    7.1 Project Financials at a Glance

    PROJECT FINANCIALS AT A GLANC

    Rupees (in lakhs)

    Cost of the project

    Means of Finance

     Total

    Det! "#uit$ Ratio

    %et &resent 'alue&rotailit$ n*e+ (&)

    nternal Rate of Return

    7.3 DETAILS OF COST OF PROJECT

    PROJECT COST CO#PONENT

    LAND $ SITE DE%ELOP#ENT

    1, -an* (inclu*in. re.istration)

    2, Cost of le/ellin. 0 site *e/elopent

    pproach 0 internal roa*s Fencin. Cul/erts ates etc,

    &'ILDING $ CI%IL (OR)S

    1, Drains an* seers inclu*in. euent treatent pit &lant uil*in.-aorator$ uil*in. 7& processin. e#uipent uil*in.s

    &ro*ucts 8tora.e 8he* &a/e* $ar* etc,

    2, Foun*ation for Reactor Fractionator Coolin. toer Copressor

    9ther iscellaneous pups etc,

    4, Chine$ foun*ation inclu*in. chine$ ith refractor$ linin. 8itch$ar*

    "#uit$! &rooters

    Det! -on. Ter -oan

    3, u+iliar$ coolin. toer Miscellaneous foun*ations for con/e$ors 7& preparationfoun*ation DM ater plant foun*ation etc,

  • 8/18/2019 PGD_CTM Project Final Worksheet

    6/215

    ci/il foun*ation Ra ater reser/oir *inistration :uil*in. enerator

    8he* 8tores Technician roo Canteen 0 /ehicle 8he* &a/eent

    reener$ *e/elopent

    PLANT $ #AC*INER+ 

      inclu*in. instruentation an* control

    Fans &ups 'al/es specialities &ipin. an* u+iliaries

      inclu*in. control 0 instruentation alternator control

    rela$ an* eterin. panels etc,

    3, 9ther &0M! Coolin. toer construction 7& han*lin. s$ste for fee*in.

    8tora.e pit Char han*lin. s$ste ;i.h pressure stea pipin. 'al/es an* supports

    u+iliar$ 0 lo pressure stea pipin. 7ater treatent plant Tanka.es for &ro*ucts st  ir con*itionin. for control roo ir copressors 0 copresse* air s$ste

    DC8 ase* instruentation s$ste for the plant an* instruentation Misc, &ups 'e

    4, -i.htin. for 7& processin. plant &lant counication s$ste

    9ther electrical an* echanical +tures

     ENGINEERING

      Detaile* en.ineerin. fees for ci/il echanical an* electrical ork

    #ISCELLANEO'S FI,ED ASSETS

    1, Transportation /ehicles

    2, Furniture coputers counication s$ste canteen facilities 9

  • 8/18/2019 PGD_CTM Project Final Worksheet

    7/215

    a. aw material stock is 3 months of the ale 6alue

     ". &n 7aterial stock is 1 week of the ale 6alue

    c. inished Product tock is 1 month of forecast sales for ne8t 9uarter d. Credit to customer is 1 month of ale 6alue

    e. Credit from supplier is 2 months of aw 7aterial price

    . )epreciation has "een counted "oth "y )6 and '7 as per Companies Act 1;$-.

    ;. Corporate Ta8 ate is taken as 32.%$+.

    10. or orkin Capital, the assumptions made are:

  • 8/18/2019 PGD_CTM Project Final Worksheet

    8/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    9/215

    Sr. No.

    Rupees (in lakhs) 1

    1===

    4==

    6=== 3

    1=== !

    2!=1 "

    216>,1 87

    (@) 9

    :

    COST 4in La56s

    3.! Aear 2=14B15

    Ra Material 8tock   =,=

    ".18

    n Material 8tock   =,=

    Finishe* &ro*uct 8tock   =,=Cre*it to custoer   =,=

    Cre*it fro supplier   =,=

    %et 7orkin. Capital   =,=

    nterest o/er 7orkin. Capi   =,=

  • 8/18/2019 PGD_CTM Project Final Worksheet

    10/215

     Aear1

    2=14B15

    5"==6

    1

    &ercent 8hare (@) =

    'olue of &ro*uction (T&) =

    8ales Re/enue (Rupees) =

    !".:!

    1"

    7aste &lastics Market&otential (T&)

    'olue of Consuption(T&)

  • 8/18/2019 PGD_CTM Project Final Worksheet

    11/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    12/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    13/215

    7. ESTI#ATED PROJECT COST

    R2ees 4in la56s

    PROJECT COST CO#PONENT COST 4in la56s

    -an* an* 8ite De/elopent 46,>

    :uil*in. an* Ci/il 7orks =,=

    6,

    36,

    &lant an* Machiner$ 42=,=

    "n.ineerin. E1,E

    Miscellaneous Fi+e* ssets 3=,=

    Contin.encies >=,=&reoperati/e "+penses 15=,=

    &reliinar$ an* Capital ssue Relate* "+penses 23,>

    Mar.in Mone$ 53,2

    TOTAL PROJECT COST

     

    2=15B16 2=16B1

    22>,1 242,3

    1>,2 1E,4

    =,= 6=,6=,= 6,=

    4=,= 42,5

    2=6,3 355,>

    2>,E 4E,>

    2a,Factor$2,

  • 8/18/2019 PGD_CTM Project Final Worksheet

    14/215

    2 3

    2=15B16 2=16B1

    55===== 6=5====

    = =,=5

    3===

    = 24==

    =   E12,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    15/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    16/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    17/215

    Sr. No.

    CONTRI&'TION 4?

    4,6>   E3,6 1

    =

    6,   135,3333

    3,6   3,33333

    42,==   >4= 3

    E,1E   1>3,33 !

    3,==   6= "

    >,==   16= 815,==   3== 7

    2,3>   4,56 9

    5,321=6,4

    :

    1==,==2===

     

    7.8 (OR)ING CAPITAL STATE#EN

    Rupees (in -akhs)

    2=1B1> 2=1>B1E 2=1EB2=

    256,6 2=,> 2>5,1

    2=,5 21, 22,>

    64,1 6, 1,3>=,> >5,5 E=,3

    45,= 4,5 5=,=

    3,= 3E>,2 41E,4

    52,> 55,> 5>,

    7." #AR)ET DETAILS

  • 8/18/2019 PGD_CTM Project Final Worksheet

    18/215

    4 5 6

    2=1B1> 2=1>B1E 2=1EB2=

    6655=== 32=5== >=5255=

    =,=5 =,=5 =,=4

    31>,5 335 3562,5

    255= 2== 2>5=

    E6E,3 1=26,3 1=>3,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    19/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    20/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    21/215

    7.

    PROJECT COST CO#PONENT COST 4in la56s1

    -an* an* 8ite De/elopent 46,> 1=,==

    :uil*in. an* Ci/il 7orks =,=

    2a, Factor$ :uil*in. 6, ,==

    2, %on Factor$ :uil*in. 36, 4,==

    &lant an* Machiner$ 42=,=

    "n.ineerin. E1,E

    Miscellaneous Fi+e* ssets 3=,=

    Contin.encies >=,=&reoperati/e "+penses 15=,=

    &reliinar$ an* Capital ssue Relate* "+penses 23,>

    Mar.in Mone$ 53,2

    &rooters 1   21,==

     Ter -oan

    &ulic shares

    Total   1=== 21

    nterest on Ter -oan12@

    2=2=B21 2=21B22 2=22B23

    2>5,1 2>5,1 2>5,1

    22,> 22,> 22,>

    1,3 1,3 1,3E5,= E5,= E5,=

    5=,= 5=,= 5=,=

    424,2 424,2 424,2

    5E,4 5E,4 5E,4

  • 8/18/2019 PGD_CTM Project Final Worksheet

    22/215

    > E

    2=2=B21 2=21B22 2=22B23

    >>5>=5 E435>5,5 1=1E44

    =,=4 =,=4 =,=3

    35= 35= 35=

    3=== 3=== 3===

    114=,3 114=,3 114=,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    23/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    24/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    25/215

     Esti0ation o< E-en=it2re =2rin erio= o< constr2ction> ! 0ont6s/

    3 ! " 8

    16,> 2=

    1= > 1= 12 14

    6 1= 4,6 > 4

    >= >= 6= 4=

    1= 12 6 6 >

    E,6 6 > 1=> 1= 1= 12

    42,>= 14,6=

    116,6 1=4 >>

    42,> 14,6 116,6 1=4 >>

    E,32> ,2> 5,2>

    6=5

    2=23B24 2=24B25 2=25B26 Aear

    2>5,1 2>5,1 2>5,1   @ Capacit$ GtiliHation

    22,> 22,> 22,>   ctual capacit$ (T&)

    1,3 1,3 1,3   aste plastics (Rs)E5,= E5,= E5,=   catal$st (Rs)

    5=,= 5=,= 5=,=   utilities (Rs)

    424,2 424,2 424,2   Ra aterials an* Gtilities (>5@)

    5E,4 5E,4 5E,4   &acka.in. (3@)

    8alaries an* 7a.es (@)

    Factor$ 9/erhea*s (5@)

  • 8/18/2019 PGD_CTM Project Final Worksheet

    26/215

    1= 11 12 Total Cost o< Pro=2ction 4Rs

    2=23B24 2=24B25 2=25B26  *ninistrati/e e+penses (Rs)

    11>E3> 12E6>12 ???  8ales e+penses (Rs)

    =,=3 =,=3 =,=3 Gross Cost o< Pro=2ction 4Rs

    35= 35= 35=

    3=== 3=== 3===

    114=,3 114=,3 114=,3

    8ales Re/enue

    'ariale C9&

    7orkin. Capital nterest

    Fi+e* Capital nterest

    Cash 8urplus

     +ear

    FI,ED COSTS

    nterest

    8alar$ an* 7a.es

    Depreciation

    Factor$ 9/erhea*s an* *in e+penses

    TOTAL

    %ARIA&LE COSTS

    Ra aterials an* Gtilities

    &acka.in. "+penses

    8ales e+penses

    TOTAL

    Total Sales Reen2e o< Pro=2cts

    :reak "/en #uantit$ sales(Ton)

    :reak "/en Capacit$ (@)

    E-en=it2re =2rin

    E-en=it2re =2rin

  • 8/18/2019 PGD_CTM Project Final Worksheet

    27/215

    I

    (ACC4

     +ear

    1

    2

    34

    5

    6

    >

    E

    1=

    Total

    7.

     +ear

    2=14B15

    2=15B16

    2=16B1

    2=1B1>

    2=1>B1E

    2=1EB2=

    2=2=B212=21B22

    2=22B23

    2=23B24

    2=24B25

    2=25B26

    TOTAL

     +ear2=14B15

    2=15B16

    2=16B1

    2=1B1>

    2=1>B1E

    2=1EB2=

    2=2=B21

    2=21B22

  • 8/18/2019 PGD_CTM Project Final Worksheet

    28/215

    2=22B23

    2=23B24

    2=24B25

    2=25B26

  • 8/18/2019 PGD_CTM Project Final Worksheet

    29/215

      ont6s ri=

    ont6s

    7 9 : 1

    6

    4= 3= 3= 25

    1= 1= 12 >

    > 6,5 6,5

    12 1= 13,4 111= 14 16 1>

    > 2 ,E 6>,5

    > 2 ,E 6>,5

    3,E 2,>> 2,33 1,3

    211,4

    7.11

    Caacit@> 3 TP

    1 2 3 4

    >= >5 E= E5

    24== 255= 2== 2>5=

    24=,= 255,= 2=,= 2>5,=3,= 3,2 3,4 3,6

    12,> 13,6 14,4 15,2

    255,> 21,> 2>,> 3=3,>

    E,= E,6 1=,2 1=,

    21,1 22,4 23, 25,=

    15,= 16,= 16,E 1,E

  • 8/18/2019 PGD_CTM Project Final Worksheet

    30/215

    3.: 31:.9 339.8 3"7.!

    21,1 22,4 23, 25,=

    24,1 25,6 2,1 2>,6

    3!8.1 387.7 39:.3 !11.

    1 2 3 4

    =,= =,= E12,3 E6E,3

    =,= =,= 2>>,E 3=,=

    =,= 2>,E 4E,> 52,>

    36,5 36,5 33,1 2>,5

    B36,5 B65,4 54=,4 5>1,=

    7

    1 3 !

    36,5 36,5 33,1 2>,5

    21,1 22,4 23, 25,=

    3,> 3,> 3,> 3,>

    36,1 3>,4 4=,6 42,E

    131." 13".1 13".3 13!.3

    255,> 21,> 2>,> 3=3,>

    E,= E,6 1=,2 1=,

    24,1 25,6 2,1 2>,6

    99.: 37. 3". 3!3.1

    E12,3 E6E,3 1=26,3 1=>3,3

    211=,= 2=3E,E 1E2>, 1>13,

    =,= 6>,= 64,3 6=,5

    7.1! DISCO'NTED PROFIT FLO(

    R2ees4in la5 

    @ear 1 4I1   246,>

    +ear 4I   253,2

  • 8/18/2019 PGD_CTM Project Final Worksheet

    31/215

    "!:.38

    .

