cm

    ZASTESNITEV STIKAs trajnoelastičnim kitom

    ODKAPNI PROFIL-odkapni PE fasadni profil

    TRAK ZA ESTRIH-elasticiran EPS trak

    TK 02 PLOŠČA NAD PRITLIČJEM + T-3 PARKET- Finalni tlak učilnic - PARKET 2cm- Izravnalni sloj do 1cm- Betonski estrih 6,5cm- PE folija- EPS plošče za vgradnjo razvoda TO 2,5cm- PE folija- Toplotno izolacijske EPS 150 plošče povečana tlačna trdnost - za tlake 3cm- AB plošča 25cm

    TK 01 TALNA PLOŠČA NA TERENU + T-3 PARKET- Finalni tlak učilnic - PARKET 2cm- Izravnalni sloj do 1cm- betonski estrih 8cm- EPS plošče za vgradnjo razvoda TO 3cm- PE folija- Toplotno izolacijske EPS 150 plošče povečana tlačna trdnost - za tlake 24cm- Bitumenska izolacija- Talna plošča 30cm- Čepasta folija- Nasutje- Ločilni sloj - Geotekstil- Izravnalni nasip- Ločilni sloj - Geotekstil- Teren

    0,25

    0,25

    0,25

    0,25

    +3,10

    +3,45

    0,35

    0,25

    0,35

    0,22

    0,24

    0,08

    D1 SENČILO STREŠNE ZASTEKLITVE - 1 FAZA 1:20

    SPD-02 SPD - FAZA 2 1:25

    SPD-02 SPD - FAZA 2 (1:10 1:10

    0506 PHPP - OS Lavrica-faza III (4) 19

  • GSPublisherVersion 245.0.96.2

    PZI - 3. FAZAprojekt

    lokacija

    naročnik

    k.o. 1696 RUDNIKParc. št.: 1843/4, 1843/10, 1843/19 (del), 1843/21 (del), 1843/22, 1843/26, 1844/1,1844/2, 1844/3, 1844/4, 1844/5, 1844/7,1844/8 in 1844/26

    Šmarska cesta 3 Škofljica SI-1291 Slovenija

    OSNOVNA ŠOLA LAVRICA

    OBČINA ŠKOFLJICA

    vrsta načrta IZVLEČKI VRAT IN OKEN

    objekt

    projektantBIMcloud: S-TEAM - BIMcloud Basic for ARCHICAD 22/JAVNI OBJEKTI/OS Lavrica PZI SP 3F - 20. 09. 2019

    odgovorni projektant David MIŠIČ, Mag.Arch.odgovorni vodja projekta

    merilo list št.

    datum

    risba

    12/17

    Boštjan ŠVENT, inž.grad., Sašo ŽOLEK, mag.ing.arh., Jernej METEŽ dipl.ing.grad.

    štev. projektaDavid MIŠIČ, Mag.Arch. ZAPS 1211

    ZAPS 1211

    1:1

    JANUAR 2019

    projekt ID

    SHEME VRAT 3. FAZA

    A.6.01

    Vrata VE02Faza gradnje 3EKom 1Št. prostora ---

    Mera elementa 1,94×2,17

    Svetla odprtina 1,80×2,10Odpiranje RPrag 0,05

    1,94

    2,17

    Okvir/Podboj ALUMINIJFinalna obdelava barvan aluminijZaklepanje glavni ključ - po shemi zaklepanjaDodatna oprema Samozapiralo, zapora za zaporedno zapiranjeToplotne zahteve Ud =< 0,8 W/(m2K)Požarne zahteve -Zvočne zahteve -Opis Visokotoplotno izolirana vrata , z vstavljenim polnim panelom.

    izolacijski panel, okvir poravnan z fasadno oblogo - glej detajle SPD in tlorisProtivlomna izvedba WK2

    Proizvajalec kot npr. Shueco ADS90.SI SimplySmart

    Shema vrat3.FAZA V

    0506 PHPP - OS Lavrica-faza III (5) 21

  • /*

    Študija požarne varnosti INVESTITOR: : Občina Škofljica

    Šmarska cesta 3, Škofljica SI -1291 Slovenija

    OBJEKT :

    OSNOVNA ŠOLA LAVRICA Parc. št.: 1843/4, 1843/10, 1843/19 (del), 1843/21 (del), 1843/22, 1843/26 (del), 1844/1, 1844/2, 1844/3, 1844/4, 1844/5, 1844/7,1844/8 in 1844/26

    VRSTA PROJEKTNE DOKUMENTACIJE :

    PGD

    ZA GRADNJO

    :

    Nova gradnja 12630 - Stavba za izobraževanje in znanstvenoraziskovalno delo 12650 - Športne dvorane 12620 - Muzeji in knjižnice 12640 - Stavbe za zdravstvo

    ODGOVORNI PROJEKTANT

    :

    ING. KLAN, d.o.o., PUŠNIKOVA 18, 2000 MARIBOR, SLOVENIJA Petra Geršak Klaneček univ. dipl. inž. gr. TP- 0699

    ODGOVORNI VODJA PROJEKTA :

    David Mišič mag.. arh.

    Datum izdelave projekta : Maj 2018 ŠTEVILKA PROJEKTA / ŠTEVILKA NAČRTA: ŠTEVILKA IZVODA:

    12/17 / 027 / 2018 1 2 3 4 5 6

    Odgovorni predstavnik podjetja:

    ING.KLAN d.o.o., Maribor

    Dominik Geršak

    Datum: Maj 2018

    0506 PHPP - OS Lavrica-faza III (6) 23

  • 2

    2

    Kazalo vsebine študije požarne varnosti

    Strokovni pisni del:

    1. Projektna naloga 2. Projektna izhodišča 3. Izjava in seznam uporabljenih predpisov 4. Opis objekta 5. Opis prostorov, dejavnosti in tehnoloških procesov 6. Vrste in količine skladiščenega blaga 7. Seznam požarno nevarnih prostorov, naprav in opravil 8. Oceno požarne nevarnosti in požarni scenariji 9. Koncept požarne varnosti objekta 10. Projektne rešitve

    10.1 Omejevanje širjenja požara na sosednje objekte 10.2 Požarna odpornost konstrukcije in 10.3 Omejevanje hitrega širjenja po objektu 10.4 Pri načrtovanju električnih, strojnih in drugih tehnoloških napeljav in naprav v objektu 10.5. Zagotovitev hitre in varne evakuacije, javljanje in alarmiranje 10.6 Učinkovita intervencija ion gašenje 10.7 Organizacijski ukrepi 11. Risbe Izkaz požarne varnosti stavbe

