The Presence & Location of all underground utilities & structures must be determined priorto construction and verified by the appropriate Utility Company or regulatory agency.
Energy Code Compliance will be confirmed by the General Contractor and InsulationSub-Contractor and then be appended to the Building Permit Application.
Project Location Map
ZONING REGULATIONS of the City of SheltonFAIRFIELDCOUNTY, CONNECTICUT
And
The Connecticut State Building CodeInclusiveof thefollowing references& documents:
2005 Ct Supplement including the 2009, 2011, 2013 Amendments
Currently Adopted Model Codes
2003 International Building Code2003 International Existing Building Code
2003 International Plumbing Code2003 International Mechanical Code2009 International Residential Code
2009 International Energy Conservation Code (new editionadopted withchanges effective8/1/2009)
2011 National Electrical Code (NFPA70) (with Connecticut Amendments effective 8/7/2011)
ICC/ANSIA117.1-2003 Accessibleand UsableBuildings andFacilities
Code References
Design/Build Team
Project Consultants
Use of DocumentsAlldrawings, data, &electronicmedia includedorreferencedin thesedocumentsare InstrumentsofService andthe property ofJosephMatto Architect.These documents are copyright protected and are not to be used for any other project or by any other persons other than those identified and authorized othispage.
Copyright© 2015 - JosephMatto Architect. AI
Accuracy of DrawingsAll dimensions & conditions depicted in these drawings are for the purpose of defining the Scope of Work and the Design Intention of the Client andArchitect. Any discrepencies between these drawings and actual field conditions or measurements must be reported promptly to the Architect prior toconstruction. Any field changes to the design while under construction must also be reported to the Architect so that the Record Drawings can be updatedandthe changesreviewedfor codecomplianceandpossibledesign conflicts.IECC (International Energy Code Compliance)
General Building Design CriteriaDesign Loads: Max Deflection L/360
1st Floor - 100 PSF Live Load, 20 PSF Dead Load2nd Floor - 50 PSF Live Load, 15 PSF Dead Load3rd Floor - 35 PSF Live Load, 15 PSF Dead Load
Roof - 30 PSF Snow Load, 15 PSF Dead Load
Call Before You Dig! 1-800-922-4445
Construction Type 5BUse Group A-3
(203) 529-1414
Joseph Matto ArchitectT h e M a t t o B u i l d i n g 414 BlackHawk Lane Stratford, Ct. 06614
AIAMemberofthe AmericanInstituteofArchitects
I N D E X O F D R A W I N G SRecord Date of First Issue 7/24/15
Revised & Re-issued on 8/12/15
Architect ................................................... Joseph Matto, AIA
Tracey Lewis Associates - Surveyors
260 Main Street Monroe, Ct. - (203) 261-8648
Construction Documents for Permitting.Plans to be Submitted
to Shelton Zoning & Building Depts
Construction Documents & Shop DrawingsFor Interior Fit-ups, Product Specifications and
Furnishings
Jim Swift, PE Landscape Architect & Engineer102 Village Drive, Shelton, Ct. - (203) 926-9665
Construction Manager......................................... Marc MattoSite Manager..................................................... Richard MattoOperations Oversight......................................... Elaine MattoProject Oversight & Quality Assurance........... Ralph Matto
434 - 436 Howe Avenue & 70-72 Bridge Street - Shelton, Ct.
Ralph Matto & Family
Surveyor
Civil Engineering &Landscape Design
StructuralEngineering
Mechanical/HVACEngineering
Thune Associates - New Canaan, Ct. PE Engineer
Glenn Tucker, PE ............Mechanical Engineer
Architectural Design
General Contracting& ConstructionCoordination
THE SHELTON FIRE ....................................... Existing Conditions - January 6, 2014
Building Comparative Data:Metric Previous Building: Proposed Building:
Footprint Area (incl detached) ....
12,232 sq ft
8,256 sq ftFloor Area.................................
25,920 sq ft
41,280 sq ftBuilding Height (AAG to Ridge)... 50 ft 60 ftNumber of Stories.................. 4 5
Number of Stores...................
