Phase IV Preliminary Design - Geography at Robert Smyth · PDF filePhase IV Preliminary Design...

14
Phase IV Preliminary Design Inland boundary of landslide system New seawall Soil nailing and drainage Stabilising piles CHURCH CLIFF ‘PREFERRED’ SCHEME) Approx. SAC Boundary

Transcript of Phase IV Preliminary Design - Geography at Robert Smyth · PDF filePhase IV Preliminary Design...

Phase IV Preliminary Design

Inland boundary of landslide system

New seawall

Soil nailing and drainage

Stabilising piles

CHURCH CLIFF ‘PREFERRED’ SCHEME)

Approx. SAC Boundary

Phase IV Preliminary Design

Cut-off drains

Soil nailing and drainage

Terminal Rock armour

New seawall

Contiguous Pile Wall with Steel Ties and drainage

Ground preparation works

Soil nailing and drainage

EAST CLIFF ‘PREFERRED’ SOLUTION

Existing and realigned drainage system

Soil Nailing and drainage

Approx. SAC Boundary

Cut-off Drains