    (ACC5 415n

    566,2 =,2 1,2= 41,>

    6=1,6 =,2 1,44 41,>

    63,= =,2 1,3 36>,662,3 =,2 2,= 324,2

    =, =,2 2,4E 2>4,4

    =, =,2 2,EE 23,=

    =, =,2 3,5> 1E,5

    =, =,2 4,3= 164,6

    =, =,2 5,16 13,2

    =, =,2 6,1E 114,3

    873." 717."

    1" DE&T SER%ICE CO%ERAGE RATIO 4DSCRR'PEES 4in La56s

    SL# Dereciation

    = 0   36,54 =

    = = 36,54 =

    4=5,E 3,>1 33,11 1>,5

    4=6,16 3,>1 2>,55 1>,5

    414,24 3,>1 23,E> 1>,5

    432,=6 3,>1 1E,41 1>,5

    45=,> 3,>1 14,>4 1>,5446,52 3,>1 1=,2> 1>,5

    444,2E 3,>1 5,1 1>,5

    442,E3 3,>1 1,14 1>,5

    441,E= 3,>1 =,== 1>,5

    441,1= 3,>1 =,== 1>,5

    !3".98 379.1! 1.11 197."

    7.18 Fina

    R2

    8ales ross Cost of &ro*uction ross &rot 9peratin. &rot= = = =

    = = = =

    E12,3 346,1 566,2 51>,3

    E6E,3 36, 6=1,6 52E,4

    1=26,3 3>E,3 63,= 54E,3

    1=>3,3 411,= 62,3 5>1,>

    114=,3 432,6 =, 614,2

    114=,3 432,6 =, 611,2

    GrossProt

    Present %al2e4P%

    Prota

  • 8/18/2019 PGD_CTM Project Final Worksheet

    32/215

    114=,3 432,6 =, 61=,5

    114=,3 432,6 =, 61=,5

    114=,3 432,6 =, 61=,5

    114=,3 432,6 =, 61=,5

  • 8/18/2019 PGD_CTM Project Final Worksheet

    33/215

    11 1

    laks

    46,>

    =,=

    6,=

    36,6

    2= 15   42=,=

    5 4,E   E1,E

    6 3   3=,=

    >=,=3= 22   15=,=

    15 >,>   23,>

    53,253,2

    211,4

    6=5,=

    >3,6 1==   1>3,6

    >3,6 1==   1===,=

    32,4

     GROSS COST OF PROD'CTION

    o< Petrole20 Pro=2cts/ R2ees 4in La56s

    5 6

    1== 1== 1==

    3=== 3=== 3===

    3==,= 3==,= 3==,=3,> 3,> 3,>

    16,= 16,= 16,=

    31E,> 31E,> 31E,>

    11,3 11,3 11,3

    26,3 26,3 26,3

    1>,> 1>,> 1>,>

  • 8/18/2019 PGD_CTM Project Final Worksheet

    34/215

    378. 378. 378.

    26,3 26,3 26,3

    3=,1 3=,1 3=,1

    !3.8 !3.8 !3.8

    ,12 C8; F-97 8TT"M"

    Rupees (in -akhs)

    5 6

    1=26,3 1=>3,3 114=,3

    325,= 343,1 361,1

    55,> 5>, 5E,4

    24,= 1E,4 14,>

    621,6 662,1 =5,=

    .13 &REA) E%EN ANAL+SIS

    R2ees 4in la56s

    " 8 7

    24,= 1E,4 14,>

    26,3 26,3 26,3

    3,> 3,> 3,>

    45,1 45,1 45,1

    133.3 19.7 1!.1

    31E,> 31E,> 31E,>

    11,3 11,3 11,3

    3=,1 3=,1 3=,1

    381.1 381.1 381.1

    114=,3 114=,3 114=,3

    11=,3 1651, 15E3,1

    5,= 55,1 53,1

    NAL+SIS TEC*NIB'ES

      s

    Ret2rn on E2it@ 4r 3?

    DeHt4D 1."

  • 8/18/2019 PGD_CTM Project Final Worksheet

    35/215

    E2it@4E 1

    Interest Rate4i 1?

    Io

    54E,36

    54E,36

    54E,3654E,36

    54E,36

    54E,36

    54E,36

    54E,36

    54E,36

    54E,36

    "!:.38 189.1 !.:

    DSCR

    1

    1

    E,1E

    E,EE

    11,14

    12,>2

    14,EE1,=4

    1E,E4

    24,23

    25,5>

    25,54

    17.!7

    ncial Projections

    es 4in La56s

    &rot :efore ta+ Corporate ta+ ot after ta+ (&= = =

    = = =

    463,1 15=,3 4=5,>

    4E6,3 161,= 4=6,2

    532,> 12,E 414,2

    5,> 1>,5 432,1

    61E,> 2=1,1 45=,E

    624,= 2=2,5 446,5

    Net Present%al2e 4NP%

    ProtaHilit@In=e- 4PI

  • 8/18/2019 PGD_CTM Project Final Worksheet

    36/215

    62>,> 2=4,1 444,3

    633,= 2=5,4 442,E

    636,2 2=6,5 441,E

    63>, 2=,2 441,1

  • 8/18/2019 PGD_CTM Project Final Worksheet

    37/215

    7.: ALLOT#ENT O

    Rupees(in

    &R9I"CT C98T C9M&9%"%T &roject Cost

    -an* an* 8ite De/elopent 4>,==

    :uil*in. an* Ci/il 7orks

    Factor$ :uil*in. 65,==

    %on Factor$ :uil*in. 35,==

    &lant an* Machiner$ 5==,==

    Miscellaneous Fi+e* ssets 35,==

     Total 893.

    Contin.encies >5,==&reoperati/e "+penses 155,==

     Total !.

    &reliinar$ an* Capital ssue Relate* "+penses 22,==

    Mar.in Mone$ 55,==

     Total 77.

     T9T-&R9I"CT C98T 1.

    total   1===,==

    > E

    1== 1==

    3=== 3===

    3==,= 3==,=3,> 3,>

    16,= 16,=

    31E,> 31E,>

    11,3 11,3

    26,3 26,3

    1>,> 1>,>

  • 8/18/2019 PGD_CTM Project Final Worksheet

    38/215

    378. 378.

    26,3 26,3

    3=,1 3=,1

    !3.8 !3.8

     T

    > E

    114=,3 114=,3

    361,1 361,1

    5E,4 5E,4

    1=,3 5,

    =E,5 14,1

    9 :

    1=,3 5,

    26,3 26,3

    3,> 3,>

    45,1 45,1

    11:.8 11".

    31E,> 31E,>

    11,3 11,3

    3=,1 3=,1

    381.1 381.1

    114=,3 114=,3

    1534,4 145,>

    51,1 4E,2

  • 8/18/2019 PGD_CTM Project Final Worksheet

    39/215

    IRR

    9."

    &rot for *i/i*en* %et cash ccurals= =

    = =

    36>,= 4=5,>

    36>,3 4=6,2

    36,4 414,2

    3E4,2 432,1

    413,1 45=,E

    4=>, 446,5

  • 8/18/2019 PGD_CTM Project Final Worksheet

    40/215

    4=6,5 444,3

    4=5,1 442,E

    4=4,1 441,E

    4=3,3 441,1

  • 8/18/2019 PGD_CTM Project Final Worksheet

    41/215

      PROJECT COST

     lakhs)

    Cost llocation Cost llocation

    4,>= 46,>= 16,16 62,E6

    6,5= 6,6 21,>E >E,56

    3,5= 36,6 11,E 4>,45

    5=,== 511,> 16>,3 6>=,24

    3,5= 3=,== 11,E 41,E

    8:3. 3. :3.

    >,5= >=,==15,5= 15=,==

    23=,==

    2,2= 23,>= 23,>=

    5,5= 53,2= 53,2=

    ,==

    1.   1===,== 1.

    =,=46>

    1=

    1==

    3===

    3==,=3,>

    16,=

    31E,>

    11,3

    26,3

    1>,>

    ContriH2tion toroject cost in

    ?

    Reise= cost

  • 8/18/2019 PGD_CTM Project Final Worksheet

    42/215

    378.

    26,3

    3=,1

    !3.8

    1= 11 12

    114=,3 114=,3 114=,3

    361,1 361,1 361,1

    5E,4 5E,4 5E,4

    1,1 =,= =,=

    1>, 1E,> 1E,>

    1

    1,1

    26,3

    3,>

    45,1

    11.!

    31E,>

    11,3

    3=,1

    381.1

    114=,3

    141,2

    4,2

  • 8/18/2019 PGD_CTM Project Final Worksheet

    43/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    44/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    45/215

    =,=46>

    =

    =,=6666666

    =,=36666666

    =,511>

    =,=3

    =,6E3==33333

    =,=>=,15

    =,23

    =,=23>

    =,=532

    =,=

    1

    =

    =

  • 8/18/2019 PGD_CTM Project Final Worksheet

    46/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    47/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    48/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    49/215

    7.1 STRA

    R2ees 4in la56s Factor@ &2il=in 43.3!?

     +ear

    'n

      62,E6 >E,56

    1   = >6,5 2,EE

      = >3,5> 2,EE

    3   = >=,5E 2,EE

    !   = ,5E 2,EE

    "   = 4,6= 2,EE

    8   = 1,61 2,EE

    7  = 6>,62 2,EE

    9   = 65,63 2,EE

    :   = 62,64 2,EE

    1= 5E,65 2,EE

    Lan= an= Site

    D8-M

  • 8/18/2019 PGD_CTM Project Final Worksheet

    50/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    51/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    52/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    53/215

    G*T LINE #ET*OD DEPRECIATION STATE#ENT

    Non Factor@ &2il=in 41.83? Plant an= #ac6iner@ 41.3!? #FA 4

    'n 'n 'n

    4>,45 6>=,24 41,E

    4,66 =,E 6=E,E= =,34 4=,3E

    46,> =,E 53E,5 =,34 3E,==

    46,=> =,E 46E,23 =,34 3,6=

    45,2E =,E 3E>,>E =,34 36,21

    44,5= =,E 32>,56 =,34 34,>1

    43,1 =,E 25>,22 =,34 33,42

    42,E2 =,E 1>,>> =,34 32,=242,13 =,E 11,55 =,34 3=,62

    41,34 =,E 4,21 =,34 2E,23

    4=,55 =,E B23,13 =,34 2,>3

    D8-M

      D8-M

  • 8/18/2019 PGD_CTM Project Final Worksheet

    54/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    55/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    56/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    57/215

      3.3! ?

    1=====

     +ear

    =   =

    1,4= 5,51   551364,1 1

    1,4= 5,51   551364,1

    1,4= 5,51   551364,1 3

    1,4= 5,51   551364,1 !

    1,4= 5,51   551364,1 "

    1,4= 5,51   551364,1 8

    1,4= 5,51   551364,17

    1,4= 5,51   551364,1 9

    1,4= 5,51   551364,1 :

    1,4= 5,51551364,1

    1

    SL#Dereciation

    R2ees

    D8-M

  • 8/18/2019 PGD_CTM Project Final Worksheet

    58/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    59/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    60/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    61/215

    7.1 (RITTEN DO(N %AL'E #ET*OD DEPRE

    Factor@ &2il=in 41? Non Factor@ &2il=in 4"?

    'n 'n

    62,E6 >E,56 4>,45

    = >=,6= >,E6 46,=3 2,42

    = 2,54 >,=6 43,3 2,3=

    = 65,2E ,25 41,54 2,1E

    = 5>,6 6,53 3E,46 2,=>

    = 52,>> 5,>> 3,4E 1,E

    = 4,6= 5,2E 35,62 1,>

    = 42,>4 4,6 33,>3 1,>= 3>,55 4,2> 32,14 1,6E

    = 34,= 3,>6 3=,54 1,61

    = 31,23 3,4 2E,=1 1,53

    Lan= an= Site

    D7D'

      D7D'

  • 8/18/2019 PGD_CTM Project Final Worksheet

    62/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    63/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    64/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    65/215

    IATION STATE#ENT

    Plant an= #ac6iner@ 4"? #FA 41? (D% Dereciation

    'n 'n 1=====

    6>=,24 41,E =,==   =

    51=,1> 1=,=6 3,61 4,1> 1>5,62   1>5615=

    3>2,64 12,55 33,>5 3,6 141,6   14166>,5

    2>6,E> E5,66 3=,46 3,3> 1=>,4>   1=>4>44=,625

    215,23 1,4 2,42 3,=5 >3,4=   >33E646,>43>

    161,42 53,>1 24,6> 2,4 64,4=   643EE=6,166

    121,= 4=,36 22,21 2,4 4E,EE   4EE>66=,562

    E=,>= 3=,2 1E,EE 2,22 3E,=3   3E=2>26,4==6>,1= 22,= 1,EE 2,== 3=,6   3=6442,165

    51,=> 1,=3 16,1E 1,>= 24,2E   242>652,513

    3>,31 12, 14,5 1,62 1E,3>1E3>444,E=6

    3,>125

    D7D'

      D7D'

  • 8/18/2019 PGD_CTM Project Final Worksheet

    66/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    67/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    68/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    69/215

    7.9 LOAN REPA+#ENT SC*ED'

    Rupees (in lakhs)

    Rate of nterest

    Repa$ent &erio*

    Moratoriu &erio*

     Ter -oan 6=5 "Jecti/e nterest Rate

    R2ees 4in la56s

    Kuarter Kuarter

     Aear &rincipal (Rs) nterest (Rs) &rincipal (Rs)

    1 6=5 36,>4 1 6=5

    2 6=5 36,>4 2 6=53 56,1E 34,54 3 52E,3>

    4 4E1,56 2E,E4 4 453,5

    5 415,E4 25,33 5 3>,13

    6 34=,31 2=,3 6 3=2,5=

    264,6E 16,12 226,>>

    > 1>E,=6 11,51 > 151,25

    E 113,44 6,E1 E 5,63

    1= 3,>1 2,3= 1= =,==

    Total Interest

    1=2

    (inlakhs)

     Aear

  • 8/18/2019 PGD_CTM Project Final Worksheet

    70/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    71/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    72/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    73/215

    LE 7.1 Derecia

    Co0onent

    12@

    Factor$ :uil*in.

