HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Holy Cross Hospital – North Addition
Location: Silver Spring, MDOwner: Holy Cross HospitalArchitect: SmithGroupEngineers: Leach Wallace Assoc. (MEP)CM/GC: Bovis Lend Lease
Size: 124,000 s.f.Completion Date: July 2005Final Cost: $21.9 million
$7.8 million MEP
* North Addition part of a global renovation plan for the facility totaling 260,000 s.f. and costing $69 million.
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Project Background
Lighting of Registration Space
Lighting of Main Lobby
Electrical Depth
Final Conclusions
Acknowledgements
Covered in Final Report
CM Breadth
Mechanical Breadth
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Topics of Discussion
Lighting of Registration Space
Lighting of Main Lobby
Electrical Depth
Final Conclusions
Acknowledgements
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Topics of Discussion
Architectural Features: Curved wooden south façade Frosted glass north façade Open to concourse/lobby on east and west walls Metal partitions separate each workstation
Design Goals: Accent architectural features Limit spill light into admin. Offices Provide ample task illuminance 30 fc horizontal (reading) 10 fc horizontal (corridor)
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Registration Space
4” Open Downlights (13Q)2x2 Direct/Indirect Recessed Basket
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Registration Space
Type Description Lamps CCT
A2' X 2' DIRECT/INDIRECT RECESSED, MICRO-PERFORATED MESH DIFFUSER, CENTER BASKET, WHITE FINISH, GRID CEILING
(2) 40WTT5 3500K
B14" OPEN DOWNLIGHT, VERTICAL LAMP, ALUMINUM REFLECTOR AND SELF-FLANGED TRIM
(1) CFL13Q 3500K
B24" OPEN DOWNLIGHT, VERTICAL LAMP, ALUMINUM REFLECTOR AND SELF-FLANGED TRIM
(1) CFL18TRT 3500K
B36" OPEN DOWNLIGHT, HORIZONTAL LAMP, ALUMINUM REFLECTOR AND SELF-FLANGED TRIM
(1) CFL26TRT 3500K
D1ADJUSTABLE TABLE LAMP, SILVER FINISH, BLUE GLASS REFLECTOR
(1) 35W GY6.35 3000K
F36" COLOR CHANGING LED COVE STRIP, COLOR ADJUSTING CAPABILITIES, VENTED PLASTIC HOUSING
INCLUDED1000-
10000K
Lighting Fixture Schedule
4” Open Downlights (18TRT)
Computer Analysis Results: (AGI32)
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Registration Space
DescriptionPlane Height
(ft)Average
(fc)Maximum
(fc)Minimum
(fc)Max/Min
(fc)Pseudo-corridor 0 18 30 5 6.0
Desktops 2.5 36 *72 15 4.8* Max value correlates to point under task lamp
Calc GridsRegistration
FixtureBallast
Watts/FixtureQuantity Total
A 81 4 324B1 16 12 192B2 20 5 100D1 35 5 175F3 6.9 24 166
957
1.15
Power Density Calcs
Power Density (W/ft2):
Total Watts:
Allowable Power Density: 1.3 W/ft2
Final Solution:
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Registration Space
Building Background
Lighting of Registration Space
Lighting of Main Lobby
Electrical Depth
Final Conclusions
Acknowledgements
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Topics of Discussion
Architectural Features: Information Kiosk central to space Reading area in SW corner Art wall adjacent to entrance Wood-paneled north facade