7
5Number of Offices................. 2 6Number of Apartments......... 26 24Number of Parking Spaces... 9 23
Page
A01
A02
A02.1
A02.2
A03
A03.1
A04
A05
A06
A07
A08
A09
A10
A11
A12
A13
A14
Sheet Name
Title Page
Exterior Elevations
Front Elevation & Exterior Materials
Signage
Exterior Views - Page 1
Exterior Views - Page 2
INDEX - Floor Plans
Basement
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
Roof
Site-Built & Modular Construction
Comparison to Avalon Apartment
Previous Matto Building
(South of Center Street)
-
8/20/2019 Phoenix Towers Plans
2/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 02
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
E x t e r i o r E l e v a t i o n s
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
Fiberglass Balustradeand Piers.
FiberglassPilasters & Plinths
Pilaster LED "Up-Lighting".
Fiberglass Entablature & Cornice Azek PVC Fascias, Crowns & Trim
1st Floor Walls and Brick Column Pedestals to be 8"x 8" "Architecturally Textured" CMU's.
Running Bond Red/Brown Brick Veneer over Wood Frame Wall Construction
Aluco-bond (or equal) Aluminum & FoamInsulation CompositeExterior Rain-ScreenCladding System
Roofing to be CertainTead's "Grand Manor"Fiberglass "Architectural Dimensional" Shingles.UL Class A Fire rating at 425 lb./Square and with"StreakGuard" Coatings.
Brushed Aluminum Storefront Glazing Systems with Tempered/Double Insulated Glass w Sunblock Coatings
Vinyl Windows w LimitedOperation & Double
Insulated-SunblockGlazing
All Storefront Signage Displayed on this 3' high"Sign-Fascia" with Uniform LED Sign Lighting as shown.(Note: Centerlight omittedon this drawing to illustrate GROW sign)
Round "Mirrored-glazed"or PaintedPediment Oculus.
Fiberglas Pediment Finials & Pedestals. (optional detail)
Front Elevation View (East) - From Howe AveSide Elevation View (North) - From Bridge Street
Rear Elevation View (West) - From Coram AveSide Elevation View (South) - From Center Street
64' 58'
-
8/20/2019 Phoenix Towers Plans
3/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 02.1
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
F r o n t E l e v a t i o n & E x t e r i o r M a t e r i a l s
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
Fiberglass Balustradeand Piers.
Fiberglass Pilasters & Plinths
Pilaster LED "Up-Lighting".
Fiberglass Entablature & Cornice Azek PVC Fascias, Crowns & Trim
1st Floor Walls and Brick Column Pedestals to be 8"x 8" "Architecturally Textured" CMU's.
Running Bond Red/Brown Brick Veneer over Wood Frame Wall Construction
Aluco-bond (or equal) Aluminum & Foam Insulation Composite Exterior
Rain-Screen Cladding System
Roofing to be CertainTead's "Grand Manor"Fiberglass "Architectural Dimensional" Shingles.UL Class A Fire rating at 425 lb./Square and with"StreakGuard" Coatings.
Brushed Aluminum Storefront Glazing Systems with Tempered/Double Insulated Glass w Sunblock Coatings
Vinyl Windows w Limited Operation & Double Insulated-Sunblock Glazing
All Storefront Signage Displayed on this 3' high"Sign-Fascia" with Uniform LED Sign Lighting as shown.(Note: Center light omitted on this drawing to illustrate GROW sign)
Round "Mirrored-glazed"Pediment Oculus.
