Development Services Department Division of Building, Construction and Safety Inspection Guidelines and Suggested Practices

Transcript of Permitting part3 9.2.2010

Page 1: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inspection Guidelines and

Suggested Practices

Page 2: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inspection Process

• To verify that the installation is in

conformance with the design of the

approved set of plans

• To verify that the installation is in

compliance with the California Electrical

Code and other applicable codes and

regulations

Page 3: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Purpose of the Code

“….the practical safeguarding of

persons and property from

hazards arising from the use of

electricity”

Page 4: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Current Code – 2007 California Electrical Code

Page 5: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

2010 California Electrical Code – effective

date – January 1, 2011 (adoptive code –

2008 NEC)5

Page 6: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inspection Process

• Contractor/owner responsibility to

schedule and coordinate all required

inspections

• Responsible party on site

• Provide access to all elements of

system installation

Page 7: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inspection• Ground-mounted

1. footings for array frame

2. underground raceways

3. final

Observe regulations for -

Brush Management Zones,

Environmentally Sensitive Lands, and

Multiple Habitat Planning Areas

Page 8: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inspection (continued)

• Roof mounted arrays

Rough electrical (for any concealed

work)

Roof array and bond (for integrated

systems or for tile roofs)

Final inspection

Page 9: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Necessary Paperwork on Site

• Approved plans

• Inspection record card (DS-1798)

• Manufacturer’s Installation instructions –

modules, racking, inverter

Page 10: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 11: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Installation manuals – inverters,

modules

Page 12: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Roof Mounted Systems

Page 13: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Roof Access

• Cal -OSHA

Compliant

Ladder

• Sitting

squarely on

level

surface

• Secured at

top

Page 14: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

14

Page 15: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Tile roofs

Page 16: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and SafetyBuilding Integrated PV

Page 17: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Racking Installation

Page 18: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and SafetyFlashing and Weather Protection

Page 19: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 20: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Clearance to Vents

Page 21: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

21

Page 22: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Plumbing Vents•Plumbing vents cannot be covered

by module installation

•Vents shall terminate a minimum

of

•6” above or 1’ away horizontally

from adjacent PV modules

•Termination shall not be higher

than the highest point of the

existing roof

•Vents less than 3” can be

extended /offset but shall be

properly and independently

supported

•All extensions shall meet the

requirements of the California

Plumbing Code

•Extension on any plumbing vent 3”

diameter or larger is not allowed

22

Page 23: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Using Identified grounding points and approved

devices and materials

Page 24: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Combiner Boxes, Junction Boxes

and Wiring Methods

• Listed equipment

• Installed per manufacturer's installation

instructions

• Cable Management

• Conduit support

Page 25: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Combiner box – string protection but

mounted in incorrect orientation

Page 26: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Listed Combiner Box providing string protection –

correctly mounted and installed

26

Page 27: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Junction boxes, conduit support

Page 28: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Wiring methods and materials

Page 29: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Cable Management

Page 30: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inverters and DC Disconnects

• Listed utility interactive inverters

• As-built conforms to the design

• Installed per manufacturer’s installation

instructions or recommendations

• System grounding electrode conductor

properly terminated

Page 31: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Listed Utility-Interactive Inverter

Page 32: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Conductor terminations

Page 33: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inverter locations

Page 34: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Service Equipment• bus rating

• existing main overcurrent protection

• PV overcurrent protection

• manufacturer breakers

• cable or conduit entry

• labeling

• multiwire branch circuit relocation and

balanced load on bus

• grounding system

Page 35: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Verifying Bus Rating

Page 36: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 37: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 38: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

PV breakers and existing multi-

wire circuits

Page 39: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Service Upgrades involving

Scheduled Outages with SDG&E

• Schedule DSD inspection for day of the

scheduled outage

• Contact the inspector re: time frame

• Equipment installed,

• framing weather-protected,

• grounded,

• service entrance raceway or riser and service

entrance conductors installed

Page 40: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Ready for reconnection?

Page 41: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Grounding

• Verify acceptable grounding for existing

service equipment or provide a

supplemental electrode

• Provide service and system grounding

compliant with the Code

Page 42: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 43: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Water piping ground must be supplemented

Page 44: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and SafetyDriven Ground Rod

Page 45: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

DC and AC wiring through a

structure

45

Page 46: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

CAUTION – Notching and

Boring Wood Members46

Page 47: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Load-bearing 2 x 12 floor joists @ 12” OC

notched in middle 1/3 of span

47

Page 48: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

48

Page 49: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Properly fire stop around all penetrations of

rated assemblies 49

Page 50: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Signage and Placarding

• Alternate power source placard

• DC raceways and DC disconnects

• Cautionary

• Site specific design

• PV disconnect for utility operation

Page 51: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Alternate Power Source Placard

Page 52: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 53: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 54: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Page 55: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Suggested practices

• Survey the site – verify the adequacy

and condition of the existing electrical

system to accommodate a PV system

• A service upgrade or other corrections

may be required

Page 56: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Inadequate work space

Page 57: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Service Disconnects – Maximum Six

Handles without a Main Disconnect

Page 58: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and SafetyExisting Service Entrance

Page 59: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Existing service

Page 60: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Service supplied by SIDA cable

Page 61: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Alternative

Energy

Systems

installed with

safeguarding

life and

property in

mind

Page 62: Permitting part3 9.2.2010

Development Services Department

Division of Building, Construction and Safety

Questions?