Design Goals: Bring attention to info kiosk Accent architectural features Provide ample task illuminance at kiosk and reading space Accent back wall to limit depth of space 10 fc horizontal, 3 fc vertical (corridor) 50 fc horizontal (info kiosk) 30 fc horizontal (reading space)
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Main Lobby
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Main Lobby
Type Description Lamps CCT
B36" OPEN DOWNLIGHT, HORIZONTAL LAMP, ALUMINUM REFLECTOR AND SELF-FLANGED TRIM
(1) CFL26TRT 3500K
B46" OPEN DOWNLIGHT, HORIZONTAL LAMP, ALUMINUM REFLECTOR AND SELF-FLANGED TRIM
(1) CFL42TRT 3500K
C12' RECESSED LINEAR WALLWASH, 2" APERTURE, BLACK METAL DIFFUSER, GRID CEILING
(1) F24T5HO 3500K
C24' RECESSED LINEAR WALLWASH, 2" APERTURE, BLACK METAL DIFFUSER, GRID CEILING
(1) F28T5 3500K
D24" RECESSED ADJUSTABLE SPOT, BLACK POWDER-COAT FINISH, WHITE TRIM
(1) 50W GY6.35 3000K
D3ADJUSTABLE WALLWASH SPOT, TRACK/CEILING MOUNTED, WHITE FINISH, INTEGRATED ELECTRONIC TRANSFORMER
(1) 75W GY6.35 3000K
F16" COLOR CHANGING LED COVE STRIP, COLOR ADJUSTING CAPABILITIES, VENTED PLASTIC HOUSING
INCLUDED1000-
10000K
F26" COLOR CHANGING LED COVE STRIP, COLOR ADJUSTING CAPABILITIES, VENTED PLASTIC HOUSING
INCLUDED1000-
10000K
Lighting Fixture Schedule
6” LED Cove Fixture6” LED Cove Fixture In Column
6” Recessed Downlights (42TRT)Ceiling Mounted PhotosensorDimmed 6” Recessed Downlights (42TRT)
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Main Lobby
Type Description Lamps CCT
B36" OPEN DOWNLIGHT, HORIZONTAL LAMP, ALUMINUM REFLECTOR AND SELF-FLANGED TRIM
(1) CFL26TRT 3500K
B46" OPEN DOWNLIGHT, HORIZONTAL LAMP, ALUMINUM REFLECTOR AND SELF-FLANGED TRIM
(1) CFL42TRT 3500K
C12' RECESSED LINEAR WALLWASH, 2" APERTURE, BLACK METAL DIFFUSER, GRID CEILING
(1) F24T5HO 3500K
C24' RECESSED LINEAR WALLWASH, 2" APERTURE, BLACK METAL DIFFUSER, GRID CEILING
(1) F28T5 3500K
D24" RECESSED ADJUSTABLE SPOT, BLACK POWDER-COAT FINISH, WHITE TRIM
(1) 50W GY6.35 3000K
D3ADJUSTABLE WALLWASH SPOT, TRACK/CEILING MOUNTED, WHITE FINISH, INTEGRATED ELECTRONIC TRANSFORMER
(1) 75W GY6.35 3000K
F16" COLOR CHANGING LED COVE STRIP, COLOR ADJUSTING CAPABILITIES, VENTED PLASTIC HOUSING
INCLUDED1000-
10000K
F26" COLOR CHANGING LED COVE STRIP, COLOR ADJUSTING CAPABILITIES, VENTED PLASTIC HOUSING
INCLUDED1000-
10000K
Lighting Fixture Schedule
Daylight Study Results:
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Main Lobby
No Controls
All DimSelective
DimNo
ControlsAll Dim
Selective Dim
No Controls
All DimSelective
Dim
979.2 967.7 927.9 443.7 371.1 297.3 443.7 366.5 300.5
991.4 939.8 868.0 624.2 456.0 301.3 605.9 460.7 333.4
1071.0 963.0 885.0 921.1 552.4 378.8 621.2 370.2 279.8Totals: 3041.6 2870.6 2680.9 1989.0 1379.5 977.4 1670.8 1197.5 913.7
Oct. 22 - Feb. 21 (Jan 21 analysis Feb. 22 - April 21 Aug. 22 - Oct. 21 (Mar. 21 analysis April 22 - Aug. 21 (May 21 analysis
Annual Energy Consumption - kW fixture shut-off below BF = .05
MonthOvercast Partly Cloudy Clear
