Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s...
Transcript of Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s...
![Page 1: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/1.jpg)
Perfect isolation system
Just replace exist ing valve without pipe revision
![Page 2: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/2.jpg)
P. 02
bout BOXY
All of BOXY’s members are kept in mind our philosophy
A
Lots of installation reference and site experiences
with BOXY’s innovative isolation blinding system proved
as a most safe and practical method among all of
piping isolation facilities in the world.
Simple design with easy operation is the technology of BOXY
that comes from long term experience and development.
Also solid structure with minimum maintenance is the strong point of BOXY.
As a specialist with most advanced technology for pipe line isolation
we promise you provide qulified product and service to meet your need at site.
BOXY blind valve warrants 36 months after delivery when provided products are installed
properly according to vender's instruction except for sealing materials.
BOXY blind valve provides engineering and/or technical information
to assist buyer in effecting field installation and/or field service.
And every request for adjustments and/or modifications will be responded with best regard.
Company Philosophy
> Best quality material / product
> Best service and quick answer
> Best reputation from global customers
Warranty
Assistance
![Page 3: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/3.jpg)
Typical Process
“Total equipment isolation valves cannot gaurantee 100% leakage free.”
Environment pollution during blinding work
Exposure to hazard of toxic fluid to worker
Potential hazard of sparking
Need tools, gasket, cranes etc
In need of specialist or trained worker
High labor cost
Long total shutoff time
ree from leakage trouble
BOXY Process
No need pipeline revision to replace existing isolation method (Typical valve (+Blank),Spool piece etc.)
Positive shutoff with quick change
No ground pollution
Safe working
No need tools, gaskets, cranes etc
Only one person with handwheel operation
Minimum maintenance
No line spreading
Leakage trouble may cause big loses of industrial equipment such as contamination of fluid mixing, personal accident by inhalation of toxic gases or unexpected explotion that leads to occasionally huge disatser.Typical blank work has been had actual problems at site as follows
We developed innovative BOXY Blind Valve to replace existing blank / spectacle plate / DBB(Double Block and Bleed)valve or spool piece without pipe revision for the first in the world.
F
![Page 4: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/4.jpg)
02
Zero leakage to the downstream
No air/ground pollution during blinding / deblinding work
Quick & Safe operation with untrained one person
BOXY quick blind system offer a combination of three essential criteria.
eatures of BOXYF
No line spread
Auto posi�oning of blind plate
Hand wheel torque indicator
Safety locking
Self s�ck free mechanism
> The unique & simple Gear-set mechanism makes a gap to switch blind plate without line spreading
> Blind plate is set on correct position by positioner
> Torque indicator provides correct positioning of tightening / releasing operation
> Locking devices with pad lock and key secure safety from wrong operation by unauthorized person
> Unique gear set mechanism shall free the blind gaskets from sticking problem
P. 04
![Page 5: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/5.jpg)
Process shall be stopped and removed this DBB valve for maintenance
When 1st valve leaks, fluid reaches to 2nd valve and there is a leakage possibility to downstream.
To avoid leakage to downstream, bleed line shall be always open to drain out continuous leaking fluid until maintenance.
Typical valve cannot gaurantee leakage trouble to down stream.
BOXY + Bu�er�y Valve
Typical Process (DBB)
BOXY 100% gaurantee perfect isolation
Even though Butterfly valve leaks and fluids(or gas) reaches to BOXY Blind Valve, it never go over downstream.
Before operating BOXY Blind Valve, internal pressure shall be depressurized and drained
between block valve and BOXY Blind Valve.
If sealing of blind valve is damaged, gasket can be replaced at site easily.
Every valve has a potential leak possibility basically. Once leakage happens, fluid leaks to downstream. But if BOXY BLIND VALVE leaks, fluid never pass to downstream but outside.
