Phelps Dodge Miami Inc.

15
Phelps Dodge Smelter Realized Cost Savings and Increased Revenues with OSIsoft’s PI System Vladimir Ushakov & Scott Voltura Phelps Dodge Miami Inc. OSIsoft User Conference May 12-14, 2003 San Francisco

description

Phelps Dodge Smelter Realized Cost Savings and Increased Revenues with OSIsoft’s PI System Vladimir Ushakov & Scott Voltura. Phelps Dodge Miami Inc. OSIsoft User Conference May 12-14, 2003 San Francisco. Communication Architecture. PI Server with RAID5. Application Servers. - PowerPoint PPT Presentation

Transcript of Phelps Dodge Miami Inc.

Page 1: Phelps Dodge Miami Inc.

Phelps Dodge Smelter Realized Cost Savings and Increased Revenues with OSIsoft’s PI

System

Vladimir Ushakov & Scott Voltura

Phelps Dodge Miami Inc.

OSIsoft User ConferenceMay 12-14, 2003San Francisco

Page 2: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 2

Communication Architecture

LAN

Data HighwayLCN

History Module

server

PI Server with RAID5server

Application Servers computer

group

Users PCs - PI clients with Win95 and W2K machines

Ethernet

Scanner 2. Gateway between LAN and Environmental Data highway

Scanner 3. Gateway between LAN and Honeywell DCS Local Control Network (LCN) Data highway

Scanner 1. Gateway between LAN and Smelter (PLC) Data highway

Data Highway

Page 3: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 3

Smelter General Schematic

Bedding PlantISA Vessel

Matte Grade = 55

Oxygen Enrichment = 40% Flow = 438 SCFM

Blast Air Avg = 28,600 Flow

=40 SCFM

Natural Gas Flow =70 SCFM

Silica Flux =4.4 dstph

Reverts

Scrap Copper = 15 stpd

Converter Slag Return

Converter Slag Return

Electric Furnace Matte

= 1,064.6 stpd

No. 2 Anode Vessel

Mold Cast Vessel

Scrap Copper

Reverts Avg = 4.4 dstph

Silica Flux Avg = 6.3dstph

Copper Concentrate 85.7

dstph

Resource Recycling Material

3.3 dstph

Bedded Material Day Tank

ISA Lance

No.5 Converter

No.4 Converter

Anode Casting Wheel

No. 1 Anode Vessel

ELECTRODES

ELF Slag Grade = 0.7

To Slag Dump 1,473.6 stpd

Total Copper Anodes

Production =624.6 STPD

ACID PLANT

Sulfur Capture = 97.6%Avg Production = 1,868 stpd, 93%

H2SO4

NOTE: All data are from the the Process Design Criteia

PHELPS DODGE MIAMI INC. SMELTER PROCESS FLOWCHART

Operating Days per Year = 351

3 BEDS @ 6,500 Tons each

Dust Recycle0.4 dstph

Offgas42,2000 scfm

Matte = 1178.4 stpdSlag = 1,015.2 stpd Matte

Grade = 57.85

Offgas10,165 scfm

Anode Scrap = 35 stpd

OffgasSlag Blow =35,000 scfm

@6.8%SO2Matte Blow = 36,000 @7.3% SO2

Blister Copper = 676.4 stpd

Reverts

Silica Flux

Reverts

Silica Flux Silica Flux

Mercury Recovery Plant

Mercury to Outside Customer

Solids

ELF

No.3 Converter

No.2Converter

Page 4: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 4

PI Server Considerations• We are a Microsoft shop.

• PI was installed in 1999.

• Collecting data for almost 5000 points.

• Excel, Access and MS SQL as enterprise-wide data storing/manipulating engines.

• Use PI-DataLink for Excel to display values for PI tags.

Page 5: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 5

PI Uses• Predictive/Preventative Maintenance.

• Capital Expenditure Justifications.

• Six Sigma Initiatives.

• Failure Analysis.

• Trouble Shooting.

• Audit Operator’s Decision Making Rationale.

Page 6: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 6

Molten Metal Level to Control

Opportunity to control demand/supply of primary product – copper.

Page 7: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 7

Rationale For Application• Operators used field input and applied a rule

of thumb to determine necessary production levels. High losses incurred due to unbalanced demand/supply.

With PI server:1. Powerful data storing/retrieving tool. 2. Conveniently incorporates into MS Office3. Data displayed in real time – reduced error in

verbal communication and enhanced accuracy of demand/supply computations.

Page 8: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 8

Daily Plan

Page 9: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 9

GUI Design and Business Logic• Not overloaded with unnecessary features.

• Based on the users’ input and suggestions.

• Retrieves values for 26 main parameters used for planning purposes.

• Business rules in Visual Basic, which allows communication to seamlessly flow among MS Office Applications.

Page 10: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 10

Demand/Supply Application

Page 11: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 11

Demand/Supply Application• Displays the status of product availability,

predicts demand and then balances supply.

• Communicates with PI server and Daily Plan to retrieve values for nearly 3 dozen critical parameters.

• Posses a dynamic character due to nature of the business and requires a periodic fine-tuning activity.

Page 12: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 12

YearGeneration ConsumptionSkims Percent Cu2001 8,092 tons 776,692 tons 426 4.51 %2002 4,713 tons 853,458 tons 407 2.57 %Delta 3,379 tons 76,766 tons 19 1.94 %

42 % 10 % 4% 43 %

Savings $ 43,000Revenue $ 200,000Total $ 243,000

Financial Outcomes

Page 13: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 13

Summary• These PI-DataLink applications enable

operators to understand the current status of the product demand/supply.

• Creates a tool to allow fine-tuning of the operating parameters which has reduced copper losses.

Future plans: - To Integrate various MS Office features such

as the automatic notification generation. - Improve GUI by migrating to Web applications.

Page 14: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 14

Thanks for Your Attention!

Page 15: Phelps Dodge Miami Inc.

May 12-14, 2003 Slide 15