PETRO DARIAN · PDF fileUsing video cameras in addition to logging tools ... Casing Design...
Transcript of PETRO DARIAN · PDF fileUsing video cameras in addition to logging tools ... Casing Design...
Address: Office 12, No 149, Neda Tower, Salehi Street,
West Lavasani Street,Farmanieh, Tehran – Iran
Contact: +98 21 22690449 , [email protected]
PETRO DARIAN KISH
COMPANY PROFILE
Date: 6/8/16
Document No.: PDKC-CP-Site
Page 2 of 71
TABLE OF CONTENTS
1. COMPANY CAPABILITIES
2. ORGANIZATION CHART
3. PROJECTS
4. ARTICLES OF ASSOCIATION & COOPERATION AGREEMENTS
5. SOFTWARE LIST
6. HARDWARE LIST
7. HSE POLICY
8. HSE MANUALS
9. INTERNATIONAL LIAISONS
Page 3 of 71
SECTION 1
COMPANY
C APABILITIES
Cementing Services
04
String Rental Services
Drilling Fluid Services
05
Fishing Services
03
Directional Drilling Services
Procurement Services
01
06
02
Drilling & Production Optimization
07
Page 4 of 71
Petro Darian Kish Drilling Engineering Co. as an engineering services company that based
on 30 years’ experience of its experts was founded in Tehran-Iran in response to a strong
market demand for procurement and engineering services to the oil and gas projects that
provides reliable and cost effective in Iran and Middle East.
PDKC offers a broad scope of services in hydrocarbon industries, both onshore and offshore.
With a team of skilled engineers and experts in various disciplines having experience in
different branches of oil and gas industry, PDKC can provide its clients with extensive
services in reservoir management, as well as undertaking engineering projects. PDKC
cooperates extensively with international engineering companies, and sees the
implementation of the most current international standards as its overarching priority. With
headquarters in Tehran-Iran, PDKC's staff is comprised of talented and dedicated
professionals. PDKC provides various services in the fields of:
1. Drilling and Production Optimization
In today’s oil market, optimizing the drilling and production of each well to increase its
efficiency by either increasing its production rate or reducing the cost of the produced oil, has
become a major interest for all oil and gas companies. PDKC in cooperation with innovative
and pioneer companies in the world provides services based on new technologies in oil and
gas industry aimed to optimize drilling and production of the well. These services include:
I. Oil Recovery Enhancement Services
Novel tertiary recovery techniques such as polymer flooding and
hydraulic fracturing and new technologies beyond tertiary such as plasma
pulse streamer are provided to enhance the recovery factor of wells.
II. Inspection Services
By using state of the art technologies, visual inspection of the out of
reach areas in underground tanks, pipes and wells are made possible
using video cameras. Using video cameras in addition to logging tools
provides a better understanding of the interiors. These services are both
usable in horizontal and vertical wells.
III. Loss Control Services
By using novel technologies, new methods of loss control such
as profile liners are provided. Also, PDKC provides mud
additives that are specifically designed for loss control both for
partial and total loss situations.
Page 5 of 71
IV. Drilling Optimization Consultancy
PDKC in cooperation with its foreign joint ventures provides consultancy for drilling
optimization. Benefiting from an expert team of drilling engineers, reservoirs engineers,
optimization engineers and completion engineers, a unique environment has been presented
for well optimization consultancy services. These services consist of:
Offset Well Review
Casing Design Verification
Cost and Time Optimization
Bit and BHA Optimization
Mud System Modification
Alternative Technologies Recommendation
Modeling completion performance
Designing sand control applications
Optimizing completion design
Cost estimate and risk assessment
ROP Enhancement
Trip Time Analysis
Bit Runs Analysis
Optimizing Drilling Parameters
Flat Time Analysis
Hidden NPT identification
Offset Well Review
V. Sand Control Services
PDKC as a part of its production optimization services provides
Expandable Sand Screens from respectable manufacturers in oil
industry. An expandable sand screen (ESS) is a compliant sand-
control solution for non-uniform, high-fines environments. While
expanding compliantly against the wellbore to eliminate annular
space and provide borehole support, ESS technology filters all but
the smallest sand grains.