    1= $ears   %on Factor$ :uil*in.

    2 $ears   &lant an* Machiner$

    6,=E@ for half $earl$ installents   MF

    1=====

     

    nterest (Rs) Financial "+penses (Rs)

    36,>4 3,6E   36>E==

    36,>4 3,6E   36>E==32,24 66,>   66>=65,625

    2,63 5,5   556E53,125

    23,=3 4>,364>35>4=,625

    1>,42 3E,153E142>,125

    13,>2 2E,E4   2EE3615,625

    E,21 2=,3   2=25=3,125

    4,61 11,51   11513E=,625

    =,== 2,3=   23=2>,125

    !3.71   423115

  • 8/18/2019 PGD_CTM Project Final Worksheet

    74/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    75/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    76/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    77/215

    ion Rate

    SL# ? (D% ?

    3,34 1=,==

    1,63 5,==

    1=,34 25,==

    3,34 1=,==

  • 8/18/2019 PGD_CTM Project Final Worksheet

    78/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    79/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    80/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    81/215

     +ear

    @ Capacit$ GtiliHation

    ctual capacit$ (T&)

    aste tire (Rs)

    catal$st (Rs)

    utilities (Rs)

    Ra aterials an* Gtilities (>5@)

    &acka.in. (3@)

    8alaries an* 7a.es (@)

    Factor$ 9/erhea*s (5@)

    Total Cost o< Pro=2ction 4Rs

    *ninistrati/e e+penses

    8ales e+penses

    Gross Cost o< Pro=2ction 4Rs

    oil

    c

    steel

    tar

    Total Sales Reen2e o< Pro=2cts 4Rs

    Gross Prot 4Rs

    Financial "+penses

    551364,1 8-M Depreciation

    551364,1 7D' Depreciation

    551364,1 Oeratin Prot

    551364,1 Prot &e

  • 8/18/2019 PGD_CTM Project Final Worksheet

    82/215

    2 36>E== 8alar$ an* 7a.es

    3 66>=66 Depreciation

    4 556E53 Factor$ 9/erhea*s an* *in e+penses

    5 4>35>41 TOTAL

    6 3E142> %ARIA&LE COSTS

    2EE3616 Ra aterials an* Gtilities

    > 2=25=3 &acka.in. "+penses

    E 11513E1 8ales e+penses

    1= 23=2>,13 TOTAL

    11 423115 ctual capacit$ (T&)

    1=== Total 8ales Re/enue of &ro*ucts (Rs)

    &rea5 Een 2antit@ sales4Ton

    &rea5 Een Caacit@ 4?

    FI,ED COSTS 4RsTon

    %ARIA&LE COSTS 4RsTon

     Total 8ales Re/enue of &ro*ucts (RsLTon)

    &rea5 Een 2antit@ sales4Ton

    &rea5 Een Caacit@ 4?

    = Total cost

    8ales Re/enue

    'ariale C9&

    7orkin. Capital nterest

    Fi+e* Capital nterest

    Cash 8urplus

    Total Sales Reen2e o< Pro=2cts 4Rs

    aste tire 4Rs

     Aear

    Ra Material 8tockn Material 8tock

    Finishe* &ro*uct 8tock

    Cre*it to custoer

    Cre*it fro supplier

    %et 7orkin. Capital

    nterest o/er 7orkin. Capital (14@)

     Aear

    i k i l ( )

  • 8/18/2019 PGD_CTM Project Final Worksheet

    83/215

    &ercent 8hare (@)

    'olue of Consuption (T&)

    'olue of &ro*uction (T&) (ain pro*ucts)

    8ales Re/enue (Rupees)

    E-en=it2re =2rin @

    E-en=it2re =2rin +

    I

    (ACC45

     +ear

    1

    2

    3

    4

    5

    6

    >

    E

    1=

    Total

    Rupees

     Aear

    nterest o/er Ter -oan (12@)

    nterest o/er 7orkin. Capital (14@)

    Financial "+penses

    E-en=it2re =2rin @

    E-en=it2re =2rin +

    I

    (ACC45

     +ear

  • 8/18/2019 PGD_CTM Project Final Worksheet

    84/215

    1

    2

    3

    4

    5

    6

    >

    E

    1=

    Total

     +ear

    1

    2

    3

    4

    5

    6

    >

    E

    1=

    Total

  • 8/18/2019 PGD_CTM Project Final Worksheet

    85/215

    GROSS COST OF PROD'

    Caacit@> 3 TPA o< Petrole2

    1 3 !

    6= 65 = 5

    1>== 1E5= 21== 225=

    1=>===== 11===== 126===== 135=====

    1152== 124>== 1344== 144===

    324=== 351=== 3>=== 4=5===

    113: 117"9 1311! 1!!:

    3E66,64=5>> 42E34,1164=5E 462E=,5>>2352E4 4E5>4,=5>>2352E

    E255>1,164=6 1==212,E41164 1=E>44,=5>>235 1156E6,4=5>>24

    66112E,41164 16223,52E41165 131,64=5>>24 >26411,64=5>>3

    13"99.3"3 1!3!!7."993"3 1"!83".:!1178" 18"93".:!1178

    E255>1,164=6 1==212,E41164 1=E>44,=5>>235 1156E6,4=5>>24

    1=5>=,=5>>24 1145E5,64=5>>2 12341=>,2352E412 132225>,>2352E41

    1"":78.!78 18!731!1.178!78 177!3".993": 1:7!7."993"3

    22>=>E64,=5>>

    23>5==== 25>35== 2>25=== 2E>125==

    (or5in Res2lts 4Rs

    144===== 156===== 16>===== 1>======

    E45==== 1=235== 11=25=== 11>125==

    22=== 3==3=== 3234=== 3465===

    EE==== 1=25== 1155=== 1235==

    781 ::13 31! 3!"1"

    1!83.":! 13!3:9"9.93":! 1!!738:!.1178!71 1""7":.!1178!7

    32=== =562= 1=513=,>=E 11334,==2

    551364,1 551364,1 551364,1 551364,1

    1>5615= 14166>,5 1=>4>44=,625 >33E646,>435

    !"78":.!:!1 "1997!.73":!1 89171::.98!78 79!7:1.3:78!7

    K8!978.!78 K1!3"!9.878!7": 3"1.8938!78 7"!"9."881!7

    =,3245 =,3245 =,3245 =,3245

    B21=3644,3E=6 B464>62,=45514= 11422E,>1=>434 22>E1>>,=2E61

    1!19889.7 131::1.97 13893." 131!:87.39

    66313=4,1 56436, 564E1E,4= 55536=3,2>

    =,=E1334135 =,65EE55=435 =,66131414E =,65524>36E

    141>266,55EE> 131EE1==,2=E=>E1 132262>2,>364>E4 131=4E66,24>446=,44E2E>25E1 =,44E2E>25E1 =,44E2E>25E1 =,44E2E>25E1

    .1 .13 .1! .18

    =,21414EE6 =,24516E=E6 =,3224>65E =,3=EE2E664

    =,6=>E253> =,62436611 =,625652=1=3 =,61EE1331=3

    = 2=6312E= 355>1=3>,5E35 3=1EE=,3125

    9.88"!3 9.:7"8388:8 :.387!19 9.97:89":33

    &REA) E%EN ANAL+SIS

    R2ees

    1 3 !

    36>E== 36>E== 66>=65 625 556E53 125

  • 8/18/2019 PGD_CTM Project Final Worksheet

    86/215

    E255>1,164=6 1>312,E411641 1E>44,=5>>2353 211E6,4=5>>235

    551364,1 551364,1 551364,1 551364,1

    15>61=,5>>235 11>E36,4=5>>24 1>51162,352E411> 1E>33>>,2352E412

    17!3""".98!7 189:13."1178!7 1879!38.79393" 1""3891.:399!

    1123E2== 1215>== 131124== 14=4E===

    3E66,64=5>> 42E34,1164=5E 462E=,5>>2352E4 4E5>4,=5>>2352E1=5>=,=5>>24 1145E5,64=5>>2 12341=>,2352E412 132225>,>2352E41

    18:389!.7": 137"1!:1.78!7": 1!9::9.93":! 1"9871".993":

    1>== 1E5= 21== 225=

    2612=== 2EE13=== 32214=== 34515===

    1,1 1,=4 =,E4 =,>3

    6= 65 = 5

    E6>4,5 >62,14 51,64 6>E=,53

    =52,=5 =52,=5 =52,=5 =52,=5

    1534=,== 1534=,== 1534=,== 1534=,==

    1,1 1,=4 =,E4 =,>3

    =,=3E =,=35 =,=31 =,=2>

    3=12624=,5=5E 3=544=5,264=6 31=>35,6=352E 313=>,>132353

    CAS* FLO( S

    R2e

    2=15B16 2=16B1 2=1B1> 2=1B1>

    = =   2612=== 2EE13===

    = = 126E36>4,=5>>24 13514E1,64=5E

    = E133,6 14415E=,15 1554546,

    36>E== 36>E== 66>=65,625 556E53,125

    B36>E== B>16=633,6 6E>65E,51E1165 >>5===>,41=2E412

    2612=== 2EE13=== 32214===

    1=>===== 11===== 126=====

    (OR)ING CAPIT

    Rupe

    2=14B15 2=15B16 2=16B1 2=1B1>

    = 6E=3=== 4>25= >=535=== 55224= 5E>26= 6442>=

    = = 1>6E562,5 2=1335

    = = 23=1=== 24E25=

    = 1>===== 1E5==== 21=====

    = 565524= 1=2E=2,5 111=3E=5

    = E133,6 14415E=,15 1554546,

    1 2 3 4

    2=14B15 2=15B16 2=16B1 2=1B1>

    5====== >5==== E6=5==== E655===

  • 8/18/2019 PGD_CTM Project Final Worksheet

    87/215

    = = =,==2 =,=2=

    1>== 1E5=

    = = 135= 1462,5

    = = 2612=== 2EE13===

    DISCO'NTED PROFIT FLO( ANAL+SIS TEC*NIB'ESR2ees4in la56s

      ar 1 4I1   2==,5

      ar 4I   24=,2

    !9.9

    .

    Gross Prot (ACC5 415n Present %al2e

    124=6=23,52E41   =,2 1,16 1=6,E4>4>=1>

    1343E>5>,>2353   =,2 1,44 E3,332352E412

    14436E4,1165   =,2 1,2 >4,14E3>44=4E

    155=52E,4116   =,2 2,=6 5,2E26>E>E1

    16541364,=5>>   =,2 2,4 66,E6E=>>>1

    1552==   =,2 2,E6 5E,356565

    1>6=E=35,2E412   =,2 3,54 52,56>E63111

    1E642>=,5>>24   =,2 4,24 46,32524E23

    2=66=5,>>235   =,2 5,=> 4=,=216E33>

    2=66=5,>>235   =,2 6,=E 33,E51>E>===6

    18:"!9:99.3"   65E,6=344>=>5

    Financial E

    2=14B15 2=15B16 2=16B1 2=1B1>

    ====== = =

    = E133,6 14415E=,15 1554546,

    = E133,6 14415E=,15 1554546,

    ======

    DISCO'NTED PROFIT FLO( ANAL+SIS TEC*NIB'ES

    R2ees4in la56s

      ar 1 4I1   246,>

      ar 4I   253,2

    "!:.38

    .

    Gross Prot (ACC5 415n Present %al2e 4P%

  • 8/18/2019 PGD_CTM Project Final Worksheet

    88/215

    566,2 =,2 1,2= 41,>

    6=1,6 =,2 1,44 41,>

    63,= =,2 1,3 36>,6

    62,3 =,2 2,= 324,2

    =, =,2 2,4E 2>4,4

    =, =,2 2,EE 23,=

    =, =,2 3,5> 1E,5=, =,2 4,3= 164,6

    =, =,2 5,16 13,2

    =, =,2 6,1E 114,3

    873." 717."