    0506 PHPP - OS Lavrica-faza III (6) 24

  • 3

    3

    1. Projektna naloga Predmet projekta je izgradnja osnovne šole Lavrica. Investitor je Občina Škofljica. Osnovna šola se bo gradila na parcelah k.o.Rudnik parc. št.1843/4, 1843/10, 1843/19(del), 1843/21(del), 1843/22,1843/26(del), 1844/1,1844/2, 1844/3, 1844/4,1844/5, 1844/7, 1844/8 in 1844/26. Objekt se bo izgradil v treh fazah. Prvo fazo predstavlja osrednji del objekta z avlo, tehniko, kuhinjo, jedilnico in srednjim delom učilnic. Druga faza predstavlja izgradnjo levega dela stavbe, ki jo predstavljajo predvsem učilnice. Zadnja, tretja faza bo telovadnica s tribunami z vsemi pomožnimi prostori, ki spadajo k telovadnici. Objekt se uvršča po klasifikaciji med stavbe za izobraževanje in znanstveno raziskovalno delo. Število oseb v objektu določi projektant po TSG 01-001:2010

    Za obravnavan objekt: Pogoji, ki jih mora objekt izpolnjevati glede na klasifikacijo za izobraževanje in znanstveno raziskovalno delo, da je za PGD projekt potrebno izdelati Študijo požarne varnosti:

    1. Stavbe v katerih se hkrati zadržuje več kot 100 oseb 2. Bruto tlorisna površina vseh prostorov znaša več kot 3000 m2 3. Višina tal zadnje etaže znaša 22 m ali več

    V objektu se bo zadrževalo več kot 100 oseb, bruto tlorisna površina je večja kot 3000 m2, zadnja višina tal je 3,85 m, kar pod 22 m. Objekt izpolnjuje dva kriterija za izdelavo študije požarne varnosti, zato se za ta objekt izdela študija požarne varnosti po Pravilniku o zasnovi in študiji požarne varnosti (Uradni list RS št. 12/2013) Namen spremembe je zagotoviti izvedbo dela objekta 3. faze do te mere, da bo objekt energetsko učinkovitejši in da bo v objekt vgrajeno čim več lesnih deležev. Predvidena je sprememba konstrukcijskega sistema objekta, ki se v večji meri spreminja iz armiranega betona v lesene konstukcijske elemente. Izboljšani so izolacijski faktorji konstrukcij, ki mejijo z zunanjostjo, izboljšne so naprave za prezračevanje, pri čemer se energet ne spreminja. Študija požarne varnosti mora zajemati kompleksno analizo požarnih nevarnosti, opredeliti scenarij požarne varnosti ter izdelavo koncepta požarne varnosti in določitev vseh projektnih rešitev za požarno varnostv stavbe. Pri tem se upoštevajo veljavni predpisi, standardi, tehnične smernice ki veljajo v RS oz. po potrebi tudi podobni tuji viri, ki so uporabljeni v TSG-1- 001-2010.

    2. Projektna izhodišča V skladu s 23. členom Zakona o varstvu pred požarom Ur.l. RS, št. 71/1993 s spremembami Ur.l. RS, št. 87/2001, 110/2002-ZGO-1, 105/2006, 3/2007-UPB1, 9/2011, 83/2012 (ZVPoz) morajo biti pri graditvi objektov izpolnjene zahteve za varnost pred požarom, določene s predpisi o graditvi objektov, kar pomeni zahteve Pravilnika o požarni varnosti stavb (Uradni list RS. št. 31/04, 10/05, 83/05 ,14/07 in 12/2013) in vseh ostalih pripadajočih predpisov. V skladu s 4. členom Zakona o varstvu pred požarom (Uradni list RS, št. 71/93) je cilj ukrepov in dejavnosti varstva pred požarom varovanje ljudi, premoženja in okolja pred požarom in eksplozijo. Za uresničevanje teh ciljev je treba zagotoviti:

    odkrivanje, obveščanje, omejitev širjenja in učinkovito gašenje požara,

    varen umik ljudi s požarno ogroženih prostorov,

    preprečevanje ali zmanjšanje škodljivih posledic požara za ljudi in premoženje,

    vzpostavitev ekonomskih razmerij med predpisanimi preventivnimi ukrepi varstva pred požarom in

    pričakovano požarno škodo.

    Zahteve te študije požarne varnosti se morajo upoštevati v nadaljnjih fazah projektiranja v celoti, da bo dosežena ustrezna stopnja požarne varnosti. Zahtev iz te Študije brez soglasja projektanta ni dovoljeno spreminjati.

    0506 PHPP - OS Lavrica-faza III (6) 25

    http://www.uradni-list.si/1/objava.jsp?urlid=2002110&stevilka=5387http://www.uradni-list.si/1/objava.jsp?urlid=20073&stevilka=102http://www.uradni-list.si/1/objava.jsp?urlid=200187&stevilka=4447http://www.uradni-list.si/1/objava.jsp?urlid=2006105&stevilka=4491http://www.uradni-list.si/1/objava.jsp?urlid=20119&stevilka=323http://www.uradni-list.si/1/objava.jsp?urlid=201283&stevilka=3292http://www.uradni-list.si/1/objava.jsp?urlid=199371&stevilka=2577

  • 4

    4

    3. Izjava odgovornega projektanta zasnove požarne varnosti

    Odgovorni projektant

    Petra Geršak Klaneček u.d.i.g. IZS TP 0699

    IZJAVLJAM, da je v študiji

    št. 027/2018

    izpolnjena bistvena zahteva varnosti pred požarom

    Projektne rešitve v elaboratu temeljijo na naslednjih predpisih oziroma drugih

    normativnih dokumentih:

    Splošno: TSG 1- 01 :2010

    Predpisi (zakoni, pravilniki, uredbe) Zakon o graditvi objektov

    Ur.l. RS, št. 110/2002 Spremembe: Ur.l. RS, št. 97/2003 Odl.US: U-I-152/00-23, 41/2004-ZVO-1, 45/2004, 47/2004, 62/2004 Odl.US: U-I-1/03-15, 102/2004-UPB1 (14/2005 popr.), 92/2005-ZJC-B, 93/2005-ZVMS, 111/2005 Odl.US: U-I-150/04-19, 120/2006 Odl.US: U-I-286/04-46, 126/2007, 57/2009 Skl.US: U-I-165/09-8, 108/2009, 61/2010-ZRud-1 (62/2010 popr.), 20/2011 Odl.US: U-I-165/09-34, 57/2012