VI. Pipe Cleanout & Deposits Prevention Services
PDKC as a part of its production optimization services provides equipment for protection and
clearing of oil-field, oil-refining and petrochemical equipment from ARPD, carbon and other
deposits. It prevents carbon producing in inner production lines and units, greatly decreases
APR and other deposits inside oil tubes and oil transfer/petroleum refining lines, increases oil
well productivity greatly, and also carry out cleaning and protection of oil tube inner walls
Page 6 of 71
and oil-field equipment without well shutdown and protects pipelines from depositing of
inner corrosion and hardness salts, ARP and other compounds;
2. Directional Drilling Services
Directional drilling is the science of deviating a wellbore along a planned path to a target
located a given lateral distance and direction from vertical. This includes drilling as vertically
as possible from a given TVD.
PDKC offers expert directional drillers and proven technologies to provide the trajectory
control needed to drill the well correctly, the high-quality hole required to successfully run
and cement casing, and the precise well placement to optimize production and maximize
recovery. PDKC LWD and MWD services deliver high-quality data to enable time-critical
decisions for accurate drilling of extended-reach, horizontal, vertical, and complex directional
wells and sidetracks.
I. Drilling Mud Motors
Positive displacement motors to meet the challenges of any hole size or drilling operation.
II. Hydra Pulse Slide Drilling Performance System
Optimize slide drilling performance in high-angle and horizontal applications by improving
weight transfer to the bit.
III. Slider Drilling System
Fully automated torque control for drilling efficiency while sliding.
IV. Path Finder Directional Drilling Services
Directional drilling services for high-volume and unconventional environments.
V. Drilling Survey Services
Certainty in wellbore position for precise well placement and well avoidance.
Page 7 of 71
VI. Geomechanics While Drilling
Benefit from robust compressional and shear slowness and Stoneley wave data delivered by
the Sonic Scope multipole sonic-while-drilling service combination of high-quality monopole
and quadrupole measurements-regardless of mud slowness.
VII. Geophysics While Drilling
Employ look-ahead technology with seismic VISION seismic-while-drilling service to
deliver time-depth-velocity information in real time without disrupting drilling operations.
VIII. Reservoir Engineering While Drilling
Measure formation pressure while drilling to accurately model the dynamic reservoir pressure
and target productive zones.
IX. Well Placement
LWD data to improve well positioning, increase ROP, maximize reservoir exposure and
enhance production.
X. Measurements While Drilling
Acquire formation evaluation and drilling optimization data during drilling operations to
guide well placement and to provide data for survey management and development planning.
3. String Rental Services
PDKC provides premium quality oilfield equipment and a range of services to meet your
requirements. Downhole equipment is available for conventional drilling applications. Rental
equipment packages are:
Milling tools, jars, drill string and downhole equipment sale and rental services.
Fishing tools, jars, drill string and downhole equipment spare parts procurement and
after-sale services.
4. Drilling Fluid Services
PDKC can provide customized, engineered solutions for optimal drilling efficiency, lower
operating costs, and minimal HSE impact for a variety of drilling challenges.
I. HPHT Drilling
Fluid solutions for stability in high-pressure, high-temperature environments with enhanced
well control.
II. Wellbore Strengthening/Lost Circulation
Page 8 of 71
Drilling solutions designed to anticipate wellbore issues and fluids that strengthen unstable
formations.
III. Unconventional Drilling
Solutions and fluid systems designed to accommodate complex extended-reach wells.
IV. Sensitive Environments
Products that are carefully balance environmental acceptability and high performance in
complex applications.
PDKC provides various range of Mud material from local and international manufacturer
such as BASF (Germany) as follows:
ANTIFOAM(ALCOHOL BASE)
ANTIFOAM(SILICON BASE)
BARITE
BENTONITE
BIO-CIDE
CALCIUM BROMIDE
CALCIUM CARBONATE
CALCIUM CHLORIDE
CAUSTIC SODA
CELLULOSE FIBER
CITRIC ACID
CORROSION INHIBITOR
DISPERSANT
DRILLING DETERGENT
EMULSIFIER (DME)
FER-O-BAR
FLC-HIGH TEMP
FLOCCULANT
H2S SCAVENGER
LIME
LIMESTONE
MICA
NACL(SALT)
NATURAL GUM
OBM THINNER
OBM VISCISIFIER
OYSTERSHELL
Page 9 of 71
PIPE-LAX
POTASSIUM CHLORIDE (KCL)
PRIMARY EMULSIFIER
SECONDARY EMULSIFIER
SODA ASH
SODIUM BICARBONATE
SODIUM CHLORIDE
STARCH(WHEAT)
STARCH
STARCH(POTATO)
STUCK PIPE FREE
SULPHUNATED ASPHALT
THINNER
TCPOLYMER
5. Cementing Services
Cement supports and protects well casings and helps achieve zonal isolation. Critical to safer,
environmentally sound, and profitable wells, zonal isolation is created and maintained in the
wellbore by the cementing process. Whatever your drilling environment or however remote
the location, our innovative cementing technologies offer you a range of cementing solutions
to achieve zonal isolation for the life of your well. Our capabilities in cementing services are
as follows:
I. Thermally Responsive Cement System:
Prevent cement failure with thermally responsive cement systems that expand and contract in
high pressures and temperatures.