Fiberglas Pediment Finials & Pedestals. (optional detail)
Front Elevation View
Alucobond Rain Screen & Cladding System
Roofing
Pilasters - Balustrades - Architectural Components
Note: Computer's and Printer's Colors for these Exteriors are notaccurate. Brick will not be "orange" as appears,etc.Samples for Exterior Materials will be provided to P&Z prior toconstruction for final review and approval,
-
8/20/2019 Phoenix Towers Plans
4/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 02.2
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
S i g n a g e
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these dincluding Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
All Storefront Signage & Information Displays will be attached to and within
the boundaries of, a 3' high "Sign-Fascia Skirt Assembly"... provided with
equally spaced and symmetrically uniform LED Sign Illumination similar to the
luminaires shown.(Note: Center light omitted on this drawing to illustrate GROW sign)
-
8/20/2019 Phoenix Towers Plans
5/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 03
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
E x t e r i o r V i e w s - P a g e 1
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
View 1 View 2 View 3 View 4
View 5
View 6
View 7 View 8
-
8/20/2019 Phoenix Towers Plans
6/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 03.1
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
E x t e r i o r V i e w s - P a g e 2
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
View 1 View 2 View 3 View 4
View 5
View 6
View 7 View 8
-
8/20/2019 Phoenix Towers Plans
7/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 04
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
I N D E X - F l o o r P l a n s
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural DConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
210 sq ft
792 sq ft
893 sq ft
C
C
C
C
C
C
C
7 0 '
56' 12' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 12' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2
' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
124'
126'
7 0 '
14'
5'
14'
5'
1 3 ' - 5 "
13'-5"
4 ' - 1 "
1 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
1 '
56' 14' 56'
4' 9'-6" 2'-10" 23'-4" 2'-10" 9'-6" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2
' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4 '
9 ' - 5 "
2
' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-6" 2'-10" 23'-4" 2'-10" 9'-6" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1
0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1
0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1
0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1
0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2
' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2
' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2
' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2
' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
1 1 ' - 2 "
7 ' - 6 "
1 ' - 5 "
3'-10"
5'-10"1'-4"5'-1"
2'
3'
5'4'-5"
14'-3" 2"
1'-5"
2 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1
0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1
0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
56' 14' 56'
126'
2 '
1'-5"
Footprint Area - 8,560 sq ft
3,821 sq ft
4,185 sq ft
172 sq ft
172 sq ft
950 sq ft
1,339 sq ft1,339 sq ft
973 sq ft974 sq ft
950 sq ft
189 sq ft
750 sq ft
750 sq ft
750 sq ft750 sq ft
750 sq ft
750 sq ft
750 sq ft 750 sq ft
171 sq ft
1,012 sq ft
