Phaze Concrete application to Overland Park, Kansas

download Phaze Concrete application to Overland Park, Kansas

of 13

Transcript of Phaze Concrete application to Overland Park, Kansas

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    1/13

    February 19 2014

    TONY ROME P.E.

    CIVIL

    ENGINEER

    SR

    PUBLIC WORKS

    CITY OF OVERLAND PARK

    8500

    SANTA FE

    DRIVE

    OVERLAND PARK

    ,

    KS 66212

    Dear Sir,

    i=JH 4ZE

    ON RETE

    PO Box 842520

    Hildale

    I T

    84 784

    Ph: 435-656-9500

    Fax: 435-656-9501

    We are pleased

    to

    provide to you this letter

    of

    introduction and a brief history

    ofPhaze

    Concrete, Inc.

    Phaze Concrete, Inc. was incorporated in 2003 in Utah as a concrete subcontracting

    firm

    servicing the commercial market. As

    a subcontractor, the company performed turn-key concrete contracts for big box stores, schools, and parking structures, and

    airport work. As the company has grown it has expanded operations

    to

    include earthwork and utility operations. In 2013 Phaze

    Concrete and Jack Daniel  s Construction, Inc. merged. Jack Daniel' s Construction is a Utah contracting firm with experience

    in

    General Contracting which includes municipal and county projects, road construction, and excavation, utility, and concrete

    operations. Today, Phaze Concrete

    is

    a nationwide contracting firm having performed contracts in every state west

    of

    the

    Mississippi River, and with an ongoing presence

    in

    several major metropolitan areas, including Kansas City, Oklahoma City,

    Denver, Phoenix, Portland, and Seattle.

    Jack Daniel  s Construction/Phaze has been working in the Kansas City area since February of2013. The following are projects

    that have been completed or are

    in

    progress

    in

    the Kansas City area:

    Project Name:

    Walmart Supercenter 4611

    Description: Subcontract - Concrete and Excavation scopes

    Location: Shawnee, Kansas

    Owner:

    Wal-Mart Stores, Inc Key Construction, Inc

    Date Completed:

    July 2013

    Contact:

    Scott Casebolt - 316-207-3024

    Project Name:

    Walmart 998

    Description:

    Subcontract - Concrete and Excavation scopes

    Location:

    Westwood, Kansas

    Owner: Wai-Mart Stores, Inc Crossland Construction

    Date Completed:

    August 2013

    Contact:

    Matt Ashmore - 602-704-8699

    Project Name:

    Scheels Sports Store

    Description:

    Subcontract - Turn-key Concrete Project

    Location:

    Overland Park, Kansas

    Owner:

    Scheels Sports Sampson Construction

    Date Completed:

    n Progress

    Contact:

    Scott Brunken - 402-434-5414

    Phaze Concrete Inc

    Page

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    2/13

    Project Name Tallgrass Creek Apartment Building

    Description Subcontract - Turn-key Concrete Project

    Location Shawnee, Kansas

    Owner Redwood - ERC Kansas LLC Brinkmann Constructors

    Date Completed

    In

    Progress

    Contact

    Jed Momet- 314-401-9395

    The following list details Phaze Concrete's experience and scope capacity on projects completed nationwide:

    Municipal

    Project Name

    CC 911 Di spatch Center

    Description

    Prime Contractor- New construction, full build-out

    Location

    Colorado City, Arizona

    Owner

    Town of Colorado City

    Date Completed October 2013

    Contact

    David Darger - City Manager - 928-875-2646

    Project Name

    Hildale City Concrete Water Tank 3

    Project Description Prime Contractor - Earthwork, Concrete, Pipeline, associated appurtenances

    Project Location Hildale, Utah

    Owner Hildale City Utilities

    Date Completed October 2004

    Contact Victor Yates- Director - 435-467-8449

    Project Name CR

    61

    Road Replacement

    Description Subcontractor - Excavation, Drainage, Asphalt Concrete 0.6 mile

    Location Kersey, Colorado

    Owner Weld County

    Date Completed October 2013

    Contact Carlin Nafziger - 970-356-3611

    tate

    TXDOT

    Project Name

    Loop 306 West Overpass Concho River Bridge.

    Project Description

    Subcontract Concrete Earthwork, Drainage, Riprap, Bridge Rails, Etc.

