    PROJECT

    SUB ITEM

    PACKAGE 2 : SEMARANG PUMPING STATION

    SCREEN FACILITIES & ROLLER GATES

    OWNER

    MAIN CONTRACTOR

    MANUFACTURER

    LINGKUNGAN PERMUKIMAN JAWA TENGAH

    PT. GRUNDFOSS POMPA - PT. BRANTAS ABIPRAYA

    P.T. AZYMUTH CITRA PERKASA

    PROCEDURENO.:J001/PR001

    Prepared PT.AzymuthCitraP TjahjotoAriW

    Knowledge GrundfosBrantas

    JV Didiet

    A

    Raharjo

    OrientalConsultant MitsuoMiura

    Representative Signature DatePreparedBy Company

    SatkerPPLP SuharsonoA.B.

    pprove

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    2/10

    PERFORMANCE TEST PROCEDURE

    FOR ROLLER GATE AT WORKSHOP

    J-001-ACP-12

    J-001-PR-001 Revision 0 Page 1 of 4

    TABLE OF CONTENT

    1 PURPOSE2 APPLICATION3 REFERENCES4 DEFINITION5 RESPONSIBILITIES6 PROCEDURE

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    3/10

    PERFORMANCE TEST PROCEDURE

    FOR ROLLER GATE AT WORKSHOP

    Q-019-ACP-11J-001-PR-001 Revision 0 Page 2 of 4

    1. PURPOSE

    This procedure covers the test for Roller Gates at PT Azymuth workshop before installingon site Package C2 Semarang Pumping Station and Retarding Pond.

    2. APPLICATION

    Applies to the all 5 units Roller Gate including motor actuator exclude rubber sealand

    3. DEFINITIONS

    PPLP : (Satker PPLP) Satker Pengembangan PenyehatanLingkungan Pemukiman shall mean the owner of this Project

    OC : (Oriental Consultant) shall mean Consultant for this project,and on behalf Satker PPLP

    GBJV : (Grundfos Brantas Joint Venture) shall mean Main Contractor

    ACP : (PT. Azymuth Citra Perkasa) shall mean Manufacturer

    4. RESPONSIBILITIES

    PPLP : Review of report

    OC : Check, review and Approved report of inspection test

    GBJV : Witness, review and approval inspection test report

    ACP : - Perform fabrication and test as per scope of work- Prepare report of fabrication and test and submit to GBJV

    for approval

    5. PROCEDURE

    5.1. Preparation for test

    Prepare the equipment and tools to be completed and ready for use

    Roller gate shall be marked RG A or RG B until RG E on the skin plateprior test.

    Review report test inspection

    5.2. Support frame

    Support frame are the finished fabricate material item RG-04

    Support frame will be used for hanging the actuator and roller gate withadditional stiffener for supported frame.

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    4/10

    PERFORMANCE TEST PROCEDURE

    FOR ROLLER GATE AT WORKSHOP

    Q-019-ACP-11J-001-PR-001 Revision 0 Page 3 of 4

    5.3. Motor Actuator

    The approved specification of motor actuator :Brand : AUMAType : SA 14.6Power : 3ph / 380 VAC / 50 Hz / 1,6 kwGear Box : GK 16.2 Ratio 4 : 1

    specification of test motor actuator shall be same with approvedspecification, and its will be used for performance testing for all five RollerGate in workshop before shipment.

    If the test motor specification different with approved specification, the testmotor will be used for performance testing for only 2 roller gate at firstshipment, the remaining 3 roller gates shall use the test motor with

    specification as approved by OC.

    5.4. Overhead crane condition at workhop

    Height span : 4.5 meters

    Overhead Crane max load : 14 tons

    Open closed for test will be : 1.5 meters

    5.5. Performance Test.Performance Test for gate will shop operated from fully closed to the openedposition under a no-flow condition, to demonstate that the gate leaf isworkable. The test shall cover followings :

    5.4.1. Document Inspection- ML (Material List)- Installation Plan- Performance Test Procedure

    5.4.2. Visual Inspection- All gates are to be visually inspected- Painting Judgment for actuator and base frame- Evaluation of visual inspection result