750 sq ft
750 sq ft
750 sq ft750 sq ft
750 sq ft
750 sq ft
750 sq ft 750 sq ft
1,012 sq ft
190 sq ft
171 sq ft
189 sq ft
750 sq ft
750 sq ft
750 sq ft750 sq ft
750 sq ft
750 sq ft
750 sq ft 750 sq ft
171 sq ft
1,011 sq ft
1,223 sq ft
3,830 sq ft
972 sq ft
218 sq ft
390 sq ft
115 sq ft
Stair Hatch Stair Hatch
24" Swing Away Grab
Bar
StairHatch
Grease Trap Access
StairHatch
S
Basement
1st Floor - Retail
2nd Floor - Professional O!ces
3rd Floor - Apartments
4th Floor - Apartments
5th Floor - Apartments
Roof
New Building Footprint
Cornice Perimeter
Roof HVAC Equipmentbetween Gable Roofs
& Behind Balustrade
Basement
8' Ceiling
EL-34.8312'
Ceiling
10'Ceiling
Up
Grow, LLCRestaurantBasement
Joy LeeRestaurant
Basement
CommercialTenant'sStorage
2
Gas
Meters
ElectricUtilities
WaterUtilities
& SprinklerSystem
TenantStorage
1
TenantStorage
13
Up
Freezer
FreezerDHW DHW
Up
6 O!ces
E l e c t r i c
M e t e r s 1 s t
& 2 n d F l r
3 S t o r e s
GASLINE IN
ELECTRICALSERVICE LINE IN
W A T E R L I N E I N
E l e c t r i c
M e t e r s 1 s t
& 2 n d F l r
TenantStorage
12
CommercialTenant'sStorage
1
CommercialTenant'sStorage
3
TenantStorage
18
TenantStorage
7
TenantStorage
8
TenantStorage
19
TenantStorage
24
Elevator
3
ProfessionalO!ce
1Professional
O!ce
2Professional
O!ce
EastStairTower
CenterHallDuct& PipingChase
6Professional
O!ce
5Professional
O!ce
4
ProfessionalO!ce
Elevator
Up
Dn
DN
DnUp
DnUpWestStair
Tower
EastStair
Tower
Apt. 2 Apt. 1
Apt. 3 Apt. 4
SupplyCloset
Apt. 8 Apt. 7
Apt. 6 Apt. 5
Elevator
DnUp
DnUpWestStair
Tower
EastStair
Tower
Apt. 2 Apt. 1
Apt. 3 Apt. 4
SupplyCloset
Apt. 8 Apt. 7
Apt. 6 Apt. 5
Elevator
DnUp
DnUp
WestStairTower
EastStair
Tower
Apt. 2 Apt. 1
Apt. 3 Apt. 4
SupplyCloset
Apt. 8 Apt. 7
Apt. 6 Apt. 5
Elevator
Joy Lee
ChineseRestaurant
LiquidLunch
Restaurant
DuctChase
Joy LeeKitchen
Dn
Dn
2'8 x6'8
Eating Area
Fan
Kitchen
Pointof
Sale
Co"eeShoppe
EL- 40.0EL- 39.0 EL- 41.0
EL- 44.0
DnEL- 48
Store2
Up
Store3
EL- 44.0 ... 12' Ceiling
EL- 46.33 ...10' Ceiling
EL- 48.16 ... 8' Ceiling
EL- 44.0
EL- 46.33
EL- 41.1
NextFloorup 9'at
EL- 58
NextFloorup11' atEL- 58
NextFloorup 13' atEL- 58
NextFloorup 18' atEL- 58 ... 14' Ceiling
NextFloorup 18' atEL- 58 ... 15' Ceiling
Baristas
EL- 42.0 EL- 43.0
Up
Back Bar
Storage
Elevator
Dn
EnunciatorPanel
EnunciatorPanel
EL- 44.0
EL- 48.66
TenantMailBoxes
Janitor'sCloset
-
8/20/2019 Phoenix Towers Plans
8/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 05
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
B a s e m e n t
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural DConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
C
1 3 ' - 5 "
13'-5"
4 ' - 1 "
1 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
7'
7 '
7 '
7'
7'
7 '
7 '
7'
1 8 '
13'-7" 13'-7" 13'-11"
3,821 sq ft
4,185 sq ft
Stair Hatch Stair Hatch
Basement
Basement
8' Ceiling
EL-
34.83
12'
Ceiling
10' Ceiling
Up
Grow, LLC
Restaurant
Basement
Joy Lee
Restaurant
Basement
Commercial
Tenant's
Storage
2
Gas
Meters
Electric
Utilities
Water
Utilities
& Sprinkler
System
Tenant
Storage
1
Tenant
Storage
13
Up
Freezer
FreezerDHW DHW
Up
6 O!ces
E l e c t r i c M e t e r s 1 s t & 2 n d F l r
3 S t o r e s
GAS LINE IN
ELECTRICAL SERVICE LINE IN
W
A T E R L I N E I N
E l e c t r i c M e t e r s
1 s t & 2 n d F l r
Tenant
Storage
12
Commercial
Tenant's
Storage
1
Commercial
Tenant's
Storage
3
Tenant
Storage
18
Tenant
Storage
7
Tenant
Storage
8
Tenant
Storage
19
Tenant
Storage
24
Elevator
-
8/20/2019 Phoenix Towers Plans
