PREPARED FOR: Baker Properties, LLC Attention: Keith Pattison 953 Islington Street #23D Portsmouth, NH 03801 PREPARED BY: S. W. Cole Engineering, Inc. 10 Centre Road Somersworth, NH 03878-2926 (603) 692-0088
DRAFT REPORT August 23, 2017 17-0671 S
Explorations & Geotechnical Engineering Services
Exeter Rose Farm Subdivision Forest & Oak Street Extensions Exeter, New Hampshire
TABLE OF CONTENTS
1.0 INTRODUCTION ....................................................................................................... 1 1.1 Scope and Purpose ............................................................................................... 1 1.2 Existing Conditions and Proposed Construction .................................................... 1
2.0 EXPLORATION AND TESTING ................................................................................ 2 2.1 Explorations ........................................................................................................... 2 2.2 Testing ................................................................................................................... 2
3.0 SITE AND SUBSURFACE CONDITIONS ................................................................. 2 3.1 Subsurface Conditions ........................................................................................... 2 3.2 Groundwater Conditions ........................................................................................ 3
4.0 EVALUATION AND DISCUSSION ............................................................................ 3 4.1 General Findings ................................................................................................... 3 4.2 Frost Considerations .............................................................................................. 6 4.3 Subgrade Preparation ............................................................................................ 4 4.4 Pavement Section .................................................................................................. 5 4.5 Backfill and Compaction ........................................................................................ 6 4.6 Utilities ................................................................................................................... 7 4.7 Routine Maintenance ............................................................................................. 7 4.8 Design Review and Construction Testing .............................................................. 8
5.0 CLOSURE ................................................................................................................. 8 Appendix A Limitations Appendix B Figures Appendix C Exploration Logs and Key Appendix D Laboratory Test Results
17-0671 S
August 23, 2017 Baker Properties, LLC Attn: Keith Pattison 953 Islington Street #23D Portsmouth, NH 03801 Subject: Explorations & Geotechnical Engineering Services
Exeter Rose Farm Subdivision Forest & Oak Street Extensions Exeter, New Hampshire
Dear Keith: In accordance with our Proposal dated June 30, 2017, we have performed subsurface explorations for the subject project. This report summarizes our findings and geotechnical recommendations and its contents are subject to the limitations set forth in Appendix A. 1.0 INTRODUCTION
1.1 Scope and Purpose The purpose of our work was to explore the subsurface conditions at the site in order to provide geotechnical recommendations relative to the proposed roadway construction. Our scope of services has included eleven test boring explorations, soils laboratory testing, a geotechnical analysis of the subsurface findings, and preparation of this report.
1.2 Existing Conditions and Proposed Construction The site is generally located south of Route 101 and Henderson-Swasey Town Forest and east of Newfields Road and a railroad alignment. The site includes a combination of undeveloped wooded and open field area north and east of Oak Street Extension. Oak Street Extension bisects the site in a north-south direction and includes several residential structures. Norris Brook occupies the western portion of the site. Based on the “Conceptual Open Space Subdivision” plan prepared by MSC Engineers and dated June 23, 2017, topography generally slopes downward from northwest to southeast from about elevation 60 feet to about elevation 18 feet, respectively.
17-0671 S August 23, 2017
2
We understand the project consists of a new residential subdivision, which will include about 2,700 linear feet of new roadway construction extending from Forest Street to the northwest, intersecting with the end of Oak Street Extension, and then continuing further northwest before terminating at a proposed cul-de-sac. We understand that about 2,100 linear feet of existing roadway (Oak Street Extension) will not be re-constructed at this time, but will remain in-place as “secondary access” to the subdivision. We understand that finish grades will generally follow the existing topography with minor cut and fill requirements. We have included a “Site Location Map” in Appendix B. Existing site features are shown on the “Exploration Location Plan” also included in Appendix B. 2.0 EXPLORATION AND TESTING
2.1 Explorations Eleven test boring explorations (B-1 through B-12, excluding B-5) were made at the site on August 4, 2017 by S. W. COLE Explorations, LLC working under subcontract to S. W. Cole Engineering, Inc. (S.W.COLE). The exploration locations were selected and established in the field by S.W.COLE using a Trimble GPS mapping grade receiver with sub-meter accuracy. Test Boring B-5 was omitted at the time of exploration work due to thick vegetation / difficult access. The approximate test boring locations are shown on the “Exploration Location Plan,” included in Appendix B. Logs of the test borings and a key to the notes and symbols used on the logs are included in Appendix C.