    Gross Prot (ACC5 415n Present %al2e

    =,=   =,2 1,2 =,=

    =,=   =,2 1,4 =,=

    =,=   =,2 1, =,=

    =,=   =,2 2,1 =,=

    =,=   =,2 2,5 =,=

    =,=   =,2 3,= =,=

    =,=   =,2 3,6 =,=

    =,=   =,2 4,3 =,=

    =,=   =,2 5,2 =,=

    =,=   =,2 6,2 =,=

    =,1 .

  • 8/18/2019 PGD_CTM Project Final Worksheet

    89/215

    TION

    0 Pro=2cts

    " 8 7 9

    >= >5 E= E5

    24== 255= 2== 2>5=

    144===== 153===== 162===== 11=====

    1536== 1632== 12>== 1>24==

    432=== 45E=== 4>6=== 513===

    1!:9"8 1": 189"99 177:"!

    52>E=3,52E41165 561E6= 5E5=16,4=5>>235 62>=2,E411>

    12341=>,2352E412 131124= 13>>31,64=5>> 14655=3,52E4

    >>15=5,>>2352E41 E366== EE16E4,1164=5E 1=46>>,2353

    1783117.8!7"99 1973 1:93399.3":!1 :3"78!.71

    12341=>,2352E412 131124= 13>>31,64=5>> 14655=3,52E4

    141=4=E,411641 14E>56= 15>61=,5>>2352E 164>61,165

    7!83".:!1178 1"!19 99:8!.7"99 !781:.!1

    31>===== 33>5== 355=== 3625==

    1E2===== 2=4===== 216===== 22>=====

    126===== 133>5== 1415=== 14E625==

    36E6=== 3E2=== 415>=== 43>E===

    132==== 14=25== 14>5=== 1565==

    38918 3:117 !1!19 !371:

    18"!138!.7"99! 17"7" 198:3".:!119 1:8!97.":

    12161,1E5 12E>6=,3>> 13>1=3,5>1 146346,4

    551364,1 551364,1 551364,1 551364,1

    643EE=6,165625 4EE>66=,562 3E=2>26,4==2266 3=6442,165

    9989393.!1993" :9:3:7"."1 1:1:"87.813119 11:!"1":.71

    ::7:9!1.33!31:9" 1!!887: 1!"891".313:" 18!:91.8"

    =,3245 =,3245 =,3245 =,3245

    323>45>,512E>6E 4=3>E4,3515 4235=,13>21> 5331236,EE5

    131919:. 13!83:.8 137!3"91."! 1!18"98.9

    562EE24,E= 5>55=2>,16 61E221,44 6613E22,2

    =,65E=6444EE =,6=31E613 =,6>1E= =,=>264341

    131>12>>,33>>311 134=63E1,5E 13435>=,>52=664 141652>6,111=,44E2E>25E1 =,44E2E>25E1 =,44E2E>25E1 =,44E2E>25E1

    .17 .19 .1: .

    =,41E5=256E =,46>=21544 =,516535>3E =,565=5=12>4

    =,6235236=44 =,63411>1E3 =,65=1221163 =,6===332

    3E>22E42,=3125 41E43>E3,5 4241E=34,35 4241E=34,35

    9.!":88197 9.7837!3: 7.8"31:83: 7."!198"

    " 8 7 9

    4>35>4= 625 3E142> 125 2EE3615 625 2=25=3 125

  • 8/18/2019 PGD_CTM Project Final Worksheet

    90/215

    2261=>,2352E411> 24=24= 25431,64=5>>2 26>5=3,52E41

    551364,1 551364,1 551364,1 551364,1

    2115614,1164=6 224>4= 23>==65,>>2352E4 25122E1,64

    1!79:7.77:!1 13:"!17.3 1317:!17.37": 1!!88."

    s

    14E>56== 15E222== 16>5>>== 1E54==

    52>E=3,52E41165 561E6= 5E5=16,4=5>>235 62>=2,E411>141=4=E,411641 14E>56= 15>61=,5>>2352E 164>61,165

    18:!:1.:!1178" 17:97 1:!"7."99! :933!.1

    24== 255= 2== 2>5=

    36>16=== 3E11=== 4141>=== 431E===

    =,4 =,66 =,5E =,53

    >= >5 E= E5

    613,=5 542,22 4>>1,2 4352,51

    =52,=5 =52,=5 =52,=5 =52,=5

    1534=,== 1534=,== 1534=,== 1534=,==

    =,4 =,66 =,5E =,53

    =,=25 =,=22 =,=2= =,=1>

    31653>4=,=1E116 31E36>E2,225 3221EE44,43=>>24 325=2EE6,63

      ATE#ENT

    s

    2=1>B1E 2=1EB2= 2=2=B21 2=21B22

    32214=== 34515=== 36>16=== 3E11===

    14>=E2E>,>2352E4 15>61=5,>>2 16E24E12,E41165 1E>22=

    1665=3,25 1>=45E,> 1>E3416,35 2==632,E

    4>35>4=,625 3E142>,125 2EE3615,625 2=25=3,125

    1=E=135,3=14=6 12E52=6,1E3 15==4=55,=>3>235 1=554=3,E5

    34515=== 36>16=== 3E11=== 4141>===

    135===== 144===== 153===== 162=====

    L STATE#ENT

    s

    2=1>B1E 2=1EB2= 2=2=B21 2=21B22

    >62>5= E2=4=== EE25= 1=3545==6E=3== 3632= >234= >2>36=

    2151>,5 23=1=== 2444>12,5 25>>625

    26>45== 2>625= 3=6>=== 325E5=

    225==== 24===== 255==== 2=====

    11E1=3,5 1215= 135244=2,5 14331235

    1665=3,25 1>=45E,> 1>E3416,35 2==632,E

    #AR)ET DETAILS

    5 6 >

    2=1>B1E 2=1EB2= 2=2=B21 2=21B22

    32=5== >=5255= >>5>=5 E435>5 5

  • 8/18/2019 PGD_CTM Project Final Worksheet

    91/215

    =,=2E =,=2> =,=2 =,=26

    21== 225= 24== 255=

    155 16>,5 1>== 1E12,5

    32214=== 34515=== 36>16=== 3E11===

    Ret2rn on E2it@ 4r 3?

    DeHt4D 1."

    E2it@4E 1

    Interest Rate4i 1?

    Io IRR

    4>= B33,=515213 =,222>=E33=6

    4>= B3>6,66641 =,1E44424=2

    4>= B3E5,>5=6156 =,15311215

    4>= B4=4,2=31 =,156>31>1=4

    4>= B413,=3=E121 =,13E51>E331

    4>= B42=,6243243 =,1236EE3243

    4>= B42,4321=3 =,1=E51645=6

    4>= B433,6245 =,=E65156

    4>= B43E,2E>231 =,=>4E62=1E

    4>= B446,=4>1=2 =,==3312=>

    !9 K!1!.3:88 .137!17!!89   6,56

    1=====

      enses

    2=1>B1E 2=1EB2= 2=2=B21 2=21B22

    = = = =

    1665=3,25 1>=45E,> 1>E3416,35 2==632,E

    1665=3,25 1>=45E,> 1>E3416,35 2==632,E

     

    Ret2rn on E2it@ 4r 3?

    DeHt4D 1."

    E2it@4E 1

    Interest Rate4i 1?

    Io IRR

    Net Present%al2e

    ProtaHilit@ In=e-4PI

    Net Present%al2e 4NP%

    ProtaHilit@ In=e-4PI

  • 8/18/2019 PGD_CTM Project Final Worksheet

    92/215

    54E,36

    54E,36

    54E,36

    54E,36

    54E,36

    54E,36

    54E,3654E,36

    54E,36

    54E,36

    "!:.38 189.1 !.: 9."

    Io IRR

    =,=

    =,=

    =,=

    =,=

    =,=

    =,=

    =,=

    =,=

    =,=

    =,=

    =,= . !.:   2>,5

    Net Present%al2e

    ProtaHilit@ In=e-4PI

  • 8/18/2019 PGD_CTM Project Final Worksheet

    93/215

     

    &articulars

    : 1 11   7aste &lastics

    1== 1== 1==   Catal$st

    3=== 3=== 3===   Gtilities

    1>====== 1>====== 1>======

    1E2=== 1E2=== 1E2===  

    54==== 54==== 54==== &articulars

    1973 1973 1973   7aste &lastics

    66112E,4116 66112E,4116 66112E,41165 Catal$st

    1542635,2E41 1542635,2E41 1542635,2E412 Gtilities

    11=1>>2,352E 11=1>>2,352E 11=1>>2,352E4

    378!7.8 378!7.8 378!7.":

    1542635,2E41 1542635,2E41 1542635,2E412 1

    163=11,64 163=11,64 163=11,641 &articulars

    "3!3:!.1 "3!3:!.1 "3!3:!.119 7aste tire

    Catal$st

    3E5==== 3E5==== 3E5==== Gtilities

    24====== 24====== 24======

    155==== 155==== 155==== 3

    462==== 462==== 462====   &articulars

    165==== 165==== 165====   7aste tire

    !8 !8 !8   Catal$st

    8787".99 8787".99 8787".99 Gtilities

    1545>E,E6 162>33,16 164>63,>6   164>63,>6

    551364,1 551364,1 551364,1

    242>652,513 1E3>444,E=6 1E3>,444E=66

    1:77"1.9 1:8"9.8 1:8!77.:

    19:3!83.! 19"7"!7.9 "::3."77

    =,3245 =,3245 =,3245

    5>132>,>41 6=226,3262 6655463,1=>>

    1!8"797.! 1!!981!8.! 139"8379.31

    =EE422,E4 6E34>2,3= 63=5=14,21

    =,3253E3521 =,243=31E> =,6E2>1>E156

    1465=>6,3=E 144>6145,62 13>563,61>=,44E2E>25E1 =,44E2E>25E1 =,44E2E>25E1

    .1 .1 .1

    =,61356441>E =,613144>54 =,613=>425>

    =,6E3=362>3E =,6>524>13E =,65545>1E>

    4241E=34,35 4241E=34,35 4241E=34,35

    8.9979:787" 8.9979:787" 8.9979:787"1

    : 1 11

    11513E= 625 23=2> 125 423115

  • 8/18/2019 PGD_CTM Project Final Worksheet

    94/215

    2>2635,2E412 2>2635,2E412 3=36=E,4116

    551364,1 551364,1 551364,1

    264451,641 264451,641 216>5=44,=5E

    118::7.87 1797:".17 1426434=,11>

    1>32=== 1>32===   3432===

    66112E,4116 66112E,4116 12112E,41165163=11,64 163=11,64 323=11,64=6

    11"81!1.19 11"81!1.19

    3=== 3=== 3==

    46=2==== 46=2==== 5>=2===

    =,4 =,43

    1== 1==

    3>6,64 356E,6=

    =52,=5 =52,=5

    1534=,== 1534=,==

    =,4 =,43

    =,=16 =,=14

    32>6=4>,>43 31>64E36,343

    2=22B23 2=23B24 2=24B25 2=25B26

    4141>=== 431E=== 46=2==== 46=2====

    1E=4=52,=5E 2==E>334,11> 21156141,165 21156141,165

    211E32E,45 22322>6 225E131 225E131

    11513E=,625 23=2>,125 = =

    1E1=652,>66 2115>1=1,5 226=42,>235 226=42,>235

    431E=== 46=2==== 46=2==== 46=2====

    11===== 1>====== 1>====== 1>======

    2=22B23 2=23B24 2=24B25 2=25B26

    1=E2E5= 115=5=== 115=5=== 115=5===>43>= E2=4== E2=4== E2=4==

    23243,5 2>625= 2>625= 2>625=

    34515== 364325= 3>35=== 3>35===

    2>5==== 3====== 3====== 3======

    1513>=6,5 15E44E== 1613665= 1613665=

    211E32E,45 22322>6 225E131 225E131

    E 1= 11 12

    2=22B23 2=23B24 2=24B25 2=25B26

    1=1E44 =5 11>E3> 455 12E6>12 3==5 142655>3 5

  • 8/18/2019 PGD_CTM Project Final Worksheet

    95/215

    =,=25 =,=24 =,=23 =,=21

    2== 2>5= 3=== 3===

    2=25 213,5 225= 225=

    4141>=== 431E=== 46=2==== 46=2====

    "+pen*iture *urin. 1st Aear (1) 246,>

    "+pen*iture *urin. 2n* Aear (2) 253,2

    5==

    = 544,424

    =,152

    =,E2

    2=22B23 2=23B24 2=24B25 2=25B26

    = = = =

    211E32E,45 22322>6 225E131 225E131

    211E32E,45 22322>6 225E131 225E131

  • 8/18/2019 PGD_CTM Project Final Worksheet

    96/215

    =,E32

    1,5515=2666

  • 8/18/2019 PGD_CTM Project Final Worksheet

    97/215

    1 TPD o< Petrole20 Pro=2cts

    Consuption (T) Rate (Rs,LT) Cost (Rs,)

    1,25 1==== 125==

    =,==1 3===== 3==

    =,3 >=== 24==

    1 TPD o< Petrole20 Pro=2cts

    Consuption (T) Rate (Rs,LT) Cost (Rs,)

    1 6=== 6===

    =,===4 16==== 64

    =,=6 3=== 1>=

    6244

    TPA o< Petrole20 Pro=2cts/ or5in Da@s@ear3

    Consuption (T) Rate (Rs,LT) Cost (Rs,)

    15= E=== 135====

    =,6 16==== E6===

    E= 3=== 2====

    116===

    TPA o< Petrole20 Pro=2cts/ or5in Da@s@ear3

    Consuption (T) Rate (Rs,LT) Cost (Rs,)

    3=== 6=== 1>======

    1,2 16==== 1E2===

    1>= 3=== 54====

    222=== 1>32===

    =,4 4======

    =,35

    =,14

    =,11

    =,6

    =,==4

    1>32===

     Aear 1 FI,ED COSTS

    nterest 3654=== 3654===

  • 8/18/2019 PGD_CTM Project Final Worksheet

    98/215

    8alar$ an* 7a.es 21=65>>,2353 223>25=

    Depreciation 3>14=3,4 3>14=3,4

    Factor$ 9/erhea*s an* *in e+penses 36112E4,116 3>3===

    TOTAL 131"39".7" 13"18"3.!