9/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 06
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
1 s t F l o o r
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural DConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
210 sq ft
893 sq ft
C
C
C
C
C
C
1 1 ' - 2 "
7 ' - 6 "
1 ' - 5 "
3'-10"
5'-10"1'-4"5'-1"
2'
3'
5'4'-5"
14'-3" 2"
1'-5"
2 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
56' 14' 56'
126'
2 '
1'-5"
1,223 sq ft
3,830 sq ft
972 sq ft
218 sq ft
390 sq ft
115 sq ft
24" Swing Away Grab
Bar
StairHatch
Grease Trap
Access
StairHatch
S
Joy Lee
Chinese
Restaurant
Liquid
Lunch
Restaurant
Duct Chase
Joy Lee
Kitchen
Dn
Dn
2'8 x6'8
Eating
Area
Fan
Kitchen
Point of
Sale
Co"ee Shoppe
EL- 40.0EL- 39.0 EL- 41.0
EL- 44.0
Dn EL- 48
Store 2
Up
Store 3
EL- 44.0 ... 12' Ceiling
EL- 46.33 ...10' Ceiling
EL- 48.16 ... 8' Ceiling
EL- 44.0
EL- 46.33
EL- 41.1
Next Floor up 9'
at
EL- 58
Next Floor up
11' at
EL- 58
NextFloor up 13' at
EL- 58
Next Floor up 18' at
EL- 58 ... 14' CeilingNext Floor up 18' at
EL- 58 ... 15' Ceiling
Baristas
EL- 42.0 EL- 43.0
1st Floor - Retail
Up
Back Bar
Storage
Elevator
Dn
Enunciator
Panel
EnunciatorPanel
EL- 44.0
EL- 48.66
Tenant
Mail
Boxes
Janitor'sCloset
-
8/20/2019 Phoenix Towers Plans
10/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 07
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
2 n d F l o o r
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
840 sq ft
56' 14' 56'
4' 9'-6" 2'-10" 23'-4" 2'-10" 9'-6" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-6" 2'-10" 23'-4" 2'-10" 9'-6" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
176 sq ft
176 sq ft
953 sq ft
1,330 sq ft
953 sq ft
953 sq ft
952 sq ft
1,330 sq ft
3
ProfessionalO!ce
1
Professional
O!ce
2
Professional
O!ce
2nd Floor - Professional O!ces
Center HallDuct& Piping
Chase
6
Professional
O!ce
5
Professional
O!ce
4
ProfessionalO!ce
Elevator
Up
DN
Duct& Piping
Chase
Duct& PipingChase
Duct& PipingChase
Up
DNEast Stair
Tower
-
8/20/2019 Phoenix Towers Plans
11/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 08
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
3 r d F l o o r
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
14'-3" 11'-4" 2'
176 sq ft
750 sq ft
750 sq ft
750 sq ft750 sq ft
750 sq ft
750 sq ft
750 sq ft 750 sq ft
175 sq ft
1,025 sq ft
3rd Floor - 1st Story of Apartments
West StairTower
Apt. 2 Apt. 1
Apt. 3 Apt. 4
Supply
Closet
Apt. 8 Apt. 7
Apt. 6 Apt. 5
Elevator
Up
DN
West Stair
Tower
Up
DN
-
8/20/2019 Phoenix Towers Plans
12/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 09
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
4 t h F l o o r
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andalIntellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
176 sq ft
750 sq ft
750 sq ft
750 sq ft750 sq ft
750 sq ft
750 sq ft
750 sq ft 750 sq ft
175 sq ft
1,025 sq ft
4th Floor - Apartments
West StairTower
Apt. 2 Apt. 1
Apt. 3 Apt. 4
Supply
Closet
Apt. 8 Apt. 7
Apt. 6 Apt. 5
Elevator
Up
DN
West Stair
Tower
Up
DN
-
8/20/2019 Phoenix Towers Plans
13/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 10
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
5 t h F l o o r
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andalIntellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 7' 7' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
126'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
176 sq ft
750 sq ft
750 sq ft
750 sq ft750 sq ft
750 sq ft
750 sq ft
750 sq ft 750 sq ft
175 sq ft
1,025 sq ft
