Nonpoint Source Management 2011 Annual Report

New Hampshire Department of Environmental Services

April 2012

Page 2: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

R-WD-12-7

Nonpoint Source Management 2011 Annual Report

PreparedbyWatershedManagementBureau

NewHampshireDepartmentofEnvironmentalServices19HazenDrive

Concord,NH03302-0095

www.des.nh.gov

ThomasS.BurackCommissioner

HarryT.Stewart,P.E.Director,WaterDivision

April2012

Front Cover:Students from School Street School in Rochester pose in front of an excavator as part of a water qual-ity awareness day to learn more about how stormwater improvements at their school will help to restore Willow Brook. Photo by Lorie Chase, Cocheco River Watershed Coalition.

Page 3: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

iii

Dedication

In memory of our friend and colleague Jody Connor,Director, Limnology Center at the New HampshireDepartmentofEnvironmentalServices.

Jodywaswellknownandhighlyrespectedasalimnologist,educator, watershed manager, innovator and motivator.His work and contributions are far reaching, and extendfrom the surface waters of New Hampshire, throughoutNorth America and across the globe. Jody’s work withlakesandwatershedsalongwithhiscommitmenttotheirprotectionandrestorationmadehimoneofthemostrespectedlimnologistsinthefieldbyhispeersandthethousandsofpeopleheencountered,eventhoughthemanhimselfwashumble.

JodydedicatedhislifeandhiscareertoprotectandrestorethebeautifulnaturalresourcesthatNewHampshireissofortunatetohave.Hewilllongberememberedbymanyasatruementorandfriend.Countless careers were launched and thousands of volunteers were mobilized to protect naturalresourcesthankstothevision,guidance,mentoring,andunselfishdisseminationofknowledgeandexperiencethatJodyembodied.Itiswithourheartfeltthanks,admirationandinfiniterespect,thatwededicatethe2011NPSAnnualReporttothememoryofJodyConnor.

Jody’s Dock on Lake Winnisquam. Photo by Jen Drociak, DES.

Page 4: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

iv

ContentsDedication..................................................................................................................................................................................v

Introduction............................................................................................................................................................................. 1

Stormwater Initiatives.......................................................................................................................................................... 2NewDo-It-YourselfToolstoManageStormwater.................................................................................................. 2UpdateonStormwaterUtilityFeasibilityStudies.................................................................................................. 3

Education and Outreach..................................................................................................................................................... 3SecondAnnual319Grantees’RoundtableCombinesProjectSiteTours....................................................... 3DippingintoSocialNetworkingwiththeNewHampshireWatershedProtectionandRestorationForumBlog............................................................................................................................................. 4WatershedGrantProceduresMeeting...................................................................................................................... 5GreenSnowProCertificationandReducingRoadSalt........................................................................................ 5PetWasteGetsSomeAirTime....................................................................................................................................... 62011NewHampshireEnvirothonaddressesNitrogenPollutionintheGreatBayEstuary................... 6WatershedGaming............................................................................................................................................................ 7

Highlights and Overview of Completed Projects..................................................................................................... 8Watershed-BasedPlanforHighQualityWatersintheActonWakefieldWatershedRegion-SalmonFallsHeadwatersLakes............................................................................................................................... 8WillandPondDrainageEstablishmentandPublicOutreach...........................................................................10HodgsonBrookRestorationYears3&4...................................................................................................................12CainsBrookandMillCreekRestoration...................................................................................................................14CainsPondRestoration..................................................................................................................................................15HancockVillageStormwaterManagementandWaterQualityImprovement..........................................17LakeWinnipesaukeeWatershedManagementPlan:Meredith,Paugus,andSaundersBays...............18Cobbett’sPondWatershedRestorationPlan.........................................................................................................20LakeHoraceMarshRestoration..................................................................................................................................21WarrenBrookRestorationPlanning..........................................................................................................................22

Looking Ahead......................................................................................................................................................................23

AppendicesA.DESSection319WatershedAssistanceGrantsforHighQualityWatersAwardedinFFY2011......24B.DESSection319WatershedRestorationGrantsforImpairedWatersAwardedinFFY2011............24C.DistributionofSection319GrantDollarsAwardedinFFY2011byWatershed...................................25D.DistributionofSection319GrantDollarsAwardedinFFY2011byNPSCategory............................25E.DESSection319BaseProjectsCompletedinFFY2011.................................................................................26F.DESSection319RestorationProjectsCompletedinFFY2011...................................................................26G.2011EstimatedPollutantLoadReductionsAchieved...................................................................................27

Page 5: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

1

IntroductionItwouldbefairtocharacterize2011asthefirstyearofthedeclineofthefederal319program.WhileCongressappropriatedlevelfunding,EPAtooktheinitiativetoreducethe319programbudgetby12percentbyre-allocatingthefundingtootherprogramsthroughamaneuvercalleda“spendingplan.”Inatypicalyear,spendingplansmustbeapprovedbyCongress,butin2011CongressdelegatedtheauthoritytoEPA,who,withoutexplanation,madethecut.