    Zakon varstvu pred požarom Ur.l. RS, št. 71/1993 Spremembe: Ur.l. RS, št. 87/2001, 110/2002-ZGO-1, 105/2006, 3/2007-UPB1, 9/2011

    Zakon o gradbenih proizvodih Ur.l. RS, št. 52/2000 Spremembe: Ur.l. RS, št. 110/2002-ZGO-1

    Zakon o tehničnih zahtevah za proizvode za ugotavljanje skladnosti (Uradni list RS, št. 59/99, 31/00-piopr. In 37/04)

    Uredba o uvedbi in uporabi enotne klasifikacije vrst objektov in o določitvi objektov državnega pomena Ur.l. RS, št. 33/2003 (78/2005 popr.) Spremembe: Ur.l. RS, št. 25/2010, 109/2011

    Pravilnik o požarni varnosti v stavbah Ur.l. RS, št. 31/2004 Spremembe: Ur.l. RS, št. 10/2005, 83/2005, 14/2007

    Pravilnik o zasnovi in študiji požarne varnosti Ur.l. RS, št. št. 12/2013

    Pravilnik o zahtevah za zagotavljanje neoviranega dostopa, vstopa in uporabe objektov v javni rabi ter večstanovanjskih stavb Ur.l. RS, št. 97/2003 Spremembe: Ur.l. RS, št. 77/2009 Odl.US: U-I-138/08-9

    Pravilnik o prezračevanju in klimatizaciji stavb Ur.l. RS, št. 42/2002 Spremembe: Ur.l. RS, št. 105/2002

    Pravilnik o tehničnih normativih za hidrantno omrežje za gašenje požarov Ur.l. SFRJ, št. 30/1991 Spremembe: Ur.l. RS, št. 52/2000-ZGPro, 83/2005

    Pravilnik o varnosti dvigal Ur.l. RS, št. 97/2003 Spremembe: Ur.l. RS, št. 83/2007

    Pravilnik o projektni dokumentaciji Ur.l. RS, št. 55/2008

    Pravilnik o požarnem redu Ur.l. RS, št. 39/1997 Spremembe: Ur.l. RS, št. 138/2004, 52/2007

    0506 PHPP - OS Lavrica-faza III (6) 26

    http://www.uradni-list.si/1/objava.jsp?urlid=200397&stevilka=4346http://www.uradni-list.si/1/objava.jsp?urlid=2005111&stevilka=4890http://www.uradni-list.si/1/objava.jsp?urlid=200187&stevilka=4447http://www.uradni-list.si/1/objava.jsp?urlid=200583&stevilka=3627http://www.uradni-list.si/1/index?edition=200578http://www.uradni-list.si/1/objava.jsp?urlid=2004102&stevilka=4398http://www.uradni-list.si/1/objava.jsp?urlid=20073&stevilka=102http://www.uradni-list.si/1/objava.jsp?urlid=200052&stevilka=2448http://www.uradni-list.si/1/objava.jsp?urlid=200441&stevilka=1694http://www.uradni-list.si/1/objava.jsp?urlid=200052&stevilka=2448http://www.uradni-list.si/1/objava.jsp?urlid=200431&stevilka=1359http://www.uradni-list.si/1/objava.jsp?urlid=2004138&stevilka=5945http://www.uradni-list.si/1/objava.jsp?urlid=2011109&stevilka=4992http://www.uradni-list.si/1/objava.jsp?urlid=201120&stevilka=827http://www.uradni-list.si/1/objava.jsp?urlid=201257&stevilka=2412http://www.uradni-list.si/1/objava.jsp?urlid=200510&stevilka=305http://www.uradni-list.si/1/objava.jsp?urlid=200855&stevilka=2336http://www.uradni-list.si/1/objava.jsp?urlid=2006105&stevilka=4491http://www.uradni-list.si/1/objava.jsp?urlid=201025&stevilka=1097http://www.uradni-list.si/1/objava.jsp?urlid=200397&stevilka=4330http://www.uradni-list.si/1/objava.jsp?urlid=200957&stevilka=2804http://www.uradni-list.si/1/objava.jsp?urlid=200583&stevilka=3627http://www.uradni-list.si/1/objava.jsp?urlid=2002110&stevilka=5387http://www.uradni-list.si/1/objava.jsp?urlid=199371&stevilka=2577http://www.uradni-list.si/1/objava.jsp?urlid=200593&stevilka=4018http://www.uradni-list.si/1/objava.jsp?urlurid=20103511http://www.uradni-list.si/1/objava.jsp?urlid=2002110&stevilka=5387http://www.uradni-list.si/1/objava.jsp?urlid=200242&stevilka=2013http://www.uradni-list.si/1/objava.jsp?urlid=200752&stevilka=2792http://www.uradni-list.si/1/objava.jsp?urlid=200592&stevilka=3952http://www.uradni-list.si/1/objava.jsp?urlid=2006120&stevilka=5106http://www.uradni-list.si/1/objava.jsp?urlid=200397&stevilka=4329http://www.uradni-list.si/1/objava.jsp?urlid=20119&stevilka=323http://www.uradni-list.si/1/index?edition=200514http://www.uradni-list.si/1/objava.jsp?urlid=2007126&stevilka=6414http://www.uradni-list.si/1/objava.jsp?urlid=199739&stevilka=2147http://www.uradni-list.si/1/objava.jsp?urlid=200462&stevilka=2851http://www.uradni-list.si/1/objava.jsp?urlid=200445&stevilka=2133http://www.uradni-list.si/1/objava.jsp?urlid=201061&stevilka=3351http://www.uradni-list.si/1/objava.jsp?urlid=200714&stevilka=611http://www.uradni-list.si/1/objava.jsp?urlid=2002110&stevilka=5387http://www.uradni-list.si/1/objava.jsp?urlid=200977&stevilka=3366http://www.uradni-list.si/1/objava.jsp?urlid=200447&stevilka=2237http://www.uradni-list.si/1/objava.jsp?urlid=200333&stevilka=1359http://www.uradni-list.si/1/objava.jsp?urlid=200783&stevilka=4212http://www.uradni-list.si/1/objava.jsp?urlid=2009108&stevilka=4889http://www.uradni-list.si/1/objava.jsp?urlid=2002105&stevilka=5224

  • 5

    5

    Pravilnik o grafičnih znakih za izdelavo prilog študij požarne varnosti in požarnih redov Ur.l. RS, št. 138/2004

    Pravilnik o usposabljanju zaposlenih za varstvo pred požarom in o usposabljanju odgovornih oseb za izvajanje ukrepov varstva pred požarom Ur.l. RS, št. 64/1995 Spremembe: Ur.l. RS, št. 32/2011 (61/2011 popr.)