5th Floor - Apartments
West StairTower
Apt. 2 Apt. 1
Apt. 3 Apt. 4
Supply
Closet
Apt. 8 Apt. 7
Apt. 6 Apt. 5
Elevator
Up
DN
West Stair
Tower
Up
DN
-
8/20/2019 Phoenix Towers Plans
14/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 11
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
R o o f
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andalIntellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
56' 14' 56'
4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4' 14' 4' 9'-5" 2'-10" 23'-8" 2'-10" 9'-5" 4'
4 '
9 ' - 5 "
2 ' - 1 0 "
1 8 ' - 1 0 "
1 8 ' - 1 0 "
2 ' - 1 0 "
9 ' - 5 "
4 '
7 0 '
126'
7 0 '
14'
5'
14'
5'
Roof HVAC Equipment
between Gable Roofs
& Behind Balustrade
-
8/20/2019 Phoenix Towers Plans
15/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 12
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
S i t e - B u i l t & M o d u l a r C o n s t r u c t i o n
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
13'-9" 11'-10"12'-11" 15'-9"
3 3 '
13'-9"11'-10" 12'-11"15'-9"
3 3 '
13'-9" 11'-10"12'-11" 15'-9"
3 3 '
13'-9"11'-10" 12'-11"15'-9"
3 3 '
4'-5"7'-5"
3 3 '
7'-5" 12'-7" 5'-7"
11'-10" 13'-9"
8'-2" 5'-7"
12'-11"15'-9"8'-1"4'-10"8'-8"7'-1"
2 9 ' - 9 "
7' 13'-7" 8'-1"
25'-7" 28'-8" 28'-8" 25'-7"
8'-1" 13'-7" 7' 5'-7" 12'-9" 7'-3"
Apt. 4
B-Type Flipped L/R
Apt. 8
A-Type B-Type
Apt. 3 Apt. 5
A-Type Flipped L/R
B-Type Flipped L/R & F/B A-Type Flipped F/B B-Type Flipped F/B A-Type Flipped L/R & F/B
Modular Construction - 24 Apartment Units
A-Type 3 A-Type :Flipped L/R 3 A-Type :Flipped L/R & T/B 3
B-Type 3 B-Type : Flipped L/R 3 B-Type : Flipped L/R & T/B 3
A-Type : Modular Unit750 sq ft
P a r t i n g W a l l
B-Type : Modular Unit750 sq ft
Apt. 1
P a r t i n g W a l l
P a r t i n g W a l l
P a r t i n g W a l l
Apt. 1 Apt. 2
Apt. 6
Apt. 7
Basic Module Types
A-Types 12 B-Types 12
P a r t i n g W a l l
P a r t i n g W a l l
P a r t i n g W a l l
P a r t i n g W a l l
Construction Process:
The Current Construction Plan is that the first two Stories of Retail & Office Spaces, includ ing the preparation of the "Transition-Structure" above the restaurants, will all be in-situ alterations & new construction. Concurrently, while this part of the constructionis taking place, the 3 upper stories of Apartments will be factory built either as "Modular-Units" or as "Panelized" Construction.This approach will reduce construction time and disruption to the operating businesses and the immediate downtown area.
This page illustrates how the Apartments have been designed to lend themselves to such Modular Construction. Of the 24Apartments, there are only Two Distinct Floor Plans, Type-A & Type-B. The Two Floor Plan Types are both 750 sq ft.All units are then mirror reflections of these plans either as Left/Right or Front/Back configurations.
-
8/20/2019 Phoenix Towers Plans
16/18
Revisio
J o s e p h M a t t o
A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 13
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
C o m p a r i s o n t o A v a l o n A p a r t m e n
t
J o s e p h M a t t o
A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orP
Createdby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
686 sq ft 763 sq ft
13'-4" 9" 11'-5"
7'-3"12'-9"5'-7"
25'-7"
11'-5" 10'-6"
2 0 ' - 4 "
13'
1 4 '
10'-11"
11'
1 2 ' - 4 "
2 6 '
1 0 ' - 2 "
7'-4" 6'-6"
9 ' - 1 "
3 1 '
22'-2"
22'-3"
3 1 '
22'-2"
3 2 ' - 1 "
24'-8"
3 3 '
1
4 ' - 6 "
1 8 ' - 1 "
Phoenix Apartments - Type-A L/RThe Matto Building - Howe Avenue, Shelton Ct.