2.2 Testing Soil samples obtained from the explorations were returned to our laboratory for further classification and testing. Gradation and moisture content tests were performed on two select soil samples. Moisture content test results are noted on the logs. Gradation test results are included in Appendix D. 3.0 SITE AND SUBSURFACE CONDITIONS
3.1 Subsurface Conditions The test borings (B-1 through B-12, excluding B-5) generally encountered a surficial layer of forest duff and topsoil at the ground surface. Below the surficial layer, Test Borings B-6 and B-9 through B-12, encountered existing fill ranging from about 2 to 4 feet in
17-0671 S August 23, 2017
3
thickness. The fill is generally loose silt and fine sand or silty sand with low percentages of gravel. At greater depth, the test borings generally encountered loose to medium dense sand, or silt and sand, ranging from about 2 to 5 feet in depth. Below the sand, or silt and sand, Test Borings B-1, 2, 4, 6, 9, and 11 were observed to transition to medium dense clayey silt to about 6 feet in depth. The test borings were generally terminated at 6 feet in depth with the exception of Test Boring B-8, which was terminated at 7 feet in depth. Please refer to the attached logs for more detailed descriptions of the subsurface findings.
3.2 Groundwater Conditions Saturated soils were observed in Test Borings B-7, 8, and 10 at depths greater than 3.5, 6.5, and 5.0 feet, respectively. No free water was observed in the remaining test borings at the time of exploration work. Long-term groundwater information is not available. Groundwater levels will fluctuate seasonally, particularly during periods of snowmelt and precipitation. 4.0 EVALUATION AND DISCUSSION
4.1 General Findings Based on the subsurface findings and our understanding of proposed construction, we offer the following geotechnical considerations:
• Based on conversation with MSC Engineers, the new roadway for the proposed subdivision should be designed for 10 trips per unit per day, which is equal to 390 trips per day.
• The new roadway should be designed in accordance with the “Standard Specifications for Construction of Public Utilities in Exeter, New Hampshire,” revised March 2002. We have reviewed this reference during our pavement evaluation.
• The site contains existing structures that will be razed in favor of new roadway
construction. Existing utilities, old foundations, and other subsurface structures should be removed and relocated as needed prior to new roadway construction.
17-0671 S August 23, 2017
4
Voids created by removal of existing utilities and foundations should be backfilled with compacted Granular Borrow.
• The test borings encountered about 2 to 4 inches of topsoil at the ground surface
with organic roots that likely extend up to about 2 feet into the subsoil. Topsoil, soils containing organics, and any other deleterious materials are not suitable as pavement subgrade and should be removed from below the new roadway. It is possible that topsoil can be re-used in landscaped areas of the site.
• Test Borings B-6, and B-9 through B-12 encountered loose, existing fill consisting
of silt-sand-gravel. Loose existing fill is not suitable as pavement subgrade and should be over-excavated and replaced. The existing fill can likely be re-used as compacted Granular Borrow assuming it meets re-use criteria outlined hereafter.
• The site contains existing wetland area, Norris Brook, and a natural spring off the
east side of Oak Street Extension. Roadway construction should adhere to practices outlined by applicable governing entities to accommodate resources on site.
• We understand that a project environmental engineer is currently evaluating
existing fill between Test Borings B-8 and B-9. We understand existing fill is anticipated to be wood-ash or coal-ash. It is our opinion that existing fill being wood-ash or coal-ash is not suitable as pavement subgrade and should be removed from below the new roadway. There is a possibility that existing fill is above background contamination level(s) for local and state regulations. The handling, transport, re-use, and/or disposal of existing fills above background contamination level(s) should adhere to practices outlined by applicable governing entities.