ForFY2012,the319budgetwascutanadditional6percent.

ThefederalOfficeofManagementandBudget,whichadvisestheExecutiveBranchonbudgetmatters,hadthe319programinitscrosshairs,recommendinga50percentcutfor2011.EPAarguedagainstsuchalargecut,recommendingthattheystudytheeffectivenessoftheprogramandproposeprogrammaticchanges,includinganincentives-based,orcompetitive,systemformakingappropriationstostates.

EPAreleaseditsstudyofthe319programinOctober2011.Itisaninterestingreadwithexamplesofbestprogrammaticpracticesfrommanystates.Whilethestudycontains162pages,therecommendationsaboutthefutureoftheprogramareincludedinafour-pageAppendix.Thesixrecommendationsofthestudyare:

1. UsethesatisfactoryprogressprovisiontostrengthenandupdatestateNPSmanagementprogramsandimproveaccountability.

2. Implementregionalcompetition/reallocationoffundsthathavenotbeenexpendedbytheendofthegrantperiod,andaportionofnewfiscalyearfunds.

3. Accelerateachievementofenvironmentalresultsandimprovingprogrammanagement.4. IncreaseuseandleveragingofCleanWaterStateRevolvingFundsand/orothersourcesof

statefunding.5. Improvemeasuringsuccessandprogramaccountability.6. ImprovepartnershipandcollaborationwithfederalagenciessuchasU.S.Departmentof

Agriculture,DepartmentofInterior,andotherstomoreeffectivelytackleNPSpollution.

The2011annualreportincludesseveralexamplesofcompletedprojectsthatimplementwatershed-basedplans,clearlyillustratinghowtheNewHampshireDepartmentofEnvironmentalServiceshasusedthe319programtoachieveenvironmentalresultsandmeasuresuccess(recommendations#3and#5inthelistabove).

• OneprojecthighlightisCainsPondinSeabrook,whichwasimpairedforrecreationaluseduetosedimentationandnowmeetswaterqualitystandardsasaresultofa319restorationproject.ThisprojectisincludedinEPA’s319successstorieswebsiteathttp://water.epa.gov/polwaste/nps/success319/.

• Severalprojectscompletedin2011addressedstormwaterretrofitsinurbansettings,includingHodgsonBrookinPortsmouth,whereneighborhood-scaleBMPssuchastree-boxfiltersweredemonstrated,andCobbett’sPondinWindham,wherehighwayrunoffwasinfiltratedinatightsetting.

• PhysicalandbiologicalrestorationprojectswerecompletedatWarrenBrookinAlsteadandLakeHoraceMarshinWeare.

• Thefirstweb-basedwatershedplanwascompletedforthreebaysofLakeWinnipesaukee,thestate’slargestlake.

Page 6: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

Example fact sheet from the New Hampshire Homeowner’s Guide to Stormwater Management.

2

• ThereportalsodescribeseffortstoexplorethefeasibilityofstormwaterutilitiesinDoverandanewtooltoquantifyandaddresspollutantloadingfromresidentialsites.

Inadditiontotheabove,wenowhavemorethan30completedwatershed-basedplanspostedontheDESwebsite.Theseplansrepresentthousandsofhoursofworkbyorganizations,volunteers,andconsultantstowardmeasurablyimprovedwaterqualityandwillserveasthebuildingblocksforonthegroundimplementationprojects.

Stormwater InitiativesNew Do-It-Yourself Tools to Manage Stormwater

Managingstormwatercanbecomplicated.Often,engineersandotherprofessionalsarecalledupontodesignandinstallstormwatertreatmentpractices,aswellascalculatetheirpollutantremovalbenefit.Whileprofessionalstormwatermanagementservicesmaybeonlyasmallpartofthebudgetforlargecommercialormulti-unitresidentialdevelopments,suchservicesaresimplynotaffordableforthemajorityofsmall-scalepropertyowners.