    Project Location San Angelo, Texas

    Owner TXDOT

    Date Completed September 2 11

    Project Name Ojo Encino School

    Description Subcontract- Earthwork, Sewer, Water, Storm Drain, Concrete

    Location Ojo Encino, New Mexico

    Owner Bureau

    of

    Indian Affairs Alutiiq International

    Date Completed September 2010

    Below are projects that our personnel have participated in as managers, either as Project Managers or Project Superintendents

    for other General Contractors:

    Project Name Beverly Glen Area Drainage and Sewer Improvement

    Description Cut

    Rd

    Down 3

     ,

    replaced sewer and drainage. Curb, sidewalk , and asphalt replacement. 1.25 mile

    Location Lake Havasu, Z

    Owner Lake Havasu City

    Date Completed October 2009

    Project Name Mission Lane Project

    Description Cut Rd Down 3 , replaced water, sewer, drainage culverts. Curb, sidewalk, and asphalt replacement. 0.9mi

    Location Prescott Valley,

    Z

    Owner City

    of

    Prescott Valley

    Date Completed November 2006

    Phaze Concrete Inc. Page 2

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    3/13

    Project Name Horizon Six Drainage

    Description Subcontractor Excavation, Drainage, Asphalt Concrete 0.5 mile/4 streets

    Location Lake Havasu, Arizona

    Owner Mohave County

    Date Completed January 2014

    Contact Fred

    Barlow-

    435-691-5232

    A

    list

    of

    additional professional references

    is

    shown

    below:

    0 Company: SSI Team

    Contact: Pat Harrison

    Phone: (913) 385-9811

    Business Type: Consulting

    0

    Company: Key Construction

    Contact: Nathan McCune

    Phone: (316) 371-2317

    Business Type: General Contractor

    Title: Project Owner

    0 Company: Hotel Concepts

    Contact: Faruq Rarnzenalli

    Phone: (206)931-1573

    Business Type: Hotel Builder and Manager

    Title: Owner

    0

    Company:

    ES

    Contact: Michael Papac

    Phone: (208) 860-7635

    Business Type: General Contractor

    Project Manager

    0 Company: NE Construction

    Contact: Andre Nichols

    Phone: (970) 821-7909

    Business Type: General Contractor

    Title: President

    of

    Operations

    0 Company: Wadman Corporation

    Contact: Cody Martin

    Phone: (801) 725-1276

    Business Type: General Contractor

    Title: General Superintendent

    A

    resume

      of

    our management

    personnel

    and

    those who

    will

    be participating

    in

    this

    project

    is included with

    this

    letter.

    We appreciate the opportunity of

    working

    with

    you,

    and

    we anticipate

    developing

    a

    trust-worthy relationship that

    will

    continue through

    future

    projects and

    for years to come.

    Respectfully Yours

    Phaze Concrete Inc.

    Phaze Concrete Inc. Page 3

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    4/13

    Phaze Concrete Inc. Page 1

    1145 N Canyon St.

    PO Box 842520

    Hildale, UT 84784

    Ph: 435-656-9500Fax: 435-656-9501

    We have organized a structure of project managers and Superintendents to include many qualified and

    experienced individuals. We have included a brief resume of each as follows:

    Paul Beagley –  President

    DOB: 5-23-1981

    SUMMARY OF QUALIFICATIONS

      17 Years’ Experience in Concrete, Earthwork, Project Superintendent

     

    Business Owner for 12 years  Strong Skills in Superintending and Scheduling with Years of On the Job Experience

      Current employer: Phaze Concrete

    CERTIFICATIONS

       NCCCO Certified Crane Operator

      Multiple Training in Stamped Concrete

      OSHA Certified "Competent Person"