4.2 Subgrade Preparation We recommend that all topsoil, soils containing organics, existing utilities and foundations, loose fills and other deleterious materials be removed from below pavement areas. We recommend any cobbles or boulders protruding into pavement subgrade be over-excavated and replaced with compacted Granular Borrow. Depending on site grading, compacted Granular Borrow may be needed to raise grade to finish pavement subgrade elevation.
17-0671 S August 23, 2017
5
We recommend pavement subgrade be crowned to promote positive gravity drainage to exterior edge of pavement. Drainage features such as roadside ditches will improve pavement performance. Final cut for pavement subgrade should be performed with a smooth-edged bucket to reduce the potential for disturbance of subgrade soils. It is important to reduce construction traffic directly over subgrade soils due to the sensitivity of the soils to disturbance.
4.3 Pavement Section Considering the new roadway will service a residential subdivision, we anticipate the new roadway will be exposed primarily to passenger car traffic, and only occasional truck traffic such as bus and delivery trucks. We performed a pavement evaluation based on the AASHTO Guide for Design of Pavement Structures making industry standard assumptions about traffic loading and using empirical data relative to subgrade strength.
Based on our evaluation and the requirements outlined in the “Standard Specifications for Construction of Public Utilities in Exeter, New Hampshire,” revised March 2002, we recommend the following pavement section for the proposed roadway.
FLEXIBLE ASPHALT CONCRETE PAVEMENT Material Thickness
NHDOT 3/8” Superpave Wearing Course (50 Gyration Design) (NHDOT Std. Spec., 2016, Section 401)
1 ¼ inches
NHDOT ¾” Superpave Binder Course (50 Gyration Design) (NHDOT Std. Spec., 2016, Section 401)
2 ¾ inches
NHDOT 304.3 Crushed Gravel Base Course 6 inches NHDOT 304.2 Gravel Subbase 12 inches
Materials are based on 2016 New Hampshire Department of Transportation specifications for base and subbase materials. Pavement base and subbase materials should be compacted to at least 95 percent of ASTM D-1557. Hot mix bituminous asphalt pavement should be compacted to 92 to 97
17-0671 S August 23, 2017
6
percent of its theoretical maximum density as determined by ASTM D-2041. A tack coat should be used between lifts of asphalt.
4.4 Frost Considerations Frost penetration can be on the order of 4.0 feet in this area of the state. The native soils are considered highly frost susceptible. In the absence of full depth excavation of frost susceptible soils or use of insulation, frost will penetrate into the subgrade and some frost heaving and pavement distress could occur. It is not common regional practice to remove frost-susceptible soils in the frost zone due to the associated high-expense. It is important to reduce the amount of water infiltration into the pavement section to reduce the potential for frost heaving.
4.5 Backfill and Compaction We recommend the following fill materials for the new roadway construction. Granular Borrow: Imported materials consisting of a mixture of sand, gravel, silt, and / or recycled products meeting the following gradation:
Granular Borrow Sieve Size Percent Finer by Weight
6 inch 100 ¼ inch 25 to 90
#40 0 to 50 #200 0 to 20
Granular Borrow is recommended for use as:
• Backfill to raise grade to bottom of pavement section • Backfill for replacement of over-excavated materials
Recycled Products: Borrow products including various proportions of recycled crushed materials such as asphalt, concrete, and brick can be submitted to S.W.COLE for review and consideration for use as Granular Borrow. Recycled products must also be tested in accordance with state environmental regulations and approved by a qualified environmental consultant.
Re-Use: Existing fill, topsoil, soils containing organics, existing utilities and foundations are not suitable for re-use below pavement areas. There is a possibility that native silt
17-0671 S August 23, 2017
7
and sand soils can be re-used as compacted Granular Borrow below pavement areas, provided that:
1) moisture content at the time of construction is adequate for achieving project compaction specifications;
2) rock particles larger than 6 inches are removed prior to re-use; and
3) the material is free of organics and debris.