KWh Cost KWh Cost KWh Cost474.3 $45.54 435.1 $41.78 390.8 $37.52306.0 $29.38 280.7 $26.95 252.3 $24.23146.9 $14.10 124.4 $11.94 102.2 $9.82569.2 $54.65 483.5 $46.42 398.8 $38.29385.6 $37.02 324.3 $31.14 264.4 $25.39192.8 $18.51 142.5 $13.68 116.5 $11.19664.0 $63.76 492.2 $47.26 403.4 $38.74642.6 $53.55 465.9 $38.83 376.0 $31.33664.0 $55.33 480.0 $40.00 386.5 $32.21449.8 $37.48 324.7 $27.06 261.2 $21.76183.6 $15.30 151.2 $12.60 119.9 $10.00550.8 $45.90 455.2 $37.93 363.6 $30.30449.8 $37.48 318.0 $26.50 253.7 $21.14153.0 $12.75 136.8 $11.40 119.8 $9.99459.0 $44.07 417.7 $40.10 372.0 $35.72474.3 $45.54 435.1 $41.78 390.8 $37.52
$610.38 $495.37 $415.14$115.01 $195.24
Annual Energy Savings fixture shut-off below BF=.05
.No Controls All Dim Selective Dim
JanuaryFebruary 1-21February 22-28MarchApril 1-21April 22-30MayJuneJulyAugust 1-21August 22-31September
Total Cost:Savings:
October 1-21October 22-31NovemberDecember
Number Dimming Ballasts
Payback Period
(yrs)34 17.723 7.834 17.723 7.1Selective Dim (no shut-off)
Payback Period
Type
All Dim (shut-off)Selective Dim (shut-off)All Dim (no shut-off)
Computer Analysis Results: (AGI32)
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Main Lobby
Allowable Power Density: 1.3 W/ft2 (lobby)1.2 W/ft2 (reading)
DescriptionPlane Height
(ft)Average
(fc)Maximum
(fc)Minimum
(fc)Max/Min
(fc)Circulation Floor 0 15 44 7.3 6.0
Reading Area 2.5 31 40 14 2.9Kiosk Desktop 2.5 61 100 35 2.9
Art Wall (vertical) - 34 64 8 8.0
Main Lobby
Calc Grids
FixtureBallast
Watts/FixtureQuantity Total
B3 29 54 1566C1 27 11 297C2 63 9 567D2 50 21 1050D3 50 2 100F1 6.9 52 359F2 6.9 12 83
4022
0.84
Total Watts:
Power Density (W/ft2):
Circulation SpacesPower Density Calcs
FixtureBallast
Watts/FixtureQuantity Total
B4 45 34 15301530
0.97
Power Density CalcsReading Space
Total Watts:
Power Density (W/ft2):
Final Solution:
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Lighting Depth – Main Lobby
Schematic:
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Electrical Depth – Alternate 1
- denotes 480Y/277V panel
- denotes 208Y/120V panel
PanelMDP-N
PanelLP-1N
PanelLP-2N
PanelLP-3N
PanelLP-4N
PanelPP-1N
PanelPP-1N1
PanelHCK
PanelPP-2N
PanelPP-3N
PanelPP-4N
XFMRT-9
XFMRT-1
XFMRT-11
XFMRT-2
XFMRT-3
XFMRT-4
PanelMDP-N
PanelMDP-L
PanelPP-2N
XFMRT-L
PanelPP-2N
PanelPP-2N
PanelPP-2N
Existing Normal Power DistributionProposed Normal Power Distribution
$40,439.34$79,769.75$39,330.41
Alternate 1 Cost Impact
Total Costs:Costs:
Credits:
Equipment Type NameLoad
Connected (A)
Rating (A)
# Poles Spaces VoltageProtection
(A)Name Size Rating (A) Ground
Conduit Size
Length (ft) Name kVAPrimary Voltage
Secondary Voltage
Type Feeding Size (A) Phase Voltage
TRANSFORMER T-1 45 480∆ 208Y/120 DRYTRANSFORMER T-2 45 480∆ 208Y/120 DRYTRANSFORMER T-3 45 480∆ 208Y/120 DRYTRANSFORMER T-4 45 480∆ 208Y/120 DRYTRANSFORMER T-9 45 480∆ 208Y/120 DRYTRANSFORMER T-11 75 480∆ 208Y/120 DRY
FEEDER #5 (3) #4 85 #8 1" 14FEEDER #6 (4) #1/0 150 #6 1 1/2" 10FEEDER #11 (3) #4 85 #8 1" 15FEEDER #12 (4) #1/0 150 #6 1 1/2" 12FEEDER #17 (3) #4 85 #8 1" 22FEEDER #18 (4) #1/0 150 #6 1 1/2" 12FEEDER #25 (3) #4 85 #8 1" 15FEEDER #26 (4) #1/0 150 #6 1 1/2" 12FEEDER #32 (3) #4 85 #8 1" 20FEEDER #33 (4) #1/0 150 #6 1 1/2" 152FEEDER #34 (4) #4/0 230 #4 1 1/2" 88FEEDER #44 (3) #1 130 #8 1 1/2" 16