      OSHA 30 Training

      Certified Traffic Flagger

      ACI Certified Finisher

    CURRENT LICENSES

      Oregon General Contractor License

      Washington Concrete Specialty License

    PROFFESSIONAL REFERENCES 

      Company: Wadman Corporation

    Contact: Dave Hogan

    Phone: (801) 726-0436

    Business Type: General Contractor

    Title: President

      Company: Wadman Corporation

    Contact: Dave Hogan

    Phone: (801) 726-0436

    Business Type: General Contractor

    Title: President

      Company: Key Construction

    Contact: Nathan McCune

    Phone: (316) 371-2317

    Business Type: General Contractor

    Title: Project Owner

      Company: Hotel Concepts

    Contact: Faruq Ramzenalli

    Phone: (206)931-1573

    Business Type: Hotel Builder and Manager

    Title: Owner

    Text

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    5/13

    Phaze Concrete Inc. Page 2

      Company: ESI

    Contact: Michael Papac

    Phone: (208) 860-7635

    Business Type: General Contractor

    Project Manager

      Company: NE Construction

    Contact: Andre Nichols

    Phone: (970) 821-7909

    Business Type: General Contractor

    Title: President of Operations

      Company: SSI Team

    Contact: Pat Harrison

    Phone: (913) 385-9811

    Business Type: Consulting

     Company: Wadman Corporation

    Contact: Cody Martin

    Phone: (801) 725-1276

    Business Type: General Contractor

    Title: General Superintendent

    PROFFESSIONAL EMPLOYMENT

    Phaze Concrete: President,  2003 - Present

    Duties:  CEO, CFO, Estimating, Project Manager, License Holder, General Superintendent, Project

    Superintendent, Laser Screed Operator, CCO crane operator, Project Scheduler and Business Scheduler, Pump

    Truck Operator.

     Projects Include:

      West Gate Resort - 9 Story Concrete Structure

      Spaceport America - Concrete and Earthwork

      Jackson Hole Airport - Demolition, Concrete, Ready mix supply

      Hildale City Water Tank #3 – 2 million gallon Circular Cast-In-Place Water Tank

      70 Walmart’s - Distribution Centers, New stores, Remodels - Concrete, Steel, Earthwork

      Cody Wyoming Airport - Concrete and excavation

      Pagosa Springs, CO Multi Family Housing - General Contractor

      3 Winco Foods - Architectural Place and finish Concrete

     

    UNM School - Architectural Structural Concrete/Suspended Slabs  OJO Encino School - Earthwork, Utilities, Concrete, Framing, Sheetrock, Structural Steel, Roofing

      Hilton Garden Inn - Parking Garage - General Contractor

      Maywood Multi Family Housing - Concrete Parking Garage

      Family Dollar Distribution Center - Concrete Tilt Panels/Place and Finish 860,000 Sq Ft

      Waste Water Treatment Plant - Ft Riley, Kansas

      Multiple Post Tensioned Parking Structures

      Desert Hills School - Architectural Tilt Panels/ Structural Concrete/Slabs

    Rohbock Enterprises:  Remodel Supervisor 2003

     Projects Include:

     

    Las Vegas Midtown Office - Remodel contractor

    Steeds Inc:  Project Superintendent/Foreman 1995 - 2003

     Projects Include:

      Santa Clara Library: Architectural Structural Concrete

      4 Walmart Super Centers - Concrete

      Sam’s Club - Concrete

      South Mountain Subdivision - 5 Miles of concrete Sidewalk

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    6/13

    Phaze Concrete Inc. Page 3

    -------------------------------------------------------------------------------------------------------------------------------

    Jacob N. JessopVP – Civil Engineering

    Date of Birth 4-18-1953

    I was born and raised in southern Utah I Northern Arizona. I enjoy outdoor activities such as fishing,

    hiking, and hunting. I love to spend time with my children. I also enjoy flying my Cessna 182.

    Started working earthwork while still in high school. After graduating from high school in 1971 I spent 4

    years building dams and dikes for the Soil Conservation Service. I operated Dozer, Scraper, Compactor, Road

    grader and helped with Survey.

    I was married in 1977 and worked for various contractors in Residential and

    Commercial Concrete up until 1981 in Utah, Arizona, and Nevada.

    Started working for Meadow Valley Contractors in 1981. Worked as job Foreman on jobs such as Bridge

    at I-15 & California Wash, Laughlin Waste Water Treatment Plant, Crown Point Subdivision development,

    Bridge across Virgin River at Mesquite Nevada.

    1985 worked as project Superintendent on projects such as Bridges on highway between Virgin and

    Rockville Utah, Bridge at Sloan Channel on East Charleston, Las Vegas, Bridge widening on I-15 and Craig Road

    in Las Vegas, Parking Garage at Palace Station Las Vegas, Floor slabs at Whisky Pete’s, and Gold Strike Inn.

