AutoCAD SHX Text
GENERAL CONSTRUCTION 1. FOR THE PURPOSE OF CONSTRUCTION DRAWINGS, THE FOLLOWING DEFINITIONS SHALL APPLY: FOR THE PURPOSE OF CONSTRUCTION DRAWINGS, THE FOLLOWING DEFINITIONS SHALL APPLY: GENERAL CONTRACTOR: OVERLAND CONTRACTING INC. (B&V) CONTRACTOR: (CONSTRUCTION) OWNER: AT&T 2. ALL SITE WORK SHALL BE COMPLETED AS INDICATED ON THE DRAWINGS AND AT&T PROJECT SPECIFICATIONS. ALL SITE WORK SHALL BE COMPLETED AS INDICATED ON THE DRAWINGS AND AT&T PROJECT SPECIFICATIONS. 3. GENERAL CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS GENERAL CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS THE SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS SITE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS FAMILIARIZE HIMSELF WITH ALL CONDITIONS FAMILIARIZE HIMSELF WITH ALL CONDITIONS HIMSELF WITH ALL CONDITIONS HIMSELF WITH ALL CONDITIONS WITH ALL CONDITIONS WITH ALL CONDITIONS ALL CONDITIONS ALL CONDITIONS CONDITIONS CONDITIONS AFFECTING THE PROPOSED WORK AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH THE PROPOSED WORK AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH THE PROPOSED WORK AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH PROPOSED WORK AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH PROPOSED WORK AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH WORK AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH WORK AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH AND SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH SHALL MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH MAKE NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH NECESSARY PROVISIONS. PRIOR TO PROCEEDING WITH PROVISIONS. PRIOR TO PROCEEDING WITH PROVISIONS. PRIOR TO PROCEEDING WITH PRIOR TO PROCEEDING WITH PRIOR TO PROCEEDING WITH TO PROCEEDING WITH TO PROCEEDING WITH PROCEEDING WITH PROCEEDING WITH WITH WITH CONSTRUCTION, GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE SHALL FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE SHALL FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE FAMILIARIZE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE HIMSELF WITH ALL CONTRACT DOCUMENTS, SITE WITH ALL CONTRACT DOCUMENTS, SITE WITH ALL CONTRACT DOCUMENTS, SITE ALL CONTRACT DOCUMENTS, SITE ALL CONTRACT DOCUMENTS, SITE CONTRACT DOCUMENTS, SITE CONTRACT DOCUMENTS, SITE DOCUMENTS, SITE DOCUMENTS, SITE SITE SITE CONDITIONS, DIMENSIONS, AND CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. DIMENSIONS, AND CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. DIMENSIONS, AND CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. AND CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. AND CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. THE WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. WORK CAN BE ACCOMPLISHED AS SHOWN ON PLAN. CAN BE ACCOMPLISHED AS SHOWN ON PLAN. CAN BE ACCOMPLISHED AS SHOWN ON PLAN. BE ACCOMPLISHED AS SHOWN ON PLAN. BE ACCOMPLISHED AS SHOWN ON PLAN. ACCOMPLISHED AS SHOWN ON PLAN. ACCOMPLISHED AS SHOWN ON PLAN. AS SHOWN ON PLAN. AS SHOWN ON PLAN. SHOWN ON PLAN. SHOWN ON PLAN. ON PLAN. ON PLAN. PLAN. PLAN. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. 4. MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, STRICT ACCORDANCE WITH ALL APPLICABLE CODES, STRICT ACCORDANCE WITH ALL APPLICABLE CODES, ACCORDANCE WITH ALL APPLICABLE CODES, ACCORDANCE WITH ALL APPLICABLE CODES, WITH ALL APPLICABLE CODES, WITH ALL APPLICABLE CODES, ALL APPLICABLE CODES, ALL APPLICABLE CODES, APPLICABLE CODES, APPLICABLE CODES, CODES, CODES, REGULATIONS, AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND SHALL ISSUE ALL APPROPRIATE NOTICES AND SHALL ISSUE ALL APPROPRIATE NOTICES AND ISSUE ALL APPROPRIATE NOTICES AND ISSUE ALL APPROPRIATE NOTICES AND ALL APPROPRIATE NOTICES AND ALL APPROPRIATE NOTICES AND APPROPRIATE NOTICES AND APPROPRIATE NOTICES AND NOTICES AND NOTICES AND AND AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC AND LAWFUL ORDERS OF ANY PUBLIC AND LAWFUL ORDERS OF ANY PUBLIC LAWFUL ORDERS OF ANY PUBLIC LAWFUL ORDERS OF ANY PUBLIC ORDERS OF ANY PUBLIC ORDERS OF ANY PUBLIC OF ANY PUBLIC OF ANY PUBLIC ANY PUBLIC ANY PUBLIC PUBLIC PUBLIC AUTHORITY REGARDING THE PERFORMANCE OF WORK. 5. ALL WORK CARRIED OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS ALL WORK CARRIED OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS WORK CARRIED OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS WORK CARRIED OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS CARRIED OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS CARRIED OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS OUT SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS SHALL COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS COMPLY WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS WITH APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS AND UTILITY COMPANY SPECIFICATIONS AND UTILITY COMPANY SPECIFICATIONS UTILITY COMPANY SPECIFICATIONS UTILITY COMPANY SPECIFICATIONS COMPANY SPECIFICATIONS COMPANY SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS IN ADDITION TO LOCAL JURISDICTIONAL CODES, ORDINANCES, AND APPLICABLE REGULATIONS. 6. UNLESS NOTED OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, UNLESS NOTED OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, NOTED OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, NOTED OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, MATERIALS, EQUIPMENT, APPURTENANCES, MATERIALS, EQUIPMENT, APPURTENANCES, EQUIPMENT, APPURTENANCES, EQUIPMENT, APPURTENANCES, APPURTENANCES, APPURTENANCES, AND LABOR NECESSARY TO COMPLETE ALL INSTALLATIONS AS SHOWN ON THE DRAWINGS. 7. PLANS SHALL NOT BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS PLANS SHALL NOT BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS SHALL NOT BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS SHALL NOT BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS NOT BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS NOT BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS TO BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS BE A DIAGRAMMATIC OUTLINE ONLY, UNLESS A DIAGRAMMATIC OUTLINE ONLY, UNLESS A DIAGRAMMATIC OUTLINE ONLY, UNLESS DIAGRAMMATIC OUTLINE ONLY, UNLESS DIAGRAMMATIC OUTLINE ONLY, UNLESS OUTLINE ONLY, UNLESS OUTLINE ONLY, UNLESS ONLY, UNLESS ONLY, UNLESS UNLESS UNLESS OTHERWISE NOTED. DIMENSIONS SHOWN ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING NOTED. DIMENSIONS SHOWN ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING NOTED. DIMENSIONS SHOWN ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING DIMENSIONS SHOWN ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING DIMENSIONS SHOWN ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING SHOWN ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING SHOWN ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING ARE TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING TO FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING FINISH SURFACES, UNLESS OTHERWISE NOTED. SPACING SURFACES, UNLESS OTHERWISE NOTED. SPACING SURFACES, UNLESS OTHERWISE NOTED. SPACING UNLESS OTHERWISE NOTED. SPACING UNLESS OTHERWISE NOTED. SPACING OTHERWISE NOTED. SPACING OTHERWISE NOTED. SPACING NOTED. SPACING NOTED. SPACING SPACING SPACING BETWEEN EQUIPMENT IS THE MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL EQUIPMENT IS THE MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL EQUIPMENT IS THE MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL IS THE MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL IS THE MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL THE MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL THE MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL MINIMUM REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL REQUIRED CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL CLEARANCE. IT IS CRITICAL TO FIELD VERIFY ALL IT IS CRITICAL TO FIELD VERIFY ALL IT IS CRITICAL TO FIELD VERIFY ALL IS CRITICAL TO FIELD VERIFY ALL IS CRITICAL TO FIELD VERIFY ALL CRITICAL TO FIELD VERIFY ALL CRITICAL TO FIELD VERIFY ALL TO FIELD VERIFY ALL TO FIELD VERIFY ALL FIELD VERIFY ALL FIELD VERIFY ALL VERIFY ALL VERIFY ALL ALL ALL DIMENSIONS. SHOULD THERE BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE SHOULD THERE BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE SHOULD THERE BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE THERE BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE THERE BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE ANY QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE QUESTIONS REGARDING THE PLAN, THE CONTRACTOR SHALL BE REGARDING THE PLAN, THE CONTRACTOR SHALL BE REGARDING THE PLAN, THE CONTRACTOR SHALL BE THE PLAN, THE CONTRACTOR SHALL BE THE PLAN, THE CONTRACTOR SHALL BE PLAN, THE CONTRACTOR SHALL BE PLAN, THE CONTRACTOR SHALL BE THE CONTRACTOR SHALL BE THE CONTRACTOR SHALL BE CONTRACTOR SHALL BE CONTRACTOR SHALL BE SHALL BE SHALL BE BE BE RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. FOR