Phoenix’s Resume Page 1 of 6 RESUME KYAW SWAR MYINT, PHOENIX BLK 512, #09-365, WEST COAST DRIVE, SINGAPORE 120512 (65) 97339264: [email protected] PERSONAL DATA NAME KYAW SWAR MYINT, PHOENIX DATE OF BIRTH 02-06-1975 MARITAL STATUS MARRIED NATIONALITY MYANMAR RELIGION MORMON CHRISTIAN PASSPORR/NRIC 582853/ S7567282 I EDUCATIONS AND QUALIFICATIONS B.E (MECHANICAL) Mandalay Technological University, Myanmar MARINE JUNIOR ENGINEER Department of Marine Administration, Myanmar

description

Testing with Resume

Transcript of phoenix's resume

Page 1: phoenix's resume

Phoenix’s Resume Page 1 of 6

RESUME

KYAW SWAR MYINT, PHOENIX

BLK 512, #09-365, WEST COAST DRIVE, SINGAPORE 120512 (65) 97339264: [email protected]

PERSONAL DATA NAME KYAW SWAR MYINT, PHOENIX DATE OF BIRTH 02-06-1975 MARITAL STATUS MARRIED NATIONALITY MYANMAR RELIGION MORMON CHRISTIAN PASSPORR/NRIC 582853/ S7567282 I EDUCATIONS AND QUALIFICATIONS

B.E (MECHANICAL) Mandalay Technological University, Myanmar MARINE JUNIOR ENGINEER

Department of Marine Administration, Myanmar

Page 2: phoenix's resume

Phoenix’s Resume Page 2 of 6

OIL/PETROCHEMICAL INDUSTRY SAFETY COURSE FOR SUPERVISORS NTUC learning hub, Singapore

SHELL PERMIT TO WORK COURSE

Shell Refinery, Palau Bukom, Singapore

MICROSOFT PROJECT SCHEDULING COURSE Ngee Ann Polytechnic, Singapore

MANUAL AND HYDRAULIC TORQUE TRAINING

Tet Lee Training Centre, Singapore

PRIMAVERA P3 PROJECT PLANNER Wisely Project Management Consultants, Singapore

PROFESSIONAL CERTIFICATE IN PROJECT MANAGEMENT Temasek Polytechnic, Singapore

PIPING SYSTEM DESIGN AND INSTALLATION DETAIL Ngee Ann Polytechnic, Singapore

PROFESSIONAL EXPERIENCE

(1) 2010 (October)- Present COMPANY ROTARY IMC PTE LTD CLIENT/OWNER SHELL CHEMICAL SEREYA PTE LTD POSITION MAINTENANCE ENGINEER ROLES AND RESPONSIBILITIES

Supporting the Lead Engineer to maintain a high plant technical availability and maximize the utilization of available resources.

Responsible to organize, oversee & optimize the maintenance of mechanical equipment & civil work to enable safe, reliable and efficient plant operation.

Comply with Health, Safety, Security & Environment standards and requirements to make the work location a safe place to work in.

Planning and execution of all maintenance activities as assigned from end-to-end basis.

Plan, execute and supervise routine servicing, inspection & maintenance activities on static & rotating equipments, plant change (PCR) work & near miss follow-up as assigned.

Lead, prepare, plan and execute shutdown/turnaround work as assigned.

Page 3: phoenix's resume

Phoenix’s Resume Page 3 of 6

Providing mechanical support to other maintenance discipline, e.g. scaffold erecting, lifting, excavation.

Providing feedbacks and updates to Planner and Scheduler periodically. Developing static & rotating equipments preventive maintenance work schedule.

(2) 2009 (MAY) – 2010 (September)

COMPANY ROTARY IMC PTE LTD CLIENT CHIYODA SINGAPORE (PTE) LTD OWNER SHELL EASTERN PETROLEUM LTD (SEPL) PROJECT TITLE LRCCU REVAMP PROJECT POSITION PROJECT ENGINEER ROLES AND RESPONSIBILITIES

Liaise with sub-contractors and vendors for issuing the change order.

Verification of sub-contractors’ progress & VO claims, sub-contract cost control & payment.

Managing subcontractors for productivity, costing and manpower.

Having progress meeting with clients. Scheduling with Primavera P3. Monitoring & Updating Project Schedule. Preparation of Weekly & Monthly Progress Reports. Preparation of Daily Work Instruction. Prepare daily progress report and plan head to make sure the project is running

smoothly according to the schedule. Coordinate with fabrication workshop for transportation of fabricated spool

pieces. Prepare work method statements, lifting plans and risk assessments (permit to

work) for execution of the project. Receive the revised drawings and report to the project Manager for major

changes. Having daily internal meeting to give guideline to the supervisors for the

execution of project with quality and safety standard. Working closing with QC team for the quality productivity. Daily site walk about for safety and quality audit. Trouble shooting on site if there is any discrepancy with the drawings. Execution of Maintenance work for rotating and static equipments.

