Nonpoint Source Management 2011 Annual Report
New Hampshire Department of Environmental Services
April 2012
![Page 2: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/2.jpg)
R-WD-12-7
Nonpoint Source Management 2011 Annual Report
PreparedbyWatershedManagementBureau
NewHampshireDepartmentofEnvironmentalServices19HazenDrive
Concord,NH03302-0095
www.des.nh.gov
ThomasS.BurackCommissioner
HarryT.Stewart,P.E.Director,WaterDivision
April2012
Front Cover:Students from School Street School in Rochester pose in front of an excavator as part of a water qual-ity awareness day to learn more about how stormwater improvements at their school will help to restore Willow Brook. Photo by Lorie Chase, Cocheco River Watershed Coalition.
![Page 3: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/3.jpg)
iii
Dedication
In memory of our friend and colleague Jody Connor,Director, Limnology Center at the New HampshireDepartmentofEnvironmentalServices.
Jodywaswellknownandhighlyrespectedasalimnologist,educator, watershed manager, innovator and motivator.His work and contributions are far reaching, and extendfrom the surface waters of New Hampshire, throughoutNorth America and across the globe. Jody’s work withlakesandwatershedsalongwithhiscommitmenttotheirprotectionandrestorationmadehimoneofthemostrespectedlimnologistsinthefieldbyhispeersandthethousandsofpeopleheencountered,eventhoughthemanhimselfwashumble.
JodydedicatedhislifeandhiscareertoprotectandrestorethebeautifulnaturalresourcesthatNewHampshireissofortunatetohave.Hewilllongberememberedbymanyasatruementorandfriend.Countless careers were launched and thousands of volunteers were mobilized to protect naturalresourcesthankstothevision,guidance,mentoring,andunselfishdisseminationofknowledgeandexperiencethatJodyembodied.Itiswithourheartfeltthanks,admirationandinfiniterespect,thatwededicatethe2011NPSAnnualReporttothememoryofJodyConnor.
Jody’s Dock on Lake Winnisquam. Photo by Jen Drociak, DES.
![Page 4: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/4.jpg)
iv
ContentsDedication..................................................................................................................................................................................v
Introduction............................................................................................................................................................................. 1
Stormwater Initiatives.......................................................................................................................................................... 2NewDo-It-YourselfToolstoManageStormwater.................................................................................................. 2UpdateonStormwaterUtilityFeasibilityStudies.................................................................................................. 3
Education and Outreach..................................................................................................................................................... 3SecondAnnual319Grantees’RoundtableCombinesProjectSiteTours....................................................... 3DippingintoSocialNetworkingwiththeNewHampshireWatershedProtectionandRestorationForumBlog............................................................................................................................................. 4WatershedGrantProceduresMeeting...................................................................................................................... 5GreenSnowProCertificationandReducingRoadSalt........................................................................................ 5PetWasteGetsSomeAirTime....................................................................................................................................... 62011NewHampshireEnvirothonaddressesNitrogenPollutionintheGreatBayEstuary................... 6WatershedGaming............................................................................................................................................................ 7
Highlights and Overview of Completed Projects..................................................................................................... 8Watershed-BasedPlanforHighQualityWatersintheActonWakefieldWatershedRegion-SalmonFallsHeadwatersLakes............................................................................................................................... 8WillandPondDrainageEstablishmentandPublicOutreach...........................................................................10HodgsonBrookRestorationYears3&4...................................................................................................................12CainsBrookandMillCreekRestoration...................................................................................................................14CainsPondRestoration..................................................................................................................................................15HancockVillageStormwaterManagementandWaterQualityImprovement..........................................17LakeWinnipesaukeeWatershedManagementPlan:Meredith,Paugus,andSaundersBays...............18Cobbett’sPondWatershedRestorationPlan.........................................................................................................20LakeHoraceMarshRestoration..................................................................................................................................21WarrenBrookRestorationPlanning..........................................................................................................................22
Looking Ahead......................................................................................................................................................................23
AppendicesA.DESSection319WatershedAssistanceGrantsforHighQualityWatersAwardedinFFY2011......24B.DESSection319WatershedRestorationGrantsforImpairedWatersAwardedinFFY2011............24C.DistributionofSection319GrantDollarsAwardedinFFY2011byWatershed...................................25D.DistributionofSection319GrantDollarsAwardedinFFY2011byNPSCategory............................25E.DESSection319BaseProjectsCompletedinFFY2011.................................................................................26F.DESSection319RestorationProjectsCompletedinFFY2011...................................................................26G.2011EstimatedPollutantLoadReductionsAchieved...................................................................................27
![Page 5: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/5.jpg)
1
IntroductionItwouldbefairtocharacterize2011asthefirstyearofthedeclineofthefederal319program.WhileCongressappropriatedlevelfunding,EPAtooktheinitiativetoreducethe319programbudgetby12percentbyre-allocatingthefundingtootherprogramsthroughamaneuvercalleda“spendingplan.”Inatypicalyear,spendingplansmustbeapprovedbyCongress,butin2011CongressdelegatedtheauthoritytoEPA,who,withoutexplanation,madethecut.
ForFY2012,the319budgetwascutanadditional6percent.
ThefederalOfficeofManagementandBudget,whichadvisestheExecutiveBranchonbudgetmatters,hadthe319programinitscrosshairs,recommendinga50percentcutfor2011.EPAarguedagainstsuchalargecut,recommendingthattheystudytheeffectivenessoftheprogramandproposeprogrammaticchanges,includinganincentives-based,orcompetitive,systemformakingappropriationstostates.
EPAreleaseditsstudyofthe319programinOctober2011.Itisaninterestingreadwithexamplesofbestprogrammaticpracticesfrommanystates.Whilethestudycontains162pages,therecommendationsaboutthefutureoftheprogramareincludedinafour-pageAppendix.Thesixrecommendationsofthestudyare:
1. UsethesatisfactoryprogressprovisiontostrengthenandupdatestateNPSmanagementprogramsandimproveaccountability.
2. Implementregionalcompetition/reallocationoffundsthathavenotbeenexpendedbytheendofthegrantperiod,andaportionofnewfiscalyearfunds.
3. Accelerateachievementofenvironmentalresultsandimprovingprogrammanagement.4. IncreaseuseandleveragingofCleanWaterStateRevolvingFundsand/orothersourcesof
statefunding.5. Improvemeasuringsuccessandprogramaccountability.6. ImprovepartnershipandcollaborationwithfederalagenciessuchasU.S.Departmentof
Agriculture,DepartmentofInterior,andotherstomoreeffectivelytackleNPSpollution.
The2011annualreportincludesseveralexamplesofcompletedprojectsthatimplementwatershed-basedplans,clearlyillustratinghowtheNewHampshireDepartmentofEnvironmentalServiceshasusedthe319programtoachieveenvironmentalresultsandmeasuresuccess(recommendations#3and#5inthelistabove).
• OneprojecthighlightisCainsPondinSeabrook,whichwasimpairedforrecreationaluseduetosedimentationandnowmeetswaterqualitystandardsasaresultofa319restorationproject.ThisprojectisincludedinEPA’s319successstorieswebsiteathttp://water.epa.gov/polwaste/nps/success319/.
• Severalprojectscompletedin2011addressedstormwaterretrofitsinurbansettings,includingHodgsonBrookinPortsmouth,whereneighborhood-scaleBMPssuchastree-boxfiltersweredemonstrated,andCobbett’sPondinWindham,wherehighwayrunoffwasinfiltratedinatightsetting.
• PhysicalandbiologicalrestorationprojectswerecompletedatWarrenBrookinAlsteadandLakeHoraceMarshinWeare.
• Thefirstweb-basedwatershedplanwascompletedforthreebaysofLakeWinnipesaukee,thestate’slargestlake.
![Page 6: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/6.jpg)
Example fact sheet from the New Hampshire Homeowner’s Guide to Stormwater Management.
2
• ThereportalsodescribeseffortstoexplorethefeasibilityofstormwaterutilitiesinDoverandanewtooltoquantifyandaddresspollutantloadingfromresidentialsites.
Inadditiontotheabove,wenowhavemorethan30completedwatershed-basedplanspostedontheDESwebsite.Theseplansrepresentthousandsofhoursofworkbyorganizations,volunteers,andconsultantstowardmeasurablyimprovedwaterqualityandwillserveasthebuildingblocksforonthegroundimplementationprojects.