Based on laboratory testing, the native silt and sand soils contain 18.7 to 88.3 percent fines. These soils will be very difficult to re-use as site fill when wet or during wet weather. Depending on the time of year of construction it may be necessary to import Granular Borrow from off site. Placement and Compaction: Fill should be placed in horizontal lifts and compacted such that the desired density is achieved throughout the lift thickness with 3 to 5 passes of compaction equipment. Loose lift thicknesses for grading, fill and backfill activities should not exceed 6 inches. We recommend that fill and backfill below be compacted to at least 95 percent of its maximum dry density as determined by ASTM D-1557. Compaction should be performed with a vibratory roller having a static weight of at least 12 tons.
4.6 Utilities Where new utilities are proposed beneath new pavement, backfilling of the utility trenches should be made in a manner to reduce differential frost action. Utility pipes should be bedded and surrounded using materials consistent with the manufacturer’s specifications. Above the utility bedding, backfill in trenches should be material similar to that in the trench sidewalls to lessen the potential for differential frost action between the trench and the adjacent materials. The backfill material should be placed in horizontal lifts not exceeding 6 inches in thickness and should be compacted to a density similar to that of the material in the adjacent trench sidewalls.
4.7 Routine Maintenance We recommend implementation of routine maintenance for the new pavement to increase the potential for achieving the pavement design life. This should include crack cleaning and sealing on a periodic basis to reduce the potential for surface water from infiltrating the pavement section.
17-0671 S August 23, 2017
8
4.8 Design Review and Construction Testing S.W.COLE should be retained to review the final design and specifications to determine that our earthwork and roadway recommendations have been properly interpreted and implemented. S.W.COLE should be retained to observe subgrade preparation for the new roadway. S.W.COLE should be retained to provide testing of soils and asphalt materials. This is to observe compliance with the design concepts, specifications, and design recommendations and to allow design changes in the event that subsurface conditions are found to differ from those anticipated prior to the start of construction. 5.0 CLOSURE It has been a pleasure to be of assistance to you with this phase of your project. Please do not hesitate to contact us if you have any questions or if we may be of further assistance. Sincerely, S. W. Cole Engineering, Inc.
Nathan M. Cote, P.E. Geotechnical Engineer NMC:cbm
APPENDIX A Limitations
This report has been prepared for the exclusive use of Baker Properties, LLC for specific application to the new roadway for the Exeter Rose Farm Subdivision in Exeter, New Hampshire. S.W.COLE has endeavored to conduct the work in accordance with generally accepted soil and foundation engineering practices. No warranty, expressed or implied, is made. The soil profiles described in the report are intended to convey general trends in subsurface conditions. The boundaries between strata are approximate and are based upon interpretation of exploration data and samples. The analyses performed during this assessment and recommendations presented in this report are based in part upon the data obtained from subsurface explorations made at the site. Variations in subsurface conditions may occur between explorations and may not become evident until construction. If variations in subsurface conditions become evident after submission of this report, it will be necessary to evaluate their nature and to review the recommendations of this report. Observations have been made during exploration work to assess site groundwater levels. Fluctuations in water levels will occur due to variations in rainfall, temperature, and other factors. S.W.COLE’s scope of work has not included the investigation, detection, or prevention of any Biological Pollutants at the project site or in any existing or proposed structure at the site. The term “Biological Pollutants” includes, but is not limited to, molds, fungi, spores, bacteria, and viruses, and the byproducts of any such biological organisms. Recommendations contained in this report are based substantially upon information provided by others regarding the proposed project. In the event that any changes are made in the design, nature, or location of the proposed project, S.W.COLE should review such changes as they relate to analyses associated with this report. Recommendations contained in this report shall not be considered valid unless the changes are reviewed by S.W.COLE.
APPROXIMATE SITE LOCATION
Copyright:© 2013 National Geographic Society, i-cubed
NOTE:SITE LOCATION MAP PREPARED FROMESRI ArcGIS ONLINE AND DATA PARTNERSINCLUDING USGS AND © 2007 NATIONALGEOGRAPHIC SOCIETY.