P a r t i n g W a l l
Apt. 7
Phoenix
Apt Unit
Type-A L/R
Avalon
Apt OOB-2018
Avalon's Apt - 00B-2018
H/C
Living RmBedroom
Dining
AreaKitchen
W/D
C o a t s
Pantry
Avalon's Apt - Interior Renderings (From Avalon's Web Site August 2015)
-
8/20/2019 Phoenix Towers Plans
17/18
Revisio
J o s e p h M a t t o A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
A 14
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
P r e v i o u s M a t t o B u i l d i n g
J o s e p h M a t t o A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orPCreatedby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
3 ' - 1 1 "
4 6 ' - 5 "
7 '
5 2
' - 4 "
1 7 ' - 2 "
8 "
1 0 5 ' - 9 "
149'-3"
6 4 '
56'-2"
28'-8"
2 0 '
8 '
1 1 9 '
56'
11,659 sq ft
573 sq ft
3,704 sq ft
3,704 sq ft
425 sq ft
1,688 sq ft
4,167 sq ft
Parking LotEntrance
Bridge StEntrance
Full LiteGlassDoor
Locksmith
ConvenienceStore
"Dollar Store"Consignment
Shop
FlowerShop
Psychic Advisor
Walk-in
Cooler
Office
Joy LeeChinese
Restaurant
BarberShop
Liquid
Lunch
LiquidLunch
Dining Area
FlowerShop
FlowerShop
Apt.
H o w e A v e n u e
Parking Lot
Apt. 19
Apt. 18
Apt.21
Apt. 20
Apt. 23
Apt. 22
Apt. 25
Apt. 24
Apt. 11
Apt. 10
Apt.13
Apt. 12
Apt. 15
Apt. 14
Apt. 17
Apt. 16
1st Floor
2nd Floor
3rd Floor
4th Floor
Previous Matto Building
Stores & Art School
Total Area .................. ........ 13,347 sq ft
Apartments - Total Area ...12,148 sq ft25 Units in Main Building - 11,575 sq ft
1 Unit in Detached Building - 573 sq ft
Ralph Matto's Office - 425 sq ft
Total Area All Spaces ......25,920 sq ft
Ralph Matto'sOffice
(above apt)
ArtSchool
Apt. 2
Apt. 1
Apt. 4
Apt. 3
Apt. 6
Apt. 5
Apt. 8
Apt. 7
Apt. 9
Art School1
2
3
4
5
6
-
8/20/2019 Phoenix Towers Plans
18/18
Revisio
J o s e p h M a t t o A r c h i t e c t A I A 4 1 4 A B l a c k h a w k L a n e
S t r a t f o r d ,
C t
0 6 6 1 4
S 01
8/12/15
Published Dat
T h e M a t t o B u i l d i n g
Page
L a n d s c a p i n g & S i t e P l a n
J o s e p h M a t t o A r c h i t e c t A I A
4 3 4 - 4 3 6 H o w e A v e &
7 0 - 7 2 B r i d g e S t r e e t
Copyright All Unique Conceptspresentedin these d
including Aesthetic Design, Structural D
ConstructionMeansandMethods, andal
Intellectual Material, Ideas, Concepts, orPCreatedby orattributedto JosephMatto A
andreferenced by these drawings, are C
Protectedunderthe Lawsofthe United
Reproductionsofthese Drawings, inclu
electronic media, may only be made forthe
andintentof the Constructionofthe Pro
whichthese drawingswere intended. Any o
ofthese drawingsisunauthorizedand requ
permissionfrom the Architect.