Stormwater InitiativesNew Do-It-Yourself Tools to Manage Stormwater
Managingstormwatercanbecomplicated.Often,engineersandotherprofessionalsarecalledupontodesignandinstallstormwatertreatmentpractices,aswellascalculatetheirpollutantremovalbenefit.Whileprofessionalstormwatermanagementservicesmaybeonlyasmallpartofthebudgetforlargecommercialormulti-unitresidentialdevelopments,suchservicesaresimplynotaffordableforthemajorityofsmall-scalepropertyowners.
Still,manypeoplewanttolessentheimpactofstormwaterrunofffromtheirproperty.Whethertheywanttoprotectwaterqualityorpreventtheirdrivewayfromwashingout,peoplearelookingforwaystomanagestormwaterwithsimplematerialsandeasytofollowinstructions.Recognizingthisneed,DEShasdevelopedthefollowingnewtools.
The New Hampshire Homeowner’s Guide to Stormwater Management: Do-It-Yourself Stormwater Solutions for Your Homeprovidesfactsheetsforavarietyofstormwatertreatmentpractices,suchasdrywellsandraingardensthatcanbeeasilyinstalledonprivateproperty.Eachfactsheetincludesamateriallist,illustrationsandstep-by-stepinstructions.Constructingthesepracticescanhelpreducefloodinganderosion,andsubsequentlyprotectnearbystreamsandpondsfromstormwaterpollution.
The New Hampshire Residential Loading Modelisaspreadsheettooltohelpestimatetheamountofstormwaterpollutants,specificallysediment,phosphorus,andnitrogen,thatcomefromagivenproperty.Thistoolcanmodelvariouspropertyscenariosincludingthewaterqualityimpactofbuildinganewgarage,forexample,orthewaterqualitybenefitofconstructingastormwatertreatmentpracticefromthehomeowner’sguide.Thetoolcanalsobeusedtodetermineifapropertymeetslocalwaterqualitygoals,iftheyhavebeendefinedforaparticularwaterbody.
Bothtoolsareavailableathttp://des.nh.gov/orga-nization/divisions/water/stormwater/stormwater-mgmt-homeowners.htm
![Page 7: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/7.jpg)
3
Update on Stormwater Utility Feasibility Studies
ThecityofDovercompleteditsstormwaterutilityfeasibilitystudywithfundingfroma2009Section319Grant.ThefundingenabledDovertohireconsultantstoidentifystormwaterprogramneedsandcosts,evaluatethepossibilityofestablishingamunicipalstormwaterutility,andidentifyapreferredapproachtofundingthecity’sstormwaterprogram.Doverspearheadedanefforttogarnerpublicsupportbyappointinganad-hocstormwaterstudycommitteeofstakeholders.Thiscitizencommitteerepresentingvariousgroupsthatwouldbeaffectedbytheoutcomeofthecommittee’srecommendationwasabletoworkcooperativelyand,despiteinitialconcernsandmisgivings,unanimouslyvotedtosupporttheformationofastormwaterutility.
Unfortunately,followingpresentationstothecitycouncilandthepublic,awell-organizedoppositionspokeatapublichearing.ConcernscenteredaroundnotwantingtobethefirststormwaterutilityinNewHampshire,delayinissuingthenewMS4permitthatmanyofthestormwaterprogramcostswerebasedon,andalackoftrustingovernmentingeneral.Followingthenegativeresponses,thecitycouncilfeltthatmuchwaslearnedbythefeasibilityprocessbutthatestablishingautilityatthistimeinDoverwaspremature.
DESthenmetwithDoverandotherstormwaterutilityfeasibilitystudygranteestoidentifylessonslearnedthatcouldbeincorporatedintotheongoingefforts.Itwasrecommended,ifpossible,towaitforthenewMS4permittobeissuedbeforebringingutilityproposalstocitycouncilsforavote.DEShassinceincorporatedadditionalrecommendationsforstormwaterutilityfeasibilitystudiesinNewHampshire,whichcanbefoundathttp://des.nh.gov/organization/divisions/water/stormwater/utilities.htm#feasibility,andwilladdnewinformationasothergrantprojectsarecompleted.
Education and OutreachSecond Annual 319 Grantees’ Roundtable Combines Project Site Tours
TheWatershedAssistanceSectionhostedthe2010WatershedManagersRoundtable(2ndEdition)andProjectSiteToursinOctoberattheDESCoastalOfficeinPortsmouth.
Thiseventcombinedthe319Grantees’Roundtablewithprojectsitetours,conventionallyheldforEPAstaff,sothat319projectmanagerscouldalsoobservepastandongoing319projectsuccesses.Attendeesatthecombinedevent,includedapproximately50past,current,andpotentialfuture319WatershedAssistanceandRestorationgrantees,privateconsultants,andrepresentativesfromseveralEPAProgramsandtheDESWatershedManagementBureau.
Duringtheroundtable,granteesbrainstormedonwaystobuildcapacityandimplementtoolsforwatershedprojectsandidentifiedfourkeyareasofinterest.
Lori Chase, Project Coordinator, Cocheco River Watershed Coalition describing BMPs for School Street School, Rochester.
![Page 8: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/8.jpg)
Tara Schroeder, Green Mountain Conservation Group sharing tips with the representatives from Lake
Wentworth Association.
4
1. Enablebestmanagementpracticeimplementationatthelocallevel.2. EstablishpartnershipswithNHDepartmentofTransportationandlocaldepartmentsofpublic
works.3. StreamlinethelocalandstateregulatoryprocessestofacilitaterestorationandBMP
implementation.4. Reducewaterqualityimpactsfromwinterroadmaintenancepractices.
Foreachkeyareaofinterest,participantsdiscussedbarriers,benefits,andrecommendationsforfollow-upaction.Someofthesuggestedactionsincluded:demonstratetoDPWshowimplementinglowimpactdevelopment(LID)cansavetheirtownmoney;streamlinethepermittingprocessforsmallerprojectsthatimprovewaterquality;and,createandpromotefactsheetsforwintermaintenancepracticestoreducesaltuse.
Attendeeswerethenescortedonabustourtovisitthree319projectsitesintheCoastalwatershed.TheHodgsonBrookRestorationProjectinPortsmouthprovidedanexampleofLIDbestmanagementpracticesretrofittedintoexistingdevelopedareasinahighlyurbanizedarea.ThestopatCain’sPondinSeabrookdemonstratedhowthepondwasrestoredforrecreationalusesthroughdredgingandinstallationofasedimenttrapchamberBMP.Finally,avisittotheCochecoRiverprojectatSchoolStreetSchoolinRochesterhighlightedstormwaterBMPsthatwereretrofittedintoexistingdevelopmentincludingaperviousasphaltbasketballcourt,perviousconcretesidewalk,threeraingardens,andaninfiltrationdrywellandtrench.
EvaluationsandresponsesindicatedtheeventwasahugesuccessandathirdeditionoftheroundtablewilloccurinFY2012.
Dipping into Social Networking with the New Hampshire Watershed Protection and Restoration Forum Blog
Tomeet319granteesrequestsforadditionalopportunitiestonetworkwithfellowgranteesandpartners,DEScreatedtheNew Hampshire Watershed Protection and Restoration Forum blogathttp://xml2.des.state.nh.us/blogs/watershed/?page_id=176.Thisblogprovidesadditionalresourcesand
opportunitiestonetworkforthoseinvolvedwithWatershedAssistanceandRestorationGrants.Over175grantprojectmanagersandinterestedpartiesareupdatedonnewpostsonaregularbasisandareprovidedtheopportunitytopostandsharetheirownresourcesandcomments.
Theblogpagesareloadedwithusefulresourcesincludinglinkstowebsitesofpastandcurrentgrantrecipients.Sincegoinglive,over50postshaveincludednotificationaboutworkshops,conferences,webinarsandother319programrelatedinformation.
![Page 9: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/9.jpg)
Green SnowPro logo.
Salt applicators go through a calibration exercise.