OBTAINING A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. FOR OBTAINING A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. OBTAINING A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. OBTAINING A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. ENGINEER PRIOR TO PROCEEDING WITH THE WORK. ENGINEER PRIOR TO PROCEEDING WITH THE WORK. PRIOR TO PROCEEDING WITH THE WORK. PRIOR TO PROCEEDING WITH THE WORK. TO PROCEEDING WITH THE WORK. TO PROCEEDING WITH THE WORK. PROCEEDING WITH THE WORK. PROCEEDING WITH THE WORK. WITH THE WORK. WITH THE WORK. THE WORK. THE WORK. WORK. WORK. DETAILS ARE INTENDED TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB ARE INTENDED TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB ARE INTENDED TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB INTENDED TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB INTENDED TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT JOB MODIFICATIONS MAY BE REQUIRED TO SUIT JOB MODIFICATIONS MAY BE REQUIRED TO SUIT JOB MAY BE REQUIRED TO SUIT JOB MAY BE REQUIRED TO SUIT JOB BE REQUIRED TO SUIT JOB BE REQUIRED TO SUIT JOB REQUIRED TO SUIT JOB REQUIRED TO SUIT JOB TO SUIT JOB TO SUIT JOB SUIT JOB SUIT JOB JOB JOB DIMENSIONS OR CONDITIONS. SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED OR CONDITIONS. SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED OR CONDITIONS. SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED CONDITIONS. SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED CONDITIONS. SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED MODIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND APPROVED SHALL BE INCLUDED AS PART OF WORK AND APPROVED SHALL BE INCLUDED AS PART OF WORK AND APPROVED BE INCLUDED AS PART OF WORK AND APPROVED BE INCLUDED AS PART OF WORK AND APPROVED INCLUDED AS PART OF WORK AND APPROVED INCLUDED AS PART OF WORK AND APPROVED AS PART OF WORK AND APPROVED AS PART OF WORK AND APPROVED PART OF WORK AND APPROVED PART OF WORK AND APPROVED OF WORK AND APPROVED OF WORK AND APPROVED WORK AND APPROVED WORK AND APPROVED AND APPROVED AND APPROVED APPROVED APPROVED BY THE ENGINEER PRIOR TO PROCEEDING WITH WORK. 8. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S MATERIALS IN ACCORDANCE WITH MANUFACTURER'S MATERIALS IN ACCORDANCE WITH MANUFACTURER'S IN ACCORDANCE WITH MANUFACTURER'S IN ACCORDANCE WITH MANUFACTURER'S ACCORDANCE WITH MANUFACTURER'S ACCORDANCE WITH MANUFACTURER'S WITH MANUFACTURER'S WITH MANUFACTURER'S MANUFACTURER'S MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY STATED OTHERWISE. 9. IF THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL IF THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL CANNOT BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL BE INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL INSTALLED AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL AS SHOWN ON THE PLAN, THE CONTRACTOR SHALL SHOWN ON THE PLAN, THE CONTRACTOR SHALL SHOWN ON THE PLAN, THE CONTRACTOR SHALL ON THE PLAN, THE CONTRACTOR SHALL ON THE PLAN, THE CONTRACTOR SHALL THE PLAN, THE CONTRACTOR SHALL THE PLAN, THE CONTRACTOR SHALL PLAN, THE CONTRACTOR SHALL PLAN, THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL PROPOSE AN ALTERNATIVE INSTALLATION SPACE FOR APPROVAL BY THE ENGINEER PRIOR TO PROCEEDING. 10. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND FOR THE SAFETY OF WORK AREA, ADJACENT AREAS, AND THE SAFETY OF WORK AREA, ADJACENT AREAS, AND THE SAFETY OF WORK AREA, ADJACENT AREAS, AND SAFETY OF WORK AREA, ADJACENT AREAS, AND SAFETY OF WORK AREA, ADJACENT AREAS, AND OF WORK AREA, ADJACENT AREAS, AND OF WORK AREA, ADJACENT AREAS, AND WORK AREA, ADJACENT AREAS, AND WORK AREA, ADJACENT AREAS, AND AREA, ADJACENT AREAS, AND AREA, ADJACENT AREAS, AND ADJACENT AREAS, AND ADJACENT AREAS, AND AREAS, AND AREAS, AND AND AND BUILDING OCCUPANTS THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK OCCUPANTS THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK OCCUPANTS THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK BY THE WORK UNDER THIS CONTRACT. WORK BY THE WORK UNDER THIS CONTRACT. WORK THE WORK UNDER THIS CONTRACT. WORK THE WORK UNDER THIS CONTRACT. WORK WORK UNDER THIS CONTRACT. WORK WORK UNDER THIS CONTRACT. WORK UNDER THIS CONTRACT. WORK UNDER THIS CONTRACT. WORK THIS CONTRACT. WORK THIS CONTRACT. WORK CONTRACT. WORK CONTRACT. WORK WORK WORK SHALL CONFORM TO ALL OSHA REQUIREMENTS AND THE LOCAL JURISDICTION. 11. GENERAL CONTRACTOR SHALL COORDINATE AND SCHEDULE WORK ACTIVITIES WITH OTHER DISCIPLINES. GENERAL CONTRACTOR SHALL COORDINATE AND SCHEDULE WORK ACTIVITIES WITH OTHER DISCIPLINES. 12. ERECTION SHALL BE DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN ERECTION SHALL BE DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN SHALL BE DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN SHALL BE DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN BE DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN BE DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN DONE IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN A WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN WORKMANLIKE MANNER BY COMPETENT, EXPERIENCED WORKMEN IN MANNER BY COMPETENT, EXPERIENCED WORKMEN IN MANNER BY COMPETENT, EXPERIENCED WORKMEN IN BY COMPETENT, EXPERIENCED WORKMEN IN BY COMPETENT, EXPERIENCED WORKMEN IN COMPETENT, EXPERIENCED WORKMEN IN COMPETENT, EXPERIENCED WORKMEN IN EXPERIENCED WORKMEN IN EXPERIENCED WORKMEN IN WORKMEN IN WORKMEN IN IN IN ACCORDANCE WITH APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID WITH APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID WITH APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID PRACTICE. ALL MEMBERS SHALL BE LAID PRACTICE. ALL MEMBERS SHALL BE LAID ALL MEMBERS SHALL BE LAID ALL MEMBERS SHALL BE LAID MEMBERS SHALL BE LAID MEMBERS SHALL BE LAID SHALL BE LAID SHALL BE LAID BE LAID BE LAID LAID LAID PLUMB AND TRUE AS INDICATED ON THE DRAWINGS. 13. SEAL PENETRATIONS THROUGH FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED SEAL PENETRATIONS THROUGH FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED PENETRATIONS THROUGH FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED PENETRATIONS THROUGH FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED THROUGH FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED THROUGH FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED FIRE RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED RATED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED AREAS, SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED SHALL BE MADE WITH UL LISTED MATERIALS, APPROVED BE MADE WITH UL LISTED MATERIALS, APPROVED BE MADE WITH UL LISTED MATERIALS, APPROVED MADE WITH UL LISTED MATERIALS, APPROVED MADE WITH UL LISTED MATERIALS, APPROVED WITH UL LISTED MATERIALS, APPROVED WITH UL LISTED MATERIALS, APPROVED UL LISTED MATERIALS, APPROVED UL LISTED MATERIALS, APPROVED LISTED MATERIALS, APPROVED LISTED MATERIALS, APPROVED MATERIALS, APPROVED MATERIALS, APPROVED APPROVED APPROVED BY THE LOCAL JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF THE LOCAL JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF THE LOCAL JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF LOCAL JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF LOCAL JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF CONTRACTOR SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF SHALL KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF KEEP AREA CLEAN AND HAZARD FREE, AND DISPOSE OF AREA CLEAN AND HAZARD FREE, AND DISPOSE OF AREA CLEAN AND HAZARD FREE, AND DISPOSE OF CLEAN AND HAZARD FREE, AND DISPOSE OF CLEAN AND HAZARD FREE, AND DISPOSE OF AND HAZARD FREE, AND DISPOSE OF AND HAZARD FREE, AND DISPOSE OF HAZARD FREE, AND DISPOSE OF HAZARD FREE, AND DISPOSE OF FREE, AND DISPOSE OF FREE, AND DISPOSE OF AND DISPOSE OF AND DISPOSE OF DISPOSE OF DISPOSE OF OF OF ALL DEBRIS DAILY. 