2,000 0 2,000 4,000
Scale in Feet
Job No.Date:
17-067108/10/2017
ScaleSheet
1:240001
SITE LOCATION MAPBAKER PROPERTIES, LLC
EXETER ROSE FARM SUBDIVISIONFOREST & OAK STREET EXTENSIONS
EXETER, NEW HAMPSHIRE
R:\20
17\17
-0671\
GIS\M
XDs\1
7-067
1 SLM
.mxd,
8/10
/2017
1:32:0
2 PM,
1:0,
TAX MAP 63 LOT 190
N/F
JEANETTE WILLIAMS
REVOCABLE TRUST
10 WADLEIGH STREET
EXETER, NH 03833
X
X
X
X
X
X
X
X
X
TAX MAP 49 LOT 7
N/F
BOSTON AND MAINE
RAILROAD CORPORATION
1700 IRON HORSE PARK
NORTH BELLERICA, MA 01862-1681
RCRD BK.529 PG.14
TAX MAP 53 LOT 4
N/F
JOHN P. & TERESA TOOMEY
2 NEWFIELDS ROAD
EXETER, NH 03833
RCRD BK.5516 PG.135
TAX MAP 54 LOT 4
N/F
NORRIS BROOK CONDOMINIUM
EXETER, NH 03833
RCRD BK.2561 PG.2642
TAX MAP 63 LOT 202
N/F
MAURA C. FAY &
MICHAEL VEAZEY
13 FOREST STREET
EXETER, NH 03833
RCRD BK.5231 PG.321
TAX MAP 63 LOT 204
N/F
TUCK D. PROPERTIES LLC
215 ATLANTIC AVENUE
SEABROOK, NH 03874
RCRD BK.4816 PG.657
"HENDERSON-SWASEY
TOWN FOREST"
(municipal)
TAX MAP 48 LOT 5
N/F
EAST COAST VENTURES INC.
C/O CP MANAGEMENT
11 COURT STREET, SUITE 100
EXETER, NH 03833
RCRD BK.5613 PG.2678
(industrial)
TAX MAP 54 LOT 1
N/F
SIG SAUER INC.
18 INDUSTRIAL DRIVE
EXETER, NH 03833
(industrial)
TAX MAP 63 LOT 207-1
N/F
JOAN GALLAGHER
5 WADLEIGH STREET
EXETER, NH 03833
RCRD BK.4428 PG.2196
(residential)
TAX MAP 63 LOT 206
N/F
JOAN GALLAGHER &
THOMAS R. LIGHT
5 WADLEIGH STREET
EXETER, NH 03833
RCRD BK.4428 PG.2194
(residential)
TAX MAP 49 LOT 8
N/F
TOWN OF EXETER
SWASEY HENDERSON FOREST
10 FRONT STREET
EXETER, NH 03833
RCRD BK.2056 PG.64
TAX MAP 63 LOT 203
N/F
MARY FRANCES DAGOSTINO
11 FOREST STREET
EXETER, NH 03833
RCRD BK.2007 PG.1579
(residential)
(residential)
(residential)
(residential)
(residential)
OAK STREET EXTENSION
(SEE RCRD BK.#419 PG.#259
FOR RIGHT OF WAY)
B-1
B-2
B-3
B-4
B-6
B-7
B-8
B-9
B-5
B-10
B-11
B-12
BAKER PROPERTIES, LLC
EXETER ROSE FARM SUBDIVISIONFOREST STREET & OAK STREET EXTENSIONS
EXETER, NEW HAMPSHIRE
EXPLORATION LOCATION PLAN
Job No.:Date :
17-067108/10/2017
Scale:Sheet:
1" = 100'1
S.W.COLEE N G I N E E R I N G , I N C .
LEGEND:
APPROXIMATE BORING LOCATION
NOTES:
1. EXPLORATION LOCATION PLAN WAS PREPARED FROM A1"=100' SCALE PLAN OF THE SITE ENTITLED"PRELIMINARY CONCEPTUAL OPEN SPACE SUBDIVISION,"PREPARED BY TFM, DATED JUNE 23, 2017.
2. THE BORINGS WERE LOCATED IN THE FIELD BY GPSSURVEY BY S. W. COLE ENGINEERING, INC. USING AMAPPING GRADE TRIMBLE GPS RECEIVER.