    5.4.3. Measurement Inspection- Major dimension to be measurement and compared to drawing- Evaluation

    5.4.4. Actuation Inspection

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    5/10

    ATTACHMENT

    Page 4 of 4

    1. Material List (ML)2. Installation Plan3. Performance Test Data Report

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    6/10

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    7/10

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    8/10

    PT AZYMUTH CITRA PERKASA

    MATERIAL LIST DETAIL

    Doc. No. : 001/PLD/RG/J-001-ACP-12 Date

    Title : ROLLER GATE "A" Revision

    Qty : 1 UNITS Prepared by

    Job No. : J-001/ACP/12

    Project : Package C2 Semarang Pumping Station

    No. Name of Good Part No. Size Qty

    Dwg No. PN (1) (2) (3) (4) (5) (6) 2 unit

    70 Bush Oilles bush roller RG-12 2 80 50 4

    71 Round bar Shaft Roller RG-12 4 75 364 L 4

    72 Plate Key Plate RG-12 5 5.00 30 100 4

    73 Plate Hanger Rib RG-13 1 10.00 40 130 8

    74 Plate Hanger Plate RG-13 2 12.00 150 160 2

    75 Plate Base Plate Pedestal RG-14 1 12.00 300 400 2

    76 Pipe Pipe Pedestal RG-14 2 4 SCH 40 860 2

    77 Plate Stiffener Plate Pedestal RG-14 3 10.00 143 860 2

    78 Plate Stiffener Plate Pedestal RG-14 4 10.00 93 860 2

    79 Plate Flange RG-14 5 10.00 210 210 2

    Empty

    C:\My document\Engineering\Master\Test Procedure for Roller Gate.xls

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    9/10

    Item : Roller Gate "A" Gate Leaf : 2400 x 4200

    Ref drawing : RG - 01 To RG - 12 Actuator : SA. 14.6

    Date : 8 Oktober 2012 Stem : dia 63 x 4330

    Owner :Satker PPLP Connection Shaft

    :

    dia 50mmConsultant : Oriental Consultant Main Wheel : dia 430 mm (No assembly for the test)

    Main Contractor : Grundfos - Brantas JV :

    Manufacturer : PT. Azymuth Citra Perkasa :

    Project : Package C2 Semarang Pumping Station

    DIMENSION & DATADESCRIPTION

    PERFORMANCE TEST

    INSTALLATION PLAN

    2400

    2400

    420

    0

    1500

    MaxCranespan:4500

    RG"A"OPENPOSITION

    RG"A"CLOSEDPOSITION

    EL+0.7Closedposition

    EL+1.9Openposition

    travelling distancefortestonly,duetocrane span

  • 7/29/2019 Performance Test Procedure Roller Gate.pdf

    10/10

    Item : Roller Gate "A" Gate Leaf : 2400 x 4200

    Ref drawing : RG - 01 To RG - 12 Actuator : SA. 14.6

    Date : 8 Oktober 2012 Stem : dia 63 x 4330

    Owner : Satker PPLP Connection Shaft : dia 50mm

    Consultant : Oriental Consultant Main Wheel : dia 430 mm

    Main Contractor : Grundfos - Brantas JV :Manufacturer : PT. Azymuth Citra Perkasa :

    Project : Package C2 Semarang Pumping Station

    Visual Check :

    Main Dimension Check Reference Drawing Result

    ( mm )

    1- Gate Leaf

    - Width

    - Height

    1 2 3

    4200

    2400

    4

    Actual Measurement

    PERFORMANCE TEST

    DATA REPORT

    DESCRIPTION DIMENSION & DATA

    - Thickness

    2- Frame

    - Frame spacing on Left

    - Frame spacing on Right

    - Base frame width (detail II)

    - Base frame lengthh (detail II)

    3- Main Wheel (diameter)

    4- Shaft of Main Wheel

    Actuti on Inspectio n Result

    1- Closed Position

    2- Open Position

    Approved by, Witness by, Prepared by,

    Oriental Consultant Grundfos - Brantas JV PT. Azymuth Citra Perkasa

    on behalf of Satker PPLP

    190.46 mm/min

    190.46 mm/min

    Hoisting speed

    350

    450

    450

    232

    4000

    430

    Actual Measurement