    Pravilnik o pogojih za izvajanje požarnega varovanja Ur.l. RS, št. 64/1995 Spremembe: Ur.l. RS, št. 107/2007

    Pravilnik o pregledovanju in preizkušanju vgrajenih sistemov aktivne požarne zaščite Ur.l. RS, št. 22/1995 Spremembe: Ur.l. RS, št. 73/1997, 45/2007

    Pravilnik o izbiri in namestitvi gasilnih aparatov Ur.l. RS, št. 67/2005

    Standardi SIST EN 1838 Razsvetljava – Zasilna razsvetljava

    SIST EN 50171 Razsvetljava – Zasilna razsvetljava

    SIST EN 50172 Razsvetljava – Zasilna razsvetljava

    SIST EN 13501 Skupina standardov za požarno klasifikacijo gradbenih proizvodov in elementov stavb

    SIST EN 14600 Vodila za določitev samozapiral

    SIST EN 81-73 Pravilnik o varnosti dvigal

    SIST EN 1021-1 in SIST EN 1021-2

    DIN 4102-4 Branndverhalten von Baustoffen und bauteilen; zusammenstellung und Anwendung klassifizierter Baustoffe, Bauteile und Sonderbautele, Požarne lastnosti gradbenih materialov, gradbenih elementov in posebnih gradbenih elementov.

    DIN 14090 Površine za gasilce ob zgradbah

    SIST EN 54 Odkrivanje in javljanje požara in alarmiranje

    Smernice in drugi dokumenti

    Tehnična smernica TSG-1-001:2010 Požarna varnost v stavbah

    SZPV 204 , Smernica za požarnovarnostne odmike med stavbami

    SZPV 405-1/10 Naprave za naravni odvod dima in toplote (NODT)

    SZPV 405-2/10 Naravni odvod dima iz stopnišč (NODS)

    SZPV 408/08 Požarnovarnostne zahteve za električne in cevne napeljave v stavbah

    SZPV 411/12 Električni sistemi za zaklepanje vrat na evakuacijskih poteh.

    SZPV – CFPA-E Smernica za naprave za izhode ob paniki in zasilne izhode

    MAutSchR ,vzorčna smernica o požarnovarnostnih tehničnih zahtevah za avtomatska drsna vrata na evakuacijskih poteh, Muster Richtlinien uber automatischeScheibe turen in Rettungswegen

    M-EltVTR; vzorčna smernica o električnih zaporah na vratih na evakuacijskih poteh, Muster Richtlinien uber elektrische Verriegelungssysteme von Turen in Rettungwegen

    MfeuR Vzorčna smernica o požarnovarnosnih tehničnih zahtevah za prostore s kurilnimi napravami, Muster Veuerungsanlagen Richtlinien

    MVStattV ; vzorčna smernica za zbirališča, Muster Versammlungstattenverordnung

    Tehnična smernica TSG-N-003:2009 Zašita pred delovanjem strele

    Maribor, MAJ 2108

    Petra Geršak Klaneček u.d.i.g.

    IZS TP 069

    0506 PHPP - OS Lavrica-faza III (6) 27

    http://www.uradni-list.si/1/objava.jsp?urlid=199564&stevilka=2944http://www.uradni-list.si/1/objava.jsp?urlid=199522&stevilka=1006http://www.uradni-list.si/1/objava.jsp?urlid=200567&stevilka=2964http://www.szpv.si/doc/smernice/SZPV_405-1.pdfhttp://www.szpv.si/doc/smernice/SZPV_405-2.pdfhttp://www.uradni-list.si/1/objava.jsp?urlid=199564&stevilka=2945http://www.szpv.si/doc/smernice/SZPV_411.pdfhttp://www.uradni-list.si/1/objava.jsp?urlid=201132&stevilka=1509http://www.uradni-list.si/1/objava.jsp?urlid=2004138&stevilka=5945http://www.uradni-list.si/1/objava.jsp?urlid=200745&stevilka=2468http://www.uradni-list.si/1/objava.jsp?urlurid=20112897http://www.szpv.si/doc/smernice/SZPV_408_08.pdfhttp://www.uradni-list.si/1/objava.jsp?urlid=2007107&stevilka=5308http://www.uradni-list.si/1/objava.jsp?urlid=199773&stevilka=3495

  • 6

    6

    4. Opis zasnove objekta

    SPLOŠNO Predmet projekta je izgradnja osnovne šole Lavrica. Investitor je Občina Škofljica. Osnovna šola se bo gradila na parcelah k.o.Rudnik parc. št.1843/4, 1843/10, 1843/19(del), 1843/21(del), 1843/22,1843/26(del), 1844/1,1844/2, 1844/3, 1844/4,1844/5, 1844/7, 1844/8 in 1844/26. Objekt se bo izgradil v treh fazah. Prvo fazo predstavlja osrednji del objekta z avlo, tehniko, kuhinjo, jedilnico in srednjim delom učilnic – ŽE ZGRAJENO Druga faza predstavlja izgradnjo levega dela stavbe, ki jo predstavljajo predvsem učilnice ŽE ZGRAJENO Zadnja, tretja faza bo telovadnica s tribunami z vsemi pomožnimi prostori, ki spadajo k telovadnici. Objekt se uvršča po klasifikaciji med stavbe za izobraževanje in znanstveno raziskovalno delo. Število oseb v objektu določi projektant po TSG 01-001:2010 je podano v nadaljevanju

