If the contents of this brochure do not point to a solution for aparticular formwork problem, we urge contractors and specifiers tocall our Technical Sales line on 01403 799601.Our reputation is built on innovation and we have a wealth ofproblem solving experience for you to call on.
PERMANENT FORMWORK SYSTEMS
For In-situ Ground Beams & Pile Caps
Introduction
Cordek, using heavy dutygrades of Correx, havedeveloped a now proven rangeof permanent formworksolutions.
� Groundform� Cellform� Pile Cap Formers
They provide the contractor with the followingbenefits:
� Arrives on site ready for immediate use
� Quick and simple to install
� Tailored to site requirements
� Saves labour and time on site
� Supplied on short lead times
� Minimises concrete wastage
� Reduces ‘muck-away’
Cordek LimitedSpring Copse Business ParkSlinfoldWest SussexRH13 0SZ England
Telephone 01403 799600Facsimile 01403 791718e-mail [email protected]
The contents of this brochure are the copyright of Cordek Limitedand may not be reproduced without permission.
For our detailed literature on these other Cordek Solutions, please call our technical sales on: 01403 799601
Formwork SolutionsFor a range of construction applications
Trough & Waffle MouldsFor forming ribbed concrete floors
Piling AccessoriesA range of product solutions and systems
CellcoreFor protecting foundations against ground movement
ClaymasterLow density polystyrene for accommodating lateral ground movement
CellformLike Groundform but with built-in protection against ground movement
CorformFor constructing Bridge Decks
Correx® & SeekureFor temporary protection
TipformA system for constructing steep sided landfill sites
Filcor EPSFor voidforming, fill and a range of other applications
Creative SolutionsFor a range of design led applications
Gas ProtectionFor venting hazardous gases from under buildings
May 2010
In addition the Cordek Design Team can provide full take-offs from site drawings.
G R O U N D F O R M • C E L L F O R M • P I L E C A P Sw w w . c o r d e k . c o m
If the contents of this brochure do not point to a solution for aparticular formwork problem, we urge contractors and specifiers tocall our Technical Sales line on 01403 799601.Our reputation is built on innovation and we have a wealth ofproblem solving experience for you to call on.
PERMANENT FORMWORK SYSTEMS
For In-situ Ground Beams & Pile Caps
Introduction
Cordek, using heavy dutygrades of Correx, havedeveloped a now proven rangeof permanent formworksolutions.
� Groundform� Cellform� Pile Cap Formers
They provide the contractor with the followingbenefits:
� Arrives on site ready for immediate use
� Quick and simple to install
� Tailored to site requirements
� Saves labour and time on site
� Supplied on short lead times
� Minimises concrete wastage
� Reduces ‘muck-away’
Cordek LimitedSpring Copse Business ParkSlinfoldWest SussexRH13 0SZ England
Telephone 01403 799600Facsimile 01403 791718e-mail [email protected]
The contents of this brochure are the copyright of Cordek Limitedand may not be reproduced without permission.
For our detailed literature on these other Cordek Solutions, please call our technical sales on: 01403 799601
Formwork SolutionsFor a range of construction applications
Trough & Waffle MouldsFor forming ribbed concrete floors
Piling AccessoriesA range of product solutions and systems
CellcoreFor protecting foundations against ground movement
ClaymasterLow density polystyrene for accommodating lateral ground movement
CellformLike Groundform but with built-in protection against ground movement
CorformFor constructing Bridge Decks
Correx® & SeekureFor temporary protection
TipformA system for constructing steep sided landfill sites
Filcor EPSFor voidforming, fill and a range of other applications
Creative SolutionsFor a range of design led applications
Gas ProtectionFor venting hazardous gases from under buildings
May 2010
In addition the Cordek Design Team can provide full take-offs from site drawings.
G R O U N D F O R M • C E L L F O R M • P I L E C A P Sw w w . c o r d e k . c o m
Groundform Cellform Pile Cap Formers
Formbrace
Infill Panel
Straight ConnectorCorner Connector
Groundform is used for constructing shallowin-situ reinforced concrete ground beams.
The U shaped beam profile is cut and creased to site requirements andincludes an extra 25mm on either side, to allow for site tolerance.
Some contractors prefer to use sides only and these can also be supplied.
There is sometimes a requirement for large sheets ofheavy duty Correx, so that Contractors can fabricatetheir own system. The standard sheet sizes are:2.0m x 2.44m2.5m x 2.442.4 m x 4.5m
Tric-Trac and Big footSpacers
Formbrace
Double Infill Panel Straight Connector
Claymaster
Single Infill Panel
ClaymasterPile Collar
Corner Connector
Cellcore
Pile Caps Formers are used forconstructing reinforced concrete pilecaps in shallow excavations and arefabricated to suit site requirements.
Examples of different Pile Caps are shown below.
A typical Groundform layout - showing accessories
Cellform is used for constructing shallowin-situ reinforced concrete groundbeams where ground movement needsto be accommodated. Cellform is madein exactly the same way as Groundformexcept that it includes the Cellcoreground movement product.
