E163: Laser Acceleration at the NLCTAGoal: Demonstrate the technical feasibility of laser-driven particle acceleration
Photonic band gap structures made by lithography (top) and fiber-drawing (bottom).
Stanford University
Bob Byer (co-PI), Tomas Plettner
SLAC
Eric Colby(spokesman), Bob Noble (Project Manager), Bob Siemann (co-PI), Jim Spencer, Dieter Walz (UTR & Project Engineer)
Ben Cowan, Mehdi Javanmard, Chris Sears (students)
Fire Protection Plans, February 3, 2003
E163 Layout
RF System
LASER ROOM
SHIELDED ENCLOSURE
NLCTA
N
E163 Counting Room(b. 225)
225 Moved hereSummer 2003
May 2003
Oct
2003
ORION Extension
2005
Oct 2003
Add/change equipment inside NLCTA enclosure: March 2004
Overhead Cable Tray
61 2
3
5
4
7
E163 Plan
April 2003: Core drill penetrations
May 2003: Start assembly of shielded enclosure
Summer 2003: Relocate building 225 to NE corner of ESB
October 2003: Start construction of laser room, rf system
March 2004: Installation of beamline components, commissioning
2005: Start construction of ORION low energy hall
2006: Knock out ceiling, North, and East walls of E163 enclosure and join to ORION low energy hall
Concrete Shielding Enclosure Fire Detection and Alarm System (“Area 2”)
Combustible Content: ~200# cabling in traysOccupancy: 0.5-1.0 FTE per yearMCFL: ~200k$MPFL:~50k$Total value of equipment: ~$500k
Structure lifespan: 3 yearsStart Construction: May 2003
Laser Room Fire Detection and Alarm System (“Area 1”)Combustible Content: ~50# cabling, ~100# books, ~1 liter solvents, 1 rack of electronic equipment
Occupancy: 0.5-1.0 FTE per year
MCFL: ~400k$
MPFL:~50k$
Total value of equipment: ~$500k
Structure lifespan: >10 yearsStart Construction: Oct 2003
E163 Concrete Enclosure Roof Fire Detection and Alarm System (“Area 3”)
Combustible Content: ~200# cabling, 3-4 racks of electronic equipment
Occupancy: few days per year total
MCFL: ~100k$
MPFL:~25k$
Total value of equipment: ~$100k
Structure lifespan: >10 yearsStart Construction: Oct 2003
NLCTA-Area Fire Detection and Alarm System (“Area 4”)Combustible Content: ~200# cabling
Added Occupancy: 0.1 FTE per year
MCFL: ~500k$
MPFL:~100k$
Total value of equipment: ~$500k
Equipment lifespan: >10 yearsStart Construction: Mar 2004
RF Power System Area Fire Detection and Alarm System (“Area 5”)Combustible Content: ~100# cabling, ~100# oil, 2-3 racks electronic equipment
Occupancy: 0.1 FTE per year
MCFL: ~400k$
MPFL:~50k$
Total value of equipment: ~$750k
Equipment lifespan: >10 yearsStart Construction: Oct 2003
8-pack HVPS
Extend existing HSSD sampling tubeKlystron & modulator
Power to modulator, HVPS, other large supplies disconnected on fire alarm by contactors controlled by FACP
NLCTAS
NLCTA Rack-Area Fire Detection and Alarm System (“Area 6”)Combustible Content: ~100# cabling
Added Occupancy: few days per year
MCFL: ~100k$
MPFL:~25k$
Total value of equipment: ~$100k
Equipment lifespan: >10 yearsStart Construction: Oct 2003
Additional Rack
Of Equipment
SW corner of ESB
NLCTA Rack-Area Fire Detection and Alarm System (“Area 6”)Combustible Content: ~100# cabling
Added Occupancy: few days per year
MCFL: ~100k$
MPFL:~25k$
Total value of equipment: ~$100k
Equipment lifespan: >10 yearsStart Construction: Oct 2003
Additional Rack
Of Equipment
SW corner of ESB
E163 Counting Room (b. 225 Relocated) (“Area 7”)Combustible Content: ~200# cabling
Added Occupancy: 1.0-1.5 FTE
MCFL: ~500k$
MPFL:~50k$
Total value of equipment: ~$500k
Equipment lifespan: >10 yearsStart Relocation: Summer 2003
B. 225 has sprinklers, which will be reconnected