    VELIKOST OBJEKTA

    0506 PHPP - OS Lavrica-faza III (6) 28

  • 7

    7

    VERTIKALNI GABARIT

    Etažnost objekta P+N1

    0506 PHPP - OS Lavrica-faza III (6) 29

  • 8

    8

    KONSTRUKCIJSKA ZASNOVA STAVBE

    Objekt ima dve nadzemni etaži. Konstrukcija objekta je armiranobetonska temeljenje je na talni plošči. Konstrukcija je kombinirana skeletno stenska zaradi potresne varnosti. Horizontalne konstrukcije so lite armiranobetonske. Prvi segment zajema objekt med osjo 11 in 15. Tu so v pritličju predvideni spremljevalni objekti šole kot ordinacija s čakalnico, tehnični prostori, garderobe in prostor za hišnika. V nadstropju sta predvideni dve učilnici s kabineti. Predvidena nosilna konstrukcija tega segmenta bo sestavljena iz AB temeljne plošče, AB etažne plošče nad pritličjem, AB notranjimi stenami in lesenim ostrešjem. Fasadne stene bodo izdelane iz montažnih lesenih elementov po navodilu dobavitelja oz. izvajalca montažne konstrukcije. Lesene stene bodo sestavljene iz vertikalnih lesenih tramičev, kateri so z obeh straneh obiti z mavčnimi in OSB ploščami. Vse notranje stene debeline 20 cm so AB monolitne izvedbe in potekajo v prečni in vzdolžni smeri objekta neprekinjeno od temeljne plošče do strehe in tvorijo togo jedro objekta. Nad pritličjem je zaradi večjih razponov, večje obremenitve (učilnice) ter konzolnega dela objekta predvidena AB etažna plošča debeline 25cm. Zaradi velikih razponov ter teže montažnih fasadnih sten in s tem pogojenimi povesi, bo etažna plošča po robovih (v vseh oseh, kjer so fasadne stene) dodatno ojačana z AB nosilcem kateri bo skrit ob lesenih fasadnih stenah. Strešna konstrukcija bo v celoti lesena. Narejena bo iz lepljenih nosilcev, kateri potekajo v prečni smeri na objekt. Višina predvidene strešne konstrukcije nam omogoča vgradnjo lesenih nosilcev do višine 36cm, kateri bodo podprti z AB vmesno sten v oseh B in C ter večjim lesenim nosilcem v fasadni steni v oseh E in A. Konstrukcija segmenta je zasnovana tako, da bodo celotno horizontalno obtežbo (veter in potres) in vertikalno obtežbo (lastna teža konstrukcije, stalna in koristna obtežba) prevzele AB stene in plošče. Fasadne montažne lesene stene pritličja ne bodo obremenjene z vertikalnimi obtežbami nadstropja. Drugi segment obsega območje med osjo 15 in 16. V tem segmentu je predvidena telovadnica s spremljevalnimi objekti (sanitarije, garderobe, shramba ter kabineti). Nosilna konstrukcija tega dela objekta je sestavljena iz AB temeljne plošče, AB stebrov, AB notranjih pritličnih sten, lesene etažne plošče ter lesenega ostrešja in lesenih fasadnih sten. Osnovno nosilno konstrukcijo tvori okvirni sistem (raster med okvirji znaša 5.35m), kateri je sestavljen iz v temeljno ploščo togo vpetih stebrov 30/60 ter primarnega lesenega strešnega nosilca 28/120. Ker vitki stebri v vzdolžni smeri ne zagotavljajo ustrezne horizontalne togosti, smo v fasadni steni pod okni predvideli AB stenski nosilec 30/80, kateri bo togo vpet v stebre in bo z njimi tvoril toge okvirje v vzdolžni smeri telovadnice. Preostali del fasadne stene bo izveden iz lesa. Tloris objekta omogoča, da bo etažna plošča nad pritličjem iz križno lepljenega lesa oz. KLH debeline 25cm. V celoti bo podprta za AB stenami. Maksimalni razpon plošče znaša 6m. Strešna konstrukcija telovadnica bo sestavljena iz lepljenih nosilcev 28/120, kateri potekajo v prečni smeri v rastru 5.35m in so na vsaki strani podprti z AB stebrom. Pravokotno na njih potekajo sekundarni nosilci, kateri jih povezujejo in nosijo strešno kritino. Na strehi telovadnice ni prodca. Na nivoju etaže je ob osi 15 predvidena konzolna plošča. Ta se bo izvedla tako, da bodo iz AB stebrov telovadnice puščene AB oz. jeklene konzole, na katere se bo pritrdila sekundarna lesena pohodna konstrukcija

    0506 PHPP - OS Lavrica-faza III (6) 30

  • 9

    9

    STENE Predelne stene v učilnicah opečne, betonske ali suho montažne, mavčno kartonske izvedbe na kovinski podkonstrukciji, z vmesno izolacijo iz materialov razreda A, skupne debeline 12 ali 15 cm. Mavčno-kartonske plošče, ki mejijo na mokre prostore (stranišča) so položene v dveh plasteh in vodoodporne..

    Armirano betonske stene so brušene in glajene na opažnih stikih ter barvane z disperzijsko barvo, v dveh nanosih. Opečne stene so ometane, glajene in opleskane z disperzijsko barvo, v dveh nanosih. Stene stopnišč in skupnih hodnikov so poslikane s pralno barvo.

    Mavčno kartonske predelne stene so bandažirane, glajene in opleskane z disperzijsko barvo, v dveh nanosih. Stiki dvoslojnih mavčnih plošč so ojačani z bandažnim trakom in kitani. Vsi vogali so ojačani s kovinskimi kotniki. Izvedba stikov montažnih predelnih sten z zidanimi in betonskimi stenami in stebri so izvedene po tehnologiji proizvajalca predelnih sten, z vsemi potrebnimi tesnili in polnili s tesnilnim materialom! Montažne predelne stene se montirajo na armirano betonsko talno ploščo, pred polaganjem ostalih slojev do finalnega tlaka. Vsi stiki med predelnimi stenami in ostalimi konstrukcijami naj bodo izvedeni zvočno izolativno in v kolikor je tako določeno tudin požarnio tesnjeno. Stene sanitarnih in kuhinjskih prostorov so do stropa obložene s keramiko.

    STROPOVI

    Vse plošče so monolitne, na razponu med nosilnimi stenami in stebri. Stropovi so fino ometani, glajeni in pleskani.

    STOPNIŠČA Armiranobetonske stopniščne rame obložene z obdelavo tlaka.

    STREHA Na objektu, je predvidena ravna streha ali streha z minimalnim naklonom . Zaščita hidroizolacije in toplotne izolacije v delu nepohodnih streh je kulir posip na HI traku (ali nasutje rečnega prodca fi 16 do 32 mm).

    HIDROIZOLACIJA Izvedene bodo bitumenske hidroizolacije skladno z zahtevami DIN 18195.

    TOPLOTNA IZOLACIJA PODLOGA TLAKOV

    Toplotna zaščita objekta je v gradbenih konstrukcijah izvedena z vgrajevanjem steklene in kamene volne.

