PHILIPPINE MINING DEVELOPMENT CORPORATIONAccomplishment Report for GY 2015
otr,u.loJo-luYF3nU'Elu-P@fo
SM1 Percentage of Mining Activities Completed
P roof of Accompli sh ment :
PMDC CY 2015 Chart ofActivities and other supporting
documents
a Exploration Stage 70o/o Actual over target 100o/o 100o/o
b Development Stage N/A Actual over target N/A N/A
c Production Stage l0o/o Actual over target 100o/o 100o/o
SM2Number of CSR Beneficiaries (Diwalwal,Dinagat, Kalinga)
L0o/o Actual over target 4,500 4,890Proof of Accomplishment:
Board ApprovedAccomolishment Reoort
SM3Percentage of Reforested Areas in PMDC
Mining Areast0o/o Actual over target
506/o
20140 Hectares
50o/o
20140 Hectares
Proof of Accomplishment:Board Approved
Accomplishment Report
SM4
Favorable Perception of the Mining Project
fThrough a Post Information, Education andCommunication (IEC) Evaluation Suruey;Scale of 1-5, 5 as Most Favorablel
5o/o Pass or fail Average of 3 Average of 3.86
Proof of Accomplishment:Copy of accomplished surveyforms, attendance sheets, and
certification
SM5 Stakeholders' Satisfaction Suruey 5o/o
90 and above =100o/o
80-89 = 90o/o
70-79 = 80o/o
60-69 = 70o/o
59 and below = 0o/o
90o/o
DAP was engaged as ThirdParty. No results yet on theSatisfaction Rating as the
Survey is still ongoing.
Sub-tutal 50o/o
Jsoz2lI-
SM6 EBITDA t0o/o
Earnings beforeInterest,Tax,
Depreciation andAmortization
PhP 60.74 M PhP 67.74 M
Sub-Flta/ too/o
ooluooEo.JzE,uJF2
SM7Percentage of Ore Shipments by OperatorsAccepted by Buyers
tlo/o Actual over target 100o/o 100o/oProof of Accomplishment:
OTPs and MOEPs
SM8Percentage of Unbidded Tenements withTechnical Data Request
L0o/o Actual over target t00o/o 100o/o
P roof of Accompli sh ment :
Communication letters withgovernment agencies
SM9Number of Cases Filed for Cancellation ofJoint Operating Agreement (JOA)
N/A Actual over target N/A N/A
Sub-bta/ 20o/o
cz(.rnFz7
=dec[JJ
SMlOAverage Percentage of RequiredCompetencies Met
5o/o Pass or failTraining of theCompetency
Team
Training held in
October 2015.
SM11 ISO 9001: 2008 Cenification I0o/o Pass or fail ISO CertificationISO Certified in
lune 2015
SM12 Establishment of IT System 5o/o Pass or failFormulation offf Road Map
Done
Sub-bta/ 20o/oTotalWeiqht lOOo/o