Still,manypeoplewanttolessentheimpactofstormwaterrunofffromtheirproperty.Whethertheywanttoprotectwaterqualityorpreventtheirdrivewayfromwashingout,peoplearelookingforwaystomanagestormwaterwithsimplematerialsandeasytofollowinstructions.Recognizingthisneed,DEShasdevelopedthefollowingnewtools.

The New Hampshire Homeowner’s Guide to Stormwater Management: Do-It-Yourself Stormwater Solutions for Your Homeprovidesfactsheetsforavarietyofstormwatertreatmentpractices,suchasdrywellsandraingardensthatcanbeeasilyinstalledonprivateproperty.Eachfactsheetincludesamateriallist,illustrationsandstep-by-stepinstructions.Constructingthesepracticescanhelpreducefloodinganderosion,andsubsequentlyprotectnearbystreamsandpondsfromstormwaterpollution.

The New Hampshire Residential Loading Modelisaspreadsheettooltohelpestimatetheamountofstormwaterpollutants,specificallysediment,phosphorus,andnitrogen,thatcomefromagivenproperty.Thistoolcanmodelvariouspropertyscenariosincludingthewaterqualityimpactofbuildinganewgarage,forexample,orthewaterqualitybenefitofconstructingastormwatertreatmentpracticefromthehomeowner’sguide.Thetoolcanalsobeusedtodetermineifapropertymeetslocalwaterqualitygoals,iftheyhavebeendefinedforaparticularwaterbody.

Bothtoolsareavailableathttp://des.nh.gov/orga-nization/divisions/water/stormwater/stormwater-mgmt-homeowners.htm

Page 7: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

3

Update on Stormwater Utility Feasibility Studies

ThecityofDovercompleteditsstormwaterutilityfeasibilitystudywithfundingfroma2009Section319Grant.ThefundingenabledDovertohireconsultantstoidentifystormwaterprogramneedsandcosts,evaluatethepossibilityofestablishingamunicipalstormwaterutility,andidentifyapreferredapproachtofundingthecity’sstormwaterprogram.Doverspearheadedanefforttogarnerpublicsupportbyappointinganad-hocstormwaterstudycommitteeofstakeholders.Thiscitizencommitteerepresentingvariousgroupsthatwouldbeaffectedbytheoutcomeofthecommittee’srecommendationwasabletoworkcooperativelyand,despiteinitialconcernsandmisgivings,unanimouslyvotedtosupporttheformationofastormwaterutility.

Unfortunately,followingpresentationstothecitycouncilandthepublic,awell-organizedoppositionspokeatapublichearing.ConcernscenteredaroundnotwantingtobethefirststormwaterutilityinNewHampshire,delayinissuingthenewMS4permitthatmanyofthestormwaterprogramcostswerebasedon,andalackoftrustingovernmentingeneral.Followingthenegativeresponses,thecitycouncilfeltthatmuchwaslearnedbythefeasibilityprocessbutthatestablishingautilityatthistimeinDoverwaspremature.

DESthenmetwithDoverandotherstormwaterutilityfeasibilitystudygranteestoidentifylessonslearnedthatcouldbeincorporatedintotheongoingefforts.Itwasrecommended,ifpossible,towaitforthenewMS4permittobeissuedbeforebringingutilityproposalstocitycouncilsforavote.DEShassinceincorporatedadditionalrecommendationsforstormwaterutilityfeasibilitystudiesinNewHampshire,whichcanbefoundathttp://des.nh.gov/organization/divisions/water/stormwater/utilities.htm#feasibility,andwilladdnewinformationasothergrantprojectsarecompleted.

Education and OutreachSecond Annual 319 Grantees’ Roundtable Combines Project Site Tours

TheWatershedAssistanceSectionhostedthe2010WatershedManagersRoundtable(2ndEdition)andProjectSiteToursinOctoberattheDESCoastalOfficeinPortsmouth.

Thiseventcombinedthe319Grantees’Roundtablewithprojectsitetours,conventionallyheldforEPAstaff,sothat319projectmanagerscouldalsoobservepastandongoing319projectsuccesses.Attendeesatthecombinedevent,includedapproximately50past,current,andpotentialfuture319WatershedAssistanceandRestorationgrantees,privateconsultants,andrepresentativesfromseveralEPAProgramsandtheDESWatershedManagementBureau.

Duringtheroundtable,granteesbrainstormedonwaystobuildcapacityandimplementtoolsforwatershedprojectsandidentifiedfourkeyareasofinterest.