    0506 PHPP - OS Lavrica-faza III (6) 31

  • 10

    10

    TLAKI Armirani plavajoči estrihi različnih debelin z obdelavo

    FASADA Fasada je kontaktna iz lesnih vlaken minimalno razereda B d1

    0506 PHPP - OS Lavrica-faza III (6) 32

  • 11

    11

    5. Opis prostorov, dejavnosti in tehnoloških procesov V osnovni šoli se izvaja proces izobraževanja otrok starih od šest do štirinajst let. Pritličje

    Faza gradnje

    št. prostora Prostor Površina Višina Neto Volume

    Š1.24 LIKOVNA UČILNICA 86,88 3,10 269,32

    Š1.28 TEHNIKA 61,13 3,10 189,51

    T1.6.1. MOŠKA GARDEROBA 21,88 3,10 67,84

    T1.7.1 ŽENSKA GARDEROBA 21,02 3,10 65,17

    Š1.2 KABINET 1-3R 15,20 3,10 47,12

    Š1.26 KABINET LIKOVNEGA POUKA 19,58 3,10 60,70

    Š1.27 SHRAMBA LIKOVNI POUK 13,73 3,10 42,55

    Š1.29 SHRAMBA TEHNIKE 7,28 3,10 22,58

    Š1.30 STROJNI DEL TEHNIKE 31,77 3,10 98,47

    Š1.31 TEHNIČNI PROSTOR 4,30 3,10 13,33

    T1.3 KABINET 14,00 3,10 43,39

    Š1.4.1 HODNIK 88,15 2,80 125,18

    Š1.4.2 HODNIK 88,15 2,80 121,65

    Š1.7 POŽ.IZHOD 7,19 2,80 20,13

    Š1.10 POŽARNO STOPNIŠČE 10,67 2,80 29,89

    Š1.14 VETROLOV 1T 15.07 2,80 42,20

    Š1.15 AVLA 163,02 3,10 505,36

    Š1.19 HODNIK 35,65 2,80 99,81

    Š1.21 VETROLOV 2-3T 8,77 2,80 24,55

    Š1.23.1 HODNIK 79,19 2,80 165,06

    Š1.23.2 HODNIK 79,19 2,80 56,68

    Š1.25 HODNIK LIKOVNA TEHNIKA 8,76 2,80 24,52

    Š1.37 DVIGALO 2,48 8,60 21,29

    T1.8 HODNIK 37,20 2,80 104,17

    T1.9 POŽARNO STOPNIŠČE 24,11 3,10 74,74

    T1.10 HODNIK 61,22 2,80 171,42

    T1.11 VETROLOV 7,86 2,80 22,00

    T2.6.2 HODNIK 4,08 2,80 11,42

    T2.7.2 HODNIK 4,08 2,80 11,42

    Š1.1 MATIČNA UČILNICA 3R 64,86 3,10 201,06

    Š1.3 MATIČNA UČILNICA 3R 60,65 3,10 188,01

    Š1.5 MATIČNA UČILNICA 2R 64,34 3,10 199,45

    Š1.6 MATIČNA UČILNICA 1R 64,36 3,10 199,51

    Š1.8 MATIČNA UČILNICA 1R 66,51 3,10 206,18

    Š1.9 MATIČNA UČILNICA 2R 62,65 3,10 194,21

    Š1.11 GARDEROBA 1T 41,71 3,10 129,29

    0506 PHPP - OS Lavrica-faza III (6) 33

  • 12

    12

    Š1.12 WC DEČKI 7,03 3,10 21,80

    Š1.13 WC DEKLICE 10,76 3,10 33,36

    T1.4 GARDEROBE UČITELJEV 9,09 3,10 28,18

    T1.12 MOŠKE SANITARIJE 7,86 3,10 24,36

    T1.13 ŽENSKE SANITARIJE 8,75 3,10 27,12

    T1.14 INVALIDI 3,70 3,10 11,48

    T.2.6.3 WC Ž 4,39 3,10 13,60

    T.2.6.4 UMIVALNICA 6,86 3,10 22,64

    T.2.7.3 WC M 4,39 3,10 13,60

    T.2.7.4 UMIVALNICA 6,86 3,10 22,64

    Š1.32.1 ENERGETSKI PROSTOR 37,27 3,45 128,58

    Š1.32.2 TEH ELEKTRO 3,62 3,45 12,49

    T1.1 TELOVADNICA 500,87 7,00 3506,10

    T1.2 TRIBUNE 35,58 7,00 249,08

    T1.5 SHRAMBA 47,36 3,10 146,81

    Š1.20 GARDEROBA2-3T 102,94 3,10 319,13

    Š1.16 SHRAMBA 18,51 3,10 57,38

    Š1.17 ARHIV 27,07 3,10 83,92

    Š1.18 JEDILNICA 142 SEDEŽEV 146,47 3,10 454,06

    Š1.22.1 KUHINJA 82,20 3,10 253,50

    Š1.22.2 POMIVALNICA 8,18 3,10 25,37

    Š1.22.3 ČISTILA 2,38 3,10 7,38

    Š1.22.4 SPREJEM 6,40 3,10 19,84

    Š1.22.5 ODPADKI 5,60 3,10 17,36

    Š1.22.6 GARDEROBA 9,09 3,10 28,19

    Š1.22.7 IZDAJA 14,51 3,10 44,99

    Š1.33 DELAVNICA HIŠNIKA 15,55 3,10 48,21

    Š1.34 TEHNIKA HIŠNIK 10,50 3,10 32,54

    Š1.35 SHRAMBA ČISTIL 7,82 3,10 24,23

    Š1.36 GARDEROBE ČISTILK 5,08 3,10 15,74

    O.1.1 ORDINACIJA 20,57 3,10 63,76

    O.1.2 GARDEROBA 5,84 3,10 18,11

    O.1.3 TEHNIKA 1,75 3,10 5,44

    SKUPAJ: 2.631,54 9.650,17

    0506 PHPP - OS Lavrica-faza III (6) 34

  • 13

    13

    1. NADSTROPJE

    FAZA št. prostora Prostor Površina Višina Neto Volume Št. oseb v nadstropju

    Š.2.1 GLASBENA UČILNICA 64,82 3,10 200,93

    Š.2.2 UČILNICA JEZIKI 59,73 3,10 185,18

    Š.2.28 MALA UČILNICA 40,15 3,10 124,46

    Š.2.32 MALA UČILNICA 50,70 3,10 157,18

    T.2.1 MALA TELOVADNICA 173,95 3,10 539,19

    Š.2.3 UČILNICA 5 RAZRED 59,78 3,10 185,33

    Š.2.4 UČILNICA 4 RAZRED 61,88 3,10 191,84

    Š.2.6 UČILNICA 4 RAZRED 62,65 3,10 194,21

    Š.2.7 UČILNICA 5 RAZRED 60,54 3,10 187,66

    Š.2.5 KABINET 22,06 3,10 68,37

    Š.2.9 KABINET –JEZIKI 15,93 3,10 49,38

    Š.2.21 KABINET 24,69 3,10 76,53

    Š.2.23 KABINET 24,88 3,10 77,12

    Š.2.26 KABINET BIO KEM 24,27 3,10 75,22

    Š.2.29 KAB ZG GEO 20,83 3,10 64,58

    Š.2.31 KABINET JEZIKI 26,03 3,10 80,69

    Š.2.18 KNJIŽNICA 113,40 3,10 351,54

    Š.2.19 KABINET 11,74 3,10 36,39