7-24-2015
Original Issue
Date 7/24/15
7/24/
8/8/1
324 sq ft
893 sq ft
2,609 sq ft
C
C
C
C
C
34.00'
2 0 .0 '
1.45'
2 . 0 0 '
2 . 0 0 '
1.45'
1 5 . 5 4 '
2 1 . 8 3 '
2 1 . 1 4 '
1 4
. 4 5 '
1 7 . 1 7
'
26.86'21.63'25.59' 25.93' 20.06'
1 1 9 . 0
0 '
21.92'
Previous Property Width - 149.25'
56.00' 7.00' 7.00' 56.00'
1 . 3 0 '
9.34' 9.00' 9.00' 9.00' 9.02' 9.00' 9.00' 9.00' 9.00' 9.02' 9.00' 9.31'
2 4 . 0 1 '
1 8 . 0 1 '
5 . 0 '
8.61'
1 4 ' + / -
5 . 0 0 '
1 8 . 0 0 '
1 8 . 3 8 '
126.00'
2.00'
7.52'
1.31'5.12'
1 . 4 5 '
14.26' 0.20'
5.00'
1 1 . 2 1 '
7 . 5 4 '
4.45'
7.03' 6.97'
0 . 6 4 '
6 . 0 0 '
6 . 6 4 '
1 6 . 5 9 '
1 8 . 0 0 '
1 . 9 2 '
1 1 . 5 0 '
3 . 9 6 '
1 5 . 4 6 '
9 . 1 1 '
Original Property Width - 149.22' 43.98'
New Building Width - 126'1.30'
New Property Width - 127.3 21.92' 9.98' 24.00' 10.00'
7 0 . 0 0 '
4 9 . 0 0 '
2 3 . 0 4 '
1 1 9 . 0
0 '
1 4 2 . 0 4 '
1 1 . 4 3 '
4 . 0 0 '
1 5 . 4 1 '
0 . 6 4 '
3.0' 5.78' 6.0'
1 8 . 5 0 '
0 . 7 1 '
2 5 . 2 8 '
1.30'
16.00'
114.88' 22.95'
Radius58"
20.00°
70.00°
110º
2,609 sq ft
972 sq ft
1,223 sq ft
218 sq ft
390 sq ft
155 sqf t
Existing Utility
Poleto Remain
Protection
Bollards
Existing Utility
Poleto Remain
S
24" Swing Away Grab
Bar
StairHatch
StairHatch
Ramp
Handrail
Bridge StreetMedian
to be Removed.
4" Exposed Curb Face
4" Exposed Curb Face
Reinf. ConcreteSlabELMatchesDriveway
No RightTurnSign
UnderStop Sign
Extruded ConcreteCurbs
RelocatedGranite
Curbs
Old PropertyLine
PreviousExposed Curb Face
Land Swap Length
Land Swap Width
Land Swap Width
L a n d S w a p
L e n g t h
Previous
Exposed CurbFace
Existing Utility Poleto Remain
ADA Ramp
4 4 . 0
P l a n t e r @
E L 4 9
4 6 . 0
4 7 . 0
4 8 . 0
4 5 . 0
4 4 . 0
4 6. 0
4 8. 0
4 5 .0
4 3 . 0
TenantMail
Boxes
Enunciator
Panel
Store 2
Store 3
EL- 41.0
FF- 46.60
Up
Dn
FF- 48.1
Elevator
Janitor's
Closet
EL- 46.61
EL- 43.8
43.7
(3)6-3/4"
R-20-1/4"=1.69
4 7. 0
(5)6-3/4"
32.5 =2.81"
EL- 43.8
(5)6-3/4"32.5 =2.81"
Total Private Parking
23 Spaces
47.40
CatchBasin
T.F.-47.0
Xnsformer
Dn
2'8 x6'8
Fan
Eating Area
NextFloorup 18' at
EL- 58 ... 14' CeilingNextFloorup 18' atEL- 58 ... 15' Ceiling
EL- 44.0
Dn
Joy Lee
Kitchen
LiquidLunch
Restaurant
Point of Sale
Joy LeeChinese
Restaurant
Kitchen
DuctChase
Up
Store 1
Planter@EL-48
Planter@EL-48
4 2 . 0
4 1 . 0
4 0 . 0
3 9 . 0
3 8 . 0
Stall
1
Stall
12
Stall
13
Stall
23
4 8 .0
One
Way
CatchBasin
T.F.-47.0
EL- 47.5
4 9 . 0
EL-47.40
48.0
47.5 47.5
47.6747.67
48.0
48.0
FF- 48.1
Pad EL.48.5
13.20' 20.00' 24.00' 10.00'
1 5 . 5 4 '
2 1 . 8 3 '
2 1 . 1 4 '
1 4
. 4 5 '
1 7 . 1 7 '
1.30'
Handrail
4 4 .
4 6. 0
4 8. 0
4 5 .0
4 3 . 0
FF- 46.60
43.7
Planter @EL-46.7
4 7. 0
Planter @EL-48
Planter @EL-48
48.0
FF- 48.1
13.20'