3. THIS PLAN SHOULD BE USED IN CONJUNCTION WITH THEASSOCIATED S. W. COLE ENGINEERING, INC.GEOTECHNICAL REPORT.
4. THE PURPOSE OF THIS PLAN IS ONLY TO DEPICT THELOCATION OF THE EXPLORATIONS IN RELATION TO THEEXISTING CONDITIONS AND PROPOSED CONSTRUCTIONAND IS NOT TO BE USED FOR CONSTRUCTION.
Feet
0 100 200
R:\2
017\
17-0
671\
CA
D\D
raw
ings
\17-
0671
ELP
.dw
g, 8
/10/
2017
1:1
1:54
PM
, 1:1
, CEM
, S. W
. Col
e En
gine
erin
g, In
c.
1D
2D
3D
24/12
24/22
24/24
2-3-4-3
10-11-9-10
12-12-13-11
2" Grassed TOPSOILLoose, brown SILT and fine to medium SAND
Medium dense, brown-gray SILT and fine tomedium SAND
Medium dense, brown-gray Clayey SILT andfine to medium SAND
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 1
BORING NO.: B- 1BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.2
2.0
5.5
6.0
1D
2D
3D
24/14
24/22
24/24
4-4-4-2
5-6-9-8
10-13-17-18
4" Grassed TOPSOIL
Loose, brown Silty fine to medium SAND
Medium dense, gray-brown Clayey SILTsome fine sand
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 2
BORING NO.: B- 2BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.3
2.0
6.0
1D
2D
3D
24/12
24/22
11/4
2-1-2-7
8-7-9-16
31-50/5"
w =20.6 %
2" Forest Duff / TOPSOILLoose, brown-orange SILT and fine SANDtrace gravel
Medium dense, gray-brown SILT some fineSAND trace gravel
...becoming dense
Bottom of Exploration at 4.9 feet
0-2
2-4
4-4.9
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 4.9
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 3
BORING NO.: B- 3BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.2
2.5
4.9
1D
2D
3D
24/18
24/24
24/24
5-5-7-8
10-13-14-12
16-19-23-20
Medium dense, light brown-gray SILT andfine SAND
Dense, gray-brown Clayey SILT some fineSAND
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 4
BORING NO.: B- 4BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
4.0
6.0
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES: Omitted due to thick vegetation / difficult access.
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tim Boyce
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): NALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 0.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft):
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 5
BORING NO.: B- 5BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
1D
2D
3D
24/14
24/20
24/22
2-2-2-3
3-4-6-7
9-12-16-17
2" Grassed TOPSOILLoose, dark brown SILT and fine to mediumSAND trace gravel (possible FILL)
Loose, brown-gray Clayey SILT some fineSAND
...becoming medium dense
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 6
BORING NO.: B- 6BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.2
2.0
6.0
1D
2D
3D
24/14
24/12
24/16
4-3-4-4
9-13-21-9
10-12-12-12
4" Grassed TOPSOIL
Loose, gray-brown SILT and fine SAND
Dense, brown-gray fine to medium SANDsome silt
Medium dense, brown Silty fine to mediumSAND
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): Soils appear saturated below 3.5 feet.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 7
BORING NO.: B- 7BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.3
2.5
4.0
6.0
1D
2D
3D
24/4
24/18
24/18
2-1-1-2
2-2-3-2
6-8-12-10
w =11.7 %