II. Cementing UGS Wells:
Reduce unwanted gas migration and effectively isolate zones with advanced cementing
technologies.
III. Self-Healing Cement System:
Ensure long-term zonal isolation and well integrity from production to abandonment—and
beyond.
IV. Gas Migration Control:
Density control, mud removal, and slurry design are critical to effectively cementing gas-
bearing formations and preventing annular gas flow.
Page 10 of 71
V. Mud Removal and Spacer Fluids:
Remove drilling fluids prior to cementing operations and achieve long-term zonal isolation.
VI. Cementing Equipment:
Use the right cementing equipment for the job with state-of-the-art technology designed for
the most challenging well environments.
VII. High Performance with Environmental Conformance Technology:
Enhance chemical treatment performance while minimizing environmental impact.
VIII. Cement Evaluation:
Noninvasively measure the bond between the casing and the cement with acoustic sonic and
ultrasonic tools.
IX. Lost Circulation Solutions:
Cement additives cure lost circulation and reduce drilling costs.
PDKC also provides various range of drilling cements and additives from local and
international manufacturer such as BASF(Germany), ELKEM(Norway) as follow:
ANTI SETTLING AGENT
BENTONITE
BORIC ACID
CALCIUM ACID
CEMENT DEFOAMER
CHEMICAL WASH
DEFOAMER
EXTENDER
FLC
FRICTION REDUCER
GAS BLOCK AGENT
MAGNE-SET
SILICA FLOUR
RETARDER
SALT SATURATED SLURRY RETARDER
Page 11 of 71
SALT WATER CEMENT DISPERSANT
SALT WATER FLUID LOSS CONTROLLER
CEMENT FRICTION REDUCER
SODIUM CHLORIDE
SPACER (MUD PUSH)
THIXOTROPIC AGENT
WEIGHTING AGENT (HIDENCE)
FRICTION WATER CEMENT FLUID LOSS CONTROL
FRESH WATER CEMENT DISPERSANT
Cementing equipment and accessories that PDKC can provide are:
Cementing Unit Trailer with Accessories
Cementing Unit Skid with Accessories
Bulk System
Silo.1050‐OR 400 Bbls Tank
Compressor
Batch Mixer 100 Bbls (R.C.M)
Cementing head and Circulating Swage All Size
6. Procurement Services
PDKC provides turn-key procurement services worldwide. Our procurement services can
meet your requirement for small and big scale project. Services include turn-key procurement
offering and pricing, sourcing at every stage of supply chain, raw materials warehousing,
transportation, global coverage and procurement management. PDKC supplies chemicals
products, petrochemicals, electrical products, oil products and others.
Chemical and petrochemical products included: antifoam agents gas odorants, lube additives,
PPD, sulfolane, oilfield chemicals.
Electrical products includes: low voltage products, high voltage products, generators,
measurement products, control systems and others.
Oil products includes: crude oil and base oil and others.
Page 12 of 71
7. Fishing Services
PDKC provides a variety of state-of-the-art equipment to aid in the recovery of equipment
lost downhole. PDKC offers onshore and offshore drilling and work over services as follows:
I. Internal and External Catching:
Retrieve drill casing, tubing, or other obstructions.
II. Jarring assemblies :
Use fishing jars and bumper subs for stuck pipe, packer retrieval, tubing removal, and debris
recovery.
III. Washover Shoes:
Free stuck pipe in the wellbore by cutting away and circulating out obstructions.