5
Watershed Grant Procedures Meeting
InJanuary2011,DESheldthefirstWatershedGrantProceduresMeetingforSection319Grantrecipients.Thepurposeofthismeetingwastoprovidetrainingregardingthepaperworkandproceduresrequiredfor319grantadministration.Historically,thisinformationwasprovidedtothegranteesduringascopingmeetingtodiscusstheparticularsoftheirproject.Itwasdeterminedthatthisapproachprovidedtoomuchinformationatonce,andthatitwouldbebesttoseparatediscussionofthescopeofworkfromtrainingongrantprocedures.Theproceduresmeetingincluded:generalgrantinformation;executionofthepaperworkneededforgrantagreementapproval;proceduresduringtheprojectperiodsuchasprocurements,paymentrequests,interimreportsandqualityassurance;andguidanceforclosingouttheproject,suchasfinalreportrequirements.Atleastonerepresentativefromeachgranteeorganizationattendedthemeeting.Inadditiontoreceivingguidanceattendeeslearnedfromeachotherastheysharedtipsthathavebeenbeneficialtothem.ThemajorityofgranteesalsotookadvantageofanopportunitytomeetoneononewithaDESgrantmanagerfollowingthemeeting.ThemeetingwaswellreceivedandDESplanstocontinueofferingthistrainingtofuturegrantrecipients.
Green SnowPro Certification and Reducing Road Salt
ContinuingwitheffortstoimplementmeasurestomeetthechlorideTotalMaximumDailyLoads(TMDL)intheI-93expansionwatersheds,DESpartneredwithUNHTechnologyTransfer(T2)Centertodesignandkick-offthe“GreenSnowPro”Certificationprogram.ThisvoluntaryprogramimprovescommunicationsandincreasestrainingopportunitieswithoneofthelargerchloridecontributorsintheTMDLwatersheds,privateapplicators.ParticipantsintheprogramareaffordedtheopportunitytobecomeaNewHampshire“GreenSnowPro”
certifiedwintermaintenanceprofessionalbyparticipatinginahalfdaycoursefollowedbyanexam.Thetrainingincludes:howsaltworks,anti-icingwithliquids,pre-wetting,spreadercalibration,materialstorageandhousekeeping,andsaltaccounting.Thefirsttwotrainingsessionsin2011,hostedbythetownofDerry,wereatmaximumcapacityandresultedinover100applicatorsearning“GreenSnowPro”certification.Inadditiontothewaterqualitybenefits,“GreenSnowPro”certifiedapplicatorslearnedtechniquestocontinuetomaintainalevelofservicewhileusinglesssalt,whichinturnsavestimeandmoney,increasesprofessionalism,andreducesriskexposure.SaltReductionComplianceforOperatorstrainingwasalsoprovidedforthemunicipalwintermaintenancestaffandincorporatedintothe“GreenSnowPro”program.Oncecertified,businessescanmarkettheircertificationwithtruckdecalsandviathewebsiteathttp://t2.unh.edu/green-snowpro-certification.
![Page 10: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/10.jpg)
Australian Filmmaker, James Boldiston, filming New Hampshire segments for a pet waste documentary at Rye Beach.
6
Pet Waste Gets Some Air Time
Thepetwasteprogram,“ScoopthePoop,”receivedlocalandinternationalfamethroughavideo/publicserviceannouncement(PSA)“BeachKarma”andadocumentary“DogPoo–theTruthatLast.”
InFebruarya“ScoopSocial”washeldtokick-offthefirstpetwastePSAhostedontheDESwebsiteathttp://des.nh.gov/organization/divisions/water/wmb/coastal/scoop_the_poop.htm.ThisinnovativevideowascreatedbyBlueOceanSocietyasmatchforaSection319WatershedAssistancegrant.ThevideocreativelycombinesalittleAlfredHitchcockwithCharlieChaplintoencouragepeopletopickuptheirpetwastebyhighlightingthatpetwasteleftonourbeachescancauseimpactstowaterqualityandmayevenclosebeaches.
InSeptember,theAustralianfilmmakerJamesBoldiston’sdocumentaryfilm“DogPoo–theTruthatLast”helditsAmericandebutattheNewHampshireFilmFestivalinPortsmouth.Shotineight
countries,thesecretlifeofdogfecesisbroughtoutin“glorious”detail.NewHampshire’sown“ScoopthePoop”petwasteeducationprogramcreatedandimplementedbyDESisfeaturedalongsideHarveyMilk’spooperscoopinglawsinSanFranciscoandpoodetectionintheoutbackofAustralia.Afterresearchingandproducingthisfunnyandinformativefilmforoverayear,BoldistondeclaredNewHampshire’sprogramas“oneofthebestpetwasteoutreachprogramsintheworld.”Themovietrailercanbeseenat:http://www.dogpootruth.com/.
2011 New Hampshire Envirothon addresses Nitrogen Pollution in the Great Bay Estuary
AnnuallyhighschoolstudentsacrossNewHampshireparticipateinthe“Envirothon,”anationalhighschoolenvironmentalsciencecompetitionthatencouragesanunderstandingoftheprinciplesandpracticesofnaturalresourcemanagementandecology.Thethemefor2011was“SaltWaterEstuaries”andDESassistedwithcreatingtheresearchandoralpresentationtopiconnitrogenloadingtotheGreatBayEstuary.ParticipatingteamsweretaskedwithdevelopingabalancedstrategytoreducenitrogenlevelsintheGreatBayEstuarybylimitingnitrogendischargefromwastewatertreatmentfacilitiesandotherpointsources,aswellasaddressingnon-pointsourcesofnitrogenpollution.About160studentsrepresenting12highschoolsfrom41communitiesparticipatedinthecompetition.
![Page 11: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/11.jpg)
7
Watershed Gaming
DESoutreachstaffwastrainedbyNorthlandNonpointEducationforMunicipalOfficials(NEMO)representativesfromMinnesotatofacilitateawatershedinteractiveactivity,The Watershed Game.Thiscompetitiveactivityusesaboardgametoincreaseparticipants’knowledgeofwhatawatershedis,howvariouslandusesimpactwaterquality,whatdifferentbestmanagementpracticeswillhelpobtainawaterqualitygoalbyreducingcertainpollutants,andtheneedforcollaborationamonglandusestewardstoreachawaterqualitygoal.
ThegamewasthenpurchasedandpilotedbeforeDESstafftoidentifyappropriateaudiencesandtosolicitfeedbackonthegameprocess.DESstaffalsofacilitatedthegameforlakeassociationmembersattheActionWakefieldWatershedAlliancesHealthyLakeskick-offmeetingandforDPWstaffattheSeacoastStormwaterCoalitionmeeting.Bothgroupswerepositiveabouttheincreaseinawarenessaboutwaterqualitygoals,lowimpactdevelopmentBMPsandthedifferentstakeholdersinvolvedinprotectingorrestoringawaterbody.
TheNewHampshireNaturalResourceOutreachCoalitionwillassistDESinpublicizingandloaningthegametoNewHampshirestakeholders,suchaswatershedorganizations,stateandlocaldecisionmakers,andeducationalinstitutions.DESwillalsorespondtorequestsfortrainingand/orfacilitationassistance.
Municipal officials are assisted by Northland NEMO Representatives in the Watershed Game exercise.
Photo by J. Bilotta, NEMO.
The Watershed Game has options for both lake and river watersheds.
![Page 12: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/12.jpg)
8
Highlights and Overview of Completed Projects
Watershed-Based Plan for High Quality Waters in the Acton Wakefield Watershed Region - Salmon Falls Headwaters Lakes
TheSalmonFallsRiverHeadwatersLakesWatershedManagementPlanincludesthefivewatershedsofGreatEastLake,HornPond,LakeIvanhoe,LovellLakeandWilsonLake.Thisareacomprisesapproximately26squaremileswithinActon,MaineandWakefield,NewHampshire.DevelopmentintheActon-Wakefieldregionisconsideredruralwithnearly89percentoflandareaundeveloped.Theremainingdevelopedlandislargelyresidential,primarilyoccurringalongmajorroadwaysandlakeshores.Thelakesandassociatedwetlandsarehometoadiverseecologicalcommunitythatdependsoncleanwater.
ThisgrantwasawardedtotheActonWakefieldWatershedsAlliance(AWWA)todevelopawatershed-basedplanfortheSalmonFallsHeadwaterLakes.ThesepristinewaterbodiesareofsignificantvaluetothecommunitiesofActonandWakefieldandactionisneededtomaintaintheirgoodcondition.
Topromotecommunityengagementintheplanningprocess,AWWAconvenedawatershedsteeringcommitteeofstakeholdersthatincludedtownofficials,planningboardmembers,representativesoflakeassociationsandlocallandtrustsaswellasinterestedcommunitymembers.