2" Grassed TOPSOILLoose, brown-gray Silty fine to mediumSAND trace gravel
Loose, brown-gray SILT and fine SAND
Medium dense, brown-gray Silty fine SAND
Bottom of Exploration at 7.0 feet
0-2
2-4
5-7
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 7.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): Soils appear saturated below 6.5 feet.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 8
BORING NO.: B- 8BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.2
3.5
5.0
7.0
1D
2D
3D
24/14
24/12
24/22
2-5-4-2
3-4-6-7
7-8-9-10
4" Grassed TOPSOIL
Loose, brown SILT and fine SAND (PossibleFILL)
Loose, light brown fine to medium SANDsome silt
Medium dense, gray-brown Clayey SILTsome fine SAND
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B- 9
BORING NO.: B- 9BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.3
2.0
3.9
6.0
1D
2D
3D
24/12
24/12
24/12
4-3-1-1
3-3-4-4
5-5-9-9
Loose, black SILT and SAND some gravel(FILL)
Loose, light brown Silty fine to medium SAND
...becoming medium dense
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): Soils appear saturated below 5 feet.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B-10
BORING NO.: B-10BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
2.0
6.0
1D
2D
3D
24/18
24/12
24/22
3-4-4-3
4-5-4-6
6-8-8-10
4" Grassed TOPSOIL
Loose, brown Silty SAND some gravel (FILL)
Loose, brown-gray SILT and fine to mediumSAND
Medium dense, brown-gray Clayey SILT andfine SAND
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B-11
BORING NO.: B-11BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
0.3
2.0
4.0
6.0
1D
2D
3D
24/6
24/10
24/24
8-6-4-4
5-3-3-6
9-12-16-13
Loose, brown Gravelly Silty SAND (FILL)
Loose, gray-brown SILT and fine SANDsome gravel (possible re-worked FILL)
Medium dense, brown-gray SILT and fineSAND
Bottom of Exploration at 6.0 feet
0-2
2-4
4-6
KEY TO NOTESAND SYMBOLS:
DRILLING CO.: S. W. Cole Explorations, LLC
HAMMER DROP (inch): 30
Drilling Information
RIG TYPE: Track Mounted Diedrich D-50
HAMMER TYPE: Automatic
GENERAL NOTES:
DRILLER: Scott Hollabaugh
HAMMER WEIGHT (lbs): 140
R = Rock Core SampleV = Field Vane Shear
Pen. = Penetration LengthRec. = Recovery Lengthbpf = Blows per Footmpf = Minute per Foot
WOR = Weight of RodsWOH = Weight of HammerRQD = Rock Quality DesignationPID = Photoionization Detector
Sv = Field Vane Shear Strength, kips/sq.ft.qU = Unconfined Compressive Strength, kips/sq.ft.N/A = Not Applicable
SAMPLER: Standard Split-Spoon
DRILLING METHOD: Hollow Stem Auger
LOGGED BY: Tyler Demers
CORE BARREL: N/A
At time of DrillingAt Completion of DrillingAfter Drilling
D = Split Spoon Sample
CASING ID/OD: N/A /N/A
Water Level
AUGER ID/OD: 2 1/4 in / 5 5/8 in
ELEVATION (FT): N/ALOCATION: See Exploration Location Plan TOTAL DEPTH (FT): 6.0
U = Thin Walled Tube Sample
HAMMER EFFICIENCY FACTOR:
WATER LEVEL DEPTHS (ft): No free water observed.
Stratification lines represent approximateboundary between soil types, transitions maybe gradual. Water level readings have beenmade at times and under conditions stated.Fluctuations of groundwater may occur due toother factors than those present at the timemeasurements were made.
SampleNo.
