Peter Chapman 261016_1
-
Upload
peter-chapman -
Category
Documents
-
view
58 -
download
0
Transcript of Peter Chapman 261016_1
Peter Chapman 1/8
PETER CHAPMAN
CONTACT DETAILS UK: CONTACT DETAILS NORWAY:
8 Towneley Cottages 63 Parkveien Ryton Molde, 6413 Tyne & Wear Norway NE40 3AY United Kingdom
Tel: +44 (0) 191 413 1158 (Home) Tel: +44 7976 160199 (Mobile) - Preferred Contact Email: [email protected] (Work) Email: [email protected] (Home) – Preferred Contact
PROFILE
A Professionally qualified & highly experienced SENIOR PROJECT ENGINEER /
CONSTRUCTION / RFO MANAGER. Overall Project MULTI-DISCIPINE PLANNING /
COORDINATING & FACILITIES knowledge in all aspects of Oil and Gas Design &
Construction, (EPCm), Marine Engineering, Automotive, Polymer Moulding,
Aluminium Casting and Petro-Chemical Process Industrial Sectors.
KEY SKILLS
• Stakeholder Management
• Project Management, EPCm, Maintenance Management
• Maintenance, Man Power, Discipline & Resource Planning
• Hands-on Multi-disciplined Background
• Greenfield, Brownfield, Yard Stay, Wet Lay-up, Shutdown (TA) Experience
• High Volume Japanese Automotive Production & Manufacturing
• PDMS Design Office Project Planning
• Cost, Budget Control including Calendarisation & forward Planning of Capital
& Revenue Portfolios
• Contractor Development, Outsourcing, Audit & Control
• TQM (Core Team Member)
• ISO 14001 (Environmental)
• Company Specifications Author, Standard Operations & Procedures
• HSEQ Safety Engineering & Risk Assessment
• Excellent Interface Team Member & Communicator
• Good IT skills including Microsoft Office, IFS, MS Project , SAFRAN, SAP,
MIPPS & AutoCAD
Peter Chapman 2/8
CAREER REVIEW – Highlights and Achievements
Norske Shell Nyhamna Gas Plant Client / Operator Risavika, Tananger, Norway March 2013 to date
Senior Project Engineer (Life Cycle) Site Construction Manager (Re-compressors) Nyhamna Expansion Project - POLARLED Aukra, Norway
Complex LNG Brownfield Site Preparation for Installation and Commissioning of Polarled Pipeline Landfall Reception Facilities including;
• Stakeholder Interface Management (Statoil)
• EPCm Kvaerner Engineering Design Interface Focal Point (Vikaero, Oslo)
• Site Construction Team Interface Manager (Focal Point)
• Pipeline Reception Landfall Civil Trench Preparation (including Subsea)
• Existing Assets (Ormen Lange, Langeled) Close Proximity Rock Blasting (ALARP)
• Pipeline Pull-in Winch Civil Preparation (Rock Anchors, Bezemer, Allseas)
• Pipeline Pull-in Coordinator / Focal Point
• RFO Preparation Facilities (Halliburton)
• RFO / Commissioning of Pipeline (Gauging, Hydro-test, Dewatering with HC)
• Large Module FAV Procurement & Fabrication (up to 2500 Tonnes)
• Large Subsea Pipeline Engineering (Allseas / Bezemer / Halliburton)
• Polarled Pipeline Impressed Current Cathodic Protection
https://www.youtube.com/watch?v=XIKqXobhY9g&feature=youtu.be
https://www.youtube.com/watch?v=U2YJ-HjSneA
Major Project Achievements
• Analyse & Facilitate Fast-track RFO Preparation from FEED Hold to BDEP inclusion
• Flexible Roving Role to facilitate Project requirements (Risavika, Oslo, Nyhamna)
• Design & Facilitate complex Multi-location Engineering Interface
• Project Plan Expedite & Auditing to ensure Partner Milestone delivery
• Design Engineering to Construction Phase, Transition Management
• Successful EPCm Interface Coordination
• Plant Turn-Around Area Construction Manager
• Re-compressor Re-bundle upgrade Construction Manager
• Polarled RFO Design, Planning & Construction Manager
3 YEARS
Peter Chapman 3/8
North Atlantic Drilling Drilling Engineering & Operations, Stavanger, Norway March 2011 to March 2013
The Leading Driller in the North Atlantic Basin
Valid Pan-European Offshore Survival and Medical
Roles and Responsibilities:
Senior / Lead Planner MS Project, SAFRAN Project, IFS, PIMS, Prestige, MIPS Responsible to; North Atlantic Drilling (SVG) – Robert Bakker, Alf Lande Major Project Achievements
• Lead Planner – West Epsilon Yard Stay 2012 Planning (STATOIL)
• Lead Planner – West Phoenix Yard Stay 2013 Planning (TOTAL)
• Lead Planner – West Phoenix, West Hercules Class Renewal Planning
(STATOIL)
• Lead Planner – West Elara In Operations Planning (STATOIL)
2 YEARS
Peter Chapman 4/8
Seadrill / Seawell UK/ Archer SVG. Drilling Facilities Engineering, Aberdeen, Blyth, Bergen & Stavanger March 2007 to March 2011
Offshore Oil and Gas Drilling Specialist (ex Smedvig).