The Problem and the Threat: PhosphorusSmallincreasesinphosphoruscanadverselyaffectlakewaterqualityleadingtodecreasedclarity,possiblealgalbloomsandacceleratedeutrophication.Thisinturncanadverselyimpactfishpopulationsandpublicusessuchasswimmingandboating.Phosphorushasthereforebeenidentifiedasthepollutantofconcernforlakemanagementintheplan.Waterqualitydataanalyses,lakeloadingmodels,andlandusemodelswereusedtodefinecurrentin-lakephosphoruslevelsforallfivelakes.Theseanalysesindicatethatallfivelakesneedphosphoruscontrol
CoastalWatershed
Watershed-BasedPlanforHighQualityWatersintheActonWakefieldWatershedRegion-SalmonFallsHeadwatersLakes
ActonWakefieldWatershedAlliance(AWWA)
2005/2007/2008Restoration
GrantAmount:$108,266
LocalMatch:$210,097
Acton Wakefield Watershed Region
![Page 13: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/13.jpg)
9
measurestomaintainorachievehighqualitywaterstatusbaseduponwaterqualitystandardssetbyDESin2010.Thisisespeciallytrueinlightofabuild-outanalysisprojectingthattheregionmaygainover4,200buildingsand9,000peoplewithinthenext44years.Ifnotcontrolled,thisincreaseingrowthcouldresultinseveralhundredmorepoundsofphosphorusenteringthelakeseachyear.
Development of the PlanOverthetwoyearprojectperiodseveralmodelswereutilizedtocharacterizecurrentwaterqualityconditionsandtoidentifyopportunitiestoimproveandprotectthelakes.TheprojectteamworkedtogetherwithMaineandNewHampshireenvironmentalagenciestoorganize,summarize,andanalyzewaterqualitydatagatheredbyvolunteersandprofessionalsovermorethanthreedecades.Theprojectteamalsoanalyzedcurrentlanduseandphosphorusinputstothewatershed.Additionally,AWWAconductedwatershedsurveysoneachlakewiththehelpofover100localvolunteerstoidentifyerosionsitescontributingexcessphosphorustotheprojectlakesandtributaries.Thesedataenabledtheprojectscientiststodeterminethecurrentin-lakestatusandsetphosphorusgoalsforeachlake.(Table1)
InJanuary2009,stakeholdersgatheredtodiscusspreliminaryresultsfromanalysesandtobrainstormwaterqualityimprovementandprotectionactionitems.Thesteeringcommitteethenusedtheseideastodevelopanactionplanwithfivekeyactionareas.(Table2)Specifictasksweredevelopedforeachkeyactionareathatidentifiedresponsibleparties,potentialfundingsources,approximatecosts,andanimplementationschedule
Next Steps Thesuccessofthiswatershedmanagementplanisdependentheavilyonthecooperationofthelocalmunicipalitiesandkeystakeholders.AWWA’sgoalistousetheplantoengageallcommunitymembersintheprotectionoftheregion’smostvaluableasset–itslakes.
AWWAwillconvenethewatershedsteeringcommitteeatleastannuallytoprovideperiodicupdatestotheplan,trackandrecordprogress,andensurethattheplanremainscurrentandrelevantbyaddingnewtasksasneeded.Allachievements,suchaspresscoverage,pollutantloadreductions,outreachactivities,numberofsitesrepaired,numberofvolunteers,fundingreceived,andnumberofsitesdocumented,willbetracked.Inaddition,establishedmeasureswillbeusedtodeterminetheeffectivenessoftheplanonreachingthewaterqualitygoals.
Table1.In-lakePhosphorusGoals:MaintainorImproveLakeWaterQuality
Maintain water quality at current in-lake phosphorus
level:• GreatEastLake-6.4ppb• WilsonLake-6.5ppb• HornPond-8.0ppb**FurtheranalysiswillbeconductedtoconfirmthegoalatHornPond
Improve water quality and reduce in-lake phosphorus
to 7.2 ppb:• LakeIvanhoe:reduceby
0.8ppb• LovellLake:reduceby
0.3ppb
Table2.FiveKeyActionAreastoMaintainorImproveLakeWaterQuality
Private and Public Roadway BMPs:Reducesedimentloadsthroughthestabilizationandreinforcementofroadcrossingsandroadsides.
Residential BMPs, Riparian Buffers, Low Impact Develop-ment and Septic Systems: Encouragevegetatedbuffersandlowimpactdevelopmenttechniques.Implementasepticsysteminspectionandpumpingprogram.
Community Planning:Strengthenandenforceregulationstoprotectwaterquality.
Land Conservation:Coordinatewithmunicipalities,landtrusts,regionalplanningcommissions,andlakeassocia-tionstoensurethatsomelandremainsinanundisturbedstatewhichwillhelpreducetotalphosphorusrunoff.
Education and Outreach:Workwithseasonalandfull-timeresidentstoenhancetheunderstandingoflanduse/waterqualityconnections.
![Page 14: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/14.jpg)
CoastalWatershed
WillandPondDrainageEstablishmentandPublicOutreach
CityofDover
2004-2007Restoration
GrantAmount:$68,064
LocalMatch:$58,517
10
Willand Pond and identified retrofit areas.
Willand Pond Drainage Establishment and Public Outreach
WillandPondisanatural,spring-fedkettlepondlocatedinbothSomersworthandDover.Thepondhasadrainageareaofapproximately330acres,andasurfaceareaofapproximately80acres.ThewatershedwasusedasapublicdrinkingwatersourcebythecityofDoverfrom1876until1966.Thepondhasalsoservedasapublicrecreationalareasincethe1890swhenitwasthesiteofaVictorian-stylepark.Itshistoricaluseasawatersupplyandrecreationaldestinationprotecteditfromsignificantcommercialdevelopmentpressureuntilthe1960swhenaggressivedevelopmentandlanduseconversionoccurredintheareasurroundingthepond.Thecumulativeeffectofmanyyearsofdevelopment,compoundedwithcessationofwaterwithdrawalsandthreeconsecutiveyearsofrecord-breakingprecipitationin2006-2008contributedtosustainedelevatedsurfacewaterlevels,flooding,propertydamage,andwaterqualitydegradation.
In2006WillandPondwaslistedasimpairedforAquaticLifeandPrimaryContactRecreationontheDES305(b)/303(d)SurfaceWaterQualityAssessment.Waterqualitydegradationofthepondculminatedwithalargecyanobacteriabloominthesummerof2007.Thepondwaspostedandclosedforrecreationalpurposesfrommid-Julyuntilthefallof2007.Historically,theadjacent
wetlandareahadbeenacrucialfactorinthepond’sabilitytobalanceitswaterbudget(throughfloodflowalterationandstorage).However,man-madealterationstothedischargecoupledwithincreasedinputsfromprecipitationandstormwaterhaveoverwhelmedthesystem’sabilitytoequilibrateitself.Toimprovewaterquality,immediateactionswouldbenecessarytoreducebothnutrientsourcesandsurfacewaterelevation.
ThegoalsofthisprojectweretoreviewandassessthenaturalandanthropogenicfactorscausingfloodingandwaterqualityissuesatWillandPond,andtodeveloppublicoutreachfocusedonpromotingpondstewardship.DESworkedwiththecitiesofDoverandSomersworthand
![Page 15: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/15.jpg)
11
twoprivateconsultants,S.W.ColeEngineeringInc.andHorsleyWittenGroupInc.toassesshistoricalandcurrenthydrologicandlanduseconditions.Theprojectteamworkedcloselywithneighborhoodresidentsandbusinessestodevelopandsustainthe“FriendsofWillandPond,”alocaladhocgroupdedicatedtorestoringandprotectingthepond.TheFriendscreatededucationalmaterialsandconductedworkshopsandactivitiestopromotepondrestorationincludingwaterqualitymonitoringevents,pondcleanups,trailplanningsessions,safetyplanningmeetings,landownerworkshops,andmore.Theassessmentofhistoricalandcurrentconditionsservedasthebasisforthedevelopmentofawatershedmanagementplan,whichprovidesbothstructuralandnon-structuralrestorationpracticesforaddressingwaterqualityandquantityissuesofthepond.
Theplan’srecommendationsincludestormwaterretrofitstoreducephosphorusloadingtothepond;conceptualdesignsforrestoringhydrologicconnectivityinthepond’soutletareatoalleviatewaterlevelissuesrelatedtoencroachmentfromdevelopment,adoptionoflocalwaterqualityprovisions,andsustainedpubliceducationandoutreacheffortssupportedbybothcitiesandtheFriendsofWillandPond.
Willand Pond. Photo by Norma Willard, Friends of Willand Pond.