    1986 worked in Phoenix Arizona as project Superintendent on Arizona Department of Transportation

     projects such as Ray Road & 1-10 Traffic Interchange, ($6 million) East Tunnel Outfall, ($3 million) and West

    Tunnel Drainage System ($7 million). These Tunnel Projects involved massive underground concrete structuresconnecting the tunnels to the Salt River. Also included a pumping station with 3 - 30" Engine driven pumps as

    well as smaller pump stations. We constructed several inlet connections to the 25' diameter tunnel 50'

    underground, working on down town city streets.

    1989 worked as Project Manager for Meadow Valley Contractors on Payson Show low Highway,

    Mogollon Rim job ($15 million). This Arizona Department of Transportation job reconstructed approximately 3

    miles of road in sensitive forest environment. It had considerable rock excavation and required major blasting. It

    also included 2 concrete bridges one of which was 910 feet long, Post Tensioned cast in place concrete structure,

     built on a Soffit fill over 140 feet in height.

    1991 Worked as Project Manager on Spring Mountain Road and I-15 Traffic interchange ($15 million

     Nevada DOT) in Las Vegas, which involved removing 2 concrete bridges and constructing 4 new concrete

     bridges and approximately 2 miles of new concrete pavement. This project had very high traffic environment.

    1993 worked as Project Manager on Salt Lake City new runway project doing the grading and drainage

    ($25 million), which included dewatering, soil stabilization, importing 6 million tons of granular fill, miles of

    drainage piping and electric conduits, and utility vaults.

    Text

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    7/13

    Phaze Concrete Inc. Page 4

    1995 worked as Project Manager on an Arizona DOT project called Mariposa Road in Nogales Arizona

    ($10 million) This project included removing 2 freeway bridges, and constructing 2 new bridges on 1-19,

    widening 2 existing bridges, 3 miles of reconstruction of 2 lane highway into a 4 lane highway. It also included

    soil cement bank protection and gabions. The project is a major route into and from Mexico and involved

    working with the Mexican and US Government Authorities as the highway connected to the border.

    1996 worked as Project Manager on a Utah DOT project in Salt Lake City, 1-15 and

    Woods Cross ($18 million). This project involved A+ B bidding with a $17,000 per day incentive/penalty of

    which we received 24 days of incentive. This project reconstructed approximately 2 miles of I-15 and remove

    and replace 4 concrete bridges. Also included reconstructing portions of 3 surface streets. This project was very

    traffic intensive.

    1999 worked as Project Manager constructing a Rest Area for Utah DOT on I-80 west of Salt Lake City

    ($3million). This project included constructing the Rest Room structures, Sewer system, Concrete parking lots,

    Caretakers Residence, Rejuvenating an existing well, installing well pump storage tank and constructing a

    complete potable water system.

    January 2000 to September 1, 2000 worked as Project Manager on Nevada DOT project on US 95 in Las

    Vegas ($5 million) widening 2 bridges, involved high traffic volumes. This project had a time incentive which

    we were able to achieve the maximum bonus.

    In the 19 years I worked for Meadow Valley Contractors I was very much involved in bidding on most of

    these projects noted as well as many many others.

    As Project Superintendent I was responsible for the operations in the field, duties involved hiring crews,

    designing forms, ordering material and equipment, and comparing costs to budgets.

    As Project Manager I was responsible for the entire project, duties involved corresponding with the

    owners, scheduling, subcontract administration, material procurement, and hiring superintendents, establishing

     budgets and tracking costs.

    September of 2000 in an effort to work closer to home I began working for Telecor Inc. of Hildale, Utah.

    I worked as Project Superintendent on Washington City Water Improvements, concrete water tank, and Enterprise

    City Water Improvements, which included 2 pump houses and a chlorination building.

    In October of 2000, along with some investors I organized JNJ Engineering Construction, Inc.

    incorporated in the State of Arizona, and now licensed in Utah and Nevada.

    March through June of 2001 I worked as Project Superintendent for JNJ on Marana High Plains Effluent

    Recharge Facility. This was a Pima County project consisting of constructing 5 earthen ponds and a Pump

    Station and associated piping and landscaping. The project was valued over $600,000.00.July through September of 2001 I worked as Project Superintendent for JNJ on a project which replaced over

    1500 water services for the city of Peoria, Arizona.

