Permanent Secant Pile Cut-Off Wall
for UIHC Children’s Hospital (CH) &
Parking Ramp No. 2 (HPR2)
Iowa City, IA
Schnabel Foundation Company
By: Mark Goudschaal, P.E.
![Page 2: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/2.jpg)
Presentation Overview
1. Owner/Project Team & Summary of
Work – Overall Plan and Facts.
2. Secant Pile Section and Soil Profile
3. Secant Pile Wall Procedures and
Installation.
4. Perm. Wall Const.
5. Conclusion
![Page 3: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/3.jpg)
Project Team
Owner:
University of Iowa Hospitals and Clinics
(UIHC)
Excavation/SiteworkContractor:
Peterson Contracting, Inc. (PCI)
SPW Contractor:
Schnabel Foundation Company (SFC)
DP Contractor:
Veit Companies
Architect/Engineer: Carl Walker, Inc. (HPR2) & Heery Design (CH) &
Shive Hattery
Geotechnical Engineer:
Terracon
Construction Manager:
Gilbane Construction Company (GCC)
![Page 4: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/4.jpg)
Existing Site – Prior to Construction
![Page 5: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/5.jpg)
Bid Package Plan/Work Sequencing
![Page 6: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/6.jpg)
Children’s Hospital & HPR2 Plan
![Page 7: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/7.jpg)
CH Temporary ERS – HPR2 S. SPW
![Page 8: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/8.jpg)
Children’s Hospital & Parking Ramp
![Page 9: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/9.jpg)
Soil Boring Locations
![Page 10: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/10.jpg)
UIHC CH & HPR2 Soil Borings
![Page 11: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/11.jpg)
SPW & ERS PLAN
Existing Caissons
Typical Section
![Page 12: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/12.jpg)
Typical SPW Section
![Page 13: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/13.jpg)
Ex. Parking Ramp Caisson Obstruction
![Page 14: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/14.jpg)
Secant Pile Walls (SPW)
Definition: SPW are formed by installing
overlapping piles to form a water cut-off.
1. First install primary piles.
2. Then install secondary piles within the
gaps and set reinforcing steel.
3. The difference in pile diameter and
spacing determines the actual overlap.
![Page 15: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/15.jpg)
Secant Piles: Hydraulic Piling Rig –Bauer BG28
BG28
Secant Pile Wall (SPW) - Plan and Verticality Tolerances are critical.
![Page 16: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/16.jpg)
Install SPW Templates
![Page 17: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/17.jpg)
Installed Circular Foam Template
![Page 18: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/18.jpg)
South SPW & Cap – Children’s
![Page 19: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/19.jpg)
SPW Drill Primary (Unreinforced) First
Concrete, f’c=3,000psi for Primary & Secondary Piles.
Secant Piles Hard-Hard Shafts
![Page 20: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/20.jpg)
HPR2 Drill More Primary Holes
![Page 21: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/21.jpg)
Secondary Holes – Pile Installation
I I I I I
![Page 22: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/22.jpg)
Finish Secondary Piles
I I I I I I I I I
![Page 23: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/23.jpg)
Casing Shoes and Tooling Repairs
New Casing teeth
![Page 24: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/24.jpg)
High Torque Rotary Casing
Thick walled sections of temporary
flush-joint steel casings (2 – 5 meter
lengths) with cutting teeth on starter
casing shoe.
Used with high torque rotary piling
equipment and/or casing oscillator.
![Page 25: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/25.jpg)
Oscillator Pulling Casing
![Page 26: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/26.jpg)
Flush-Joint Casing – Conical Bolts
![Page 27: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/27.jpg)
Placing Concrete & Pile
![Page 28: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/28.jpg)
Drilling and Setting Pile
![Page 29: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/29.jpg)
Crane Mat Access Road
![Page 30: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/30.jpg)
SPW Tie Connections
![Page 31: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/31.jpg)
Drilling 2nd Tier Permanent
Tiebacks
![Page 32: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/32.jpg)
Drilling Tiebacks – Using Uncoiler
![Page 33: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/33.jpg)
Automated Grout Plant
![Page 34: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/34.jpg)
Automated High Volume Grout Station
![Page 35: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/35.jpg)
Finished SPW - October 2013
![Page 36: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/36.jpg)
Current HPR2 & Childrens Hospital
![Page 37: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/37.jpg)
CH- April 2014 – Looking North
![Page 38: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First](https://reader034.fdocuments.us/reader034/viewer/2022050407/5f84763e41891e65b33dd62c/html5/thumbnails/38.jpg)
ANY QUESTIONS/COMMENTS?