CIRCUIT BREAKER PP-1N 70 3 208Y/120CIRCUIT BREAKER PP-1N1 70 3 208Y/120CIRCUIT BREAKER HCK 100 3 208Y/120CIRCUIT BREAKER PP-2N 70 3 208Y/120CIRCUIT BREAKER PP-3N 70 3 208Y/120CIRCUIT BREAKER PP-4N 70 3 208Y/120
Circuit Breaker
Electrical Equipment - Deleted Normal System Components (Existing)
Panelboard Feeder TransformerFeeder Size VL-N Amperage Length Factor Vdrop % Vdrop
#1H (2) #1/0 277 140 16 0.127 0.283 0.10
#1L(3) #300
MCM120 215 20 0.0545 0.234 0.20
#1N #1/0 120 168 6 0.127 0.128 0.11#1N1 #3/0 120 160 152 0.0865 2.104 1.75#2N #1/0 120 148 12 0.127 0.226 0.19#3N #1/0 120 160 24 0.127 0.488 0.41#4N #1/0 120 32 36 0.127 0.146 0.12
#1HCK #4/0 120 56 88 0.0695 0.342 0.29
Voltage Drop Calculations - Alt. 1
Summary:
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Electrical Depth – Alternate 1
- Feeder upsized due to voltage drop
Equipment Type NameLoad
Connected (A)
Rating (A)
# Poles Spaces VoltageProtection
(A)Name Size Rating (A) Ground
Conduit Size
Length (ft) Name kVAPrimary Voltage
Secondary Voltage
Type Feeding Size (A) Phase Voltage
TRANSFORMER T-L 225 480∆ 208Y/120 DRYPANEL MDP-L 644 800 3 24 208Y/120 800
FEEDER #1H2 SETS (3) #1/0
300 #6 1 1/2" 16
FEEDER #1L3 SETS (4) #300
855 #2 2 1/2" 20
FEEDER #1N (4) #1/0 150 #6 1 1/2" 6FEEDER #1N1 (4) #1/0 150 #6 1 1/2" 152FEEDER #2N (4) #1/0 150 #6 1 1/2" 12FEEDER #3N (4) #1/0 150 #6 1 1/2" 24FEEDER #4N (4) #1/0 150 #6 1 1/2" 36FEEDER #1HCK (4) #4/0 230 #4 1 1/2" 88
CIRCUIT BREAKER T-L 300 3 480Y/277CIRCUIT BREAKER MDP-L 800 3 208Y/120CIRCUIT BREAKER PP-1N 150 3 208Y/120CIRCUIT BREAKER PP-1N1 150 3 208Y/120CIRCUIT BREAKER HCK 200 3 208Y/120CIRCUIT BREAKER PP-2N 150 3 208Y/120CIRCUIT BREAKER PP-3N 150 3 208Y/120CIRCUIT BREAKER PP-4N 150 3 208Y/120
Circuit Breaker
Electrical Equipment - Added Normal System Components (Proposed)Panelboard Feeder Transformer
Proposed Standby Power DistributionExisting Standby Power Distribution
Schematic:
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Electrical Depth – Alternate 2
- denotes 480Y/277V panel
- denotes automatic transfer switch
SUBSTATION D
LIFE SAFETY BRANCH
ATS-1
ATS-2
ATS-3
EX. EMERGENCY GENERATOR SETS
CRITICAL
BRANCH
EQUIPMENT BRANCH
NORMAL
BRANCH
EMERGENCY BRANCHES
- denotes switchgear with secondary voltage 480Y/277V
SUBSTATION D
LIFE SAFETY BRANCH
ATS-1
ATS-2
ATS-3
ISOLATED EMERGENCY GENERATOR
CRITICAL
BRANCH
EQUIPMENT BRANCH
NORMAL
BRANCH
EMERGENCY BRANCHES
ATS-4
Summary:
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Electrical Depth – Alternate 2
- Feeder upsized due to voltage drop
Equipment Type
NameLoad
Connected (A)
Rating (A)
# Poles Spaces VoltageProtection
(A)Name Size Rating (A) Ground
Conduit Size
Length (ft) NameRating
(A)Priority Voltage Phase Feeding Size (A) Phase Voltage
FEEDER #13 SETS (4) #400 MCM
1005 (3) #1/0 (3) 3 1/2" 500
FEEDER #2 (4) #1/0 150 #4 2" 500FEEDER #3 (4) #4 85 #6 1 1/4" 500
FEEDER #35(4) #350
MCM310 #1 3" 500
FEEDER #36 (3) #2/0 175 #6 2" 40
Electrical Cost Analysis - Deleted System Components (Existing)