IV. Milling Tools:
Clean out restrictions with tools for light to heavy milling.
V. Packer Milling and Retrieving:
Mill and retrieve in one run.
Page 13 of 71
VI. Junk Baskets
Retrieve even the smallest and most stubborn debris from the hole bottom.
VII. Drillpipe and Cutters
Eliminate the time needed for banding or wedging with a knife return system that ensures
knives are secured in retracted position when running in hole.
VIII. Safety Joints
Ensure parting ability if the workstring gets stuck in the wellbore during fishing.
IX. Reverse Units and Power Swivels
Recover right-hand pipestring and use power swivels with one hydraulic motor.
Page 14 of 71
PDKC’s services include all phases of project development. Its principal efforts include
feasibility studies, engineering design and project management. A feasibility study is a
recommendation, based on engineering analysis, for the best method of development of an
industrial project. Evaluations include capital and operational (CAPEX and OPEX) analysis,
potential operational problems and probable economic return for a new venture. Such studies
are recommended prior to the initiation of engineering design.
Engineering design comprises all the technical data required for the enablement of purchase
and installation of equipment as well as the construction of the facilities. Data includes basic
and detailed engineering document, specifications, bid documents, contractual obligations
and equipment list.
Project management extends project design to encompass material and equipment
procurement, expediting, inspection, transportation and handling at site. It further includes
assistance to the client in locating, evaluating, and selecting construction contractors, contract
negotiations, supervision on construction, on-site inspection and testing, operator training and
plant startup.
The most important asset of any engineering firm is its personnel. PDKC owes its success
and reputation to the knowledge, experience and dedication of its well-trained staff. The
company's dynamic and industrious management and its experienced and motivated
personnel constantly strive to implement all projects activities in a timely manner and in
accordance with the most up-to-date engineering and technical standards and to the entire
satisfaction of the clients. In addition, PDKC enters collaborative agreements with other
reputable Iranian or international firms to supplement its capabilities or resources.
Page 15 of 71
PDKC welcomes inquiries and proposals from clients and suppliers. For further information,
please contact us:
Kish Office: Office 6, 2nd
floor,
Offices Block 28, Iran Blvd.,
Kish - Iran
Tehran Office: Office 12, No 149, Neda Tower, Salehi Street,
West Lavasani Street, Farmanieh,
Tehran - Iran
P.O. Box: 19379-43911
Tel: (+9821) 22690449
(+9821) 22690457
Fax: (+9821) 22694061
Email: [email protected]
Website: www.petrodariankish.com
Page 16 of 71
SECTION 2
Page 17 of 71
Sen
ior
Dri
llin
g E
xp
ert
Sec
reta
ry
Advis
ors
Dri
llin
g M
anag
er
Fin
ance
& A
dm
inis
trat
ion M
anag
er
Com
mer
cial
Man
ager
Sen
ior
Equ
ipm
ent
En
gin
eer
Fin
ance
Exp
ert
Ad
min
istr
atio
n E
xp
ert
Sen
ior
Co
mm
erci
al E
xp
ert
Lo
gis
tics
Exp
ert
Jun
ior
Dri
llin
g E
xp
ert
Jun
ior
Co
mm
erci
al E
xp
ert
Man
agin
g D
irec
tor
Bo
ard
of
Dir
ecto
rs
Sen
ior
Cem
ent
& M
ud
En
gin
eer
Jun
ior
Equ
ipm
ent
En
gin
eer
Jun
ior
Cem
ent
& M
ud
En
gin
eer
Leg
al
Q &
HS
E &
H2S
Tec
hnic
al M
anag
er
Page 18 of 71
KEY PERSONNEL
Name Position Degree Years of
Experience
Jamshid Vadiee Chairman of the Board of Directors BS 32
Hossein Hosseini Deputy Chairman MS 21
E. Tavasolinia Manager Director BS 18
Reza Akbari Drilling Manager MS 17
Masoumeh Mahdian Technical Manager BS 21
Mohammad Reza
Karimi Finance and Administration Manager BS 16
Mohsen Akbari Commercial Manager PhD 5
E. Bagheri Q & HSE & H2S BS 12
Page 19 of 71
SECTION 3
PROJECTS
Page 20 of 71
Drilling and Production Enhancement
Project DPE-PPT-IOOC-T01
Client I.O.O.C
Country Iran
Main activities and
responsibilities