    %ARIA&LE COSTS

    Ra aterials an* Gtilities 255>==== 21>5=

    &acka.in. "+penses E=2>23,52E41 E5E25=8ales e+penses 24=52E,411> 255>===

    TOTAL 99:3".:! 38:8

    ctual capacit$ (T&) 1>= 1E5

     Total 8ales Re/enue of &ro*ucts (Rs) E122=== E6E2>6>,5

    &rea5 Een 2antit@ sales4Ton   =,21 =,2=

    &rea5 Een Caacit@ 4?   6 6,5

    FI,ED COSTS 4RsTon   3=3,>1 6E2>5,4=

    %ARIA&LE COSTS 4RsTon   16=5=1,E6 15415,3>

     Total 8ales Re/enue of &ro*ucts (RsLTon) 5=6>16,6 4E==,1E

    &rea5 Een 2antit@ sales4Ton   211=,=4 2=3E,>>

    &rea5 Een Caacit@ 4?   =,=== 6,EE6

    FI,ED COSTS

    nterest 36,5 36,5

    8alar$ an* 7a.es 21,1 22,4

    Depreciation 3,> 3,>

    Factor$ 9/erhea*s an* *in e+penses 36,1 3>,4

    TOTAL   131,5 135,1

    %ARIA&LE COSTS

    Ra aterials an* Gtilities 255,> 21,>

    &acka.in. "+penses E,= E,6

    8ales e+penses 24,1 25,6

    TOTAL   2>>,E 3=,=

     Total 8ales Re/enue of &ro*ucts (Rs) E12,2 E6E,2>6>5

    13 INDIA2=25B26   2=14

    156E2141 E 2=15

  • 8/18/2019 PGD_CTM Project Final Worksheet

    99/215

    =,=1E   2=16

    3===   2=1

    225=   2=1>

    114=335=   2=1E

    2=2=

    2=21

    2=22

    2=23

    2=24

    2=25

    2=26

    2=2

  • 8/18/2019 PGD_CTM Project Final Worksheet

    100/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    101/215

    #ass Halance oer s@ste0 +ear

    INP'T   1

    1 T 7aste &lastics 2

    O'TP'T   3

    =,1 T Caron Char 4

    =,1 T ;$*rocaron as 5

    =,1 T asoline 6

    =,46 T Diesel

    =,1 T Fuel 9ils >

      t. conersion to Petrole20 Pr   E

    1=

    1" TPA o< Petrole20 Pro=2cts/ or5in Da@s@ear3

    &articulars &ro*uction (T) Rate (Rs,LT) Cost (Rs,)

    asoline 31>,5 !3   13====

    Diesel >62,5 !1"   35E35=

    Fuel 9ils 31>,5 "   11>5

    Caron Char 1>,5 1"   2>125=

    63,5

    125

    1>====== 63,5

    1E2=== 35

    54====

    13 TPA o< Petrole20 Pro=2cts/ or5in Da@s@ear3

    &articulars &ro*uction (T) Rate (Rs,LT) Cost (Rs,)

    24====== oil 12==   24======

    155==== c 1=5= 1"   155====

    462==== steel 42= 11   462====

    165==== tar 33= "   165====

    3=== 46=2====

    35==== 35 16,66666666 ""888.8887

    26==== 26 14,2>5142>6

    12==== 12 26,1E=461E1>== >==== > 15,151515152

    >1 2,2E4322E4

    &REA) E%EN ANAL+SIS

    R2ees

    3 ! " 8 7

    331143 5 2>546> 5 23EE3 5 1E411> 5 14>443 5

  • 8/18/2019 PGD_CTM Project Final Worksheet

    102/215

    236EE11,64=5E 25=153,52E4 2633235,2E41165 2633235,2E41 2633235,2E41

    3>14=3,4 3>14=3,4 3>14=3,4 3>14=3,4 3>14=3,4

    4=62=5,>>2353 42>>411,64 451411,64=5>>2 451411,641 451411,641

    13""!"9."!71 13!878.1: 13388:3.9!119 198::!3.9! 1!131:3.9!

    2>5== 3=3625= 31E5=== 31E5=== 31E5===

    1=1566,4=5>>2 1=21=2,E412 112>52E,411641 112>52E,411> 112>52E,411>2=>4=,5>>2353 2>5>E41,165 3==E411,64=5>> 3==E411,64 3==E411,64

    3"18!7."99 3!37:!.1 3811:!1.178!7 3811:!1.19 3811:!1.19

    21= 225 24= 255 2=

    1=263=35 1=>332=62,5 114=335= 114=335= 114=335=

    =,1E =,1> =,1 =,1 =,16

    ,5 > >,5 E

    644=6,E5 5E61,45 5552,>E 5=4=,3 45E4,E

    1546E,5 15246,>6 15=4=,5E 14161E,3> 13351,63

    4>>16,= 4>145,>3 4514=,63 441E1,1> 42234,22

    1E2>,66 1>13,3 11=,2E 1651,6 15E3,=5

    64,2>E 6=,45> 5,=1= 55,=56 53,1=2

    33,1 2>,5 24,= 1E,4 14,>

    23, 25,= 26,3 26,3 26,3

    3,> 3,> 3,> 3,> 3,>

    4=,6 42,E 45,1 45,1 45,1

    135,3 134,3 133,3 12>, 124,1

    2>,> 3=3,> 31E,> 31E,> 31E,>

    1=,2 1=, 11,3 11,3 11,3

    2,1 2>,6 3=,1 3=,1 3=,1

    325,= 343,1 361,1 361,1 361,1

    1=26,3=35 1=>3,32=625 114=,335 114=,335 114=,335

    &lastics MMT& 1=@ 7& MMT& 7& (MT&)12,5 1,25 5 5======

    13 5 1 35 5 5 55=====

  • 8/18/2019 PGD_CTM Project Final Worksheet

    103/215

    15,125 1,5125 6,=5 6=5====

    16,635 1,6635 6,655 6655===

    1>,3=125 1,>3=125 ,32=5 32=5==

    2=,13135 2,=13135 >,=5255 >=5255=

    22,1445125 2,21445125 >,>5>=5 >>5>=5

    24,35>E635 2,435>E635 E,435>55 E435>5,5

    26,E4>6=125 2,6E4>6=125 1=,1E44=5 1=1E44,=5

    2E,44346135 2,E4434613> 11,>E3>455 11>E3>,455

    32,421>=513 3,2421>=51 12,E6>123==5 12E6>12,3=1

    35,663E5>>264 3,5663E5>>26 14,2655>353=6 142655>3,531

    3E,23=354=E 3,E23=354=E 15,6E2141>>36 156E2141,>>4

    43,1533E=1EE 4,31533E=1> 1,261356=2 1261356,=2

  • 8/18/2019 PGD_CTM Project Final Worksheet

    104/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    105/215

    Cororate ta- rate 4?

    33,66  +ear

    33,66 ctual capacit$ (T&)

    33,66 ross Cost of &ro*uction (Rs)

    33,EE oil (Rs Lton)

    33,EE C: (RsLton)

    33,EE steel (RsL ton)

    33,EE tar(RsLton)

    32,44

    32,45

    32,45

    8lt

    "lt

    "lt

    1.")

    !lt

    35

    1"5

    3)

    9 : 1

    1=26> 5 5=E3 5 1141> 5

  • 8/18/2019 PGD_CTM Project Final Worksheet

    106/215

    2633235,2E41165 2633235 2633235,2E41165

    3>14=3,4 3>14=3 3>14=3,4

    451411,64=5>>2 451411> 451411,64=5>>2

    11:"8!!3.9!1178" 1E7 11!:!3.9!1178"

    31E5=== 31E5=== 31E5===

    112>52E,411641 112>52E 112>52E,4116413==E411,64=5>> 3==E412 3==E411,64=5>>

    3811:!1.178!78 !E7 3811:!1.178!78

    2>5 3== 3==

    114=335= 1,1"==> 114=335=

    =,15 =,15 =,14

    E,5 1= 1=

    41E52,43 3>332,31 36>=E,>1

    12612,= ??? 12=36,4

    4==11>,42 ??? 3>=112,5=

    1534,44 145,>2 141,2=

    51,14> 4E,1E4 4,24=

    1=,3 5, 1,1

    26,3 26,3 26,3

    3,> 3,> 3,>

    45,1 45,1 45,1

    11E,6 115,= 11=,4

    31E,> 31E,> 31E,>

    11,3 11,3 11,3

    3=,1 3=,1 3=,1

    361,1 361,1 361,1

    114=,335 114=,33> 114=,335

     +ear

    FI,ED COSTS

    nterest

    8alar$ an* 7a.es

    Depreciation

    Factor$ 9/erhea*s an* *in e+penses

    TOTAL

    %ARIA&LE COSTS

    Ra aterials an* Gtilities

    &acka.in. "+penses8ales e+penses

    TOTAL

  • 8/18/2019 PGD_CTM Project Final Worksheet

    107/215

    Total Sales Reen2e o< Pro=2cts

    :reak "/en #uantit$ sales(Ton)

    :reak "/en Capacit$ (@)

  • 8/18/2019 PGD_CTM Project Final Worksheet

    108/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    109/215

    Gross Cost o< Pro=2ction o< Pro=2cts

    1 3 ! " 8

    1>== 1E5= 21== 225= 24== 255=

    152=5E6,41 1643141 14=3=5,>> 1E==4=,5>> 2=24635,2E4 21541>==

    2>2=,>2 2>2=,>2 2>2=,>2 2>2=,>2 2>2=,>2 2>2=,>2

    246>,22 246>,22 246>,22 246>,22 246>,22 246>,22

    E>,2E E>,2E E>,2E E>,2E E>,2E E>,2E

    5,3 5,3 5,3 5,3 5,3 5,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    110/215

    3==

    &REA) E%EN ANAL+SIS

    R2ees 4in la56s1 3 ! " 8

    36,5 36,5 33,1 2>,5 24,= 1E,4

    21,1 22,4 23, 25,= 26,3 26,3

    3,> 3,> 3,> 3,> 3,> 3,>

    36,1 3>,4 4=,6 42,E 45,1 45,1

    131." 13".1 13".3 13!.3 133.3 19.7

    255,> 21,> 2>,> 3=3,> 31E,> 31E,>

    E,= E,6 1=,2 1=, 11,3 11,324,1 25,6 2,1 2>,6 3=,1 3=,1

    99 : 37 3" 3!3 1 381 1 381 1

  • 8/18/2019 PGD_CTM Project Final Worksheet

    111/215

    E12,3 E6E,3 1=26,3 1=>3,3 114=,3 114=,3

    211=,= 2=3E,E 1E2>, 1>13, 11=,3 1651,

    =,= 6>,= 64,3 6=,5 5,= 55,1

  • 8/18/2019 PGD_CTM Project Final Worksheet

    112/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    113/215

    7 9 : 1

    2== 2>5= 3=== 3===

    22>=>E64,=6 24=612E,412 253432E4,116 253432E4,1

    2>2=,>2 2>2=,>2 2>2=,>2 2>2=,>2

    246>,22 246>,22 246>,22 246>,22

    E>,2E E>,2E E>,2E E>,2E

    5,3 5,3 5,3 5,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    114/215

    7 9 : 1

    14,> 1=,3 5, 1,1

    26,3 26,3 26,3 26,3

    3,> 3,> 3,> 3,>

    45,1 45,1 45,1 45,1

    1!.1 11:.8 11". 11.!