Page 4: phoenix's resume

Phoenix’s Resume Page 4 of 6

COMPANY

ROTARY IMC PTE LTD CLIENT FOSTER WHEELER LTD OWNER SHELL EASTERN PETROLEUM LTD (SEPL) PROJECT TITLE HVU 5 BRM PROJECT POSITION PROJECT ENGINEER ROLES AND RESPONSIBILITIES

Steam tracings installation according the Client’s DEP 49 numbers of manifolds with over 16 km tracers Planning for the job to go smoothly and finish in time according to the

schedule and coordinate client’s superintendents and other contractors. To make sure the safety and quality of the job is according to the client’s

standard. Lead the team of about 150 persons to perform well To give the daily report to the management and the client. To clear the punch list. To over see the logistics and materials

(3) 2006- 2009 (April) COMPANY HIAP SENG ENGINEERING LTD, SINGAPORE CLIENT SHELL EASTERN PETROLEUM LTD (SEPL) SINGAPORE REFINING COMPANY (SRC) LINDE SYNGAS POSITION PROJECT ENGINEER, MAINTENANCE ENGINEER ROLES AND RESPONSIBILITIES

Involving in daily planning meeting, 14 days planning meetings, monthly planning meeting with Client.

Page 5: phoenix's resume

Phoenix’s Resume Page 5 of 6

Executing and supervising the daily routine maintenance job such as piping renewal, removing and installation of rotating equipment, static equipments, tank maintenance and projects.

Estimation of costing for daily maintenance jobs and Turn Around. Coordinating and managing the Turn Around according to the TA schedule

involving such as piping installation, equipment maintenance, furnace tube renewal, misc repairs specified in TA scope of works.

Working closely with SEPL TA team to monitor progress and provide daily update and solve the problems on site and to have a detail planning and execution for discovery jobs during TA.

Coordinating the QC team to have a top quality TA. Managing and assigning the respective engineers and supervisors according to

their skills and strengths to have a flawless TA according to Client’s safety action plan, quality plan.

New IFC (Internal floating cone) for the tank.

(4) 2002- 2006 COMPANY MYANMAR LANYWA OIL REFINERY LTD, MYANMAR POSITION APPRENTICE ENGINEER AND MAINTENANCE ENGINEER ROLES AND RESPONSIBILITIES

Learning the work nature of oil refinery. Meeting with maintenance manager and execute the job assigned by manager. Discussing with supervisors and technicians to execute the job safely. To make sure they follow the safe work method statement and correct working

procedure. To coordinate and discuss with the contractors for the execution of the job. To have weekly safety meeting with managements. Working together with operations to make sure the job is going smoothly and

to minimize the backlogs. MILESTONES

2006 SRU SHUTDOWN, LINDE SYNGAS. 2006 RCC TURN AROUND, SRC. 2006, 2007, 2008 HFA TURN AROUND, SEPL. 2006 HYDROCRACKER TA, SEPL. 2006 LUB OIL COMPLEX TA, SEPL. 2007 THERMAL GAS UNIT TA, SEPL. 2008 CRUDE DISTILLER UNIT 4 TA, SEPL. 2008 PLATFORMER 3 TA, SEPL.

Page 6: phoenix's resume

Phoenix’s Resume Page 6 of 6

2008 HYDROTREATER 4, SEPL. 2007 TANK 92, TANK JACKING AND IFC PROJECT, SEPL. 2008 TANK 64, TANK JACKING AND IFC PROJECT, SEPL. 2008 HFA, C 3712 TOP SECTION RENEWAL PROJECT, SEPL. 2007/2008 ( 4 ) MILLIONS MANHOURS WITHOUT ACCIDENT,SEPL. 2008 (5) MILLIONS MANHOURS WITHOUT ACCIDENT, SEPL. 2009 SHELL CHEMICAL SERAYA SHUTDOWN, SEPL. 2009/2010 HIGH VACUUM UNIT 5 PROJECT, SEPL. 2010 LRCCU REVAMP PROJECT, SEPL 2011 U5800 SHUTDOWN, SHELL CHEMICAL SERAYA 2011 A2651THIN FILM EVAPORATOR ROTOR CHANGE OUT 2011 CONDUCT VAIROUS AIR VESSELS INSPECTION WITH MOM 2011 A5302 CHILLER, GENERATOR RETUBING

TOTAL WORKING EXPERIENCE = ABOUT 9 YEARS