![Page 16: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/16.jpg)
CoastalWatershed
HodgsonBrookRestorationYears3&4
BlueOceanSocietyforMarineConservation
2006Restoration
GrantAmount:$85,020
LocalMatch:$58,277
12
Hodgson Brook Restoration Years 3 & 4
HodgsonBrookisanurbanstreamthatisimpactedbyhighstormwaterflowsthatarecontaminatedfromparkinglotsandroads.Inaddition,overtheyearsithasbeenstraightened,channelized,andpipedunderground.Thisprojectimplementsyear3and4oftheWatershedRestorationPlanforHodgsonBrook.Theprojectgoalsincludedraisingthepublic’sawarenessofthebrook’sconditionbyconnectingwatershedresidentsandbusinessestothebrook,andbyhighlightingsolutionseachcouldtaketoimproveitscondition.
Thesupportofwatershedresidentsandbusinessesandultimatelytheiractionsarecriticaltoachievingthegoalofcleaningupthebrook.Theactivitiesconductedthroughthisprojectinitiatedtheprocessofengaginglocalresidentsandbusinessandschoolsintherestorationeffort.Capacitybuildingactivitiesincluded:
• Participationinthewaterqualitysampling,monitoringstreamflow,trashsurveysandcleanups,stormdrainstenciling,andhelpingwithinvasiveplantsurveys.
• NewFranklinSchoolstudentsandteacherscreatedandrecordedpublicserviceradioannouncementsencouragingthepublictohelp“SavetheBrook!”ThesewereintroducedbythestudentsontheEnvironmentalShowandairedonPortsmouthCommunityRadio106.1.
•Stormdrainstencilinganddistributionofinformationalflyers.
•UNHstudentsconductedstormwaterretrofitsurveystoidentifylocationsforfutureLIDinstallations.
•TheHodgsonBrookAdvisoryBoardmembershelpedboththeCityofPortsmouthandPeaseDevelopmentAuthority(PDA)evaluateand
Volunteers plant a buffer along Hodgson Brook.
![Page 17: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/17.jpg)
13
strengthentheirregulationstobetterprotectthebrookandotherwaterresources.BoardmembersalsoadvisedonamajorredevelopmentprojectalongthebrookwhichresultedinadditionalinstallationsofLIDtechnologiestoreducetheimpactofstormwaterrunofffromthesite.
• GreatBayCommunityCollegeprovidedofficespaceforprojectworkandembracedthechallengeofretrofittingitscampusgroundsforwaterqualityincludingusingperviouspavementinarecentparkinglotexpansionanddaylightingasectionofdrainage.
Amajorsuccessoftheprojectwastherestorationofapproximately150feetofstreambufferlocatedatthePortInn.Thestreambankwaserodingandunstable.Vegetationatthesiteconsistedmainlyofinvasivespecies.UNHCooperativeExtensionstaffdesignedanattractivenativeplantingplanforthebuffer.InvasivespecieswereremovedfromthesiteandvolunteersfromtheUnitedWayhelpedplantthenewbuffer.TheprojectwasfeaturedonNewHampshirePublicTelevisioninaseriesofinterviewsandsitevisits.Thebankisnowstabilizedandnativevegetationisinplacetofilterpollutantsandhelpkeepthebankintact.ThePortInnprovidedgenerousdonationsofcash,staffassistance,andservicestosupporttheproject.OwnersofthePortInnmaintainthebufferandareproudofitsnaturalbeautyandwaterqualitybenefits.
ThelocalcapacitybuiltduringthisgrantwillenablethenextphaseoftheHodgsonBrookRestorationProjecttomoveforwardwithstronglocalpartnershipsanddemonstratedsuccess!
Catch basin retrofit in Portsmouth before (above) and after (right).
![Page 18: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/18.jpg)
CoastalWatershed
CainsBrookandMillCreekRestoration
TownofSeabrook
2006Restoration
GrantAmount:$68,240
LocalMatch:$57,758
SedimentLoadReduction:1.9tons/year
Cains Brook clean-up day.
14
Cains Brook and Mill Creek Restoration
TheCainsBrookandMillCreekWatershedManagementPlanwasdevelopedbytheSeabrookConservationCommissionin2006,andrevisedin2009,toguidelocalrestorationeffortstorestoreaquatic,riverineandrecreationalusestothewatershed.ThisprojectimplementedthreeactionitemsfromtheplanincludinginstallingastructuralBMP,anoil/trash/gritseparatorchamberdevice,toreducesedimentandpollutantloadingfromtheadjacentUSRoute1roadway.TheinstallationofthisBMPwillremoveanestimated1.9tonsofsedimentannually.
Toaddressthelargevolumeoftrashdepositedinthewatershed,outreachtothecommunitywasconductedandaCainsPondclean-updaywasheldwhereparticipantsremovedoveronetonoftrashfromtheriparianarea.
AteamofvolunteermonitorswasrecruitedandtrainedbytheDESVolunteerRiverAssessmentProgramstaff.Eightsitesweresampledforvariousparametersduringtheprojectperiod.Finalreportswereproducedandsamplingresultswillbeusedtoguidefuturerestorationefforts.AssessmentworkconductedduringtheprojectalsoresultedindocumentationofanadditionalimpairmentfornavigationtoCainsPond(seeCainsPondRestorationonpage15).
Theprojectraisedlocalawarenessofthebrookandpondsinthewatershedasrecreationalresourcesworthprotecting.Italsohelpedbuildmomentumforfutureworkandimplementedkeysedimentloadreductionmeasures.
![Page 19: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/19.jpg)
CoastalWatershed
CainsPondRestoration
TownofSeabrook
2006Restoration
GrantAmount:$91,800
LocalMatch:$196,300
SedimentLoadReduction:750tons/year
Cains Pond shallow depth before dredging. Photo: Duncan Mellor, Waterfront Engineers
15
Cains Pond Restoration
Formanyyears,Seabrookresidentsenjoyedskating,fishing,smallboating,andotherrecreationalactivitiesonCainsPond.However,increaseddevelopmentsurroundingthepondandthebreachoftheCainsDamduringtheMothersDaystormof2006resultedinmorerapidthannormalinfiltrationofsedimentandshallowerponddepths.Asthepond’sdepthbecameshallower,conditionsbecamemoreconducivetoinvasiveplantswhichinfestedthemarginsandsurfaceofthepond.Thisseverelylimitedrecreationalactivitiesduetosedimentdepositsanddenseplantgrowth.
CainsPondwaslistedonthe2010303(d)listforasecondarycontactrecreationimpairment.Thegoalsofthisprojectweretorestorenavigation,improvehabitat,andcreatebetterpublicaccesstothepond.InaccordancewiththeCainsBrookandMillCreekWatershedManagementPlan,lowimpactdredgingwasdeterminedtobeawaytoremoverecentlyaccumulatedmaterialsincludingsedimentanddecayedplantmaterialandrestorethepondtohistoricaldepthsthatwerepresentwhenrecreationwaspossible.Additionalrecommendationsintheplantoimprovepublicaccess,constructionofafishingplatform,andaquaticorganismpassagewerealsoimplementedduringthisproject.
Toaddressthenavigationimpairmentover7,500cubicyardsofmaterialwasremovedfromthepondand25,000squarefeetofinvasiveplants.Inaddition,“deepholes”ofuptosevenfeetweredugtoprovidehabitatforfishandotheraquaticlife.The“inlet-to-outlet”dredgepatternmakestheentirelengthofthepondnavigable.
Two“CainsBrook–KeepitClean”signswereplacedalongRoute1neartherestorationsitetoremindvisitors,residentsandmotoriststokeeptrashandotherdebrisoutofthepondandbrook.Thisisacontinuationofpreviousoutreacheffortstoreducetrashinputtothebrook.
Abathymetricsurveywasconductedtoshowpostdredgeponddepthsandprovidesacomparisontopre-dredgedepths.Pre-andpostphotodocumentationofthesitewasconductedtorecordchangesinconditionsandrecreationalactivity.