    31E,> 31E,> 31E,> 31E,>

    11,3 11,3 11,3 11,33=,1 3=,1 3=,1 3=,1

    381 1 381 1 381 1 381 1

  • 8/18/2019 PGD_CTM Project Final Worksheet

    115/215

    114=,3 114=,3 114=,3 114=,3

    15E3,1 1534,4 145,> 141,2

    53,1 51,1 4E,2 4,2

  • 8/18/2019 PGD_CTM Project Final Worksheet

    116/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    117/215

     

     +ear Prot a 141,>3

    2=1>B1E 131,EE

    2=1EB2= 132,26

    2=2=B21 131,=5

    2=21B22 131,>1

    2=22B23 134,=6

    2=23B24 13,44

    2=24B25 141,65

    2=25B26 146,51

    2=26B2 144,>6

    TOTAL 1373.!7

  • 8/18/2019 PGD_CTM Project Final Worksheet

    118/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    119/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    120/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    121/215

    DE&T SER%ICE CO%ERAGE RATIO 4DSCR

    R'PEES 4in La56s

    SL# Dereciation Interest on Ter0 Loan

    0   3,6E

    = 3,6>E

    5,51 66,>

    5,51 5,5

    5,51 4>,36

    5,51 3E,15

    5,51 2E,E4

    5,51 2=,3

    5,51 11,51

    5,51 2,3=

    5,51 =,==

    5,51 =,==

    7"".1! !3.71

  • 8/18/2019 PGD_CTM Project Final Worksheet

    122/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    123/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    124/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    125/215

    Princial Rea@0ent DSCR

    = 1

    = 1

    3,>1 2,2

    3,>1 2,>

    3,>1 2,E

    3,>1 3,1E

    3,>1 3,5=

    3,>1 3,E3

    3,>1 4,55

    3,>1 5,4

    3,>1 5,>

    3,>1 5,>3

    379.13 !.9

  • 8/18/2019 PGD_CTM Project Final Worksheet

    126/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    127/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    128/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    129/215

     +ear   &ro*uction (T&)

    2=15B16 =

    2=16B1 =

    2=1B1> 1>==

    2=1>B1E 1E5=

    2=1EB2= 21==

    2=2=B21 225=

    2=21B22 24==

    2=22B23 255=

    2=23B24 2==

    2=24B25 2>5=

    2=25B26 3===

    2=26B2 3===

    3===

     +ear   &ro*uction (T&)

    2=14B15   =

    2=15B16   =

    2=16B1   1>==

    2=1B1>   1E5=

    2=1>B1E   21==

    2=1EB2=   225=

    2=2=B21   24==

    2=21B22 255=

    2=22B23 2==

    2=23B24 2>5=

    2=24B25 3===

    2=25B26 3===

    1=====

    34>12===

    313===

    4=614===43515===

    46416===

    4E31===

    5221>===

    5511E===

    5>=2====

    5>=2====

    5>=2===

  • 8/18/2019 PGD_CTM Project Final Worksheet

    130/215

     Aear 2=14B15

    Ra Material 8tock =,=

    n Material 8tock =,=

    Finishe* &ro*uct 8tock =,=

    Cre*it to custoer =,=

    Cre*it fro supplier =,=

    %et 7orkin. Capital =,=

    nterest o/er 7orkin. Capital (14@) =,=

     Aear  1

    2=14B15

    7aste &lastics Market &otential (T&)   5======

    &ercent 8hare (@) =

    'olue of Consuption (T&)

    'olue of &ro*uction (T&) =

    8ales Re/enue (Rupees) =

  • 8/18/2019 PGD_CTM Project Final Worksheet

    131/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    132/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    133/215

    Financial

    R2es

    Capacit$ GtiliHation (@) 8ales ross Cost of &ro*uction

    = = =

    = = =

    6= 34>,1 152,1

    65 3,1 164,

    = 4=6,1 1,4

    5 435,2 1E=,1

    >= 464,2 2=2,

    >5 4E3,2 215,4

    E= 522,2 22>,1

    E5 551,2 24=,>

    1== 5>=,2 253,4

    1== 5>=,2 253,4

    Financial

    R2es

    Capacit$ GtiliHation (@) 8ales ross Cost of &ro*uction

    = = =

    = = =

    6= E122=== 346=>235,2E4116

    >5 E6E2>6>,5 36125=

    E= 1=263=35 3>E34264,=5>>24

    E5 1=>332=62,5 41=E2E,41164

    1== 114=335= 4326=2E4,11641

    1== 114=335= 4326=2E4,11641

    1== 114=335= 4326=2E4,11641

    1== 114=335= 4326=2E4,11641

    1== 114=335= 4326=2E4,11641

    1== 114=335= 4326=2E4,11641

    1>==

    1E5= 152=5E6,4=5>>2

    21==225= 152=5E6,4=5>>2

    24== 1643141,164=6

    255= 14=3=5,>>2352E

    2== 1E==4=,5>>2353

    2>5= 2=24635,2E4116

    3=== 21541>==

    3=== 22>=>E64,=5>>24

    3=== 24=612E,41164

    253432E4,11641

    253432E4,11641253432E4,11641

  • 8/18/2019 PGD_CTM Project Final Worksheet

    134/215

    (OR)I

    2=15B16 2=16B1 2=1B1>

    22>,1 242,3 256,6

    1>,2 1E,4 2=,5

    =,= 6=,6 64,1

    =,= 6,= >=,>

    4=,= 42,5 45,=

    2=6,3 355,> 3,=

    2>,E 4E,> 52,>

     

    2 3 4

    2=15B16 2=16B1 2=1B1>

    55===== 6=5==== 6655===

    = =,=5 =,=5

    3=== 31>,5

    = 24== 255=

    =   E12,3 E6E,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    135/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    136/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    137/215

     Projections

     4in La56s

    ross &rot 9peratin. &rot &rot :efore ta+ Corporate ta+

    = = = =

    = = = =

    1E6,1 11,3 ,2 2,3

    212,4 12E,> 63, 2=,

    22>, 152,2 11E,2 3>,

    245,1 16>,4 16=,5 52,1

    261,4 1>4, 1E5,> 63,5

    2,> 2==,E 226,5 3,5

    2E4,1 21,2 253, >2,3

    31=,4 233,5 2>,3 E=,3

    326,> 24E, 3==,E E,

    326,> 24E,6 3=5,> EE,2

     Projections

     4in La56s

    ross &rot 9peratin. &rot &rot :efore ta+ Corporate ta+

    = = = =

    = = = =

    5661>64,=5>>2 51>26461,3=5>>2 46314364,=5>>2 15=2E=11,34=5>>

    6=1543,5 52E3E253,5 4E62>=1,E 161=4513,6655

    636E611=,2E411> 54E33361,4E=EE3 532>4E3=,64=EE3 12E=E5E,EE3==21

    6234>3,=>>235 5>151=1,=444>5 5>31>,6=6E>5 1>5=644,3>466

    =3455,>>2353 61416>4=,5EE> 61E63=,3>2353 2=111311,45535

    =3455,>>2353 6111EE=,35353 624=1=5,352==E 2=24E143,11=2

    =3455,>>2353 61=533>,66E>53 62>>31>5,654451 2=4=55E3,44>6E5

    =3455,>>2353 61=533>,66E>53 633=136>,3E6523 2=5412E4,=44616

    =3455,>>2353 61=533>,66E>53 63621=E,6=56 2=645=4=,3>44=E6

    =3455,>>2353 61=533>,66E>53 63>6635,=54>E 2=2463>,=5314

    1643141,1641 14=3=5,>>2353 1E==4=,5>>235 2=24635,2E4116

    152,=5E64=5E

    164,3141164

    1,4=3=5>>235

    1E=,=4=5>>24

    2=2,46352E412

    215,41>

    22>,=>E64=5>>

    24=,612E4116

    253,432E41165

    253,432E41165253,432E41165

  • 8/18/2019 PGD_CTM Project Final Worksheet

    138/215

    G CAPITAL STATE#ENT

    Rupees (in -akhs)

    2=1>B1E 2=1EB2= 2=2=B21 2=21B22

    2=,> 2>5,1 2>5,1 2>5,1

    21, 22,> 22,> 22,>

    6, 1,3 1,3 1,3

    >5,5 E=,3 E5,= E5,=

    4,5 5=,= 5=,= 5=,=

    3E>,2 41E,4 424,2 424,2

    55,> 5>, 5E,4 5E,4

    AR)ET DETAILS

    5 6 >

    2=1>B1E 2=1EB2= 2=2=B21 2=21B22

    32=5== >=5255= >>5>=5 E435>5,5

    =,=5 =,=4 =,=4 =,=4

    335 3562,5 35= 35=

    2== 2>5= 3=== 3===

    1=26,3 1=>3,3 114=,3 114=,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    139/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    140/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    141/215

    &rot after ta+ (&T) &rot for *i/i*en* %et cash ccurals

    = = =

    = = =

    1E=,5 114,E 1E=,5

    1>4, 1=E,2 1>4,

    1>E,= 113,5 1>E,=

    1E1,> 116,3 1E1,>

    1E6, 121,1 1E6,

    2=3,= 12,5 2=3,=

    21=,4 134,E 21=,4

    21>, 143,1 21>,

    22,6 152,1 22,6

    225,E 15=,4 225,E

    &rot after ta+ (&T) &rot for *i/i*en* %et cash ccurals

    = = =

    = = =

    4=5>>53,35>>235 36E44E,E5>>235 4=5>>51,32E>>=E

    4=616143,13345 36>343E,3345 4=616141,1=2642>

    41423>=4,>EEE=5 36424=1,4EEE=5 41423>=2,>26>==3

    432=5>6=,=66=1>6 3E424456,666=1>6 432=5>5,E=5256

    45=>6E32,2524=44 413=552>,>524=44 45=>6E2E,EE>=5>

    4465216,646626 4=>=64,246626 44652165,414=16

    4442E1E,324E>35 4=64E3,E24E>35 4442E1E5,1=35236

    442E34E,=251>13 4=512=E3,6251>13 442E34E4,>1=5=65

    441>E5=,6>54434 4=4=>34,2>54434 441>E4>,45E55E

    4411=152,36453>E 4=32>4>,E6453>E 4411=15=,15E=313

    21541>== 22>=>E64,=5>>24 24=612E,41164 253432E4,11>

  • 8/18/2019 PGD_CTM Project Final Worksheet

    142/215

    2=22B23 2=23B24 2=24B25 2=25B26

    2>5,1 2>5,1 2>5,1 2>5,1

    22,> 22,> 22,> 22,>

    1,3 1,3 1,3 1,3

    E5,= E5,= E5,= E5,=

    5=,= 5=,= 5=,= 5=,=

    424,2 424,2 424,2 424,2

    5E,4 5E,4 5E,4 5E,4

    E 1= 11 12

    2=22B23 2=23B24 2=24B25 2=25B26

    1=1E44,=5 11>E3>,455 12E6>12,3==5 142655>3,5

    =,=3 =,=3 =,=3 =,=3

    35= 35= 35= 35=

    3=== 3=== 3=== 3===

    114=,3 114=,3 114=,3 114=,3

  • 8/18/2019 PGD_CTM Project Final Worksheet

    143/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    144/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    145/215

     +ear   8ales ross Cost of &ro*uction

    2=14B15 = =

    2=15B16 = =

    2=16B1 E12,3 346,1

    2=1B1> E6E,3 36,

    2=1>B1E 1=26,3 3>E,3

    2=1EB2= 1=>3,3 411,=

    2=2=B21 114=,3 432,6

    2=21B22 114=,3 432,6

    2=22B23 114=,3 432,6

    2=23B24 114=,3 432,6

    2=24B25 114=,3 432,6

    2=25B26 114=,3 432,6

    1 2

    8ales Re/enue =,= =,=

    'ariale C9& =,= =,=

    7orkin. Capital nterest =,= 2>,E

    Fi+e* Capital nterest 36,5 36,5

    Cash 8urplus B36,5 B65,4

    3266=5,>>2352E

    253432E4,11641 253432E4,12 24E6=4,E22352E

    325=EE=3,54463

    21E623,213352

    1=54E463,1=>>13

    21E623>,311416

    14411=14,211416

  • 8/18/2019 PGD_CTM Project Final Worksheet

    146/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    147/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    148/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    149/215

    Financial Projections

    R2es 4in La56s

    ross &rot 9peratin. &rot &rot :efore ta+ Corporate ta+

    = = = =

    = = = =

    566,2 51>,3 463,1 15=,3

    6=1,6 52E,4 4E6,3 161,=

    63,= 54E,3 532,> 12,E

    62,3 5>1,> 5,> 1>,5

    =, 614,2 61E,> 2=1,1

    =, 611,2 624,= 2=2,5

    =, 61=,5 62>,> 2=4,1

    =, 61=,5 633,= 2=5,4

    =, 61=,5 636,2 2=6,5

    =, 61=,5 63>, 2=,2

    C8; F-97 8TT"M"%T

    Rupees (in -akhs)

    3 4 5 6

    E12,3 E6E,3 1=26,3 1=>3,3

    2>>,E 3=,= 325,= 343,1

    4E,> 52,> 55,> 5>,

    33,1 2>,5 24,= 1E,4

    54=,4 5>1,= 621,6 662,1

  • 8/18/2019 PGD_CTM Project Final Worksheet

    150/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    151/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    152/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    153/215

