10/22/2012 1 Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS Master CPIM, CSCP, Lean, Instructor Development Debra’s Cycle Count History Focus on the root cause and not the number of counts per day counts per day . View cycle counting like inspecting incoming materials. Annual inventory created more problems. Annual inventory created more problems. Needed change!

Transcript of Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting...

Page 1: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

1

Perfecting the Cycle Count

Debra A. Hansford, CPIM, CIRM, CSCPAPICS Master – CPIM, CSCP, Lean, Instructor Development

Debra’s Cycle Count History

• Focus on the root cause and not the number of counts per daycounts per day.

• View cycle counting like inspecting incoming materials.

• Annual inventory created more problems.Annual inventory created more problems.

• Needed change!

Page 2: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

2

The Goal?

Count all parts within a year?

Identify and correct process problems?

Traditional ABC

A items 12 times per year

B items 4 times per year

C items 2 timesC items 2 times per year

Page 3: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

3

ABC Tolerance

AWithin tolerance?

0 %

B+/‐ 2 %

C

Within tolerance?– consider correct– do not adjust

C+/‐5 %

Root Cause Analysis

Key to successKey to success

Keep it simple ‐ 5 Why

Identify actions that creates reactions

Look for process variances

Page 4: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

4

Controversy?

Inspecting parts increase quality or stop unacceptable quality?

Cycle counting increase i di llaccuracy or periodically 

“correct” balance?

Control Groups

Determine accuracy goal

Select numbers

Count every day

Root cause analysis to correct

Page 5: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

5

Selecting Challenging Part Numbers

By process By supplier By area used

By size By value ???By size By value ???

Add To Current Cycle Counts

KaizenKaizen

Identify Create small control group

potential process problems

Page 6: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

6

Simulation

Simulation Observations

Cycle count everything

Control group

Page 7: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

7

Simulation Observations

Cycle count everything

Control group

Perfecting The Cycle Count

• Consider adding control group

• Root cause analysis over counting parts

• Get the buy‐in from management

• May be viewed as “unconventional”

Page 8: Perfecting the Cycle Count Hansfordmedia.apics.org/sites/AnnualConference2012/handouts/Perfecting the...Perfecting the Cycle Count ... correct process ... Microsoft PowerPoint - Perfecting

10/22/2012

8

Thank You!

Hope you have some ideas to challenge the status quo 

if your current cycle count practices need a change!

Deb@PreCrest [email protected]