6500 staff worldwide. Valid Pan-European Offshore Survival and Medical
Roles and Responsibilities;
Mechanical Engineer Close Out Engineer SAP Planning Engineer MS Project, SAFRAN Project Lead Planner IFS, PIMS, Prestige Responsible to; Archer Manager (SVG) – Marius Berg MODU / Tender Rig (NCL) – Ian Langham North Atlantic Drilling (SVG) – Robert Bakker Major Project Achievements
• Close-Out Eng - 65 Projects on 11 Shell’s Platforms in the North Sea Sector
• Planner - Statoil Veslefrikk A/B Platform extended life 2020 Project (FEED).
• Planner - Gullfaks Minor Projects 2008 – 2010
• Lead Planner - SFLL Brown Field Refurbishment
• Lead Planner - Office Resource Project Planning / Coordinator
• Lead Planner - Blyth Office Phase 2 & 3 Growth / Expansion Coordinator
• Lead Planner – MODU, Tender Rig Greenfield Project
• Lead Planner – West Epsilon Yard Stay Planning 2011 (Statoil)
• Lead Planner – GYDA Drill Stop 2011 / 2012 TA Planning (Talisman)
• Lead Planner – West Alpha Yard Stay 2012 Planning (ExxonMobil)
• Lead Planner – West Phoenix Yard Stay 2013 Planning (TOTAL)
• Lead Planner – West Phoenix, West Hercules Class Renewal Planning
• Lead Planner – West Hercules Norwegian Sector Mobilisation Planning
• Lead Planner – West Elara Valemon Hook up
4 YEARS
Peter Chapman 5/8
Nissan Motor Manufacturing UK Ltd, Sunderland, UK 1989 – March 2007
Automotive Production and Manufacturing (Green Field). Vehicles - Primera, Almera, Micra, Micra Soft-top, Note and Quashqui platform vehicles. 4500 Staff
Roles and Responsibilities:
Maintenance Engineer Plant Engineer Facilities Engineer Shops: Plastics, Body Shop, Castings
Responsible to the Facility Engineering Manager Major Achievements;
• Head Project Coordinator of two model launches involving back to back change.
• Core Team - Design, Installation & Commissioning of Aluminium LP Die Casting Plant.
• Led Major Facility design modifications to enable third model volume of 345K units on
existing equipment – Plastics Blow Moulding.
• Author of Plant Mechanical Specification for Hydraulic Equipment & Cleanliness.
• Successfully out-sourced Plant Facility Maintenance Management.
• Main Coordinator of Facilities refurbishment program and shut-down planning.
• Responsible for site Cranage (LOLER and PUWER regulations).
• Prepared and controlled Engineering Department Annual Budgets.
• Successfully reduced productivity costs in direct materials, energy and quality.
• Site Energy Coordinator.
• Key facilities OEE (Overall Equipment Efficiency) Coordinator.