Pen./Rec.(in)
SAMPLE INFORMATION
BlowCount
orRQD
CasingPen.(bpf)
Typ
e
Gra
phic
Log
Elev.(ft)
Depth(ft)
5
H20DepthField / Lab
Test Data
SampleDescription &Classification
Depth(ft)
Remarks
PROJECT NO. 17-0671SHEET: 1 of 1
BORING LOG
DATE START: 8/4/2017DATE FINISH: 8/4/2017
BORING NO.: B-12
BORING NO.: B-12BO
RIN
G /
WE
LL 1
7-06
71.G
PJ
SW
CE
TE
MP
LAT
E.G
DT
8/1
7/17
CLIENT: Baker Properties, LLCPROJECT: Exeter Rose Farm SubdivisionLOCATION: Forest & Oak Street, Exeter, New Hampshire
3.0
4.0
6.0
KEY TO NOTES & SYMBOLS
Test Boring and Test Pit Explorations All stratification lines represent the approximate boundary between soil types and the transition may be gradual. Key to Symbols Used: w - water content, percent (dry weight basis) qu - unconfined compressive strength, kips/sq. ft. - laboratory test Sv - field vane shear strength, kips/sq. ft. Lv - lab vane shear strength, kips/sq. ft. qp - unconfined compressive strength, kips/sq. ft. – pocket penetrometer test O - organic content, percent (dry weight basis) WL - liquid limit - Atterberg test WP - plastic limit - Atterberg test WOH - advance by weight of hammer WOM - advance by weight of man WOR - advance by weight of rods HYD - advance by force of hydraulic piston on drill RQD - Rock Quality Designator - an index of the quality of a rock mass. γT - total soil weight γB - buoyant soil weight Description of Proportions: Description of Stratified Soils Parting: 0 to 1/16” thickness Trace: 0 to 5% Seam: 1/16” to 1/2” thickness Some: 5 to 12% Layer: ½” to 12” thickness “Y” 12 to 35% Varved: Alternating seams or layers And 35+% Occasional: one or less per foot of thickness With Undifferentiated Frequent: more than one per foot of thickness REFUSAL: Test Boring Explorations - Refusal depth indicates that depth at which, in the drill foreman's opinion, sufficient resistance to the advance of the casing, auger, probe rod or sampler was encountered to render further advance impossible or impracticable by the procedures and equipment being used. REFUSAL: Test Pit Explorations - Refusal depth indicates that depth at which sufficient resistance to the advance of the backhoe bucket was encountered to render further advance impossible or impracticable by the procedures and equipment being used. Although refusal may indicate the encountering of the bedrock surface, it may indicate the striking of large cobbles, boulders, very dense or cemented soil, or other buried natural or man-made objects or it may indicate the encountering of a harder zone after penetrating a considerable depth through a weathered or disintegrated zone of the bedrock.
Project Name EXETER NH - FOREST AND OAK STREET EXTENSION - GEOTECHNICAL ENGINEERING SERVICES
Project Number 17-0671
Lab ID 16277S
Material Source B-3, 2D, 2.5'-4.0'Date Completed 8/11/2017
Tested By BRADLEY GERSCHWILER
Date Received 8/7/2017
ASTM C-117 & C-136
Client BAKER PROPERTIES, LLC
Report of Gradation
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.00100.01000.10001.000010.0000100.0000
SIEVE SIZE - mm
AM
OU
NT
PA
SS
ING
GRAY-BROWN SILT SOME SAND TRACE GRAVEL
3" 2" 1" #10 #20 #40 #100 #2001/2" 1/4"
SIEVE SIZE AMOUNT PASSING (%)STANDARD DESIGNATION (mm/µm)
3/8" 1009.5 mm1/4" 996.3 mm
No. 4 0.9% Gravel994.75 mmNo. 10 982.00 mmNo. 20 97850 umNo. 40 10.8% Sand95425 umNo. 60 94250 umNo. 100 92150 umNo. 200 88.3% Fines88.375 um
Comments: Moisture Content = 20.6% Sheet
Project Name EXETER NH - FOREST AND OAK STREET EXTENSION - GEOTECHNICAL ENGINEERING SERVICES
Project Number 17-0671
Lab ID 16278S
Material Source B-8, 1D, 0.2'-2.0'Date Completed 8/11/2017
Tested By BRADLEY GERSCHWILER
Date Received 8/7/2017
ASTM C-117 & C-136
Client BAKER PROPERTIES, LLC
Report of Gradation
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.00100.01000.10001.000010.0000100.0000
SIEVE SIZE - mm
AM
OU
NT
PA
SS
ING
BROWN-GRAY SILTY SAND TRACE GRAVEL
3" 2" 1" #10 #20 #40 #100 #2001/2" 1/4"
SIEVE SIZE AMOUNT PASSING (%)STANDARD DESIGNATION (mm/µm)
1/4" 1006.3 mmNo. 4 0.1% Gravel1004.75 mm
No. 10 992.00 mmNo. 20 95850 umNo. 40 81.3% Sand86425 umNo. 60 72250 umNo. 100 46150 umNo. 200 18.7% Fines18.775 um
Comments: Moisture Content = 11.7% Sheet