Phase: Subcontractors - Home | The Plumbing Info Subcontractors UNIT TOTAL UNIT ... Toilet...

1
Phase: Subcontractors UNIT TOTAL UNIT TOTAL DESCRIPTION QUANTITY UNIT ESTIMATED ESTIMATED PRICE MAT.COST PRICE LABORCOST Pipe Covering (Insulation) Backflow Certification Electric Tracing Fire Safing Power Wiring Control Wiring Trench Box Rental Water Tap Contractor Exterior Utilities Sewers & Excavating (Operator & Machine) Haul Surplus Dirt Meter Vaults Super Grease Basins Chlorination Core Drilling Saw Cutting Warehouse Space Rental .- Chemical Toilets Painting Special Hoisting of Material/Crane Rental Millright Equipment Hoisting Metal Drip Pans Bathtub Patching Hi Jacker Rental Sprinkler Work Pump Rentals Rubbish Removal (Scavenger) Wellpoints Soil/Proctor Tests Rentals Special Tools or Machinerv Tub/Shower Enclosures (If Subcontractor) Scaffold Rentals Vanity Tops (Only If Subcontrator) Vanity Cabinets (Only If Subcontractor) Toilet Partitions Toilet Room Accessories (Only If Subcontractor) FORM #S-1

Transcript of Phase: Subcontractors - Home | The Plumbing Info Subcontractors UNIT TOTAL UNIT ... Toilet...

Phase: SubcontractorsUNIT TOTAL UNIT TOTAL

DESCRIPTION QUANTITY UNIT ESTIMATED ESTIMATEDPRICE MAT.COST PRICE LABORCOST

Pipe Covering (Insulation)

Backflow Certification

Electric Tracing

Fire Safing

Power Wiring

Control Wiring

Trench Box Rental

Water Tap Contractor

Exterior Utilities

Sewers & Excavating (Operator & Machine)

Haul Surplus Dirt

Meter Vaults

Super Grease Basins

Chlorination

Core Drilling

Saw Cutting

Warehouse Space Rental .-Chemical Toilets

Painting

Special Hoisting of Material/Crane Rental

Millright

Equipment Hoisting

Metal Drip Pans

Bathtub Patching

Hi Jacker Rental

Sprinkler Work

Pump Rentals

Rubbish Removal (Scavenger)

Wellpoints

Soil/Proctor Tests

Rentals Special Tools or Machinerv

Tub/Shower Enclosures (If Subcontractor)

Scaffold Rentals

Vanity Tops (Only If Subcontrator)

Vanity Cabinets (Only If Subcontractor)

Toilet Partitions

Toilet Room Accessories (Only If Subcontractor)

FORM #S-1