    Š1.15.1 TRIBUNA 52,38 3,10 162,38

    Š.2.10.1 HODNIK 103,97 2,80 119,84

    Š.2.10.2 HODNIK 103,97 2,80 171,28

    Š.2.11 STOPNIŠČE 8,61 3,10 26,68

    Š.2.17 AVLA 96,70 3,10 299,77

    Š.2.34 HODNIK 24,63 2,80 68,96

    Š.2.39.1 HODNIK 131,00 2,80 289,99

    Š.2.39.2 HODNIK 131,00 2,80 76,82

    T.2.3 HODNIK 54,95 2,80 153,86

    T.2.5 STOPNIŠČE 23,45 3,10 72,69

    Š.2.12 WC ŽENSKI 11,58 3,10 35,90

    Š.2.13 WC MOŠKI 11,58 3,10 35,91

    Š.2.14 WC ZAPOSLENI 3,41 3,10 10,58

    Š.2.35 WC ZAPOSLENI 11,39 3,10 35,31

    T.2.6 WC ŽENSKI 10,11 3,10 31,33

    T.2.7 WC MOŠKI 9,47 3,10 29,36

    Š.2.16 TEHNIČNI PROSTOR 3,35 3,45 11,56

    0506 PHPP - OS Lavrica-faza III (6) 35

  • 14

    14

    Š.2.40 TEHNIČNI PROSTOR 3,39 3,45 11,70

    Š.2.41.1 JAŠEK 6,25 3,45 21,56

    Š.2.41.2 JAŠEK 3,17 3,45 10,92

    Š.2.41.3 JAŠEK 1,15 3,45 3,97

    Š.2.41.7 JAŠEK 0,56 3,45 1,95

    Š.2.41.7 JAŠEK 1,85 3,45 6,39

    Š.2.41.8 JAŠEK 0,24 3,45 1,15

    Š.2.41.9 JAŠEK 2,04 3,45 7,02

    T.2.2 GALERIJA 48,57 3,10 150,56

    T.2.4 SHRAMBA 13,09 3,10 40,57

    Š.2.15.2 AVLA PODEST 31,07 3,10 96,30

    Š.2.8 UČILNICA –JEZIKI 60,31 3,10 186,97

    Š.2.20 MEDIATEKA 79,46 3,10 246,32

    Š.2.22 GOSP MATEMATIKA 60,79 3,10 188,44

    Š.2.24 KAB FIZIKA MATEM 24,48 3,10 75,88

    Š.2.25 FIZIKA+MAT 80,68 3,10 250,10

    Š.2.27 BIOLOGIJA +KEM 81,11 3,10 251,46

    Š.2.30 ZGOD + GEOGRAFIJA 59,84 3,10 185,52

    Š.2.33 ZBORNICA 87,71 3,10 271,89

    Š.2.36 RAZGOVORI 8,38 3,10 25,99

    Š.2.37 SVETOVANJE 15,03 3,10 46,60

    Š.2.38 RAVNATELJ 15,03 3,10 46,60

    SKUPAJ: 2397,11 6616,26

    0506 PHPP - OS Lavrica-faza III (6) 36

  • 15

    15

    Matična učilnica in učilnice za pouk slovenskega jezika, tujih jezikov, geografije, zgodovine, …

    Je prostor za pouk, ki ne potrebujejo posebnih prostorov in pripomočkov. Gorljive snovi v obravnavanih prostorih (učilnice in kabineti predstavljajo papir, redniki, lesene omare, stoli, mize, rekviziti, dekoracijski materiali – okraski, razna oblačila, plastični materiali (stoli, računalniki,..) in elektro oprema (kabelske izolacije, gorljiva ohišja in ostala oprema) Shranjevanje in uporaba posebno nevarnih, vnetljivih ali eksplozijskih snovi v matičnih učilnicah ni dovoljena. V učilnicah je predvidenih 29 oseb naenkrat. Naravoslovna učilnica (KE, BI in FI) Delo z nevarnimi snovmi (kemikalijami) in laboratorijskimi pripomočki pomeni za učitelja kemije nevarnost in možnost za poškodbe. Da se temu izogne mora imeti ustrezno znanje o kemijski varnosti. Z ustreznimi varovalnimi ukrepi, uporabo zaščitnih sredstev in opreme, skladiščenjem nevarnih snovi ter zbiranjem in odstranjevanjem odpadnih kemikalij mora poskrbeti za svojo varnost in varnost učencev. V skladu z veljavno zakonodajo mora zato tudi opraviti izpit iz varstva pri delu. Kemikalije, ki se uporabljajo so lahko organska topila, organske in anorganske kisline in baze, organske spojine in razstopine v dovoljenih količinah. Kemikalije je potrebno skladiščiti v varnostnih omarah za nevarne snovi, ki so certificirane. Omare morajo imeti sistem odzračevanja. V naravoslovni učilnici je predvideno 29 oseb naenkrat. Računalniška učilnica Je prostor za pouk računalništva in ostalih predmetov, ki potrebujejo podporo programske opreme za nazornejšo predstavitev učne snovi. Opremljena je z računalniki. V računalniški učilnici je predvideno 32 učencev. Knjižnica Knjižnica je šolska knjižnica , manjše kvadrature od 113,40 m2. Predvideno število ljudi v knjižnici je do 60.

    Prostori (garderobe, pisarne, kabineti, avle) Gorljive snovi v obravnavanih prostorih predstavljajo papir, redniki, lesene omare. Stoli, mize, rekviziti, dekoracijski materiali – okraski, oblačila v garderobnih omarah, plastični materiali (stoli, računalniki,..) in elektro oprema (kabelske izolacije, gorljiva ohišja in ostala oprema) Kuhinja Predvidena je kuhinja za kuhanje rednih obrokov. Kuhanje v kuhinji je predvideno na plin. Število zaposlenih v kuhinji je 5 oseb. Učilnica za likovni pouk Opremljena kot predmetna učilnica, vendar z malo več papirja . V učilnici je predvidenih 29 oseb naenkrat. Učilnica za glasbeni pouk Opremljena kot predmetna učilnica, vendar z več opreme: instrumenti in multimedijsko opremo. V učilnici je predvidenih 29 oseb naenkrat.