Lori Chase, Project Coordinator, Cocheco River Watershed Coalition describing BMPs for School Street School, Rochester.

Page 8: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

Tara Schroeder, Green Mountain Conservation Group sharing tips with the representatives from Lake

Wentworth Association.

4

1. Enablebestmanagementpracticeimplementationatthelocallevel.2. EstablishpartnershipswithNHDepartmentofTransportationandlocaldepartmentsofpublic

works.3. StreamlinethelocalandstateregulatoryprocessestofacilitaterestorationandBMP

implementation.4. Reducewaterqualityimpactsfromwinterroadmaintenancepractices.

Foreachkeyareaofinterest,participantsdiscussedbarriers,benefits,andrecommendationsforfollow-upaction.Someofthesuggestedactionsincluded:demonstratetoDPWshowimplementinglowimpactdevelopment(LID)cansavetheirtownmoney;streamlinethepermittingprocessforsmallerprojectsthatimprovewaterquality;and,createandpromotefactsheetsforwintermaintenancepracticestoreducesaltuse.

Attendeeswerethenescortedonabustourtovisitthree319projectsitesintheCoastalwatershed.TheHodgsonBrookRestorationProjectinPortsmouthprovidedanexampleofLIDbestmanagementpracticesretrofittedintoexistingdevelopedareasinahighlyurbanizedarea.ThestopatCain’sPondinSeabrookdemonstratedhowthepondwasrestoredforrecreationalusesthroughdredgingandinstallationofasedimenttrapchamberBMP.Finally,avisittotheCochecoRiverprojectatSchoolStreetSchoolinRochesterhighlightedstormwaterBMPsthatwereretrofittedintoexistingdevelopmentincludingaperviousasphaltbasketballcourt,perviousconcretesidewalk,threeraingardens,andaninfiltrationdrywellandtrench.

EvaluationsandresponsesindicatedtheeventwasahugesuccessandathirdeditionoftheroundtablewilloccurinFY2012.

Dipping into Social Networking with the New Hampshire Watershed Protection and Restoration Forum Blog

Tomeet319granteesrequestsforadditionalopportunitiestonetworkwithfellowgranteesandpartners,DEScreatedtheNew Hampshire Watershed Protection and Restoration Forum blogathttp://xml2.des.state.nh.us/blogs/watershed/?page_id=176.Thisblogprovidesadditionalresourcesand

opportunitiestonetworkforthoseinvolvedwithWatershedAssistanceandRestorationGrants.Over175grantprojectmanagersandinterestedpartiesareupdatedonnewpostsonaregularbasisandareprovidedtheopportunitytopostandsharetheirownresourcesandcomments.

Theblogpagesareloadedwithusefulresourcesincludinglinkstowebsitesofpastandcurrentgrantrecipients.Sincegoinglive,over50postshaveincludednotificationaboutworkshops,conferences,webinarsandother319programrelatedinformation.

Page 9: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

Green SnowPro logo.

Salt applicators go through a calibration exercise.

5

Watershed Grant Procedures Meeting

InJanuary2011,DESheldthefirstWatershedGrantProceduresMeetingforSection319Grantrecipients.Thepurposeofthismeetingwastoprovidetrainingregardingthepaperworkandproceduresrequiredfor319grantadministration.Historically,thisinformationwasprovidedtothegranteesduringascopingmeetingtodiscusstheparticularsoftheirproject.Itwasdeterminedthatthisapproachprovidedtoomuchinformationatonce,andthatitwouldbebesttoseparatediscussionofthescopeofworkfromtrainingongrantprocedures.Theproceduresmeetingincluded:generalgrantinformation;executionofthepaperworkneededforgrantagreementapproval;proceduresduringtheprojectperiodsuchasprocurements,paymentrequests,interimreportsandqualityassurance;andguidanceforclosingouttheproject,suchasfinalreportrequirements.Atleastonerepresentativefromeachgranteeorganizationattendedthemeeting.Inadditiontoreceivingguidanceattendeeslearnedfromeachotherastheysharedtipsthathavebeenbeneficialtothem.ThemajorityofgranteesalsotookadvantageofanopportunitytomeetoneononewithaDESgrantmanagerfollowingthemeeting.ThemeetingwaswellreceivedandDESplanstocontinueofferingthistrainingtofuturegrantrecipients.