Thisprojectalsoaddressedrelatedactionitemsinthewatershedplanforimprovingpondhabitatandpublicaccess:
![Page 20: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/20.jpg)
16
• AquaticandWildlifePassageImprovementsNature-likestonerock/riffleswereconstructedtoreplaceaverticalconcreteweirstructureattheRoute1crossing/outletofCainsPondandatadjacentMary’sPondatLakeshoreDrive.Thenature-likerockrifflesallowforgreatlyimprovedaquaticorganismstreampassageandwillalsopreventculvertentrancescourandwillmaintainthepond’swaterlevelstopreserveaquatichabitat,recreationaluses,andscenicviews.Afterconstruction,wildlifewereobservedusingthenewrockriffletotravelupstreamfromthelowerreachesofthewatershedintoCainsPond.Priortoconstructionoftheberm,wildlifehadtocrossRoute1inordertoenterorleaveCainsPond.
• PublicAccessImprovementsPublicaccessimprovementsincludedconstructionofahandicappedaccessibleoverlook/fishingplatformadjacenttothepondandinstallationofacartopboatlaunch.AneasementwiththeneighboringpropertyownerwasgrantedforthecreationofapublicADAparkingareaadjacenttothepublicaccessimprovements.
Asaresultoftheseimprovements,smallboatsarenowabletonavigatethepondonceagain.AsuccessstorydetailingtherestorationworkwaspostedtotheEPA“SuccessStory”websiteinthefallof2011http://water.epa.gov/polwaste/nps/success319/nh_cain.cfm.Accordingly,thesecondarycontactrecreationuseimpairmentforCainsPondwillberemovedfromthestate’sCWAsection303(d)listin2012.
Kayaking returns to Cains Pond.Photo: Sue Foote, Seabrook Conservation Commission
![Page 21: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/21.jpg)
MerrimackRiverWatershed
HancockVillageStormwaterManagementandWaterQualityImprovement
TownofHancock
2005/2007Base
GrantAmount:$94,800
LocalMatch:$125,879
TSSReduction:8.8tons/year
PhosphorusReduction:25.9lbs/yr
NitrogenReduction:265.3lbs/yr
The town of Hancock’s road agent, Kurtis Grassett, leads DES and EPA staff on a tour of
the town’s stormwater improvements.
17
Hancock Village Stormwater Management and Water Quality Improvement
Throughthisproject,thetownofHancocktookaproactiveapproachtoprotectinglocalresources.ThoughwaterqualityintheadjacentNorwayPondandDavisBrookwerequitegood,stormwaterrunoffwascontributingpollutantsandthreateningthesevaluableresources.TheHancockMainStreetroadwayimprovementprojectrepresentedatimelyopportunitytoincorporatepracticesthatwouldimproveroaddrainageandothertraditionalgoalsforstormwaterconveyance–butwouldalsoprovideprotectionforNorwayPondandDavisBrook.
Thevillagearea’supgradedstormwatermanagementsystemnowincludesseveraltreatmentdevicestoprotectwaterqualityincludingseventeendeepsumpcatchbasins,thirteenleachingcatchbasins,andtwoinfiltrationchambers.Thecatchbasinsaredesignedtoremovesedimentsuchasroadsandfromthestormwaterbyallowingittosettleinthebasinwhilethewaterflowsthrough.Thebasinscanthenbecleanedoutandthesanddiscardedorreused.Theinfiltrationchambersallowthesoiltoactasanaturalfiltertreatingstormwaterpollutantssuchasbacteriaandphosphorus.Itisestimatedthatthesetreatmentdeviceswillresultinannualpollutantloadreductionsofover8.8tonsofsediment,25.9poundsofphosphorusand265.3poundsofnitrogenthatwouldotherwisehavebeendelivereddirectlytoNorwayPondandDavisBrook.
Theprojectalsoimprovedtheboatrampandbeachareabyre-gradingtheparkingandboatrampsothatstormwaterisnowredirected,reducingbeacherosionandstormwaterrunofftothepond.Anadditionalbenefitofthisworkistheimprovedparkingareaandaccesspathsforbeachusers.Akioskwasinstalledthatprovideseducationalinformationtoresidentsandvisitorsonstormwater,theBMPsthatwereinstalledandwaysthatindividualscantakeresponsibilitytoprotectwaterquality.
![Page 22: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/22.jpg)
18
MerrimackRiverWatershed
LakeWinnipesaukeeWatershedManagementPlan:Meredith,PaugusandSaundersBays
LakesRegionPlanningCommission
2008Base
GrantAmount:$76,640
LocalMatch:$73,519
Lake Winnipesaukee Watershed Management Plan: Meredith, Paugus, and Saunders Bays
LakeWinnipesaukee,thelargestfreshwaterbodyinNewHampshire,istheprincipaleconomicandenvironmentalfeatureintheNewHampshireLakesRegion.Withasizeof44,587acresthetotalwatershedareaencompasses369squaremiles.Inlightofitssignificance,itissurprisingtonotethattheredoesnotexistacomprehensivewatershedmanagementplanforthegreaterWinnipesaukeewatershedarea.Thisprojectispartofalong-termstrategytocreateapublic,comprehensiveweb-basedwatershedmanagementplanforLakeWinnipesaukee.Duetothesizeofthewatershedandthenumberofcommunitiesinvolved,theplanwillbecompletedinsegments,usingasub-watershedapproach.Thisprojectfocusedonthesub-watershedsofMeredithBay,PaugusBayandSaundersBay.Potentialthreatstowaterqualityincludenonpointsourcedischargesasaresultoffailingsepticsystems,recreationalimpactsanddevelopmentpressures.Theprojectincludedanevaluationofthecausesandpotentialthreatstowaterquality,landusemapping,establishingin-lakephosphoruslevelsandawaterqualitygoal,developmentofawebsite,outreachandon-goingmonitoring.
In2005thecommunitiesofMeredith,LaconiaandGilfordformedanadvisorycommitteetofocusonwaterqualityprotectionofMeredithBay,PaugusBayandSaundersBay.PartneringwiththeLakeWinnipesaukeeWatershedAssociation,LakesRegionPlanningCommission,NorthCountryResourceConservationandDevelopmentAreaCouncil,UNH,PlymouthStateandDESthesuccessofthisproject
wasrealized.
Oneofthemajoroutcomesoftheprojectwasaconsensus-basedwaterqualitygoalandmissionstatementforthethreebaysstudiedunderthisphaseoftheplan.AnexcerpttakenfromthemanagementplanforthesubwatershedincludingMeredith,Paugus,andSaundersBaysincludesthefollowingsharedmissionstatement:“Thefundamentalgoalofthiswatershedmanagementplanistohaltorminimizefurtherwaterqualitydegradationattributabletonutrientinputs,primarilyphosphorusinordertomaintainourhighqualitywater.CurrenttotalphosphoruslevelsinMeredith,Paugus,andSaundersBaysarebelowthestatestandardof8.0ug/Lestablishedforhighqualitywater.WewillworktowardmaintainingLake Winnipesaukee Water Sampling Points.
![Page 23: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/23.jpg)
19
orimprovingcurrenttotalphosphoruslevelsbystabilizingnutrientinputsthroughthereductionofnutrientsources.Wewillmanagelandscapechangetolimitnutrientloadsthroughstormwatermanagement,adoptionoflowimpactdevelopmenttechniques,innovativelanduseplanning,andinstallationofbestmanagementpractices.Ourlocallyderivedstrategiesarepurposeful,considerateandcomprehensive.Ourapproachembodiesflexibilityallowingustoachieveourstatedgoalwhilemeetingthediverseneedsandcapacitiesofallwatershedstakeholders.”Thewebbasedplanknownas“WinnipesaukeeGateway”islocatedatwww.winnipesaukeegateway.org.Itisthefirstofitskindinthestateinthatratherthanastaticdocument,theweb-basedplanwillensurethattheplanisreadilyaccessibletoallstakeholdersandthegeneralpublicwiththemostcurrentinformationsothatprogresscanbetracked.Italsolaysthefoundationforfuturesub-watershedplandevelopmentthatwilleventuallyresultinacomprehensivewatershedmanagementplanfortheentireWinnipesaukeewatershed.Inrecognitionofcreatingthefirstweb-basedwatershedmanagementplantobeapprovedbyDES,theWinnipesaukeeGatewaywasselectedbytheNewHampshirePlannersAssociationasProjectoftheYearin2011.BuildingfromthesuccessfuldevelopmentoftheWinnipesaukeeGateway,theLakesRegionPlanningCommissionhasalreadyinitiatedthenextphaseofwatershedmanagementplanningforCenterHarborandhasplanstopursueadditionalfundinginthecomingyearstodevelopaplanforMoultonboroughInletaswell.
Lake Winnipesaukee. Photo by Gary Tompkins.