hat’s differenceW
![Page 6: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/6.jpg)
P. 06
roduct Selection GuideP
⑥ Sealing Gasket
⑤ Blind Material
⑤Blind Material
④ Body Material
④Body Material
③ Pressure ra�ng
Pipe Line Checking Material Checking Other Requirement
Size and pressure ra�ng
Face to face dimension
End connec�on
Max working temperature
Max working pressure
Body / trim material
Fluid / media informa�on
Sealing gasket
Fire safety
Automa�c system
Blind Storage
Sensors
NACE requirement
Customer requirement BOXY’s Result
Example Code :
PRODUCT CODE
DBX 8 300 WCB / SS304 / FKM
NBR / HNBR : Nitrill Rubber, Buna-NFKM / FPM : VitonFEPV / PFAV / PFAS : Te�on Encapsulated 0-ringVMQ / FVMQ : Silicone, FluorosiliconeEPDM : Ethylene Propylene RubberFFKM / FFPM : Per�uoro Elastomer, Kalrez, ChemrezGR : Graphite mold, Spiral wound gasketSo� Metal
AN300 : ASME Class 300PN16 : DIN PN 16JS10K : JIS 10K
WCB / CS : Carbon SteelSS304 : Stainless Steel 304C276 : Hastelloy C276
SS304 : Stainless Steel 304SS316L : Stainless Steel 316LC276 : Hastelloy C276
② Size
①Type
① TypeDBX : Devided Blind PlateSBX : Single Blind Plate
NPS 8”(inches)DN200 (DIN)
AN②Size ③Pressure rating ⑥Sealing Gasket
![Page 7: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/7.jpg)
Gate ValveorDBB Valve
Gate Valve + Spectacle Plate
BOXY + Butterfly Valve
BOXY + Butterfly Valve
BOXY + Block Valve
B B
AA
CC
conomical replacement plan withoutEpiping modification
BOXY Blind Valve can replaces existing isolation equipements installed - Gate valve + Spectacle plate / Gate valve / DBB Valve / Spool piece without pipe revision.BOXY enhances facility safety level and save maintenance cost.
DBB Valve orSpool Piece
![Page 8: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/8.jpg)
Absolutely Shut o�
Easy Opera�ng
Heavy piping can be blinded / deblinded with easy & safe operation.
BOXY Blind Valve has compact design with short face to face dimension
It is simply operating to tighten and release by handwheel.
No dead space design of BOXY Blind Valveensures contamination free of remaining fluid.
No Dead Space
eliability of BOXY technologyR
P. 08
Though blind sealing is damaged, enclosed body
holding leaking fluid prevents enviroment pollution.
Sealing gasket can be replaced easiliy at site.
![Page 9: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/9.jpg)
Installed safety lock allows to proceed by authorized person only
Safety Lock
Tightening Indicator Blind Storage
No lifting tools are required to switch OPEN / CLOSE procedure
No need ToolsEnvironment Pollu�on FreeFully enclosed body prevents hazard and / or pollution and enables safe operationfrom toxic, flamable media
![Page 10: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/10.jpg)
YPET
P. 10
DBX type of Blind valve has good advantages in Oil terminal / Offshore applications where is limited installation space and marine pollution is strictly prohibited. The enclosed body / compact design prevent ground pollution and it allows to install at parallel pipe lines.
TECHNICAL SPECIFICATIONS
GENERAL INFORMATIONINSTRUCTION & FEATURES
APPLICATIONS• REFINERY •
• Ethlylene Furnace
• Decoking line
• Steam & Vapor line
• FCCU Fractionator isolation
(overhead & bottom line)
• Catalyst service
• Flare gas line
• Reactor Blowdown
• Chemical Cleaning isolation
• Mixing lines
• Regernation gas line
• Filteration system
• Loading station
• Transfer line
• FPSO
• LNG ship
• Shipboard lines
• Vessel inlet
• Inert Gas system
• Coke Oven Gas
• Blast Furnace Gas
• CHEMICAL PLANT • • OFFSHORE • • STEEL •
• Oil & Chemical tankfarm
• Loading Station
• Pump isolation
• LNG tank
• Airport fuel line
• OIL TERMINAL •
NOMINAL DIAMETERNPS 1 (DN25) - NPS40 (DN1000)
PRESSURE RATING MATERIALSASME Class 150 to Class 1500Other presure classes up to ASME Class 2500Available upon request
FUNCTIONGas & Liquid Perfect Isolation( Zero Leakage )
OPERATION METHODManual OperationElectric, Pneumatic or Hydraulic Operation
TEMPERATURE RANGEStandard Design : -20℃ ~ +200℃
High Temp. Design : +200℃ ~ +816℃
Cryogenic Design : -196℃
BODY : Carbon Steel, Stainless Steel, Special Material (Duplex, Hastelloy, Monel, Inconel etc.)BLIND : Stainless Steel, Special Material (Duplex, Hastelloy, Monel, Inconel etc.)MOVING PARTS / SEALING SURFACE are Anti-corrosion Materials
![Page 11: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/11.jpg)
Part Description
Body
Handwheel Locking Device
WormScrew jack
Blind plate
Gear Set
Body Drain
Depressurizing Bleeder
Seat
Seat Holder
Travelling Nut
TighteningIndicator
to tighten / releaseblind plate
>
> enclosed body to prevent ground pollution
> to release internal pressure
> to remove remaining fluid in body case
> make a gap without pipeline spreading
> to prevent mis-operation by unauthorized person
![Page 12: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/12.jpg)
YPET
TECHNICAL SPECIFICATIONS
GENERAL INFORMATIONINSTRUCTION & FEATURES
SBX type Blind valve has good advantages in gaseous fluid or critical pipeline with acid, flamable, toxic or carcinogenic media. The fully enclosed body / compact design prevent environmental pollution and it allows to install at parallel pipe lines.