Data gathering,
Feasibility study for using the tool on I.O.O.C’s wells,
Finding a suitable test well,
Providing the unique treatment for the well,
Testing the treatment on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Project DPE-PPT-NISOC-T02
Client N.I.S.O.C
Country Iran
Main activities and
responsibilities
Data gathering,
Feasibility study for using the tool on N.I.S.O.C’s wells,
Finding a suitable test well,
Providing the unique treatment for the well,
Testing the treatment on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (20%)
Page 21 of 71
Project DPE-PPT-ICOFC-T03
Client I.C.O.F.C
Country Iran
Main activities and
responsibilities
Data gathering,
Feasibility study for using the tool on I.C.O.F.C’s wells,
Finding a suitable test well,
Providing the unique treatment for the well,
Testing the treatment on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (25%)
Project DPE-SJP-IOOC-T01
Client I.O.O.C
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the perforation on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Page 22 of 71
Project DPE-SJP-NISOC-T02
Client N.I.S.O.C
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the perforation on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Project DPE-SJP-ICOFC-T03
Client I.C.O.F.C
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the perforation on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Page 23 of 71
Project DPE-SJP-NIDC-T04
Client N.I.D.C
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the perforation on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (20%)
Project DPE-SJP-SA-T05
Client SARVAK AZAR
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the perforation on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Page 24 of 71
Project DPE-PI-IOOC-T01
Client I.O.O.C
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the polymer injection on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Project DPE-PI-NISOC-T02
Client N.I.S.O.C
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the polymer injection on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Page 25 of 71
Project DPE-PI-ICOFC-T03
Client I.C.O.F.C
Country Iran
Main activities and
responsibilities
Data gathering, Feasibility study, Finding a suitable test
well, Testing the polymer injection on the well
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Page 26 of 71
Directional Drilling Services
Project DD-M-NIDC-T01
Client N.I.D.C
Country Iran
Main activities and
responsibilities
Supplying Downhole Motors for directional drilling
projects , Testing by N.I.D.C
Financial Value
Duration and kick-
off day
Contract Status In Progress (50%)
Page 27 of 71
String Rental Services
Project SR-J-PECO01
Client PEJVAK ENERGY
Country Iran
Main activities and
responsibilities 2 Jars (4¾ ” , 6½ ”)
Financial Value 57600 USD
Duration and kick-
off day 94/2/18 - 4 month
Contract Status Completed
Project SR-OS-PECO01
Client PEJVAK ENERGY
Country Iran
Main activities and
responsibilities 4 Overshots (11 ¾” + eq.)
Financial Value 42100 USD
Duration and kick-
off day 94/2/12 - 4 months
Contract Status Completed
Page 28 of 71
Drilling Fluid Services
Project DF-EA-PMP01
Client Petro Mena Pasargad Kish
Country Iran
Main activities and
responsibilities
Drilling Fluid Engineering Services,
Drilling Fluid Additives Procurement
Financial Value ~10,000,000,000 IRR (2,000,000,000 IRR Paid)
Duration and kick-
off day 94/3/7 - ~2 Years
Contract Status In Progress (20%)
Project DF-A-SRP01
Client Saba Rig Procurement Company
Country Iran
Main activities and
responsibilities Drilling Fluid Additives Procurement
Financial Value
Duration and kick-
off day
Contract Status In Progress (30%)
Page 29 of 71
Cementing Services
Project C-EA-PMP01
Client Petro Mena Pasargad Kish
Country Iran
Main activities and
responsibilities
Cementing Engineering Services,
Cementing Additives Procurement
Financial Value ~10,000,000,000 IRR (3,000,000,000 IRR Paid)
Duration and kick-
off day 94/3/7 - ~2 Years
Contract Status In Progress (30%)