    September of 2001 through May of2002 I worked as Project Superintendent for Steeds, Inc. On a

    $3,000,000.00 Sewer project for Hildale City in Southern Utah. This project consisted of approximately 15 miles

    of Sewer main outfall line collector lines, and force main and re-use line. We constructed an elevated sewer

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    8/13

    Phaze Concrete Inc. Page 5

    crossing a major drainage. We also constructed a pump station and 90 acres of clay lined sewer lagoons with over

    500,000 cubic yards of excavation. It also included Boring & Jacking across Utah State Highway 59.

    May through October of 2002 I worked as project Superintendent for JNJ on the Northern Hills Mainline

    Replacement, which was an $836,000 job for Metropolitan water District in Tucson. This project consisted of

    Water mains, vaults, valves, water services, and landscaping.

    From September o£2002 through April of 2003I worked as project Superintendent for JNJ on an Arizona

    Department of Transportation project in Douglas Arizona. This project consisted of Constructing a new multi-use

     pathway along the west side of US 191B in the Town of Douglas from. 3rd street to 14th street. Along the new

     pathway, there were constructed two ramadas, a box culvert extension, landscaping, Irrigation and lighting and

    other incidental work. This project was valued at over $1, 522,000.00.

    From March of2003 through the end of the year I worked as Project Superintendent on the Willard Street

    I Mingus Drainage Improvement project for the City of Cottonwood Arizona which included 11 concrete box

    culverts, relocation of existing sewer and water lines and installing several storm drain pipes, and the associated

    asphalt replacement. This project was valued at approximately $1,100,000

    From January 2004 through April I was involved as project superintendent in construction of Sidewalk,

    Curb & Gutter and Storm Drains on Jordan Road for the City of Sedona, Arizona. This project was valued at

    approximately $400,000.

    In March of 2004 I worked as superintendent of the Colorado City Airport taxiway construction, about

    $500,000 project consisting of grading, storm drains paving and installing taxiway lights and signs and pavement

    markings.

    In August of 2004 through March of 2005, I worked as project superintendent on the Cottonwood Old

    Town Street Improvements, which consisted of installing curb, gutter, sidewalk, and streetlights through the

    historic district of Cottonwood, Arizona. This project was valued at approximately $900,000.00.

    Starting in August of 2005 I worked as Project Manager on the Las Vegas Springs

    Preserve, Trails project for the Las Vegas Valley Water District, valued at

    $2,600,000.00, which consisted of constructing trails, and 8 waysides, 1waysides with shade structures, and a

    Ramada with composting restrooms powered by solar power, in an environmentally and historically sensitive

    area of Las Vegas, Nevada.

    From October 2000 I was actively involved in the management of JNJ Engineering Construction, Inc. as

    well as being responsible for the referenced projects, and many others not noted here that had other

    superintendents and project managers.

    Since February 2013 I have been involved with Phaze Concrete in Project Management working in the

    Civil Contracting division of the business.

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    9/13

    Phaze Concrete Inc. Page 6

    Glen Knudson Project Manager

    DOB: 7-17-1972

    SUMMARY OF QUALIFICATIONS  20 Years’ Experience in Earthwork, Utilities & Demolition

      Strong Skills in Superintending and Estimating Coupled With Hands-On In-The-Field Experience

      Current employers: Eco Alliance and Phaze Concrete

    CERTIFICATIONS

      Certified “Orenco” Sewer Treatment System Installer

      Class D Water & Wastewater Operator

      OSHA Certified "Competent Person"

      OSHA 40 Hour HAZWOPER Training

      Certified Traffic Flagger

    CURRENT LICENSES

       Nevada: A-General Engineering (Unlimited)

       New Mexico: GA01, GF02, GF03, GF04, GF05, GF07, GF08, GF09 & GS08 (Unlimited)

    PROFFESSIONAL REFERENCES

      Company: Spackman Enterprises – Centerville, Utah

    Contact: Troy Spackman – Ph: (801) 589-1707

    Business Type: Environmental Consultant, Above and Below Ground Storage Tank Installation

      Company: Sun Western Contractors – Tucson, Arizona

    Contact: Arnold Mullenbach – Ph: (520) 294-8000Business Type: Mine Equipment Design & Install, General Engineering & Utilities