The system often includes Claymastersheet and Pile Collars. For furtherdetails and specifications of the Cellcorecomponents refer to our GroundMovement brochure or the CordekTechnical Department
They arrive on site as a complete unit, flat packed and ready for immediate use.
Shuttering configurationsto accommodate two or more piles.
Flanged optionsare available for extra stability
Groundform Cellform Pile Cap Formers
Formbrace
Infill Panel
Straight ConnectorCorner Connector
Groundform is used for constructing shallowin-situ reinforced concrete ground beams.
The U shaped beam profile is cut and creased to site requirements andincludes an extra 25mm on either side, to allow for site tolerance.
Some contractors prefer to use sides only and these can also be supplied.
There is sometimes a requirement for large sheets ofheavy duty Correx, so that Contractors can fabricatetheir own system. The standard sheet sizes are:2.0m x 2.44m2.5m x 2.442.4 m x 4.5m
Tric-Trac and Big footSpacers
Formbrace
Double Infill Panel Straight Connector
Claymaster
Single Infill Panel
ClaymasterPile Collar
Corner Connector
Cellcore
Pile Caps Formers are used forconstructing reinforced concrete pilecaps in shallow excavations and arefabricated to suit site requirements.
Examples of different Pile Caps are shown below.
A typical Groundform layout - showing accessories
Cellform is used for constructing shallowin-situ reinforced concrete groundbeams where ground movement needsto be accommodated. Cellform is madein exactly the same way as Groundformexcept that it includes the Cellcoreground movement product.
The system often includes Claymastersheet and Pile Collars. For furtherdetails and specifications of the Cellcorecomponents refer to our GroundMovement brochure or the CordekTechnical Department
They arrive on site as a complete unit, flat packed and ready for immediate use.
Shuttering configurationsto accommodate two or more piles.
Flanged optionsare available for extra stability
Groundform Cellform Pile Cap Formers
Formbrace
Infill Panel
Straight ConnectorCorner Connector
Groundform is used for constructing shallowin-situ reinforced concrete ground beams.
The U shaped beam profile is cut and creased to site requirements andincludes an extra 25mm on either side, to allow for site tolerance.
Some contractors prefer to use sides only and these can also be supplied.
There is sometimes a requirement for large sheets ofheavy duty Correx, so that Contractors can fabricatetheir own system. The standard sheet sizes are:2.0m x 2.44m2.5m x 2.442.4 m x 4.5m
Tric-Trac and Big footSpacers
Formbrace
Double Infill Panel Straight Connector
Claymaster
Single Infill Panel
ClaymasterPile Collar
Corner Connector
Cellcore
Pile Caps Formers are used forconstructing reinforced concrete pilecaps in shallow excavations and arefabricated to suit site requirements.
Examples of different Pile Caps are shown below.
A typical Groundform layout - showing accessories
Cellform is used for constructing shallowin-situ reinforced concrete groundbeams where ground movement needsto be accommodated. Cellform is madein exactly the same way as Groundformexcept that it includes the Cellcoreground movement product.
The system often includes Claymastersheet and Pile Collars. For furtherdetails and specifications of the Cellcorecomponents refer to our GroundMovement brochure or the CordekTechnical Department
They arrive on site as a complete unit, flat packed and ready for immediate use.
Shuttering configurationsto accommodate two or more piles.
Flanged optionsare available for extra stability
If the contents of this brochure do not point to a solution for aparticular formwork problem, we urge contractors and specifiers tocall our Technical Sales line on 01403 799601.Our reputation is built on innovation and we have a wealth ofproblem solving experience for you to call on.
PERMANENT FORMWORK SYSTEMS
For In-situ Ground Beams & Pile Caps
Introduction
Cordek, using heavy dutygrades of Correx, havedeveloped a now proven rangeof permanent formworksolutions.
� Groundform� Cellform� Pile Cap Formers
They provide the contractor with the followingbenefits:
� Arrives on site ready for immediate use
� Quick and simple to install
� Tailored to site requirements
� Saves labour and time on site
� Supplied on short lead times
� Minimises concrete wastage
� Reduces ‘muck-away’
Cordek LimitedSpring Copse Business ParkSlinfoldWest SussexRH13 0SZ England
Telephone 01403 799600Facsimile 01403 791718e-mail [email protected]
The contents of this brochure are the copyright of Cordek Limitedand may not be reproduced without permission.
For our detailed literature on these other Cordek Solutions, please call our technical sales on: 01403 799601
Formwork SolutionsFor a range of construction applications
Trough & Waffle MouldsFor forming ribbed concrete floors
Piling AccessoriesA range of product solutions and systems
CellcoreFor protecting foundations against ground movement
ClaymasterLow density polystyrene for accommodating lateral ground movement
CellformLike Groundform but with built-in protection against ground movement
CorformFor constructing Bridge Decks
Correx® & SeekureFor temporary protection
TipformA system for constructing steep sided landfill sites
Filcor EPSFor voidforming, fill and a range of other applications
Creative SolutionsFor a range of design led applications
Gas ProtectionFor venting hazardous gases from under buildings
May 2010
In addition the Cordek Design Team can provide full take-offs from site drawings.
G R O U N D F O R M • C E L L F O R M • P I L E C A P Sw w w . c o r d e k . c o m