Project C-A-SK01
Client SARVAK KISH
Country Iran
Main activities and
responsibilities Cementing Additives Procurement
Financial Value ~2,000,000 AED (119,750 AED Paid)
Duration and kick-
off day 19/09/15 - ~1 year
Contract Status In Progress (10%)
Page 30 of 71
Project C-A-AB01
Client ABESCON
Country Iran
Main activities and
responsibilities Cementing Additives Procurement
Financial Value ~5,000,000,000 IRR (1,000,000,000 IRR Paid)
Duration and kick-
off day 94/3/5 - ~1 year
Contract Status In Progress (20%)
Page 31 of 71
Procurement Services
Project P-DE01
Client DANA ENERGY
Country Iran
Main activities and
responsibilities Hydraulic Wrench Procurement
Financial Value
Duration and kick-
off day
Contract Status In Progress (40%)
Project P-NIDC01
Client N.I.D.C
Country Iran
Main activities and
responsibilities Logging Cable Procurement
Financial Value ~79000 USD
Duration and kick-
off day 94/7/11 - ~5 month
Contract Status In Progress (70%)
Page 32 of 71
Fishing Services
Project F-PECO01
Client PEJVAK ENERGY
Country Iran
Main activities and
responsibilities Fishing Services
Financial Value ~300,000 USD (45,000 USD Paid)
Duration and kick-
off day 94/5/24 - ~1 year
Contract Status In Progress (35%)
Page 33 of 71
SECTION 4
ARTICLES OF
ASSOCIATION
&
COOPERATION
AGREEMENTS
Page 34 of 71
Page 35 of 71
Page 36 of 71
Page 37 of 71
Page 38 of 71
Page 39 of 71
Page 40 of 71
Page 41 of 71
Page 42 of 71
Page 43 of 71
Page 44 of 71
Page 45 of 71
Page 46 of 71
Page 47 of 71
Page 48 of 71
Page 49 of 71
Page 50 of 71
Page 51 of 71
Page 52 of 71
Page 53 of 71
Page 54 of 71
Page 55 of 71
Page 56 of 71
Page 57 of 71
SECTION 5
Page 58 of 71
MaxDrill Drilling Efficiency of drill bit
Max3Di Process Monitoring for Directional Drillling
CemCADE Cementing engineering / design
StimCADE Stimulation engineering / design
LabDB Laboratory calculations / simulation
Drilling Office Drilling calculations / simulation / design
HYSYS Unit operation calculations / simulation / design
Aspen Plus Unit operation calculations / simulation / design
AUTOCAD Technical drawings
PDMS Plant design
CAESAR II Plant analyze
Ansys Fluent Technical analyze
OpenFoam Technical analyze
Gambit Technical analyze
MATLAB Technical calculations / simulation
Page 59 of 71
SECTION 6
Page 60 of 71
Network Qty
1. Windows Advanced Server 1
2. Mail Server 1
3. Internet Server 1
4. IP-Phone Server 1
5. Office Automation 1
Internet Qty
1. ADSL2+ Internet Connection 1
(10 Mbps Receive / 1Mbps send)
Computers Qty
1. HP Proliant ML310e Gen8 Server 1
2. PC Core i5 7
3. Notebook Core i7 4
4. Notebook Core i5 10
Printers Qty
1. HP Color LaserJet CP2025n 1
2. HP LaserJet 2700 PCL6 1
Scanners Qty
1. HP Scanjet 3800 1
Page 61 of 71
Peripherals Qty
1. HDTelevisions 2
2. Video Projector 2
3. IP-Phone Server 1
4. Router DLink 1
5. ADSL Modem DLink 1
6. IP-Phones 22
2. DVD Writer 8
Page 62 of 71
Equipment Count Status
Hydraulic Power Tong 12 Available
Cementing Unit Skid with Accessories - Available
Bulk System 20 Available
Silo.1050‐OR 400 Bbls Tank - Available
Compressor 7 Available
Batch Mixer 100 Bbls (R.C.M) - Available
Cementing head and Circulating Swage All Size - Available
Hydraulic Power Unit 2 Available
Cementing Unit Trailer with Accessories - Available
Make-up Torque Record, Control & Analysis System 3 Available
Manual Tong(Rig Tongs) 12 Available
Casing Fill-up / Circulation Tool (TDS Case-Auto Fill-up
Device) 2 Available
Casing Slips - Available
Set of Single Joint Elevator with Sling and Swivel 2 Available
Side-door Casing Elevator 18 Available
Side-door Casing Elevator/Tubing Elevator 8 Available
Grip Type Casing Elevator 10 Available
Tubing Spider 3 Available
Solution Tank 5 Available
Pick Up Vehicle 2 Available
Page 63 of 71
SECTION 7
Page 64 of 71
Petro Darian Kish’s employees are the Company’s most important
asset. Preventing occupational injuries and illnesses and protection of
the environment are of such consequence that management will provide
all the facilities and supports reasonably required to ensure success.