    PROFFESSIONAL EMPLOYMENT

    Phaze Concrete  Estimator, Project Manager 2009 - Present

     Projects Include:

      Holloman AFB F-22 Flight Simulator: demolition, earthwork & utilities

      La Terraza Apartments: earthwork, on-site and off-site utilities

      Zuni Bluebird Subdivision - Phase III: earthwork, rip rap channels & utilities

      Cheyenne High Plains Grasslands Research Station: sewer system & pavement replacement

      Flagg Ranch Water System: well pump installation, HDPE water main, building demolitions

     

    Meinders Site Building Demolition: 225,000 SF of steel building demolition.

    Prism Contractors  Estimator, Project Manager 2003 – 2009

     Projects Include:

      Underground storage tank removal, excavation services for underground storage tank installation

      Removal, transportation and disposal of Petroleum Impacted Soils

      Community sewer and water systems for the Tohono O’odham Indian Reservation

      Domestic and fire line replacement on the Tonopah Test Range in Nevada

    Text

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    10/13

    Phaze Concrete Inc. Page 7

      Town home projects, subdivisions, commercial projects ranging from single family to 260+ lots. Projects

    have included: Site grading and earthwork from single building pads & 100,000+ SF commercial pads,

    import and export in excess of 100,000 cubic yards, demolition, blasting, paving, curb & gutter, sidewalk,

    retaining walls, sewer, water, storm drain & power trenching.

      Water mains, transmission lines, poly service replacements.

     Lift stations, force mains, “Orenco” sewer treatment systems

      Lakeside resort marina improvements incorporating a “Port-A-Dam” cofferdam to hold back lake water.

    TerraTec Inc.  Estimator, Project Manager 2001 – 2003

     Projects Include:

      Subdivisions ranging up to 200 plus lots

      Cell tower excavation and concrete

      Underground storage tank removal, excavation services for underground storage tank installation

      Removal, transportation and disposal of Petroleum Impacted Soils

      Boring and extensive utility work for both private and municipal entities

    Paragon Contractors  Estimator, Foreman and Occasional Equipment Operator 1998 – 2000

     Projects Include:

      Blasting for pipe and foundation installation in rock.

      24” to 48” jack & bore under Highway 248.

      24” ductile iron pipe transmission lines, air vac’s, valve vaults, blow-offs.

      HDPE force mains, servicing some of the first developments on the North side of Jordanelle Reservoir in

    Wasatch County, Utah

      Foundation excavation and backfill, site grading

      Under-drain dewatering system for subdivision improvements

      Dewatering for sewer, storm drain and water main installation

     

    Soils stabilization with geotextile fabrics and cobble rock

    DMC Construction  Estimator, Foreman 1995 – 1997

     Projects Include:

      Abandonment/installation of 100 scattered septic systems incorporating 30’ deep vertical dry wells

      Foundation excavations, retaining walls, diversion structures

      Commercial site work, demolition and utilities

      Performed the excavation and utilities for several subdivisions in the Salt Lake City area as well as small

    commercial sites

    Triple B Excavation  Laborer, Pipe Layer and Equipment Operator 1993 – 1995

     Projects Include:  Installed sewer mains and septic systems

      Stacked rock retaining walls

      Water mains, fire lines, commercial and domestic service lines

    -------------------------------------------------------------------------------------------------------------------------------

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    11/13

    Phaze Concrete Inc. Page 8

    Daniel Jessop

    VP – Concrete Division

    Daniel has worked for several years in the contracting industry. He has managed crews, subcontractors,

    dealing with schedule and material procurement. His experience includes the construction of roadways, box

    culverts, drainage structures, dams and reservoirs, as well as all scopes of excavation and concrete surroundingcommercial and industrial building. Some of the projects were: Foxglen Park water line-Flagstaff, AZ – City

    Drainage Improvements-Lake Havasu, AZ – Home Depot Excavation and Concrete-Kingman, AZ – Short Creek

    Highway-Fredonia, AZ – Short Creek Reservoir and Dam Project-Short Creek, AZ – Page Public Safety Facility-

    Page, AZ.

    Daniel has managed production of many of the projects in the above list. With numerous qualities as an

    engineer in the field as well as a successful project manager, we are pleased to have his leadership skills guiding

    the overall production of our business.