• Implemented Plant Hydraulics Refurbishment Strategy & Condition Monitoring.
• Improved Facility up-time by downtime analysis through Cross Functional Teams.
• Resolved major breakdown concern due to hydraulic oil ZDDP anti-wear additive.
• Resolved inherent design defect of 90 degree epicyclical servo drive gearbox.
18 YEARS
Peter Chapman 6/8
Calsonic UK Ltd, Washington, UK
1988 - 1989 Automotive Exhaust Emissions Component Manufacture. Synchronous parts first tier supplier to NMUK. 200 Staff
Roles and Responsibilities: Facilities Engineer Maintenance Engineer Responsible to the Plant Manager Achievements Sole Facilities / Maintenance Engineer in a new 40,000 square foot green field Plant
Reactive breakdown support Maintenance
Project Manager
Installation and Commissioning of automated Production plant including:
Robot and Automatic MIG Welding Cells
CNC Pipe Bending Facilities
Jig & Tooling Design
Rohm & Hass Ltd, Jarrow, UK
1987 - 1988
Process Plant manufacturing Paint Primals, Ion Exchange Resins & Industrial Biocides 300 Staff
Roles and Responsibilities: Facilities Engineer Maintenance Engineer Responsible to the Plant Engineer Achievements Chemical Biocide - Automated Plant Installation & Commissioning
Initiated Plant Planned Maintenance Systems
2 YEARS
2 YEARS
Peter Chapman 7/8
Shell Tankers UK Ltd, London, UK
1977 - 1987 Worldwide petrochemical transportation and exploration 600 Sea-going Staff
Roles and Responsibilities: Marine Engineering Officer – Third Engineer Responsible to the Chief Engineer Marine Roles and Experience
• DOT Certificated Senior Watch keeper on Motor and Steam Vessels
• Marine Maintenance Management
• Automated Bridge Control and UMS Systems
• Dangerous Cargo Certificate including LNG and LPG
• VLCC Vessel Wet lay-up Management (Loch Striven)
• Refrigeration & Cryogenic Cargo Management (G & I Class)
• Bitumen Cargo Management
• Iron Ore Cargo Management
• FPSO Operations
• VLCC Lightening Operations
• Dry Dock Commissioning Management
Baileys Dock – Cardiff, Smiths Dock – Tyne,
Stanlow, Harland & Wolf, St Johns – Canada,
Sambowang – Singapore, Pyrias – Greece,
Mitsui Yard - Japan
• Off-shore SBM & Spar Loading (Brent)
• Platform Supply Vessels
Churchill Gear Machines, Blaydon, UK
1973-1977
Machine Tool Manufacturing. Part of the TI Group. 400 Staff
Roles and Responsibilities: Machine Tool Fitter
Four year Mechanical Apprenticeship under EITB Training Scheme
10 YEARS
5 YEARS
Peter Chapman 8/8
Professional Qualifications
Department of Transport (UK)
• DOT Class 1 Combined - Certificate of Competency
• DOT Class 2 Steam - Certificate of Competency
• DOT Class 4 Motor - Certificate of Competency
• HND in Mechanical Engineering (Northern Counties Examination Board)
• HND in Production Engineering (EDEXCEL)
• HEFC in Psychology (Post Graduate)
Personal
Born: 16/03/1957
Marital status: Married
Children: Two sons
Hobbies
Cycle Racing
Competed Nationally in Road Time Trials in UK and Europe. Sponsored by GS Metro, Rob Telfer Cycles and Middridge Cycle Racing Team, 1984 - 1994. Member of North East Centre of Excellence & UK National Track squad. Registered Durham and Northumberland Cycle Coach. PB times 10 miles 20’ 01” 25 miles 52’ 01” 50 miles 1’ 44’ 36” 100 miles 3’ 45’ 36” 12 hour 279 miles
Rugby Union
Durham Count Colts squad aged 18 / 19. Senior Player until aged 24. Club Vice President (current) Club Junior Coach – 4 Years
Other
Hill walking / Climbing Sports Science & Nutrition Japanese Automotive Enthusiast