Panelboard Feeder Automatic Transfer Switch Circuit Breaker
Feeder Size VL-N Amperage Length Factor Vdrop % Vdrop
ATS-1 #1 277 59 500 0.156 4.602 1.66ATS-2 #2 277 52.5 500 0.196 5.145 1.86ATS-3 #300 MCM 277 205 500 0.0545 5.586 2.02
ATS-4(3) #350
MCM277 241 500 0.047 5.664 2.04
EATS-1 #3 277 59 20 0.2495 0.294 0.11EATS-2 #3 277 52.5 35 0.2495 0.458 0.17EATS-3 #250 MCM 277 205 20 0.062 0.254 0.09
EATS-4(3) #300
MCM277 241 20 0.0545 0.263 0.09
EMDP(4) #400
MCM277 259 500 0.043 5.563 2.01
E6ATS(E) #2/0 277 50.5 40 0.104 0.210 0.08
E6ATS(N) #2/0 277 50.5 40 0.104 0.210 0.08
Voltage Drop Calculations - Alt. 2
NameLoad
Connected (A)
Rating (A)
# Poles Spaces VoltageProtection
(A)Name Size Rating (A) Ground
Conduit Size
Length (ft) NameRating
(A)Priority Voltage Phase Feeding Size (A) Phase Voltage
PANEL EMDP 828 1200 3 24 480Y/277 1000FEEDER ATS-1 (4) #1 130 #8 1 1/2" 500FEEDER ATS-2 (4) #2 115 #8 1 1/4" 500
FEEDER ATS-3(4) #300
MCM285 #2 2 1/2" 500
FEEDER ATS-43 SETS (4) #300 MCM
855 (3) #2 (3) 2 1/2" 500
FEEDER EATS-1 (4) #3 100 #8 1 1/4" 20FEEDER EATS-2 (4) #3 100 #8 1 1/4" 35
FEEDER EATS-3(4) #250
MCM255 #2 2 1/2" 20
FEEDER EATS-43 SETS (4) #300 MCM
855 (3) #2 (3) 2 1/2" 20
FEEDER EMDP4 SETS (4) #400 MCM
1340 (3) #1/0 (3) 3 1/2" 500
FEEDER E6ATS (E) (3) #2/0 175 #6 2" 40FEEDER E6ATS (N) (3) #2/0 175 #6 2" 40
CIRCUIT BREAKER ATS-1 100 1 480Y/277 3CIRCUIT BREAKER ATS-2 100 2 480Y/277 3CIRCUIT BREAKER ATS-3 250 3 480Y/277 3CIRCUIT BREAKER ATS-4 800 4 480Y/277 3
PARALLELING SWITCHGEAR
EMDP 1200 3 480Y/277
Circuit Breaker
Electrical Cost Analysis - Added System Components (Proposed)Panelboard Feeder Automatic Transfer Switch
Equipment Type
$73,232.22$426,547.64$353,315.42
Alternate 2 Cost Impact
Total Costs:Costs:
Credits:
Building Background
Lighting of Registration Space
Lighting of Main Lobby
Electrical Depth
Final Conclusions
Acknowledgements
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Topics of Discussion
Lighting Depth –
Registration Space – complimented architectural elements
while keeping fixtures minimally obtrusive to the space, provided
sufficient illuminance levels under ASHRAE 90.1 Power Density
recommendations
Main Lobby – utilized light as a means to call attention to
particular functions and artistic features within the space,
created a more inviting space by washing the back wall, provided
sufficient illuminance levels for various tasks under ASHRAE
90.1 Power Density recommendations
Electrical Depth – investigated cost impact of centralizing
normal branch step-down transformers, provided alternative
emergency back-up power generation system and assessed
the feasibility of proposed implementation
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Final Conclusions
Professional Leach Wallace and Associates, Inc. Reese Engineering, Inc.
Faculty Dr. Richard Mistrick Dr. Martin Moeck Prof. M. Kevin Parfitt
Personal Family Friends/ Roommates Fellow AE Students
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Acknowledgements
HCHOLY CROSS HOSPITAL – NORTH ADDITION
FINAL REPORT Phil Mackey
Questions?
Comments