    0506 PHPP - OS Lavrica-faza III (6) 37

  • 16

    16

    6. Vrste in količine skladiščenega blaga

    Šolski prostori niso namenjeni skladiščenju materiala. Dotrajano pohištvo in dotrajani potrošni materiali (papir, učbeniki, knjige) se morajo odstranjevati iz šole redno, da ne pride do kopičenja in hranjenja večih količin.

    7. Seznam požarno nevarnih prostorov, naprav in opravil

    Vrste ter količina požarno nevarnih snovi ( požarna obremenitev )

    Specifična požarna obremenitev Q (MJ/m2)

    Učilnice - klasične, kabineti 300

    Učilnice -fi, BI, KE, kabineti 500

    kotlovnica 200

    PISARNIŠKI PROSTORI 600

    garderobe – kovinske omarice 300

    garderobe – lesene omarice 400

    sanitarije, stopnišča, hodniki Manj kot 50

    Posebno nevarnih prostorov in opravil v šoli ni. Bolj nevarni prostori v šoli so prostor prostor kotlovnice, prostor s sekanci

    Podani so vsi prostori s predvidenim številom oseb v prostoru, razdeljeni po požarnih sektorjih

    8. Oceno požarne nevarnosti in požarni scenariji Možni vzroki za nastanek požara

    Vzroki za nastanek požara v obravnavanem objektu so lahko:

    Okvare električnih instalacij in naprav

    Okvare ostalih instalacij

    Okvare in poškodbe ostalih instalacij in naprav, kot so naprave za prezračevanje, tehnični prostori,…

    Nepravilnosti pri vzdrževalnih delih (varjenje, delo s kotno brusilko, polaganje in spajanje izolacije s pomočjo plinskih trošil, obdelava kovin – varjenje, brušenje, nanos gorljivih premaznih sredstev.

    Nered in nečistoča (spontan vžig z vnetljivimi tekočinami prepojene cunje, mešanje različnih vrst odpadkov

    Nespoštotavnje požarnega reda (vžig zaradi cigaretnih ogorkov in podobno)

    Podtaknjeni / namerni požar

    0506 PHPP - OS Lavrica-faza III (6) 38

  • 17

    17

    Požar v razredu – kjerkoli: V primeru požara v razrednih prostorih je požar možen od nepazlivosti učitelja in nevarne igre otrok s sredstvi, ki jih otrok prinese od doma ali jih najde zunaj (vžigalniki, vžigalice, iskrice, petarde, ipd).

    Požarne nevarnosti – kritične vrednost Pri analizi požarnih nevarnosti upoštevamo vrednosti posameznih parametrov, ki so kritične za ljudi in za gradbene elemente.

    Kritične vrednosti za ljudi so: Temperatura vročega dima pod stropom (h > 1,5 m), T > 93 C, temperatura dima, ki se spusti pod 1,8 m (h > 1,8 m), T > 49 C; koncentracija kisika O2 > 16 % vol; koncentracija ogljikovega monoksida CO > 30000 ppm – min (> 3% - min)

    Kritične vrednosti za konstrukcijske gradbene materiale Za jeklo je kritična temperatura Tkrit > 472 C. Za beton, opeko, plinobeton je kritična temperatura T > 1000 C. Les in papir se vnameta pri gostoti srednjega toka j=12,5 kW/m2 in začneta goreti pri T=200C. Steklo, ki nima požarne odpornosti, se mehansko poškoduje (poči zaradi termičnih napetosti pri temperaturah, ki presegajo kritično temperaturo T>300C. Vidljivost: V kolikor se dim v prostoru spusti nižje kot 1,8 m so lahko ogroženi ljudje, ki se tam nahajajo. V kolikor bi se dim spustil pod nivo 1,8 m morajo imeti ljudje dovolj časa, da se umaknejo na varno, preden se dim spusti na takšni nivo.

    Požarni scenarij Pričakovan dogodek: Nastanek požara v učilnici, igralnici ali kuhinji ali kabinetu zaradi napake na električni instalaciji (računalnik, kabli) oziroma nastanek požara na elektroinstalacijah po objektu (kabelske police, instalacijski jaški, elektro omare) Požar v kuhinji (razdelilna kuhinja, samo pogrevanje preko električnega štedilnika)

    - Ogenj na plošči se ne vgasne - Možnost požara na kuhinjski napi - Okvara električnih naprav v kuhinji

    Kuhinja je locirana na sredini objekta. Iz kuhinje možen direkten izhod na prosto preko skupnega hodnika. Požar v kuhinji se lahko razširi na celotni požarni sektor v kateren se kuhinja nahaja.

    Zaznava dogodka: Aktiviranje avtomatskega javljalnika požara v prostoru ali aktiviranje ročnega javljalnika, alarmiranje ogroženih s sirenami po posameznih požarnih sektorjih ter prenos signalnega alarma na 24 urno dežurno mesto, ki aktivira intervencijske enote (odgovorna oseba za gašenje začetnih požarov in izvajanje evakuacije, varnostniki, gasilci)

    0506 PHPP - OS Lavrica-faza III (6) 39

  • 18

    18

    Ukrepanje: Kdor opazi požar mora le tega pogasiti z gasilnikom ali notranjim hidrantom, če to lahko stori brez nevarnosti za svoje zdravje in zdravje drugih. Zaposleni alarmirajo ostale zaposlene, bolnike in obiskovalce, da zapustijo ogrožene prostore po evakuacisjkih poteh. Zaposleni morajo po potrebi odpreti okna v ogroženi etaži. Pasivni in aktivni ukrepi pred požarom so navedeni v nadaljevanju elaborata. Glede na arhitekturno zasnovo, namembnost posameznih delov objekta ter upoštevajoč zahteve iz predpisov, nujno potrebni za dosego zmanjšanja nevarnosti in ogrožanja oseb kakor tudi premoženja na ustrezno raven, pri čemer je potrebno upoštevati, da gre za nov javni objekt v katerem so otroci.

    0506 PHPP - OS Lavrica-faza III (6) 40

  • 19

    19

    9. Koncept požarne varnosti objekta Vsak objekt za vidika požarne varnosti grajen tako, da:

    - je zagotovljena nosilnost konstrukcije objekta za določen čas požara - je omejena možnost širjenja ognja in dima po objektu - je omejeno širjenje požara na sosednje objekte - je zagotovljena varna evakuacija vseh oseb v objektu iz objekta - se upošteva varnost reše