    &rot after ta+ (&T) &rot for *i/i*en* %et cash ccurals

    = = =

    = = =

    4=5,> 36>,= 4=5,>

    4=6,2 36>,3 4=6,2

    414,2 36,4 414,2

    432,1 3E4,2 432,1

    45=,E 413,1 45=,E

    446,5 4=>, 446,5

    444,3 4=6,5 444,3

    442,E 4=5,1 442,E

    441,E 4=4,1 441,E

    441,1 4=3,3 441,1

    > E 1=

    114=,3 114=,3 114=,3 114=,3

    361,1 361,1 361,1 361,1

    5E,4 5E,4 5E,4 5E,4

    14,> 1=,3 5, 1,1

    =5,= =E,5 14,1 1>,

  • 8/18/2019 PGD_CTM Project Final Worksheet

    154/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    155/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    156/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    157/215

    11 12

    114=,3 114=,3

    361,1 361,1

    5E,4 5E,4

    =,= =,=

    1E,> 1E,>

  • 8/18/2019 PGD_CTM Project Final Worksheet

    158/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    159/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    160/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    161/215

    R988 C98T 9F &R9DGCT9%

    Capacit$! 3=== T& of &etroleu &ro*ucts

     Aear 1 2

    @ Capacit$ GtiliHation >= >5

    ctual capacit$ (T&) 24== 255=

    aste plastics (Rs) 24====== 255=====

    catal$st (Rs) 3===== 31>5=

    utilities (Rs) 12>==== 136====

    Ra aterials an* Gtilities (>5@) 255>==== 21>5=

    &acka.in. (3@) E=2>23,52E411 E5E25=

    8alaries an* 7a.es (@) 21=65>>,2352E41 223>25=

    Factor$ 9/erhea*s (5@) 15=4=5,>>2353 15E>5=

     Total Cost of &ro*uction (Rs) 3==E411,64=5E 31E5===

    *ninistrati/e e+penses 21=65>>,2352E41 223>25=

    8ales e+penses 24=52E,41164 255>===

    ross Cost of &ro*uction (Rs) 346=>235,2E411> 36125=

    aste plastics (Rs) 24= 255

    catal$st (Rs) 3 3,1>5

    utilities (Rs) 12,> 13,6

    Ra aterials an* Gtilities (>5@) 255,> 21,>5

    &acka.in. (3@) E,=2>2352E41 E,5E25

    8alaries an* 7a.es (@) 21,=65>>2352E 22,3>25

    Factor$ 9/erhea*s (5@) 15,=4=5>>235 15,E>5

     Total Cost of &ro*uction (Rs) 3==,E41164=6 31E,5

    *ninistrati/e e+penses 21,=65>>2352E 22,3>25

    8ales e+penses 24,=52E4116 25,5>

    ross Cost of &ro*uction (Rs) 346,=>2352E412 36,125

  • 8/18/2019 PGD_CTM Project Final Worksheet

    162/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    163/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    164/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    165/215

    3 4 5 6 > E 1=

    E= E5 1== 1== 1== 1== 1== 1==

    2== 2>5= 3=== 3=== 3=== 3=== 3=== 3===

    2====== 2>5===== 3======= 3======= 3======= 3======= 3======= 3=======

    335== 35625= 35=== 35=== 35=== 35=== 35=== 35===

    144==== 152==== 16===== 16===== 16===== 16===== 16===== 16=====

    2>5== 3=3625= 31E5=== 31E5=== 31E5=== 31E5=== 31E5=== 31E5===

    1=1566 1=21=3 112>52E 112>52E 112>52E 112>52E 112>52E 112>52E

    236EE12 25=154 2633235 2633235 2633235 2633235 2633235 2633235

    16E2E4 1>6>3> 1>>=>>2 1>>=>>2 1>>=>>2 1>>=>>2 1>>=>>2 1>>=>>2

    33>55>>2 353665 36164 36164 36164 36164 36164 36164

    236EE12 25=154 2633235 2633235 2633235 2633235 2633235 2633235

    2=>41 2>5>E41 3==E412 3==E412 3==E412 3==E412 3==E412 3==E412

    3>E34265 41=E2E 4326=2E4 4326=2E4 4326=2E4 4326=2E4 4326=2E4 4326=2E4

    2= 2>5 3== 3== 3== 3== 3== 3==

    3,35 3,5625 3,5 3,5 3,5 3,5 3,5 3,5

    14,4 15,2 16 16 16 16 16 16

    2>,5 3=3,625 31E,5 31E,5 31E,5 31E,5 31E,5 31E,5

    1=,1566 1=,21=3 11,2>52E 11,2>52E 11,2>52E 11,2>52E 11,2>52E 11,2>52E

    23,6EE12 25,=154 26,33235 26,33235 26,33235 26,33235 26,33235 26,33235

    16,E2E4 1,>6>3> 1>,>=>>2 1>,>=>>2 1>,>=>>2 1>,>=>>2 1>,>=>>2 1>,>=>>2

    33>,55>> 35,366 36,165 36,165 36,165 36,165 36,165 36,165

    23,6EE12 25,=154 26,33235 26,33235 26,33235 26,33235 26,33235 26,33235

    2,=>41 2>,5>E41 3=,=E412 3=,=E412 3=,=E412 3=,=E412 3=,=E412 3=,=E412

    3>E,3426 41=,E2> 432,6=2E 432,6=2E 432,6=2E 432,6=2E 432,6=2E 432,6=2E

  • 8/18/2019 PGD_CTM Project Final Worksheet

    166/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    167/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    168/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    169/215

    Caacit@> 3

    11 Aear 1

    1==   @ Capacit$ GtiliHation >=

    3===   ctual capacit$ (T&) 24==

    3======= aste plastics (Rs) 24=,=

    35=== catal$st (Rs) 3,=

    16===== utilities (Rs) 12,>

    31E5=== Ra aterials an* Gtilities (>5@) 255,>

    112>52E &acka.in. (3@) E,=

    2633235 8alaries an* 7a.es (@) 21,1

    1>>=>>2 Factor$ 9/erhea*s (5@) 15,=

    36164 Total Cost o< Pro=2ction 4Rs 3.:

    2633235 *ninistrati/e e+penses (Rs) 21,1

    3==E412   8ales e+penses (Rs) 24,1

    4326=2E4 Gross Cost o< Pro=2ction 4Rs 3!8.1

    3==

    3,5

    16

    31E,5

    11,2>52E

    26,33235

    1>,>=>>2

    36,165

    26,33235

    3=,=E412

    432,6=2E

  • 8/18/2019 PGD_CTM Project Final Worksheet

    170/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    171/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    172/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    173/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    174/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    175/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    176/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    177/215

    1=

    1==

    3===

    3==,=

    3,>

    16,=

    31E,>

    11,3

    26,3

    1>,>

    378.

    26,3

    3=,1

    !3.8

  • 8/18/2019 PGD_CTM Project Final Worksheet

    178/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    179/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    180/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    181/215