14. AS-BUILT CONDITIONS ARE REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR AS-BUILT CONDITIONS ARE REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR CONDITIONS ARE REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR CONDITIONS ARE REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR ARE REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR ARE REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR REPRESENTED BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR BY LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR LIGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR SHADED LINES AND NOTES. THE SCOPE OF WORK FOR SHADED LINES AND NOTES. THE SCOPE OF WORK FOR LINES AND NOTES. THE SCOPE OF WORK FOR LINES AND NOTES. THE SCOPE OF WORK FOR AND NOTES. THE SCOPE OF WORK FOR AND NOTES. THE SCOPE OF WORK FOR NOTES. THE SCOPE OF WORK FOR NOTES. THE SCOPE OF WORK FOR THE SCOPE OF WORK FOR THE SCOPE OF WORK FOR SCOPE OF WORK FOR SCOPE OF WORK FOR OF WORK FOR OF WORK FOR WORK FOR WORK FOR FOR FOR THIS PROJECT IS REPRESENTED BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE PROJECT IS REPRESENTED BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE PROJECT IS REPRESENTED BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE IS REPRESENTED BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE IS REPRESENTED BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE REPRESENTED BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE REPRESENTED BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE BY DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE DARK SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE SHADED LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE LINES AND NOTES. CONTRACTOR SHALL NOTIFY THE AND NOTES. CONTRACTOR SHALL NOTIFY THE AND NOTES. CONTRACTOR SHALL NOTIFY THE NOTES. CONTRACTOR SHALL NOTIFY THE NOTES. CONTRACTOR SHALL NOTIFY THE CONTRACTOR SHALL NOTIFY THE CONTRACTOR SHALL NOTIFY THE SHALL NOTIFY THE SHALL NOTIFY THE NOTIFY THE NOTIFY THE THE THE GENERAL CONTRACTOR OF ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE CONTRACTOR OF ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE CONTRACTOR OF ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE OF ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE OF ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE THAT DEVIATE FROM THE DRAWINGS PRIOR TO THE DEVIATE FROM THE DRAWINGS PRIOR TO THE DEVIATE FROM THE DRAWINGS PRIOR TO THE FROM THE DRAWINGS PRIOR TO THE FROM THE DRAWINGS PRIOR TO THE THE DRAWINGS PRIOR TO THE THE DRAWINGS PRIOR TO THE DRAWINGS PRIOR TO THE DRAWINGS PRIOR TO THE PRIOR TO THE PRIOR TO THE TO THE TO THE THE THE COMMENCEMENT OF CONSTRUCTION. 15. CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO WRITTEN NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO NOTICE TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO THE CONSTRUCTION MANAGER, 48 HOURS PRIOR TO CONSTRUCTION MANAGER, 48 HOURS PRIOR TO CONSTRUCTION MANAGER, 48 HOURS PRIOR TO MANAGER, 48 HOURS PRIOR TO MANAGER, 48 HOURS PRIOR TO 48 HOURS PRIOR TO 48 HOURS PRIOR TO HOURS PRIOR TO HOURS PRIOR TO PRIOR TO PRIOR TO TO TO COMMENCEMENT OF WORK. 16. THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING, AND PAVEMENTS, CURBS, LANDSCAPING, AND PAVEMENTS, CURBS, LANDSCAPING, AND CURBS, LANDSCAPING, AND CURBS, LANDSCAPING, AND LANDSCAPING, AND LANDSCAPING, AND AND AND STRUCTURES DURING CONSTRUCTION OPERATIONS. ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE DURING CONSTRUCTION OPERATIONS. ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE DURING CONSTRUCTION OPERATIONS. ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE CONSTRUCTION OPERATIONS. ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE CONSTRUCTION OPERATIONS. ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE OPERATIONS. ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE OPERATIONS. ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE ANY DAMAGED AREAS/ SITE ELEMENTS SHALL BE DAMAGED AREAS/ SITE ELEMENTS SHALL BE DAMAGED AREAS/ SITE ELEMENTS SHALL BE AREAS/ SITE ELEMENTS SHALL BE AREAS/ SITE ELEMENTS SHALL BE SITE ELEMENTS SHALL BE SITE ELEMENTS SHALL BE ELEMENTS SHALL BE ELEMENTS SHALL BE SHALL BE SHALL BE BE BE REPAIRED AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER. 17. THE CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. SERVICES PRIOR TO THE START OF CONSTRUCTION. SERVICES PRIOR TO THE START OF CONSTRUCTION. PRIOR TO THE START OF CONSTRUCTION. PRIOR TO THE START OF CONSTRUCTION. TO THE START OF CONSTRUCTION. TO THE START OF CONSTRUCTION. THE START OF CONSTRUCTION. THE START OF CONSTRUCTION. START OF CONSTRUCTION. START OF CONSTRUCTION. OF CONSTRUCTION. OF CONSTRUCTION. CONSTRUCTION. CONSTRUCTION. CONTRACTOR IS ALSO RESPONSIBLE FOR THE NOTIFICATION OF TIER-TWO FACILITY/UTILITY OWNERS. 18. GENERAL CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO GENERAL CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO ACCESS FOR ALL TRADES AND CONTRACTORS TO ACCESS FOR ALL TRADES AND CONTRACTORS TO FOR ALL TRADES AND CONTRACTORS TO FOR ALL TRADES AND CONTRACTORS TO ALL TRADES AND CONTRACTORS TO ALL TRADES AND CONTRACTORS TO TRADES AND CONTRACTORS TO TRADES AND CONTRACTORS TO AND CONTRACTORS TO AND CONTRACTORS TO CONTRACTORS TO CONTRACTORS TO TO TO THE SITE AND/OR BUILDING. 19. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF FOR SECURITY OF THE SITE FOR THE DURATION OF FOR SECURITY OF THE SITE FOR THE DURATION OF SECURITY OF THE SITE FOR THE DURATION OF SECURITY OF THE SITE FOR THE DURATION OF OF THE SITE FOR THE DURATION OF OF THE SITE FOR THE DURATION OF THE SITE FOR THE DURATION OF THE SITE FOR THE DURATION OF SITE FOR THE DURATION OF SITE FOR THE DURATION OF FOR THE DURATION OF FOR THE DURATION OF THE DURATION OF THE DURATION OF DURATION OF DURATION OF OF OF CONSTRUCTION UNTIL JOB COMPLETION. 20. THE GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL THE GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL CONDITION ONE COMPLETE SET OF PLANS WITH ALL CONDITION ONE COMPLETE SET OF PLANS WITH ALL ONE COMPLETE SET OF PLANS WITH ALL ONE COMPLETE SET OF PLANS WITH ALL COMPLETE SET OF PLANS WITH ALL COMPLETE SET OF PLANS WITH ALL SET OF PLANS WITH ALL SET OF PLANS WITH ALL OF PLANS WITH ALL OF PLANS WITH ALL PLANS WITH ALL PLANS WITH ALL WITH ALL WITH ALL ALL ALL REVISIONS, ADDENDA, AND CHANGE ORDERS, ON THE PREMISES, AT ALL TIMES. 21. THE CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A THE CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A WITH A RATING OF NOT LESS THAN 2-A WITH A RATING OF NOT LESS THAN 2-A A RATING OF NOT LESS THAN 2-A A RATING OF NOT LESS THAN 2-A RATING OF NOT LESS THAN 2-A RATING OF NOT LESS THAN 2-A OF NOT LESS THAN 2-A OF NOT LESS THAN 2-A NOT LESS THAN 2-A NOT LESS THAN 2-A LESS THAN 2-A LESS THAN 2-A THAN 2-A THAN 2-A 2-A 2-A OT 2-A:10-B:C LOCATED WITHIN 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS 2-A:10-B:C LOCATED WITHIN 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS 2-A:10-B:C LOCATED WITHIN 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS LOCATED WITHIN 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS LOCATED WITHIN 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS WITHIN 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS WITHIN 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS 25 FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS FEET OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS OF TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS TRAVEL DISTANCE TO WORK ALL AREAS OR WHERE WORK IS DISTANCE TO WORK ALL AREAS OR WHERE WORK IS DISTANCE TO WORK ALL AREAS OR WHERE WORK IS TO WORK ALL AREAS OR WHERE WORK IS TO WORK ALL AREAS OR WHERE WORK IS WORK ALL AREAS OR WHERE WORK IS WORK ALL AREAS OR WHERE WORK IS ALL AREAS OR WHERE WORK IS ALL AREAS OR WHERE WORK IS AREAS OR WHERE WORK IS AREAS OR WHERE WORK IS OR WHERE WORK IS OR WHERE WORK IS WHERE WORK IS WHERE WORK IS WORK IS WORK IS IS IS BEING PERFORMED DURING CONSTRUCTION. 22. ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL AND OTHER UTILITIES SHALL BE PROTECTED AT ALL AND OTHER UTILITIES SHALL BE PROTECTED AT ALL OTHER UTILITIES SHALL BE PROTECTED AT ALL OTHER UTILITIES SHALL BE PROTECTED AT ALL UTILITIES SHALL BE PROTECTED AT ALL UTILITIES SHALL BE PROTECTED AT ALL SHALL BE PROTECTED AT ALL SHALL BE PROTECTED AT ALL BE PROTECTED AT ALL BE PROTECTED AT ALL PROTECTED AT ALL PROTECTED AT ALL AT ALL AT ALL ALL ALL TIMES, AND WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS AND WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS AND WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS EXECUTION OF THE WORK, SHALL BE RELOCATED AS EXECUTION OF THE WORK, SHALL BE RELOCATED AS OF THE WORK, SHALL BE RELOCATED AS OF THE WORK, SHALL BE RELOCATED AS THE WORK, SHALL BE RELOCATED AS THE WORK, SHALL BE RELOCATED AS WORK, SHALL BE RELOCATED AS WORK, SHALL BE RELOCATED AS SHALL BE RELOCATED AS SHALL BE RELOCATED AS BE RELOCATED AS BE RELOCATED AS RELOCATED AS RELOCATED AS AS AS DIRECTED BY THE ENGINEER. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING BY THE ENGINEER. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING BY THE ENGINEER. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING THE ENGINEER. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING THE ENGINEER. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING ENGINEER. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING ENGINEER. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING BE USED BY THE CONTRACTOR WHEN EXCAVATING BE USED BY THE CONTRACTOR WHEN EXCAVATING USED BY THE CONTRACTOR WHEN EXCAVATING USED BY THE CONTRACTOR WHEN EXCAVATING BY THE CONTRACTOR WHEN EXCAVATING BY THE CONTRACTOR WHEN EXCAVATING THE CONTRACTOR WHEN EXCAVATING THE CONTRACTOR WHEN EXCAVATING CONTRACTOR WHEN EXCAVATING CONTRACTOR WHEN EXCAVATING WHEN EXCAVATING WHEN EXCAVATING EXCAVATING EXCAVATING OR DRILLING PIERS AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE DRILLING PIERS AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE DRILLING PIERS AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE PIERS AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE PIERS AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE SHALL PROVIDE SAFETY TRAINING FOR THE SHALL PROVIDE SAFETY TRAINING FOR THE PROVIDE SAFETY TRAINING FOR THE PROVIDE SAFETY TRAINING FOR THE SAFETY TRAINING FOR THE SAFETY TRAINING FOR THE TRAINING FOR THE TRAINING FOR THE FOR THE FOR THE THE THE WORKING CREW. TRAINING SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED CREW. TRAINING SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED CREW. TRAINING SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED TRAINING SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED TRAINING SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED INCLUDE BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED BUT NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED NOT BE LIMITED TO A) FALL PROTECTION, B) CONFINED BE LIMITED TO A) FALL PROTECTION, B) CONFINED BE LIMITED TO A) FALL PROTECTION, B) CONFINED LIMITED TO A) FALL PROTECTION, B) CONFINED LIMITED TO A) FALL PROTECTION, B) CONFINED TO A) FALL PROTECTION, B) CONFINED TO A) FALL PROTECTION, B) CONFINED A) FALL PROTECTION, B) CONFINED A) FALL PROTECTION, B) CONFINED FALL PROTECTION, B) CONFINED FALL PROTECTION, B) CONFINED PROTECTION, B) CONFINED PROTECTION, B) CONFINED B) CONFINED B) CONFINED CONFINED CONFINED SPACE, C) ELECTRICAL SAFETY, AND D) TRENCHING & EXCAVATION. 23. ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE AND OTHER UTILITIES, WHICH INTERFERE WITH THE AND OTHER UTILITIES, WHICH INTERFERE WITH THE OTHER UTILITIES, WHICH INTERFERE WITH THE OTHER UTILITIES, WHICH INTERFERE WITH THE UTILITIES, WHICH INTERFERE WITH THE UTILITIES, WHICH INTERFERE WITH THE WHICH INTERFERE WITH THE WHICH INTERFERE WITH THE INTERFERE WITH THE INTERFERE WITH THE WITH THE WITH THE THE THE EXECUTION OF THE WORK, SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT OF THE WORK, SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT OF THE WORK, SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT THE WORK, SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT THE WORK, SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT WORK, SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT WORK, SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT SHALL BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT BE REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT REMOVED, CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT CAPPED, PLUGGED, OR OTHERWISE DISCONNECTED AT PLUGGED, OR OTHERWISE DISCONNECTED AT PLUGGED, OR OTHERWISE DISCONNECTED AT OR OTHERWISE DISCONNECTED AT OR OTHERWISE DISCONNECTED AT OTHERWISE DISCONNECTED AT OTHERWISE DISCONNECTED AT DISCONNECTED AT DISCONNECTED AT AT AT POINTS WHICH WILL NOT INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE WHICH WILL NOT INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE WHICH WILL NOT INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE WILL NOT INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE WILL NOT INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE NOT INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE NOT INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE INTERFERE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE OF THE WORK, AS DIRECTED BY THE RESPONSIBLE OF THE WORK, AS DIRECTED BY THE RESPONSIBLE THE WORK, AS DIRECTED BY THE RESPONSIBLE THE WORK, AS DIRECTED BY THE RESPONSIBLE WORK, AS DIRECTED BY THE RESPONSIBLE WORK, AS DIRECTED BY THE RESPONSIBLE AS DIRECTED BY THE RESPONSIBLE AS DIRECTED BY THE RESPONSIBLE DIRECTED BY THE RESPONSIBLE DIRECTED BY THE RESPONSIBLE BY THE RESPONSIBLE BY THE RESPONSIBLE THE RESPONSIBLE THE RESPONSIBLE RESPONSIBLE RESPONSIBLE ENGINEER, AND SUBJECT TO THE APPROVAL OF THE OWNER AND/OR LOCAL UTILITIES. 24. THE AREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, THE AREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, AREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, AREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, BY THE WORK AND NOT COVERED BY THE TOWER, BY THE WORK AND NOT COVERED BY THE TOWER, THE WORK AND NOT COVERED BY THE TOWER, THE WORK AND NOT COVERED BY THE TOWER, WORK AND NOT COVERED BY THE TOWER, WORK AND NOT COVERED BY THE TOWER, AND NOT COVERED BY THE TOWER, AND NOT COVERED BY THE TOWER, NOT COVERED BY THE TOWER, NOT COVERED BY THE TOWER, COVERED BY THE TOWER, COVERED BY THE TOWER, BY THE TOWER, BY THE TOWER, THE TOWER, THE TOWER, TOWER, TOWER, EQUIPMENT, OR DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT OR DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT OR DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT SHALL BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT SHALL BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT BE GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT GRADED TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT TO A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT A UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT UNIFORM SLOPE AND PROPERLY STABILIZED TO PREVENT SLOPE AND PROPERLY STABILIZED TO PREVENT SLOPE AND PROPERLY STABILIZED TO PREVENT AND PROPERLY STABILIZED TO PREVENT AND PROPERLY STABILIZED TO PREVENT PROPERLY STABILIZED TO PREVENT PROPERLY STABILIZED TO PREVENT STABILIZED TO PREVENT STABILIZED TO PREVENT TO PREVENT TO PREVENT PREVENT PREVENT EROSION. 25. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND SHALL MINIMIZE DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND SHALL MINIMIZE DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND MINIMIZE DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND MINIMIZE DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND DISTURBANCE TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND TO THE SITE DURING CONSTRUCTION. EROSION CONTROL AND THE SITE DURING CONSTRUCTION. EROSION CONTROL AND THE SITE DURING CONSTRUCTION. EROSION CONTROL AND SITE DURING CONSTRUCTION. EROSION CONTROL AND SITE DURING CONSTRUCTION. EROSION CONTROL AND DURING CONSTRUCTION. EROSION CONTROL AND DURING CONSTRUCTION. EROSION CONTROL AND CONSTRUCTION. EROSION CONTROL AND CONSTRUCTION. EROSION CONTROL AND EROSION CONTROL AND EROSION CONTROL AND CONTROL AND CONTROL AND AND AND SEDIMENT CONTROL MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH CONTROL MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH CONTROL MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH CONSTRUCTION, SHALL BE IN CONFORMANCE WITH CONSTRUCTION, SHALL BE IN CONFORMANCE WITH SHALL BE IN CONFORMANCE WITH SHALL BE IN CONFORMANCE WITH BE IN CONFORMANCE WITH BE IN CONFORMANCE WITH IN CONFORMANCE WITH IN CONFORMANCE WITH CONFORMANCE WITH CONFORMANCE WITH WITH WITH FEDERAL AND/OR LOCAL JURISDICTIONS. 26. FILL OR EMBANKMENT MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, FILL OR EMBANKMENT MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, OR EMBANKMENT MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, OR EMBANKMENT MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, EMBANKMENT MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, EMBANKMENT MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, MATERIAL SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, SHALL NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, NOT BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW, ON FROZEN GROUND. FROZEN MATERIALS, SNOW, ON FROZEN GROUND. FROZEN MATERIALS, SNOW, FROZEN GROUND. FROZEN MATERIALS, SNOW, FROZEN GROUND. FROZEN MATERIALS, SNOW, GROUND. FROZEN MATERIALS, SNOW, GROUND. FROZEN MATERIALS, SNOW, FROZEN MATERIALS, SNOW, FROZEN MATERIALS, SNOW, MATERIALS, SNOW, MATERIALS, SNOW, SNOW, SNOW, OR ICE SHALL NOT BE PLACED IN ANY FILL OR EMBANKMENT. 27. THE SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT THE SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT UNIFORM GRADE AND COMPACTED TO 95 PERCENT UNIFORM GRADE AND COMPACTED TO 95 PERCENT GRADE AND COMPACTED TO 95 PERCENT GRADE AND COMPACTED TO 95 PERCENT AND COMPACTED TO 95 PERCENT AND COMPACTED TO 95 PERCENT COMPACTED TO 95 PERCENT COMPACTED TO 95 PERCENT TO 95 PERCENT TO 95 PERCENT 95 PERCENT 95 PERCENT PERCENT PERCENT STANDARD PROCTOR UNDER PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN PROCTOR UNDER PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN PROCTOR UNDER PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN UNDER PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN UNDER PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN STRUCTURES AND 80 PERCENT STANDARD PROCTOR IN OPEN AND 80 PERCENT STANDARD PROCTOR IN OPEN AND 80 PERCENT STANDARD PROCTOR IN OPEN 80 PERCENT STANDARD PROCTOR IN OPEN 80 PERCENT STANDARD PROCTOR IN OPEN PERCENT STANDARD PROCTOR IN OPEN PERCENT STANDARD PROCTOR IN OPEN STANDARD PROCTOR IN OPEN STANDARD PROCTOR IN OPEN PROCTOR IN OPEN PROCTOR IN OPEN IN OPEN IN OPEN OPEN OPEN SPACE. ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR TRENCHES IN THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR TRENCHES IN THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR IN THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR IN THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR THE PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR RIGHT-OF-WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR SHALL BE BACKFILLED WITH FLOWABLE FILL OR SHALL BE BACKFILLED WITH FLOWABLE FILL OR BE BACKFILLED WITH FLOWABLE FILL OR BE BACKFILLED WITH FLOWABLE FILL OR BACKFILLED WITH FLOWABLE FILL OR BACKFILLED WITH FLOWABLE FILL OR WITH FLOWABLE FILL OR WITH FLOWABLE FILL OR FLOWABLE FILL OR FLOWABLE FILL OR FILL OR FILL OR OR OR OTHER MATERIAL, PRE-APPROVED BY THE LOCAL JURISDICTION. 28. ALL NECESSARY RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM ALL NECESSARY RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM NECESSARY RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM NECESSARY RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED FROM STONES, AND OTHER REFUSE SHALL BE REMOVED FROM STONES, AND OTHER REFUSE SHALL BE REMOVED FROM AND OTHER REFUSE SHALL BE REMOVED FROM AND OTHER REFUSE SHALL BE REMOVED FROM OTHER REFUSE SHALL BE REMOVED FROM OTHER REFUSE SHALL BE REMOVED FROM REFUSE SHALL BE REMOVED FROM REFUSE SHALL BE REMOVED FROM SHALL BE REMOVED FROM SHALL BE REMOVED FROM BE REMOVED FROM BE REMOVED FROM REMOVED FROM REMOVED FROM FROM FROM THE SITE AND DISPOSED OF IN A LAWFUL MANNER. 29. ALL BROCHURES, OPERATION MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER ALL BROCHURES, OPERATION MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER BROCHURES, OPERATION MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER BROCHURES, OPERATION MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER OPERATION MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER OPERATION MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER MANUALS, MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER MAINTENANCE MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER MANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER CATALOGS, SHOP DRAWINGS, AND OTHER CATALOGS, SHOP DRAWINGS, AND OTHER SHOP DRAWINGS, AND OTHER SHOP DRAWINGS, AND OTHER DRAWINGS, AND OTHER DRAWINGS, AND OTHER AND OTHER AND OTHER OTHER OTHER DOCUMENTS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND BE TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND BE TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND CONTRACTOR AT COMPLETION OF CONSTRUCTION AND CONTRACTOR AT COMPLETION OF CONSTRUCTION AND AT COMPLETION OF CONSTRUCTION AND AT COMPLETION OF CONSTRUCTION AND COMPLETION OF CONSTRUCTION AND COMPLETION OF CONSTRUCTION AND OF CONSTRUCTION AND OF CONSTRUCTION AND CONSTRUCTION AND CONSTRUCTION AND AND AND PRIOR TO PAYMENT.
AutoCAD SHX Text
30. CONTRACTOR SHALL SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON CONTRACTOR SHALL SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON SHALL SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON SHALL SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON A COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON REDLINES TO THE GENERAL CONTRACTOR UPON REDLINES TO THE GENERAL CONTRACTOR UPON TO THE GENERAL CONTRACTOR UPON TO THE GENERAL CONTRACTOR UPON THE GENERAL CONTRACTOR UPON THE GENERAL CONTRACTOR UPON GENERAL CONTRACTOR UPON GENERAL CONTRACTOR UPON CONTRACTOR UPON CONTRACTOR UPON UPON UPON COMPLETION OF PROJECT AND PRIOR TO FINAL PAYMENT. 31. THE PROPOSED FACILITY WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND THE PROPOSED FACILITY WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND PROPOSED FACILITY WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND PROPOSED FACILITY WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND FACILITY WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND FACILITY WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND WILL BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND BE UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND UNMANNED, DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND NOT REQUIRE POTABLE WATER OR SEWER SERVICE, AND REQUIRE POTABLE WATER OR SEWER SERVICE, AND REQUIRE POTABLE WATER OR SEWER SERVICE, AND POTABLE WATER OR SEWER SERVICE, AND POTABLE WATER OR SEWER SERVICE, AND WATER OR SEWER SERVICE, AND WATER OR SEWER SERVICE, AND OR SEWER SERVICE, AND OR SEWER SERVICE, AND SEWER SERVICE, AND SEWER SERVICE, AND SERVICE, AND SERVICE, AND AND AND IS NOT FOR HUMAN HABITAT (NO HANDICAP ACCESS REQUIRED). 32. OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER LIMITED TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER LIMITED TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER TO PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER PERIODIC MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER MAINTENANCE AND INSPECTION OF APPROXIMATELY TWO TIMES PER AND INSPECTION OF APPROXIMATELY TWO TIMES PER AND INSPECTION OF APPROXIMATELY TWO TIMES PER INSPECTION OF APPROXIMATELY TWO TIMES PER INSPECTION OF APPROXIMATELY TWO TIMES PER OF APPROXIMATELY TWO TIMES PER OF APPROXIMATELY TWO TIMES PER APPROXIMATELY TWO TIMES PER APPROXIMATELY TWO TIMES PER TWO TIMES PER TWO TIMES PER TIMES PER TIMES PER PER PER MONTH BY AT&T TECHNICIANS. 33. NO OUTDOOR STORAGE OR SOLID WASTE CONTAINERS ARE PROPOSED. NO OUTDOOR STORAGE OR SOLID WASTE CONTAINERS ARE PROPOSED. 34. ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST BE PERFORMED IN ACCORDANCE WITH THE LATEST BE PERFORMED IN ACCORDANCE WITH THE LATEST PERFORMED IN ACCORDANCE WITH THE LATEST PERFORMED IN ACCORDANCE WITH THE LATEST IN ACCORDANCE WITH THE LATEST IN ACCORDANCE WITH THE LATEST ACCORDANCE WITH THE LATEST ACCORDANCE WITH THE LATEST WITH THE LATEST WITH THE LATEST THE LATEST THE LATEST LATEST LATEST REVISION AT&T MOBILITY GROUNDING STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM AT&T MOBILITY GROUNDING STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM AT&T MOBILITY GROUNDING STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM MOBILITY GROUNDING STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM MOBILITY GROUNDING STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM GROUNDING STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM GROUNDING STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM STANDARD "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM "TECHNICAL SPECIFICATION FOR CONSTRUCTION OF GSM SPECIFICATION FOR CONSTRUCTION OF GSM SPECIFICATION FOR CONSTRUCTION OF GSM FOR CONSTRUCTION OF GSM FOR CONSTRUCTION OF GSM CONSTRUCTION OF GSM CONSTRUCTION OF GSM OF GSM OF GSM GSM GSM WIRELESS SITES" AND "TECHNICAL SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT SITES" AND "TECHNICAL SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT SITES" AND "TECHNICAL SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT AND "TECHNICAL SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT AND "TECHNICAL SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT "TECHNICAL SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT "TECHNICAL SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT SPECIFICATION FOR FACILITY GROUNDING". IN CASE OF A CONFLICT FOR FACILITY GROUNDING". IN CASE OF A CONFLICT FOR FACILITY GROUNDING". IN CASE OF A CONFLICT FACILITY GROUNDING". IN CASE OF A CONFLICT FACILITY GROUNDING". IN CASE OF A CONFLICT GROUNDING". IN CASE OF A CONFLICT GROUNDING". IN CASE OF A CONFLICT IN CASE OF A CONFLICT IN CASE OF A CONFLICT CASE OF A CONFLICT CASE OF A CONFLICT OF A CONFLICT OF A CONFLICT A CONFLICT A CONFLICT CONFLICT CONFLICT BETWEEN THE CONSTRUCTION SPECIFICATIONS AND THE DRAWINGS, THE DRAWINGS SHALL GOVERN. 35. CONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR CONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR ALL PERMITS AND INSPECTIONS REQUIRED FOR ALL PERMITS AND INSPECTIONS REQUIRED FOR PERMITS AND INSPECTIONS REQUIRED FOR PERMITS AND INSPECTIONS REQUIRED FOR AND INSPECTIONS REQUIRED FOR AND INSPECTIONS REQUIRED FOR INSPECTIONS REQUIRED FOR INSPECTIONS REQUIRED FOR REQUIRED FOR REQUIRED FOR FOR FOR CONSTRUCTION. IF CONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR IF CONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR IF CONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR CONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR CONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR CANNOT OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR OBTAIN A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR A PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR THEY MUST NOTIFY THE GENERAL CONTRACTOR THEY MUST NOTIFY THE GENERAL CONTRACTOR MUST NOTIFY THE GENERAL CONTRACTOR MUST NOTIFY THE GENERAL CONTRACTOR NOTIFY THE GENERAL CONTRACTOR NOTIFY THE GENERAL CONTRACTOR THE GENERAL CONTRACTOR THE GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR CONTRACTOR CONTRACTOR IMMEDIATELY. 36. CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS. CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS. 37. CONTRACTOR SHALL LEAVE PREMISES IN A CLEAN CONDITION. CONTRACTOR SHALL LEAVE PREMISES IN A CLEAN CONDITION. 38. INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS ON THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS ON THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS THESE DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS WAS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS OBTAINED FROM SITE OBSERVATIONS AND/OR DRAWINGS FROM SITE OBSERVATIONS AND/OR DRAWINGS FROM SITE OBSERVATIONS AND/OR DRAWINGS SITE OBSERVATIONS AND/OR DRAWINGS SITE OBSERVATIONS AND/OR DRAWINGS OBSERVATIONS AND/OR DRAWINGS OBSERVATIONS AND/OR DRAWINGS AND/OR DRAWINGS AND/OR DRAWINGS DRAWINGS DRAWINGS PROVIDED BY THE SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR BY THE SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR BY THE SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR THE SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR THE SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR THE ENGINEER OF ANY DISCREPANCIES PRIOR THE ENGINEER OF ANY DISCREPANCIES PRIOR ENGINEER OF ANY DISCREPANCIES PRIOR ENGINEER OF ANY DISCREPANCIES PRIOR OF ANY DISCREPANCIES PRIOR OF ANY DISCREPANCIES PRIOR ANY DISCREPANCIES PRIOR ANY DISCREPANCIES PRIOR DISCREPANCIES PRIOR DISCREPANCIES PRIOR PRIOR PRIOR TO ORDERING MATERIAL OR PROCEEDING WITH CONSTRUCTION. 39. WHITE STROBE LIGHTS ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND WHITE STROBE LIGHTS ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND STROBE LIGHTS ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND STROBE LIGHTS ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND LIGHTS ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND LIGHTS ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND ARE NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND NOT PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND PERMITTED. IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND IF LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND LIGHTING IS REQUIRED, IT SHALL MEET FAA STANDARDS AND IS REQUIRED, IT SHALL MEET FAA STANDARDS AND IS REQUIRED, IT SHALL MEET FAA STANDARDS AND REQUIRED, IT SHALL MEET FAA STANDARDS AND REQUIRED, IT SHALL MEET FAA STANDARDS AND IT SHALL MEET FAA STANDARDS AND IT SHALL MEET FAA STANDARDS AND SHALL MEET FAA STANDARDS AND SHALL MEET FAA STANDARDS AND MEET FAA STANDARDS AND MEET FAA STANDARDS AND FAA STANDARDS AND FAA STANDARDS AND STANDARDS AND STANDARDS AND AND AND REQUIREMENTS. 40. ALL COAXIAL CABLE CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND ALL COAXIAL CABLE CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND COAXIAL CABLE CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND COAXIAL CABLE CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND CABLE CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND CABLE CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND CONTRACTOR SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND SHALL INSTALL PER MANUFACTURER'S INSTRUCTIONS AND INSTALL PER MANUFACTURER'S INSTRUCTIONS AND INSTALL PER MANUFACTURER'S INSTRUCTIONS AND PER MANUFACTURER'S INSTRUCTIONS AND PER MANUFACTURER'S INSTRUCTIONS AND MANUFACTURER'S INSTRUCTIONS AND MANUFACTURER'S INSTRUCTIONS AND INSTRUCTIONS AND INSTRUCTIONS AND AND AND RECOMMENDATIONS. ANTENNA MOUNTING 41. DESIGN AND CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR DESIGN AND CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR AND CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR AND CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR ANTENNA SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR SUPPORTS SHALL CONFORM TO CURRENT ANSI/TIA-222 OR SHALL CONFORM TO CURRENT ANSI/TIA-222 OR SHALL CONFORM TO CURRENT ANSI/TIA-222 OR CONFORM TO CURRENT ANSI/TIA-222 OR CONFORM TO CURRENT ANSI/TIA-222 OR TO CURRENT ANSI/TIA-222 OR TO CURRENT ANSI/TIA-222 OR CURRENT ANSI/TIA-222 OR CURRENT ANSI/TIA-222 OR ANSI/TIA-222 OR ANSI/TIA-222 OR OR OR APPLICABLE LOCAL CODES. 42. ALL STEEL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC ALL STEEL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC STEEL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC STEEL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC BE GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC AFTER FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC FABRICATION IN ACCORDANCE WITH ASTM A123 "ZINC IN ACCORDANCE WITH ASTM A123 "ZINC IN ACCORDANCE WITH ASTM A123 "ZINC ACCORDANCE WITH ASTM A123 "ZINC ACCORDANCE WITH ASTM A123 "ZINC WITH ASTM A123 "ZINC WITH ASTM A123 "ZINC ASTM A123 "ZINC ASTM A123 "ZINC A123 "ZINC A123 "ZINC "ZINC "ZINC (HOT-DIP GALVANIZED) COATINGS ON IRON AND STEEL PRODUCTS", UNLESS NOTED OTHERWISE. 43. ALL BOLTS, ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM ALL BOLTS, ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM BOLTS, ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM BOLTS, ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM BE GALVANIZED IN ACCORDANCE WITH ASTM BE GALVANIZED IN ACCORDANCE WITH ASTM GALVANIZED IN ACCORDANCE WITH ASTM GALVANIZED IN ACCORDANCE WITH ASTM IN ACCORDANCE WITH ASTM IN ACCORDANCE WITH ASTM ACCORDANCE WITH ASTM ACCORDANCE WITH ASTM WITH ASTM WITH ASTM ASTM ASTM A153 "ZINC-COATING (HOT-DIP) ON IRON AND STEEL HARDWARE", UNLESS NOTED OTHERWISE. 44. DAMAGED GALVANIZED SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM DAMAGED GALVANIZED SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM GALVANIZED SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM GALVANIZED SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM SHALL BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM BE REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM REPAIRED BY COLD GALVANIZING IN ACCORDANCE WITH ASTM BY COLD GALVANIZING IN ACCORDANCE WITH ASTM BY COLD GALVANIZING IN ACCORDANCE WITH ASTM COLD GALVANIZING IN ACCORDANCE WITH ASTM COLD GALVANIZING IN ACCORDANCE WITH ASTM GALVANIZING IN ACCORDANCE WITH ASTM GALVANIZING IN ACCORDANCE WITH ASTM IN ACCORDANCE WITH ASTM IN ACCORDANCE WITH ASTM ACCORDANCE WITH ASTM ACCORDANCE WITH ASTM WITH ASTM WITH ASTM ASTM ASTM A780. 45. ALL ANTENNA MOUNTS SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE ALL ANTENNA MOUNTS SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE ANTENNA MOUNTS SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE ANTENNA MOUNTS SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE MOUNTS SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE MOUNTS SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE INSTALLED WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE WITH LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE LOCK WASHERS AND/OR DOUBLE NUTS, AND SHALL BE WASHERS AND/OR DOUBLE NUTS, AND SHALL BE WASHERS AND/OR DOUBLE NUTS, AND SHALL BE AND/OR DOUBLE NUTS, AND SHALL BE AND/OR DOUBLE NUTS, AND SHALL BE DOUBLE NUTS, AND SHALL BE DOUBLE NUTS, AND SHALL BE NUTS, AND SHALL BE NUTS, AND SHALL BE AND SHALL BE AND SHALL BE SHALL BE SHALL BE BE BE TORQUED TO MANUFACTURER'S RECOMMENDATIONS. 46. CONTRACTOR SHALL INSTALL ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S CONTRACTOR SHALL INSTALL ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S SHALL INSTALL ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S SHALL INSTALL ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S INSTALL ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S INSTALL ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S ANTENNA AND ASSOCIATED GROUNDING PER MANUFACTURER'S AND ASSOCIATED GROUNDING PER MANUFACTURER'S AND ASSOCIATED GROUNDING PER MANUFACTURER'S ASSOCIATED GROUNDING PER MANUFACTURER'S ASSOCIATED GROUNDING PER MANUFACTURER'S GROUNDING PER MANUFACTURER'S GROUNDING PER MANUFACTURER'S PER MANUFACTURER'S PER MANUFACTURER'S MANUFACTURER'S MANUFACTURER'S RECOMMENDATIONS. 47. ALL UNUSED PORTS ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER ALL UNUSED PORTS ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER UNUSED PORTS ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER UNUSED PORTS ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER PORTS ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER PORTS ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER ON ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER ANY ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER ANTENNA OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER OR TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER TMA, SHALL BE COVERED BY CONCEALOR CAP WITH PROPER SHALL BE COVERED BY CONCEALOR CAP WITH PROPER SHALL BE COVERED BY CONCEALOR CAP WITH PROPER BE COVERED BY CONCEALOR CAP WITH PROPER BE COVERED BY CONCEALOR CAP WITH PROPER COVERED BY CONCEALOR CAP WITH PROPER COVERED BY CONCEALOR CAP WITH PROPER BY CONCEALOR CAP WITH PROPER BY CONCEALOR CAP WITH PROPER CONCEALOR CAP WITH PROPER CONCEALOR CAP WITH PROPER CAP WITH PROPER CAP WITH PROPER WITH PROPER WITH PROPER PROPER PROPER WEATHER PROOFING OR BE TERMINATED WITH A 50 Ω LOAD. 48. PRIOR TO SETTING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA PRIOR TO SETTING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA TO SETTING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA TO SETTING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA SETTING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA SETTING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA AND DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA DOWNTILTS, ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA CONTRACTOR SHALL CHECK THE ANTENNA SHALL CHECK THE ANTENNA SHALL CHECK THE ANTENNA CHECK THE ANTENNA CHECK THE ANTENNA THE ANTENNA THE ANTENNA ANTENNA ANTENNA MOUNT FOR TIGHTNESS AND ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM FOR TIGHTNESS AND ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM FOR TIGHTNESS AND ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM TIGHTNESS AND ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM TIGHTNESS AND ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM AND ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM AND ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM ENSURE THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM THAT THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM THEY ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM ARE PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM ANTENNA AZIMUTHS SHALL BE SET FROM ANTENNA AZIMUTHS SHALL BE SET FROM AZIMUTHS SHALL BE SET FROM AZIMUTHS SHALL BE SET FROM SHALL BE SET FROM SHALL BE SET FROM BE SET FROM BE SET FROM SET FROM SET FROM FROM FROM TRUE NORTH AND BE ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS NORTH AND BE ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS NORTH AND BE ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS AND BE ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS AND BE ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS BE ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS BE ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS ORIENTED WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS WITHIN +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS +/- 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS 3 DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS DEGREES AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS DEFINED BY THE RFDS. ANTENNA DOWNTILTS DEFINED BY THE RFDS. ANTENNA DOWNTILTS BY THE RFDS. ANTENNA DOWNTILTS BY THE RFDS. ANTENNA DOWNTILTS THE RFDS. ANTENNA DOWNTILTS THE RFDS. ANTENNA DOWNTILTS RFDS. ANTENNA DOWNTILTS RFDS. ANTENNA DOWNTILTS ANTENNA DOWNTILTS ANTENNA DOWNTILTS DOWNTILTS DOWNTILTS SHALL BE WITHIN +/- 0.5 DEGREES AS DEFINED BY THE RFDS. REFER TO ATT-002-290-210. 49. JUMPERS FROM THE TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH JUMPERS FROM THE TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH FROM THE TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH FROM THE TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH THE TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH THE TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH TOWER MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH MOUNTED AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH AMPLIFIERS MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH MUST TERMINATE TO OPPOSITE POLARIZATIONS IN EACH TERMINATE TO OPPOSITE POLARIZATIONS IN EACH TERMINATE TO OPPOSITE POLARIZATIONS IN EACH TO OPPOSITE POLARIZATIONS IN EACH TO OPPOSITE POLARIZATIONS IN EACH OPPOSITE POLARIZATIONS IN EACH OPPOSITE POLARIZATIONS IN EACH POLARIZATIONS IN EACH POLARIZATIONS IN EACH IN EACH IN EACH EACH EACH SECTOR. 50. CONTRACTOR SHALL RECORD THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT CONTRACTOR SHALL RECORD THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT SHALL RECORD THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT SHALL RECORD THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT RECORD THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT RECORD THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT THE SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT SERIAL NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT NUMBER, SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT SECTOR, AND POSITION OF EACH ACTUATOR INSTALLED AT AND POSITION OF EACH ACTUATOR INSTALLED AT AND POSITION OF EACH ACTUATOR INSTALLED AT POSITION OF EACH ACTUATOR INSTALLED AT POSITION OF EACH ACTUATOR INSTALLED AT OF EACH ACTUATOR INSTALLED AT OF EACH ACTUATOR INSTALLED AT EACH ACTUATOR INSTALLED AT EACH ACTUATOR INSTALLED AT ACTUATOR INSTALLED AT ACTUATOR INSTALLED AT INSTALLED AT INSTALLED AT AT AT THE ANTENNAS AND PROVIDE THE INFORMATION TO AT&T. 51. TOWER MOUNTED AMPLIFIERS SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO TOWER MOUNTED AMPLIFIERS SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO MOUNTED AMPLIFIERS SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO MOUNTED AMPLIFIERS SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO AMPLIFIERS SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO AMPLIFIERS SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO SHALL BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO BE MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO MOUNTED ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO ON PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO PIPE DIRECTLY BEHIND ANTENNAS AS CLOSE TO DIRECTLY BEHIND ANTENNAS AS CLOSE TO DIRECTLY BEHIND ANTENNAS AS CLOSE TO BEHIND ANTENNAS AS CLOSE TO BEHIND ANTENNAS AS CLOSE TO ANTENNAS AS CLOSE TO ANTENNAS AS CLOSE TO AS CLOSE TO AS CLOSE TO CLOSE TO CLOSE TO TO TO ANTENNA AS FEASIBLE IN A VERTICAL POSITION. 52. ANTENNAS SHALL HAVE A 4'-0" MINIMUM CENTER-TO-CENTER HORIZONTAL SEPARATION. ANTENNAS SHALL HAVE A 4'-0" MINIMUM CENTER-TO-CENTER HORIZONTAL SEPARATION. TORQUE REQUIREMENTS 53. ALL RF CONNECTIONS SHALL BE TIGHTENED BY A TORQUE WRENCH. 54. A TORQUE MARK FORMING A CONTINUOUS STRAIGHT LINE IS TO BE MADE IN THE FOLLOWING APPLICATIONS: A TORQUE MARK FORMING A CONTINUOUS STRAIGHT LINE IS TO BE MADE IN THE FOLLOWING APPLICATIONS: A. RF CONNECTIONS - MARK BOTH SIDES OF THE CONNECTOR RF CONNECTIONS - MARK BOTH SIDES OF THE CONNECTOR B. GROUNDING AND ANTENNA HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE GROUNDING AND ANTENNA HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE AND ANTENNA HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE AND ANTENNA HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE ANTENNA HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE ANTENNA HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE HARDWARE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE - MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE MARK ON THE NUT SIDE OF THE BOLT, STARTING FROM THE ON THE NUT SIDE OF THE BOLT, STARTING FROM THE ON THE NUT SIDE OF THE BOLT, STARTING FROM THE THE NUT SIDE OF THE BOLT, STARTING FROM THE THE NUT SIDE OF THE BOLT, STARTING FROM THE NUT SIDE OF THE BOLT, STARTING FROM THE NUT SIDE OF THE BOLT, STARTING FROM THE SIDE OF THE BOLT, STARTING FROM THE SIDE OF THE BOLT, STARTING FROM THE OF THE BOLT, STARTING FROM THE OF THE BOLT, STARTING FROM THE THE BOLT, STARTING FROM THE THE BOLT, STARTING FROM THE BOLT, STARTING FROM THE BOLT, STARTING FROM THE STARTING FROM THE STARTING FROM THE FROM THE FROM THE THE THE THREADS TO THE SOLID SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA TO THE SOLID SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA TO THE SOLID SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA THE SOLID SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA THE SOLID SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SOLID SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SOLID SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SURFACE. SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SOLID SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA SURFACE EXAMPLES INCLUDE A GROUND BAR OR ANTENNA EXAMPLES INCLUDE A GROUND BAR OR ANTENNA EXAMPLES INCLUDE A GROUND BAR OR ANTENNA INCLUDE A GROUND BAR OR ANTENNA INCLUDE A GROUND BAR OR ANTENNA A GROUND BAR OR ANTENNA A GROUND BAR OR ANTENNA GROUND BAR OR ANTENNA GROUND BAR OR ANTENNA BAR OR ANTENNA BAR OR ANTENNA OR ANTENNA OR ANTENNA ANTENNA ANTENNA BRACKET METAL. 55. ALL 8M ANTENNA HARDWARE SHALL BE TIGHTENED TO 9 LB-FT (12 NM). 56. ALL 12M ANTENNA HARDWARE SHALL BE TIGHTENED TO 43 LB-FT (58 NM). 57. ALL GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING ALL GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING SHALL BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING BE TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING TIGHTENED UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING UNTIL THE LOCK WASHER COLLAPSES AND THE GROUNDING THE LOCK WASHER COLLAPSES AND THE GROUNDING THE LOCK WASHER COLLAPSES AND THE GROUNDING LOCK WASHER COLLAPSES AND THE GROUNDING LOCK WASHER COLLAPSES AND THE GROUNDING WASHER COLLAPSES AND THE GROUNDING WASHER COLLAPSES AND THE GROUNDING COLLAPSES AND THE GROUNDING COLLAPSES AND THE GROUNDING AND THE GROUNDING AND THE GROUNDING THE GROUNDING THE GROUNDING GROUNDING GROUNDING HARDWARE IS NO LONGER LOOSE. 58. ALL DIN TYPE CONNECTIONS SHALL BE TIGHTENED TO 18-22 LB-FT (24.4 - 29.8 NM). 