![Page 24: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/24.jpg)
20
MerrimackRiverWatershed
Cobbett’sPondWatershedRestorationPlan
Cobbett’sPondImprovementAssociation
2004/2005/2008Restoration
GrantAmount:$83,591
LocalMatch:$61,826
Cobbett’s Pond Watershed Restoration Plan
Cobbett’sPondinWindhamislocatedinaheavilydevelopedwatershedinsoutheasternNewHampshire.VLAPmonitoringhasshownthatoverthepast19yearsthepondhasshiftedfromoligotrophictoeutrophicstatus.Diminisheddissolvedoxygenlevelsandincreasedlevelsofchlorophyll-ahaveresultedinCobbett’sPondnolongersupportingthedesignateduseforaquaticlife.Whentheprojectstarted,Cobbett’sPondwasonthe305(b)/303(d)listofimpairedwatersforadissolvedoxygensaturationimpairment.Afterthegrantaward,additionalimpairmentsforchorophyll-a,non-nativeaquaticplants,andtotalphosphorushavebeenadded.
In2008,theCobbett’sPondImprovementAssociationwasawardedSection319grantfundstocreateawatershedrestorationplan.Thegoalsfortheassociationweretoidentifypollutantsourcescausingthedissolvedoxygenimpairment,generateawatershedrestorationplantoaddressthesesources,andimplementrecommendedactionswithinthewatershedtohelprestorethepondtofullysupportingstatus.Afterthedevelopmentoftherestorationplan,theassociationcreatedateamofresidentstoreviewandprioritizesitesinthewatershedthatshouldmoveforwardwiththeimplementationofBMPs.
InAugustof2009,theCPIAwroteaWatershedProtectionOrdinanceforCobbett’sPond.InDecember,theWindhamPlanningBoardunanimouslysupportedthepetitionfortownmeeting,andinMarchof2010,townresidentsadoptedtheordinance.TheadoptionoftheseadditionalprotectionsforCobbett’sPondwillfacilitatewaterqualityimprovementpracticesinthewatershed.
AlthoughtheultimategoalofrestoringCobbett’sPondtofullysupportingdesignatedusesmaynotberealizedimmediately,therecommendedstrategiesintheplanaswellastheimplementationofpriorityNPScontrolmeasureswillactasthecatalystforchangestobemadeatboththemunicipalandindividuallandownerscalesthroughregulatoryandvolunteerinitiatives.
A stormwater generated sediment plume discharging to Cobbett’s Pond from the Fossa Road area - one of the priority sites identified for the
construction of BMPs in the Cobbett’s Pond watershed restoration plan.
![Page 25: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/25.jpg)
21
MerrimackRiverWatershed
LakeHoraceMarshRestoration
PiscataquogLandConservancy
2003/2004Restoration
GrantAmount:$64,359
LocalMatch:$42,843
Lake Horace Marsh Restoration
LakeHoraceMarshisadesignated“primewetland”inWearealongtheNorthBranchofthePiscataquogRiver.Itsecologicalfunctionswereseverelycompromisedbydownstreamdamoperations.RaisingthelevelsofLakeHoraceinthespringandloweringtheminthefalltoaccommodatewaterfrontdockprotectiononHoraceLakehaddireeffectsformostaquaticfloraandfauna.Wildlifesurveysthroughoutthemarshreflecteddrasticreductionsfromnumbersonewouldexpectofwaterfowl,amphibians,mammals,aquaticreptilesandinsects.
Thisprojectinvolvedtheconstructionofarun-of-riverecologicalwatercontrolstructure,designedbyengineersfromtheDESDamBureau,downstreamofthemarshattheconfluenceofHoraceLake.Consistingofcrushedstone,coveredbyageomembranefabricwithlargerdiameterstoneontop,theinstalledcontrolstructureextendsacrosstheriverinadownstream-facingarc.Whenthelakeisdrainedinthefall,waterlevelsdonotfallbelowthetopofthestructure,thuseliminatingthedramaticspringandfallfluctuationsthatcharacterizedthemarshsystembeforeinstallation.Atfullpondelevationinthesummermonths,theecologicalwatercontrolstructureissubmergedbyatleasttwofeetofwaterallowingpassageforcanoes,kayaksandsmallboats.Postmonitoringtodatehasshownthatmarshvegetationhasrespondedpositivelytothestabilizedwaterlevelswithdamagestonestingareasofmanymammalsbeingeliminatedaswell.
Additionalmonitoringisplannedforfiveyearspostconstructiontofurtherevaluatehowtheplantandfishpopulationsareresponding.
Lake Horace Marsh before construction of water control structure in 1998 and after construction in 2011.
![Page 26: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/26.jpg)
22
ConnecticutRiverWatershed
WarrenBrookRestorationPlanning
TownofAlstead
2007Restoration
GrantAmount:$12,600
LocalMatch:$8,600
Warren Brook Restoration Planning
AsaresultoftheOctober2005flooddisasterinAlstead,WarrenBrookwaslistedasimpairedforaquaticlifeusesupportbasedonbioassess-mentdata.InitialdisasterresponsefundingfromtheNaturalResourcesConservationServiceledtostabilizationofWarrenBrook,mostlywithstonebanking,in2006and2007.DESprovidedfundingtothetownofAlsteadin2008todeveloparestorationplan,prioritizerestorationsites,anddevelopandpermitafinaldesignforonesite
Theprojectpartners,includingtheNewHampshireFish&GameDe-partmentandthetownofAlstead,identifiedthereachofWarrenBrookbetweenstateRoute123andGriffinHillRoadasthetopprioritysiteforrestorationduetoitsgeomorphicinstabilityandthelimitednumberoflandownersthatwouldbeaffectedbyconstruction.
Projectdesignandpermittingwerecompletedwith319fundswhich,inturn,helpedAlsteadsecure$240,000infederalstimulusmoneyfromtheU.S.FishandWildlifeServiceforconstruction,whichwascompletedin2011.
Restored channel of Warren Brook looking upstream.
Section of Warren Brook prior to restoration.
![Page 27: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/27.jpg)
23
Looking Ahead
In2012,stateswillbeworkingwithEPAtoredesignthefederal319programtoaddressconcernsde-scribedinEPA’sreporttotheOfficeofManagementandBudget.ItislikelythatNewHampshire,likemanystates,willberequiredtoupdatethestateNonpointSourceManagementPlanbytheendof2013.Thisworkwillbeginin2012andislikelytoincludeaprioritysystemforworkinginwatersheds,aswellasrecommendedchangestostatewideapproachestononpointsourcemanagement.
Weanticipateincreasedfederalscrutinyrelativetotheuseof319funds,forwhichDESiswell-pre-pared.Wearecarefultoensurethatgranteesfollowfederalfundingguidelinesandthateachprojecthasquantifiablegoalsandsystemstomeasureprogresstowardthosegoals.Itisourrecentexperi-encethatsuchanapproachimprovesthelikelihoodofsuccessforlocalwatershedpractitionersbecausewatershedstakeholdersbetterunderstandwhyspecificmeasuresarebeingproposedandimplemented.
NitrogenfrompermittedwastewaterdischargesintheGreatBaywatershedhasreceivedquiteabitofattentioninthenewsmediaduringthepastyear.Meanwhile,DEShasbeenbusyworkingtoquan-tifythenonpointsourcesofnitrogeninthewatershed.BySeptember2012,DESexpectstohavethebreakdownofNPSnitrogenfromlawnfertilizer,septicsystems,andstormwaterrunoff,whichwillguideeffortsbymanystakeholdersworkingtorestoreGreatBay.
Alongtheselines,DESwillbeparticipatinginaneffortledbytheNewEnglandgovernorstodevelopvoluntarylawnfertilizerguidelines.WithheavystakeholderparticipationandcoordinatedbytheNewEnglandInterstateWaterPollutionControlCommission,thegoalofthiseffortistocreateguide-linesforthemanufacture,saleandapplicationoflawnfertilizers.
In2012wealsohopetogainsomeclarityonhowstormwaterisaddressedwithrespecttothe319program.SincestormwaterisregulatedasapointsourceunderthefederalMS4program,and319fundscannotbeusedtoimplementprojectsrequiredbyapointsourcepermit,thedistinctionofwhatisrequiredbythepermitisanimportantone.Adraftpermitreleasedin2009byEPAincludesprovisionsrequiringmunicipalretrofitsinareasdrainingtoimpairedwaters.Severalwatershed-basedplansdevelopedbyourpartnersinMS4areasrecommendthisveryactivity.Ifthedraftpermitlanguageremainsunchanged,thiswillcurtailourabilitytoassistlocalgroupswhocontinuetoimple-menttheseplans.Buildingthecapacitytodevelopandimplementwatershed-basedplansrequiressignificantinvestmentsoftimeandmoney,anditisourhopethatthisworkcancontinue,regardlessofhowitisfundedorpermitted.
