Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners January 18, 2017 CERTIFICATE 26008 RESOLVED That the Design Commission, having considered designs for the installation of tower lighting, Building 77, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn, submitted by the the Brooklyn Navy Yard Development Corporation, represented by exhibits 6063-JQ, JR & JS of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that (1) this approval should not be misconstrued as a tacit approval of the same orange color for use throughout the Navy Yard; (2) the Navy Yard will submit a comprehensive environmental graphics proposal for review by September 2017; and (3) depending on the graphics proposal, the Commission may request that the tower be repainted a different color. Final approval is conditioned upon commencement of work before January 18, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on January 18, 2017. Justin Garrett Moore Executive Director

Transcript of Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons,...

Page 1: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26008

RESOLVED That the Design Commission, having considered designs for the installation of

tower lighting, Building 77, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn,

submitted by the the Brooklyn Navy Yard Development Corporation, represented by exhibits

6063-JQ, JR & JS of record in this matter, hereby gives to the same unanimous preliminary

and final approval with the understanding that (1) this approval should not be misconstrued as

a tacit approval of the same orange color for use throughout the Navy Yard; (2) the Navy Yard

will submit a comprehensive environmental graphics proposal for review by September 2017;

and (3) depending on the graphics proposal, the Commission may request that the tower be

repainted a different color.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 2: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26009

RESOLVED That the Design Commission, having considered a proposal for the installation of

Luminescence by Nobuho Nagasawa, The Peninsula, Hunter’s Point South Waterfront Park,

54th Avenue, Center Boulevard, 55th Avenue, and the East River, Long Island City, Queens,

submitted by the the Department of Cultural Affairs’ Percent for Art Program and the Economic

Development Corporation, represented by exhibits 6544-BG, BH, BI, BJ & BK of record in this

matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon commencement of work before January 18, 2019,

and submission of this project for final review and approval.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 3: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26010

RESOLVED That the Design Commission, having considered designs for the installation of a

containment fill box and stairs, Fire Academy Building 10, 7 Cammarata Avenue, Randall’s

Island, Manhattan, submitted by the the Department of Design and Construction, represented

by exhibits 6242-AE, AF, AG & AH of record in this matter, hereby gives to the same

unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 4: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26011

RESOLVED That the Design Commission, having considered designs for the reconstruction of

the spillway channel walls, Amawalk Dam, Amawalk Road and Lake Road, Somers,

Westchester County, submitted by the the Department of Environmental Protection,

represented by exhibits 5740-V, W, X & Y of record in this matter, hereby gives to the same

unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and

approval before January 18, 2019.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 5: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26012

RESOLVED That the Design Commission, having considered designs for the installation of light

fixtures, Pine Hill Wastewater Treatment Plant, Shandanken, Ulster County, submitted by the

the Department of Environmental Protection, represented by exhibits 7272-A, B & C of record

in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 6: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26013

RESOLVED That the Design Commission, having considered designs for the installation of

rooftop mechanical equipment and light fixtures, Grand Gorge Wastewater Treatment Plant,

Grand Gorge, Roxbury, Delaware County, submitted by the the Department of Environmental

Protection, represented by exhibits 1322-K, L & M of record in this matter, hereby gives to the

same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 7: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26014

RESOLVED That the Design Commission, having considered designs for the installation of

rooftop mechanical equipment and light fixtures, Tannersville Wastewater Treatment Plant,

Hunter, Greene County, submitted by the the Department of Environmental Protection,

represented by exhibits 1323-CU, CV & CW of record in this matter, hereby gives to the same

unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 8: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26015

RESOLVED That the Design Commission, having considered designs for the installation of

photovoltaic panels, Brooklyn New School, J.H.S. 142, 610 Henry Street, Brooklyn, submitted

by the the Department of Education, represented by exhibits 1164-X, Y & Z of record in this

matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 9: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26016

RESOLVED That the Design Commission, having considered designs for the installation of

pole-top antennae, battery packs, and access point devices for Con Edison, Bronx, Brooklyn,

Queens, submitted by the the Department of Transportation and the Department of

Information, Technology & Telecommunications, represented by exhibits 7273-A, B, C & D of

record in this matter, hereby gives to the same unanimous preliminary and final approval with

the understanding that (1) no more than 2500 devices will be installed citywide; (2) the devices

will not be installed on intersection, signal, or distinctive lightpoles; and (3) no additional

devices will be installed on the same poles as these devices.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 10: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26017

RESOLVED That the Design Commission, having considered designs for the reconstruction of

a playground and athletic courts, Dutch Kills Playground, Crescent Street and 36th Avenue,

Long Island City, Queens, submitted by the the Department of Parks & Recreation, represented

by exhibits 2843-G, H, I & J of record in this matter, hereby gives to the same unanimous

preliminary approval with the understanding that when this project is submitted for final, (1) the

entrances to the play areas will be revised to be a continuation of the concrete pavers instead

of a mix of safety surface and concrete and (2) the entrance to the picnic area west of the

comfort station will be moved slightly south to align with the material change from safety

surface to asphalt.

Preliminary approval is conditioned upon submission of this project for final review and

approval before January 18, 2019.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 11: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26018

RESOLVED That the Design Commission, having considered designs for the reconstruction of

a playground and construction of two entrance plazas, Friends Field Park, East 4th Street,

Avenue L, McDonald Avenue, and Avenue M, Brooklyn, submitted by the the Department of

Parks & Recreation, represented by exhibits 4198-W, X & Y of record in this matter, hereby

gives to the same unanimous preliminary approval with the understanding that the bollards will

be removed from the plaza at the intersection of East 4th Street and Avenue L.