59. ALL N TYPE CONNECTIONS SHALL BE TIGHTENED TO 15-20 LB-IN (1.7 - 2.3 NM). FIBER & POWER CABLE MOUNTING 60. THE FIBER OPTIC TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY THE FIBER OPTIC TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY FIBER OPTIC TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY FIBER OPTIC TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY OPTIC TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY OPTIC TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY TRUNK CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY CABLES SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY SHALL BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY BE INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY INSTALLED IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY IN CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY CONDUITS OR INNERDUCT. WHEN UTILIZING A CABLE TRAY OR INNERDUCT. WHEN UTILIZING A CABLE TRAY OR INNERDUCT. WHEN UTILIZING A CABLE TRAY INNERDUCT. WHEN UTILIZING A CABLE TRAY INNERDUCT. WHEN UTILIZING A CABLE TRAY WHEN UTILIZING A CABLE TRAY WHEN UTILIZING A CABLE TRAY UTILIZING A CABLE TRAY UTILIZING A CABLE TRAY A CABLE TRAY A CABLE TRAY CABLE TRAY CABLE TRAY TRAY TRAY SYSTEM, PLACE FIBER OPTIC TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED PLACE FIBER OPTIC TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED PLACE FIBER OPTIC TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED FIBER OPTIC TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED FIBER OPTIC TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED OPTIC TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED OPTIC TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED TRUNK CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED CABLE INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED INTO AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED AN INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED INTER-DUCT. A PARTITION BARRIER SHALL BE INSTALLED A PARTITION BARRIER SHALL BE INSTALLED A PARTITION BARRIER SHALL BE INSTALLED PARTITION BARRIER SHALL BE INSTALLED PARTITION BARRIER SHALL BE INSTALLED BARRIER SHALL BE INSTALLED BARRIER SHALL BE INSTALLED SHALL BE INSTALLED SHALL BE INSTALLED BE INSTALLED BE INSTALLED INSTALLED INSTALLED BETWEEN THE 600 VOLT CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK THE 600 VOLT CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK THE 600 VOLT CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK 600 VOLT CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK 600 VOLT CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK VOLT CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK VOLT CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK CABLES AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK AND THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK THE INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK INTER-DUCT IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK IN ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK ORDER TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK TO SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK SEGREGATE CABLE TYPES. OPTIC FIBER TRUNK CABLE TYPES. OPTIC FIBER TRUNK CABLE TYPES. OPTIC FIBER TRUNK TYPES. OPTIC FIBER TRUNK TYPES. OPTIC FIBER TRUNK OPTIC FIBER TRUNK OPTIC FIBER TRUNK FIBER TRUNK FIBER TRUNK TRUNK TRUNK CABLES SHALL HAVE APPROVED CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE SHALL HAVE APPROVED CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE SHALL HAVE APPROVED CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE HAVE APPROVED CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE HAVE APPROVED CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE APPROVED CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE APPROVED CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE CABLE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE RESTRAINTS EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE EVERY (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE (6) SIX FEET AND SHALL BE SECURELY FASTENED TO THE SIX FEET AND SHALL BE SECURELY FASTENED TO THE SIX FEET AND SHALL BE SECURELY FASTENED TO THE FEET AND SHALL BE SECURELY FASTENED TO THE FEET AND SHALL BE SECURELY FASTENED TO THE AND SHALL BE SECURELY FASTENED TO THE AND SHALL BE SECURELY FASTENED TO THE SHALL BE SECURELY FASTENED TO THE SHALL BE SECURELY FASTENED TO THE BE SECURELY FASTENED TO THE BE SECURELY FASTENED TO THE SECURELY FASTENED TO THE SECURELY FASTENED TO THE FASTENED TO THE FASTENED TO THE TO THE TO THE THE THE CABLE TRAY SYSTEM. NFPA 70 (NEC) ATRICLE 770 RULES SHALL APPLY. 61. TYPE TC-ER CABLES SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT TYPE TC-ER CABLES SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT TC-ER CABLES SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT TC-ER CABLES SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT CABLES SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT CABLES SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT SHALL BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT BE INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT INSTALLED INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT INTO CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT CONDUITS OR CABLE TRAYS, AND SHALL BE SECURED AT OR CABLE TRAYS, AND SHALL BE SECURED AT OR CABLE TRAYS, AND SHALL BE SECURED AT CABLE TRAYS, AND SHALL BE SECURED AT CABLE TRAYS, AND SHALL BE SECURED AT TRAYS, AND SHALL BE SECURED AT TRAYS, AND SHALL BE SECURED AT AND SHALL BE SECURED AT AND SHALL BE SECURED AT SHALL BE SECURED AT SHALL BE SECURED AT BE SECURED AT BE SECURED AT SECURED AT SECURED AT AT AT INTERVALS NOT EXCEEDING (6) FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL NOT EXCEEDING (6) FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL NOT EXCEEDING (6) FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL EXCEEDING (6) FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL EXCEEDING (6) FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL (6) FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL (6) FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL FEET. WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL CABLES ARE NOT SUBJECT TO PHYSICAL CABLES ARE NOT SUBJECT TO PHYSICAL ARE NOT SUBJECT TO PHYSICAL ARE NOT SUBJECT TO PHYSICAL NOT SUBJECT TO PHYSICAL NOT SUBJECT TO PHYSICAL SUBJECT TO PHYSICAL SUBJECT TO PHYSICAL TO PHYSICAL TO PHYSICAL PHYSICAL PHYSICAL DAMAGE, CABLES SHALL BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT CABLES SHALL BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT CABLES SHALL BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT SHALL BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT SHALL BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT TO MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT MAKE A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT A TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT TRANSITION BETWEEN CONDUITS OR CABLE TRAYS THAT BETWEEN CONDUITS OR CABLE TRAYS THAT BETWEEN CONDUITS OR CABLE TRAYS THAT CONDUITS OR CABLE TRAYS THAT CONDUITS OR CABLE TRAYS THAT OR CABLE TRAYS THAT OR CABLE TRAYS THAT CABLE TRAYS THAT CABLE TRAYS THAT TRAYS THAT TRAYS THAT THAT THAT ARE SERVICING UTILIZATION EQUIPMENT OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES SERVICING UTILIZATION EQUIPMENT OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES SERVICING UTILIZATION EQUIPMENT OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES UTILIZATION EQUIPMENT OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES UTILIZATION EQUIPMENT OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES EQUIPMENT OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES EQUIPMENT OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES OR DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES DEVICES. A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES A TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES TRANSITION DISTACE EXCEEDING (6) FEET REQUIRES DISTACE EXCEEDING (6) FEET REQUIRES DISTACE EXCEEDING (6) FEET REQUIRES EXCEEDING (6) FEET REQUIRES EXCEEDING (6) FEET REQUIRES (6) FEET REQUIRES (6) FEET REQUIRES FEET REQUIRES FEET REQUIRES REQUIRES REQUIRES CONTINUOUS SUPPORTING. NFPA 70 (NEC) ARTICLES 336 AND 392 RULES SHALL APPLY. 62. WHEN INSTALLING OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) WHEN INSTALLING OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) INSTALLING OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) INSTALLING OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) OR TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) TYPE TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) TC-ER CABLES INTO CONDUITS, NFPA 70 (NEC) CABLES INTO CONDUITS, NFPA 70 (NEC) CABLES INTO CONDUITS, NFPA 70 (NEC) INTO CONDUITS, NFPA 70 (NEC) INTO CONDUITS, NFPA 70 (NEC) CONDUITS, NFPA 70 (NEC) CONDUITS, NFPA 70 (NEC) NFPA 70 (NEC) NFPA 70 (NEC) 70 (NEC) 70 (NEC) (NEC) (NEC) ARTICLE 300 RULES SHALL APPLY.