    -------------------------------------------------------------------------------------------------------------------------------

    Ernest Jessop

     Project Manager

    Ernest has worked for several years in the General and Civil Contracting industry. He was a foreman on a

    2 mile long sewer line project in Heber City, UT. Then in 1997, he was a foreman on a sewer line project on

    Brewer Rd and Palisade Dr in Sedona, AZ. He superintended the installation of all utility services in a 40 unit

    subdivision for the BIA in Red Mesa, AZ. He also replaced an existing water mainline with a new ductal iron

    water mains and new fire hydrants in a subdivision in Flagstaff, AZ. In Prescott, AZ, he supervised and laid out,

    formed and poured culvert bridges, cast in place concrete flatwork, curb and gutter, and other structures within the

    storm drainage scope. He has superintended dozens of road resurface or widening projects throughout the states of

    Arizona and Texas. Ernest superintended all the concrete, utilities and earthwork scopes on Sams Club #4843 on

    South Freeway in Pearland, TX, and, on WalMart #5799 on Speedway Blvd in Tucson AZ. He, also, was the

     project manager for the CR 61 Road replacement project in Kersey, CO.

    He has been involved with the Management of Safety, Compliance, and Inspections. Coordination with

    the Corp of Engineers, Subcontractors, materials, and manpower. Management of the Contract, Submittals,

    Material Resourcing, Production Schedule, Certified Payroll, and AIA Draw submission.

    With his extensive experience as a tradesman, operator, supervisor and manager, we are confident in his

    abilities to help our firm meet and exceed your expectations.

    -----------------------------------------------------------------------------------------------------------------------------------------

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    12/13

    Phaze Concrete Inc. Page 9

    Jackson M Jessop

     Superintendent  

    Jackson has been involved with the concrete and excavation construction industry for many years. He

    worked as a foreman on the following jobs: Foxglen Park water line-Flagstaff, AZ – City Drainage

    Improvements-Lake Havasu, AZ – Short Creek Highway-Fredonia, AZ – Short Creek Reservoir and DamProject-Short Creek, AZ – Page Public Safety Facility-Page, AZ.

    As a Superintendent, he has led our crews to complete several retail box stores, Dollar General, Aarons

    Rental projects, etc. Our scope included site utilities, earthwork, storm drainage, building and site concrete

     placement, and steel erection. Project sites are as follows: Kingsville, TX – Lancaster, OH – Urbana, OH – San

    Antonio, TX – Pearland, TX – Lawton, OK – Brian, TX – College Station, TX. He also superintended a

    Walmart on Montana St in El Paso, TX with the site utilities, earthwork, storm drainage, and building and site

    concrete placement scopes. He managed a couple concrete tilt-up projects, a Toys-R-Us in Houston, TX and a

    warehouse in Hildale, UT, which included all concrete scopes.

    His performance of the responsibilities as a Superintendent have shown us his outstanding ability to bring

    his projects from contract to completion on time and under budget every time.

    -------------------------------------------------------------------------------------------------------------------------------

    Thomas J Steed

     Superintendent

    Thomas has worked for several years in the Civil Engineering and General Construction industry. We feel

    that he is a professional and conscientious leader, well qualified to manage or superintend production on any

     project we contract.

    He superintended the excavation, drainage and utility placement for Providence Center overpass in Cedar

    City, UT. He also worked on the excavation on the construction on the Virgin River Bridge in LaVerkin, UT. In a

    section of downtown Salt Lake City, he supervised a crew in replacing all water, sewer, and storm drainage, along

    with replacing the road, curbs and sidewalks.

    In Lake Havasu City, AZ, he set thousands of feet mainline sewer pipe with over a thousand residential

    connections and associated road and site work, and he superintended construction on a city water tank and the

    recharge wells associated therewith. Constructed numerous ADOT Spec box culverts and associated road work on

    an airport access road in Lake Havasu City and on public roads in Sedona, AZ.

    He has superintended a rock and mass excavation, utiltities, and concrete project for the Bureau of Indian

    Affairs in Dennehotso, AZ. He was a site manager on a highway reconstruction project in Weld County,Colorado.

  • 8/20/2019 Phaze Concrete application to Overland Park, Kansas

    13/13