PDKC is committed to a health, safety and environmental management
system based on ISO14001 and OHSAS18001 that conforms to the
best practices of oil industry. Health, safety and environmental
considerations are a top priority in planning and development of
services and processes. We acknowledge the principle that all accidents
can be prevented and actively promote the highest standards of safety
awareness and performance. PDKC is committed to continuous
improvement of health, safety and environmental processes while
supplying high quality, environmentally responsible services to our
customers.
Our objective is the lowest possible number of accidents, injuries,
illnesses and environmental problems.
PDKC recognizes the importance of working closely with its customers
and contractors. Only through the cooperative effort of all can the best
possible health, safety and environmental record be achieved. This
policy requires internal cooperation in all health, safety and
environmental matters, not only between supervisor and employee,
but also between each employee and his fellow workers.
PDKC recognizes that responsibilities for health, safety and the
environment are shared: 1. Management accepts the responsibility for leadership of the
health, safety and environmental program, for its effectiveness
and improvement and for providing the safeguards required to
ensure safe, environmentally responsible conditions;
2. Supervisors are responsible for developing proper attitudes towards
health, safety and the environment in themselves and directing those
whom they supervise toward this goal. Supervisors are responsible
locally for ensuring that all operations are performed with the
utmost regard for the health and safety of personnel and protection
of the environment;
3. All employees are responsible for wholehearted, genuine cooperation
with every aspect of the health, safety and environmental program.
This includes compliance with all rules and regulations and
continuous, safe, environmentally responsible job performance.
MANAGING DIRECTOR
E.TAVASOLI
Page 65 of 71
SECTION 8
HSE MANUALS
Page 66 of 71
HSE Manuals are attached in the appendixes as follows (in CD):
Appendix A-HSE PLAN
Appendix B-H2S
Appendix C-Fire Fighting Equipment
Appendix D-Hazardous Area Classification
Appendix E-Incident Reporting Procedure
Appendix F-QHSE Management System
Appendix G-Safety Equipment
Appendix H-PPE
Page 67 of 71
SECTION 9
INTERNATIONAL
L IAISONS
Page 68 of 71
PARTNERS
International Procurement Services FZCO (IPS) is a major oilfield
and procurement services provider to the energy industry and active in the field of
renewable energy. Founded in 2004, headquartered in Dubai - UAE, IPS provides
reliable, cost effective and differentiated oilfield and procurement services to
international Oil and Gas companies.
Our partner facilities include:
• An onshore yard in excess of 10,000 m2 with the required utilities/services
such as power, water, telephone, internet and security.
• 2500 m2
offices, sheltered workshops and storage areas housing IPS’
electrical/mechanical workshops, drilling moveable equipment and the central
spare parts store.
Page 69 of 71
JOINT VENTURE & COOPERATION
Executing exclusive joint-venture agreement with SOKOL
Co. from RUSSIA as downhole motor manufacturer for
directional drilling services.
Executing exclusive joint-venture agreement with MUSTANG SERVICE
International SAS Co. from FRANCE for fishing and directional drilling
services.
Executing exclusive joint-venture agreement with NEFT-SERVIS Co.
from RUSSIA for providing handling tools and tubing tongs as in
manufacturer and hydraulic perforation and plasma system provider.
Executing exclusive agency agreement with Cougar Drilling Solutions
from Canada as drilling tools manufacturer.
Page 70 of 71
Executing exclusive agency agreement with MATFOR SAS Co. from
FRANCE as drilling tools manufacturer.
Executing exclusive agency agreement with LIANE MECHANIQUE
SAS Co. from FRANCE as drilling tools manufacturer.
Executing exclusive joint-venture agreement with
“ZHIGERMUNAISERVICE” LLP from Kazakhstan for rental, repair
and the manufacturer of drilling.
Executing joint-venture agreement with “OpDrill” from Canada for
drilling and completion engineering and optimization services.
Executing exclusive joint-venture agreement with SYSTEM.SERVICE
Co. from RUSSIA for providing loss control solution and drilling fluid
services.
Page 71 of 71
Executing exclusive joint-venture agreement with LLC RME "ABC"
Co. from UKRAINE for working on the intensification of wells.