Preliminary approval is conditioned upon submission of this project for final review and

approval before January 18, 2019.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 12: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26019

RESOLVED That the Design Commission, having considered designs for the construction of

two plazas and adjacent site work, Brownsville Recreation Center, 1555 Linden Boulevard,

Brooklyn, submitted by the the Department of Parks & Recreation, represented by exhibits

3068-K, L, M & N of record in this matter, hereby gives to the same unanimous preliminary

approval with the understanding that the team will develop final drawings with the goal of

incorporating the add alternate concrete paving in the base contract. Commissioner Nielsen

recused herself.

Preliminary approval is conditioned upon submission of this project for final review and

approval before January 18, 2019.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 13: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26020

RESOLVED That the Design Commission, having considered designs for the reconstruction of

Ennis Playground, 2nd Avenue, 11th Street, 3rd Avenue, and 12th Street, Brooklyn, submitted

by the the Department of Parks & Recreation, represented by exhibits 7274-A, B, C & D of

record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and

approval before January 18, 2019.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 14: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26021

RESOLVED That the Design Commission, having considered designs for the interim

rehabilitation of the 107th Street Pier, 107th Street, and the East River, Manhattan, submitted

by the the Department of Parks & Recreation, represented by exhibits 5053-L & M of record in

this matter, hereby gives to the same unanimous preliminary and final approval with the

understanding that this is an interim project that will reopen part of the pier to the public until

the entire structure can be reconstructed.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 15: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26022

RESOLVED That the Design Commission, having considered designs for the reconstruction of

a comfort station, Stapleton Playground, adjacent to P.S./I.S. 78, Tompkins Avenue between

Broad Street and Hill Street, Stapleton, Staten Island, submitted by the the Department of

Parks & Recreation, represented by exhibits 4029-I & J of record in this matter, hereby gives to

the same unanimous preliminary and final approval with the understanding that no other

design-build proposals will be submitted until final sign-off photos are submitted

demonstrating that the pilot was successful.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 16: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26023

RESOLVED That the Design Commission, having considered designs for the reconstruction of

athletic fields, Phase I, Red Hook Recreation Area, Lorraine Street, Henry Street, Bay Street,

and Hicks Street, Brooklyn, submitted by the the Department of Parks & Recreation,

represented by exhibits 2081-BN, BO, BP & BQ of record in this matter, hereby gives to the

same unanimous final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 17: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26024

RESOLVED That the Design Commission, having considered designs for the reconstruction of

Lincoln Terrace Playground, Lincoln Terrace Park, East New York Avenue between Rochester

Avenue and Buffalo Avenue, Brooklyn, submitted by the the Department of Parks & Recreation,

represented by exhibits 2043-AC & AD of record in this matter, hereby gives to the same

unanimous final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 18: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26025

RESOLVED That the Design Commission, having considered a final report for the replication of

a sword, General Gouverneur Kemble Warren (1893) by Henry Baerer, Grand Army Plaza,

Brooklyn, submitted by the the Department of Parks & Recreation, represented by exhibits

1611-AR, AS & AT of record in this matter, hereby gives to the same unanimous final approval.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 19: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26026

RESOLVED That the Design Commission, having considered a final report for the replication of

a sword, General Josiah Porter (1902) by William Clark Noble, Van Cortlandt Park, Bronx,

submitted by the the Department of Parks & Recreation, represented by exhibits 6067-J, K & L

of record in this matter, hereby gives to the same unanimous final approval.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 20: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26027

RESOLVED That the Design Commission, having considered designs for the rehabilitation of

the Owen F. Dolen Golden Age Recreation Center, Owen F. Dolen Park, 2551 Westchester

Avenue, Bronx, submitted by the the Department of Parks & Recreation, represented by

exhibits 1396-AH, AI, AJ, AK & AL of record in this matter, hereby gives to the same

unanimous preliminary and final approval with the understanding that DPR will reach out to the

Commission and Conservation Advisory Group (CAG) to schedule a site visit to review samples

of brick, mortar, and cast stone before the work is completed.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 21: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26028

RESOLVED That the Design Commission, having considered designs for the construction of an

ADA ramp, canopy, and ticket office, Yankee Stadium, 1 East 161st Street, Bronx, submitted

by the the Department of Parks & Recreation, represented by exhibits 4052-EI, EJ & EK of

record in this matter, hereby gives to the same unanimous preliminary approval with the

understanding that (1) revised drawings that accurately show the Kalwall canopy and structure

will be submitted before the project returns for final review and (2) all metal detectors and

screening tables are temporary and will be installed on the entrance platform during events

only.

Preliminary approval is conditioned upon submission of this project for final review and

approval before January 18, 2019.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director

Page 22: Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017  · Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Shin-pei

Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,

Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners

January 18, 2017

CERTIFICATE 26029

RESOLVED That the Design Commission, having considered designs for the installation of

rooftop stacks, Emergency Medical Station 32 (EMS 32), 347 Bond Street, Brooklyn, submitted

by the the Fire Department, represented by exhibits 6313-H, I, J & K of record in this matter,

hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before January 18, 2019, and

submission of comprehensive photographic documentation of the completed project

consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by

the Design Commission at its meeting

on January 18, 2017.

Justin Garrett Moore

Executive Director