P. 12
APPLICATIONS• REFINERY •
• Ethlylene Furnace
• Decoking line
• Steam & Vapor line
• FCCU Fractionator isolation
(overhead & bottom line)
• Catalyst service
• Flare gas line
• Reactor Blowdown
• Chemical Cleaning isolation
• Mixing lines
• Regernation gas line
• Filteration system
• Loading station
• Transfer line
• FPSO
• LNG ship
• Shipboard lines
• Vessel inlet
• Inert Gas system
• Coke Oven Gas
• Blast Furnace Gas
• CHEMICAL PLANT • • OFFSHORE • • STEEL •
• Oil & Chemical tankfarm
• Loading Station
• Pump isolation
• LNG tank
• Airport fuel line
• OIL TERMINAL •
NOMINAL DIAMETERNPS 1 (DN25) - NPS40 (DN1000)
PRESSURE RATING MATERIALSASME Class 150 to Class 1500Other presure classes up to ASME Class 2500Available upon request
FUNCTIONGas & Liquid Perfect Isolation( Zero Leakage )
OPERATION METHODManual OperationElectric, Pneumatic or Hydraulic Operation
TEMPERATURE RANGEStandard Design : -20℃ ~ +200℃
High Temp. Design : +200℃ ~ +816℃
Cryogenic Design : -196℃
BODY : Carbon Steel, Stainless Steel, Special Material (Duplex, Hastelloy, Monel, Inconel etc.)BLIND : Stainless Steel, Special Material (Duplex, Hastelloy, Monel, Inconel etc.)MOVING PARTS / SEALING SURFACE are Anti-corrosion Materials
![Page 13: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/13.jpg)
Part Description
Body
Blind Handwheel
TighteningIndicator
Blind Position Indicator
BevelScrew Jack
Seat
Gear SetSeat Holder
Body Drain
Blind Plate
SEAT PositionHandwheel> to tighten / release blind plate
> to remove remaining fluid in body case
Travelling Nut
> make a gap without pipeline spreading
> switch blind plate OPEN / CLOSE position
Depressurizing Bleeder> to release internal pressure
> enclosed body to prevent ground / air pollution
![Page 14: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/14.jpg)
P. 14
> Oil & Gas Teminal
> FPSO / FSO
> LNG ships
> Inert Gas System
ritical applicationsC
> Loading Staion
> Tank farm
> Product isolation
> Chemical cleaning isolation
> COG / BFG isolation
> Off-shore facility
> Reactor shut off valve
> Reactor blow-down
> Pump isolation
> Vessel inlets
> Fuel line
> Pig lauching station
> Tank ventInstalla�on ReferenceBOXY offers customized solutions in various installation condition.
Enclosed body to prevent air pollution Block valve + BOXY + Block valve
BOXY with Blind storage
Enclosed body / compact design prevent ground pollution and it allows to install at parallel pipe lines.
Combination of BOXY and Butterfly valve in Oil terminal pipelines
BOXY installation in vertical pipeline
![Page 15: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/15.jpg)
ngineering & CertificatesE
Boilers & Pressure Vessels
Approved from ABSA
Speci�ca�on for pipeline valves
Approved from API
ABSA API 6D
CE-PED Module H.
API Spec. Q1
Quality Management System
Approved from Bureau Veritas
Fire Safe design
Approved from Velosi
Quality Management system
Approved from API
Pressure Equipment
Approved from Bureau Veritas
Boilers & Pressure Vessels
Approved from TSSA
On safety of equipement for high pressureApproved from SERCONS
ISO 9001 Fire Safety Test
TSSATRCU 032/2013
Cer��cate
Engineering
DBX type, NPS 6, ASME 150Lbs, WCB valve, part coupled thermal - structural F.E Analysis ( ANSYS 17.2 )
Total Deformation Eqiuvalent Stress
F.E Analysis
Overall stress distribu�on is the same as each other( inside pressure 49bar )
Total Deformation Eqiuvalent StressAtmosphere Temperature (705℃)
Coupled Analysis Stress Distribu�on
![Page 16: Perfect isola˜ion system Just replace exis˜ing valve … · · 2017-02-24with BOXY’s innova˜ive isola˜ion blinding system proved as a most safe and prac˜ical method among](https://reader031.fdocuments.us/reader031/viewer/2022030718/5b030e8d7f8b9a8c688b8c6f/html5/thumbnails/16.jpg)
32, Iyeon gil, Sangnam myeon,
Miryang-si, Kyeongnam, Korea (50449)
+82 - 55 - 356 - 8870
+82 - 55 - 356 - 8871
BOXY BLIND VALVE Co.,Ltd
Phone :
:FAX
The perfect isolation system
20
16 P
RO
DU
CT
INS
TR
UC
TIO
N
www.boxyblindvalve.com