![Page 28: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/28.jpg)
24
Appendix ADESSection319WatershedAssistanceGrantsforHighQualityWatersAwardedinFFY2011
Grantee ProjectName ProjectNo.
NPSPollutantCategory
Watershed SourceofFunds(FFY)
GrantAward
LakesRegionPlanning
Commission
LakeWinnipesaukeeWatershedMgt.Plan-CenterHarbor
B-11-M-02 AllSources Merrimack 2011Baseand2010/2011
Incremental
$55,000
GreenMountainConservation
Group
OssipeeWatershedPlan-Phase1AlternativesAnalysis
B-11-S-01 AllSources Saco 2011Base $15,000
TownofWolfeboro LakeWentworthandCrescentLakeWatershedMgt.Plan
B-11-M-03 AllSources Merrimack 2011Base $67,800
TownofBrentwood
MiddleExeterRiverWatershedMgt.PlanImplementationPhase1,RowellRoadWest
B-11-C-04 UrbanRunoff/
Stormwater
Coastal 2010Incremen-tal
$49,152
UNHStormwaterCenter
UNHStormwaterCenterOnCallEngineersforSmallScale
BMPImplementation
B-11-C-01 UrbanRunoff/
Stormwater
Statewide 2010Incremen-tal
$25,000
TotalAward:$211,952
DESSection319WatershedRestorationGrantsforImpairedWatersAwardedinFFY2011Grantee ProjectName Project
No.NPSPollutant
CategoryWatershed Sourceof
Funds(FFY)GrantAward
BlueOceanSocietyforMarine
Conservation
HodgsonBrookWatershedRestorationPlanPhase2BMPsand
ChlorideTMDLdevelopment
R-11-C-05 UrbanRunoff/
Stormwater
Coastal 2009/2010Incremental
$104,574
CityofFranklin WebsterLake-LakeShoreDriveCommunitySepticSystemDesign
andDesign/implementationofBMPs
R-09-M-03 Stormwater/Other
Merrimack 2009Incremental
$70,000
CityofDover BerryBrookWatershedRestorationPlanPhase1Implementation
R-06-C-10 UrbanRunoff/Storm-
water
Coastal 2006Incremental
$55,000
CityofDover BerryBrookWatershedRestorationPlanImplementationPhase2,LID
Retrofits
R-11-C-02 UrbanRunoff/Storm-
water
Coastal 2008/2011Incremental
$147,200
CobbettsPondImprovement
Association
CobbettsPondWatershedRestorationPlanImplementation
Phase2,FossaRoadBMPs
R-10-M-05 UrbanRunoff/Storm-
water
Merrimack 2006/2010Incremental
$100,000
CochecoRiverWatershedCoalition
CochecoRiverWatershedRestorationPlanImplementation
Phase2,RochesterLID
R-11-C-04 UrbanRunoff/Storm-
water
Coastal 2011Incremental
$109,500
NHRiversCouncil McQuestenBrookWatershedRestorationPlanPhase1
R-11-M-01 UrbanRunoff/Storm-
water
Merrimack 2011Incremental
$17,000
TotalAwarded: $603,274
Appendix B
![Page 29: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/29.jpg)
25
Appendix CDistribution of Section 319 Grant Dollars
Awarded in FFY 2011 by Watershed
Appendix DDistribution of Section 319 Grant Dollars
Awarded in FFY 2011 by NPS Category
Statewide3%
Saco2%
Merrimack38%
Coastal57%
C. Distribution of Section 319 Grant Dollars Awarded in FFY 2011 by Watershed
Urban Runoff/Stormwater
$677,426
General NPS $137,800
D. Distribution of Section 319 Grant Dollars Awarded in FFY 2011 by NPS Category
![Page 30: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/30.jpg)
26
Appendix EDESSection319BaseProjectsCompletedinFFY2011
Grantee ProjectName FFYSourceof
Funds
Grant# DateCompleted
Watershed 319Funds
TotalCost
ActonWakefieldWatershed
Alliance
Watershed-BasedPlanforHighQualityWatersinthe
AWWARegion
2005/2007/2008
B-08-C-02 10/14/2010 Coastal $108,266 $318,363
TownofHancock HancockVillageStormwaterMgt.andWaterQuality
Improvement
2005/2007 B-07-M-04 1/18/2011 Merrimack $94,800 $220,679
LakesRegionPlanning
Commission
LakeWinnipesaukeeWatershedMgt.Plan:Meredith,Paugusand
SaundersBays
2008 B-08-M-04 3/31/2011 Merrimack $76,640 $150,159
Total $279,706 $689,201
Appendix FDESSection319RestorationProjectsCompletedinFFY2011
Grantee ProjectName FFYSource
ofFunds
Grant# DateCompleted
Watershed 319Funds TotalCost
CobbettsPondImprovement
Association
CobbettsPondWatershedRestorationPlan
2004/2005/2008
R-08-M-01 1/3/2011 Merrimack $83,591 $145,417
TownofAlstead
WarrenBrookRestorationPlanning
2007 R-07-CT-05 1/5/2011 Connecticut $12,600 $21,200
CityofDover WillandPondDrainage 2004/2007
R-07-C-02 1/31/2011 Coastal $68,064 $126,581
PiscataquogLand
Conservancy
LakeHoraceMarshRestoration
2003/2004
R-04-M-01 2/7/2011 Merrimack $64,359 $107,201
BlueOceanSociety
forMarineConservation
HodgsonBrookWatershedRestorationPlan
ImplementationYears3&4
2006 R-05-C-13 3/10/2011 Coastal $85,020 $143,297
TownofSeabrook
CainsBrookandMillCreekRestoration
2006 R-06-C-06 4/15/2011 Coastal $68,240 $125,998
TownofSeabrook
CainsPondRestoration-DredgingtoRemove
NavigationImpairment
2006 R-08-C-03 3/28/2011 Coastal $91,800 $288,100
Total $473,674 $957,794
![Page 31: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011](https://reader033.fdocuments.us/reader033/viewer/2022042303/5eced8130e2bd5210370c1d6/html5/thumbnails/31.jpg)
27
Appendix G2011EstimatedPollutantLoadReductionsAchieved
Grantee ProjectName FFYSourceofFunds
319Funds
TotalCost
P(lbs/yr)
N(lbs/yr)
Sediment(tons/yr)
Other Model/Method
Notes
CochecoRiver
WatershedCoalition
IntroducingLIDinthe
WillowBrookWatershed
2005and2009-
Restoration
$84,912 $141,548 n/a n/a n/a 34lbs/yrTSS
Region5Model
projectstillin
progress
BlueOceanSociety
forMarineConserva-
tion
ReducingEf-fectiveImper-viousSurfaceintheLower
HodgsonBrookWater-shedThrough
LID
2007and2009-
Restoration
$120,416 $210,398 3 18 1.3 n/a Region5Model
projectstillin
progress
CobbettsPondIm-
provementAssocia-
tion
CobbettsPnd-WatershedRestorationPlanImple-mentation
Phase2:FossaRoadBMPs
2006and2010-
Restoration
$100,000 $173,000 12.1 n/a 4.7 n/a Physicalmeasure
NewfoundLake
RegionAs-sociation
NewfoundLakeWater-shedMasterPlanImple-mentation:
Phase1
2008and2010-Base
$127,960 $238,600 2.7 9.9 0.5 n/a Region5Model
Also43.9lbs/yrBOD,0.26lbs/yrlead,
and0.54lbs/yrzinc
CityofDover
BerryBrookWatershed
ManagementPlan-Imple-
mentationProjectsPhase
1
2006-Restoration
$55,000 $96,790 1 0.01 n/a 147.8lbs/yr
TSS
Region5Model
GraniteLakeAs-sociation
GraniteLakeWatershed
ManagementPlan
2008-Base $50,000 $83,354 0.25 n/a n/a n/a Region5Model
ActonWakefield
Water-sheds
Alliance
SalmonFallsHeadwater
LakesWater-shedManage-
mentPlan
2010-Base $107,952 $214,189 18.7 n/a 21.7 n/a Region5Model
projectstillin
progress