    ross &rot (Rs)Financial "+pense

    8-M Depreciation

    7D' Depreciatio

    9peratin. &rot

    &rot :efore ta+

    Corporate ta+ rate

    Corporate ta+

    &rot after ta+ (&

    &rot for *i/i*en*

    Di/i*en*

    %et cash ccurals

    prot ar.in

    Return on n/est

    1=====

  • 8/18/2019 PGD_CTM Project Final Worksheet

    182/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    183/215

    1E6=6=23,52E411> 2123E>5>,>2353   22>36E4,1   245=52E,411632=== =562=   1=513=,>   11334,==2

    551364,1 551364,1   551364,1   551364,1

    1>5615= 14166>,5   1=>4>44=,6   >33E646,>435

    11265E,42E411> 12E>2>4,2353 15211EE,2 16>42E1,3=E6

    123,52E41163 636451,32352E 11E2=122,6>36 16=545=>,566=1

    =,3245 =,3245 =,3245 =,3245

    23255,26=2E411 2=6623,E544>5 3>6>=E,>1=>4 52=E6>>,=2E62

    1E=4626>,26E116 1>46>===,>6E=4 1>E==4>3,4E> 1E1>446,3>==E

    114E4E=4,16E116 1=E16636,6E=4 1134E11E,3E> 116331=3,2>==E

    =,E523134135 =,E234===435 =,E45=2414E =,E5E22336E

    1E=4626,316>=42 1>46EEE,E4564 1>E==4>2,552> 1E1>4466,42=>

    =,5631E24> =,5631E24> =,5631E24> =,5631E24>

    =,1E6=6=2353 =,2123E>5>>2 =,22>36E412 =,245=52E41

    ross &rot (Rs) Financial "+pense8-M Depreciatio7D' Depreciatio

    1E6=6=23,52E411> 32=== 551364,1 1>5615=2123E>5>,>2352E4 =562= 551364,1 14166>,5

    22>36E4,1 1=513=,> 551364,1 1=>4>44=,6

    245=52E,41164 11334,==2 551364,1 >33E646,>435

    26141364,=5>>24 12161,1E5 551364,1 643EE=6,16563

    252== 12E>6=,3>> 551364,1 4EE>66=,56234

    2E4=E=35,2E4116 13>1=3,5>1 551364,1 3E=2>26,4==23

    31=42>=,5>>2353 146346,4 551364,1 3=6442,16566>

    3266=5,>>2352E 1545>E,E6 551364,1 242>652,512E6E

    3266=5,>>2352E 162>33,16 551364,1 1E3>444,E=663

    3266=5,>>2352E 164>63,>6 551364,1 1E3>,444E=663

    1E6,=6 3,2 5,51 1>5,62

    212,4= ,=6 5,51 141,6

    22>,4 1,=5 5,51 1=>,4>

    245,=> 1,13 5,51 >3,4=

    261,41 1,22 5,51 64,4=

    2,5 1,3= 5,51 4E,EE

  • 8/18/2019 PGD_CTM Project Final Worksheet

    184/215

    2E4,=E 1,3> 5,51 3E,=3

    31=,43 1,46 5,51 3=,6

    326, 1,55 5,51 24,2E

    326, 1,63 5,51 1E,3>

    326, 1,65 5,51 =,=2

    = = = =

  • 8/18/2019 PGD_CTM Project Final Worksheet

    185/215

    26141364,1 252== 2E4=E=35 31=42>=,6 3266=5,>> 3266=5,E12161,1E5 12E>6=,3>> 13>1=3,5> 146346,4 1545>E,E6 162>33,16

    551364,1 551364,1 551364,1 551364,1 551364,1 551364,1

    643EE=6,1 4EE>66=,56 3E=2>26 3=6442,1 242>652,513 1E3>444,E1

    1>46>3>3,41 2==E3E5,5 211E56> 2334515E, 24E=51,>2 24E625=>,6

    1E5E>41,33 226466E 2536>1=5 2>2E=>1,6 3==E3463,4 3=5542,>

    =,3245 =,3245 =,3245 =,3245 =,3245 =,3245

    635365>,513 34>>4,35 >231E5= E=3=536,EE E6532>,>4 EE2126,33

    1E666=>E 2=2E64E2,3 21=3>E>2 21>65E>6,> 2256> 225E2146,4

    1211424,E 124512>,2 134>61 14314622, 152=5422,E4 15=4=>2,3

    1,=   1,=14>2461 1,=51E4E1 1,=E32EE34 1,13>3E352 1,12E6=32

    1E666=>>,=   2=2E64E1,2 21=3>E>= 21>65E>5, 2256>5,E 225E2145,3

    =,6   =,5631E2 =,5631E3 =,5631E2 =,5631E25 =,5631E2

    =,3   =,252 =,2E4=E=4 =,31=42>1 =,3266=5E =,3266=6

    9peratin. &ro &rot :efore Corporate ta &rot after ta &rot for *i/

    11265E,43 123,52E =,3245 23255,26 1E=4626>,2 114E4E=4,212E>2>4,2 636451,32 =,3245 2=6623,E5 1>46>===,> 1=E16636,>

    15211EE,2 11E2=122, =,3245 3>6>=E,>1 1>E==4>3,5 1134E11E,4

    16>42E1,31 16=545=>,6 =,3245 52=E6>>,=3 1E1>446,3> 116331=3,3

    1>46>3>3,41 1E5E>41,3 =,3245 635365>,51 1E666=>E 1211424,E

    2==E3E5,51 226466E =,3245 34>>4,35 2=2E64E2,26 124512>,2

    211E56,61 2536>1=5,3 =,3245 >231E5=,1 21=3>E>1,54 134>61,4

    2334515E,1 2>2E=>1,6 =,3245 E=3=536,EE 21>65E>6,>2 14314622,

    24E=51,>2 3==E3463,4 =,3245 E6532>,> 2256> 152=5422,E

    24E625=>,62 3=5542,> =,3245 EE2126,33 225E2146,4 15=4=>2,3

    24E6=4,E2 325=EE=3,6 =,3245 1=54E463, 21E623>,31 14411=14,2

    11,2> ,1 =,== 2,33 1E=,46 114,E5

    12E,>3 63,6 =,== 2=,66 1>4,6> 1=E,1

    152,1 11E,2= =,== 3>,6> 1>E,== 113,4E

    16>,43 16=,55 =,== 52,1= 1E1,>4 116,33

    1>4,6> 1E5,>= =,== 63,54 1E6,66 121,15

    2==,E4 226,4 =,== 3,4E 2=2,E6 12,45

    Corporate ta+rate

  • 8/18/2019 PGD_CTM Project Final Worksheet

    186/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    187/215

    3266=5,>>2352E164>63,>6

    551364,1

    1E3>,444E=663

    24E6=4,E22352E

    325=EE=3,54463

    =,3245

    1=54E463,1=>>13

    21E623>,311416

    14411=14,211416

    1,=E>11>E156

    21E623,213352

    =,5631E24>

    =,3266=5>>

    Di/i*en* %et cash ccurals prot ar.in Return on n/est

    =,E523134135 1E=4626,316>=42 =,5631E24> =,1E6=6=2353=,E234===435 1>46EEE,E456441 =,5631E24> =,2123E>5>>2

    =,E45=2414E 1>E==4>2,552E4 =,5631E24> =,22>36E412

    =,E5E22336E 1E1>4466,42=>6E6 =,5631E24> =,245=52E41

    1,= 1E666=>>,= =,6 =,3

    1,=14>24613 2=2E64E1,2456>> =,5631E24> =,252

    1,=51E4E= 21=3>E>=,4>2E64 =,5631E24> =,2E4=E=352E

    1,=E32EE341 21>65E>5,25E5> =,5631E24> =,31=42>=5E

    1,13>3E3521 2256>5,E=344 =,5631E24> =,3266=5>>

    1,12E6=31E> 225E2145,266555 =,5631E24> =,3266=5>>

    1,=E>11>E156 21E623,213352 =,5631E24> =,3266=5>>

    =,== 1E=,46 =,== =,==

    =,== 1>4,6> =,== =,==

    =,== 1>E,== =,== =,==

    =,== 1E1,>4 =,== =,==

    =,== 1E6,66 =,== =,==

    =,== 2=2,E6 =,== =,==

  • 8/18/2019 PGD_CTM Project Final Worksheet

    188/215

    =,== 21=,3E =,== =,==

    =,== 21>,66 =,== =,==

    =,== 22,5 =,== =,==

    =,== 225,E2 =,== =,==

    =,== 21E,62 =,== =,==

    = =,== =,== =,==

  • 8/18/2019 PGD_CTM Project Final Worksheet

    189/215

    ent (R9)

  • 8/18/2019 PGD_CTM Project Final Worksheet

    190/215

  • 8/18/2019 PGD_CTM Project Final Worksheet

    191/215

    1=====

    /ol F"D C98T8 'R:-" sales tot total cost

    1>== E6>4,5325> =52,=4 34>12=== 1E7 1E71E5= >62,135134 =52,=4 313=== !E7   1432441

    21== 51,636564 =52,=4 4=614=== !E7   15426353

    225= 6>E=,5253=3 =52,=4 43515=== !E7   1652>235

    24== 613,=52E4E =52,=4 46416=== "E7   163=11>

    255= 542,2244=2 =52,=4 4E31=== "E7   1>32===

    2== 4>>1,2656E3 =52,=4 5221>=== "E7   1E>33>>2

    2>5= 4352,513165 =52,=4 5511E=== 8E7   2=E3565

    3=== 3>6,635>>E =52,=4 5>=2==== 8E7   22=364

    3=== 1=52,4=22 =52,=4 5>=2==== 8E7   22=364

    3=== 22=364

    = = = =

    = E6>4,53 =52,=4 = 132,225E

    = >62,135 =52,=4 = 143,244

    1>== 51,63 =52,=4 34>,12 154,2635

    1E5= 6>E=,525 =52,=4 3,13 165,2>24

    21== 613,=53 =52,=4 4=6,14 16,3=12

    225= 542,224 =52,=4 435,15 1>,32

    24== 4>>1,266 =52,=4 464,16 1E>,33>>

    255= 4352,513 =52,=4 4E3,1 2=E,356

    2== 3>6,636 =52,=4 522,1> 22=,365

    2>5= 1=52,4 =52,=4 551,1E 22=,365

    3=== = 5>=,2 22=,365

    3=== 5>=,2

    =

  • 8/18/2019 PGD_CTM Project Final Worksheet

    192/215

    15426353 1652>235 163=11> 1>32=== 1E>33>>2 2=E3565 22=364 22=364

  • 8/18/2019 PGD_CTM Project Final Worksheet

    193/215

    22=364

  • 8/18/2019 PGD_CTM Project Final Worksheet

    194/215

    1=====

    Capacit$! 3=== T& of &etroleu &ro*ucts

     Aear 1 2 3

    @ Capacit$ GtiliHation 6= 65 =

    ctual capacit$ (T&) 1>== 1E5= 21==aste tire (Rs) 1=>===== 11===== 126=====

    catal$st (Rs) 1152== 124>== 1344==

    utilities (Rs) 324=== 351=== 3>===

    Ra aterials an* Gtilities (>5 1123E2== 1215>== 131124==

    &acka.in. (3@) 3E66,6 42E34,1 462E=,6

    8alaries an* 7a.es (@) E255>1,2 1==213 1=E>45

    Factor$ 9/erhea*s (5@) 66112E,4 16223,5 131,6

     Total Cost of &ro*uction (Rs) 132225>> 1432441 15426353

    *ninistrati/e e+penses E255>1,2 1==213 1=E>45

    8ales e+penses 1=5>= 1145E5> 12341=>ross Cost of &ro*uction (Rs) 152=5E6 1643141 14=3=6

    1=>,= 11,= 126,=

    1,2 1,2 1,3

    3,2 3,5 3,>

    112,4 121,> 131,1

    4,= 4,3 4,6

    E,3 1=,= 1=,>

    6,6 ,2 ,

    132,2 143,2 154,3

    E,3 1=,= 1=,>

    1=,6 11,5 12,3

    152,1 164, 1,4

    = = =

  • 8/18/2019 PGD_CTM Project Final Worksheet

    195/215

    4 5 6 > E 1= 11

    5 >= >5 E= E5 1== 1== 1==

    225= 24== 255= 2== 2>5= 3=== 3=== 3===135===== 144===== 153===== 162===== 11===== 1>====== 1>====== 1>======

    144=== 1536== 1632== 12>== 1>24== 1E2=== 1E2=== 1E2===

    4=5=== 432=== 45E=== 4>6=== 513=== 54==== 54==== 54====

    14=4E=== 14E>56== 15E222== 16>5>>== 1E54== 1>32=== 1>32=== 1>32===

    4E5>4,1 52>E=3,5 561E6= 5E5=16,5 62>=2,E 66112E,4 66112E,4 66112E,4

    1156E6 12341=> 131124= 13>>32 14655=4 1542635 1542635 1542635

    >26411,> >>15=5,E E366== EE16E4,1 1=46>> 11=1>>2 11=1>>2 11=1>>2

    1652>235 163=11> 1>32=== 1E>33>>2 2=E3565 22=364 22=364 22=364

    1156E6 12341=> 131124= 13>>32 14655=4 1542635 1542635 1542635

    132225E 141=4=E 14E>56= 15>611 164>61 163=12 163=12 163=121E==41 2=24635 21541>== 22>=>E65 24=612E 253432E4 253432E4 253432E4

    135,= 144,= 153,= 162,= 11,= 1>=,= 1>=,= 1>=,=

    1,4 1,5 1,6 1, 1,> 1,E 1,E 1,E

    4,1 4,3 4,6 4,E 5,1 5,4 5,4 5,4

    14=,5 14E,E 15E,2 16>,6 1>,= 1>,3 1>,3 1>,3

    5,= 5,3 5,6 6,= 6,3 6,6 6,6 6,6

    11,6 12,3 13,1 13,E 14, 15,4 15,4 15,4

    >,3 >,> E,4 E,E 1=,5 11,= 11,= 11,=

    165,3 16,3 1>,3 1E>,3 2=E,4 22=,4 22=,4 22=,4

    11,6 12,3 13,1 13,E 14, 15,4 15,4 15,4

    13,2 14,1 15,= 15,E 16, 1,6 1,6 1,6

    1E=,1 2=2, 215,4 22>,1 24=,> 253,4 253,4 253,4

    = = = = = = = =

  • 8/18/2019 PGD_CTM Project Final Worksheet

    196/215

    79RN% C&T- 8TT"M"%T

    Rupees

     Aear 2=14B15Ra Material 8tock =

    n Material 8tock =

    Finishe* &ro*uct 8tock =

    Cre*it to custoer =

    Cre*it fro supplier =

    %et 7orkin. Capital =

    nterest o/er 7orkin. Capita =

    =,=

    =,==,=

    =,=

    =,=

    =,=

    =,=

    =,=

    5======,= >5====,=

    =,= =,=

    =,= =,=

    =,= =,=

    =,= =,=

    = =

  • 8/18/2019 PGD_CTM Project Final Worksheet

    197/215

    1=====

    2=15B16 2=16B1 2=1B1> 2=1>B1E>=3=== E42>25= 1=1535== 1=>>5=

    6E624= 5426= >122>= >=3==

    = 235=62,5 253>35 21E6>,5

    = 2E=1=== 31425= 33>45==

    1>===== 1E5==== 21===== 225====

    5EE24= 134E=52,5 14546E=5 156=323,5

    1=63>E3,6 1>>>6>=,15 2=36566, 21>4453,25

    >,= E4,3 1=1,5 1=>,>

    ,= ,5 >,1 >,=,= 23,6 25,4 2,2

    =,= 2E,= 31,4 33,>

    1>,= 1E,5 21,= 22,5

    6,= 134,E 145,5 156,=

    1=,6 1>,E 2=,4 21,>

    =,= =,= =,= =,=

    E6=5====,= E655===,= 32=5==,= >=5255=,=

    =,= =,= =,= =,=

    1>==,= 1E5=,= 21==,= 225=,=

    135=,= 1462,5 155,= 16>,5

    2612===,= 2EE13===,= 32214===,= 34515===,=

    26,12 2EE,13 322,14 345,15

  • 8/18/2019 PGD_CTM Project Final Worksheet

    198/215

    2=1EB2= 2=2=B21 2=21B22 2=22B23116=4=== 1232E25= 13=545== 13E5=

    E2>32= E>634= 1=4436= 11=23>=

    2E=1=== 3=>2312,5 3263625 3444E3,5

    362625= 3>6>=== 41=E5= 43515==

    24===== 255==== 2===== 2>5====

    1665E5= 115E=2,5 1>2235 1E>2>56,5

    233233E,> 24>=226,35 262>112,E 25EEE,45

    116,= 123,3 13=,5 13,>

    E,3 E,E 1=,4 11,=2E,= 3=,> 32,6 34,4

    36,3 3>, 41,1 43,5

    24,= 25,5 2,= 2>,5

    166,6 1,2 1>, 1E>,3

    23,3 24,> 26,3 2,>

    =,= =,= =,= =,=

    >>5>=5,= E435>5,5 1=1E44,1 11>E3>,5

    =,= =,= =,= =,=

    24==,= 255=,= 2==,= 2>5=,=

    1>==,= 1E12,5 2=25,= 213,5

    36>16===,= 3E11===,= 4141>===,= 431E===,=

    36>,16 3E1,1 414,1> 43,1E

  • 8/18/2019 PGD_CTM Project Final Worksheet

    199/215

    2=23B24 2=24B25 2=25B26145=5=== 145=5=== 145=5===

    116=4== 116=4== 116=4==

    362625= 362625= 362625=

    45E325= 4>35=== 4>35===

    3====== 3====== 3======

    2=>>4E== 2112665= 2112665=

    2E23>>6 2E531 2E531

    145,1 145,1 145,1

    11,6 11,6 11,636,3 36,3 36,3

    45,E 4>,4 4>,4

    3=,= 3=,= 3=,=

    2=>,> 211,3 211,3

    2E,2 2E,6 2E,6

    =,= =,= =,=

    12E6>12,3 142655>3,5 156E2141,E

    =,= =,= =,=

    3===,= 3===,= 3===,=

    225=,= 225=,= 225=,=

    46=2====,= 46=2====,= 114=335=,=

    46=,2 46=,2 114=,335

  • 8/18/2019 PGD_CTM Project Final Worksheet

    200/215

    D8C9G%T"D &R9FT F-97 %-A88 T"C;%KG"8

    Rupees(in lakhs)

    "+pen*iture *urin. $ear 1 (1) 15=,5

    "+pen*iture *urin. Aear 2 (2) 24=,2

    = 42=,>7CC(k) =,2

     Aear ross &rot 7CCOk (1k)Pn

    1 1E6,=6=2352E41 =,2 1,16

    2 212,3E>5>>2353 =,2 1,44

    3 22>,36E41165 =,2 1,2

    4 245,=52E4116 =,2 2,=6

    5 261,41364=5>> =,2 2,4

    6 2,52 =,2 2,E6

    2E4,=E=352E41