Green SnowPro Certification and Reducing Road Salt

ContinuingwitheffortstoimplementmeasurestomeetthechlorideTotalMaximumDailyLoads(TMDL)intheI-93expansionwatersheds,DESpartneredwithUNHTechnologyTransfer(T2)Centertodesignandkick-offthe“GreenSnowPro”Certificationprogram.ThisvoluntaryprogramimprovescommunicationsandincreasestrainingopportunitieswithoneofthelargerchloridecontributorsintheTMDLwatersheds,privateapplicators.ParticipantsintheprogramareaffordedtheopportunitytobecomeaNewHampshire“GreenSnowPro”

certifiedwintermaintenanceprofessionalbyparticipatinginahalfdaycoursefollowedbyanexam.Thetrainingincludes:howsaltworks,anti-icingwithliquids,pre-wetting,spreadercalibration,materialstorageandhousekeeping,andsaltaccounting.Thefirsttwotrainingsessionsin2011,hostedbythetownofDerry,wereatmaximumcapacityandresultedinover100applicatorsearning“GreenSnowPro”certification.Inadditiontothewaterqualitybenefits,“GreenSnowPro”certifiedapplicatorslearnedtechniquestocontinuetomaintainalevelofservicewhileusinglesssalt,whichinturnsavestimeandmoney,increasesprofessionalism,andreducesriskexposure.SaltReductionComplianceforOperatorstrainingwasalsoprovidedforthemunicipalwintermaintenancestaffandincorporatedintothe“GreenSnowPro”program.Oncecertified,businessescanmarkettheircertificationwithtruckdecalsandviathewebsiteathttp://t2.unh.edu/green-snowpro-certification.

Page 10: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

Australian Filmmaker, James Boldiston, filming New Hampshire segments for a pet waste documentary at Rye Beach.

6

Pet Waste Gets Some Air Time

Thepetwasteprogram,“ScoopthePoop,”receivedlocalandinternationalfamethroughavideo/publicserviceannouncement(PSA)“BeachKarma”andadocumentary“DogPoo–theTruthatLast.”

InFebruarya“ScoopSocial”washeldtokick-offthefirstpetwastePSAhostedontheDESwebsiteathttp://des.nh.gov/organization/divisions/water/wmb/coastal/scoop_the_poop.htm.ThisinnovativevideowascreatedbyBlueOceanSocietyasmatchforaSection319WatershedAssistancegrant.ThevideocreativelycombinesalittleAlfredHitchcockwithCharlieChaplintoencouragepeopletopickuptheirpetwastebyhighlightingthatpetwasteleftonourbeachescancauseimpactstowaterqualityandmayevenclosebeaches.

InSeptember,theAustralianfilmmakerJamesBoldiston’sdocumentaryfilm“DogPoo–theTruthatLast”helditsAmericandebutattheNewHampshireFilmFestivalinPortsmouth.Shotineight

countries,thesecretlifeofdogfecesisbroughtoutin“glorious”detail.NewHampshire’sown“ScoopthePoop”petwasteeducationprogramcreatedandimplementedbyDESisfeaturedalongsideHarveyMilk’spooperscoopinglawsinSanFranciscoandpoodetectionintheoutbackofAustralia.Afterresearchingandproducingthisfunnyandinformativefilmforoverayear,BoldistondeclaredNewHampshire’sprogramas“oneofthebestpetwasteoutreachprogramsintheworld.”Themovietrailercanbeseenat:http://www.dogpootruth.com/.

2011 New Hampshire Envirothon addresses Nitrogen Pollution in the Great Bay Estuary

AnnuallyhighschoolstudentsacrossNewHampshireparticipateinthe“Envirothon,”anationalhighschoolenvironmentalsciencecompetitionthatencouragesanunderstandingoftheprinciplesandpracticesofnaturalresourcemanagementandecology.Thethemefor2011was“SaltWaterEstuaries”andDESassistedwithcreatingtheresearchandoralpresentationtopiconnitrogenloadingtotheGreatBayEstuary.ParticipatingteamsweretaskedwithdevelopingabalancedstrategytoreducenitrogenlevelsintheGreatBayEstuarybylimitingnitrogendischargefromwastewatertreatmentfacilitiesandotherpointsources,aswellasaddressingnon-pointsourcesofnitrogenpollution.About160studentsrepresenting12highschoolsfrom41communitiesparticipatedinthecompetition.

Page 11: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

7

Watershed Gaming

DESoutreachstaffwastrainedbyNorthlandNonpointEducationforMunicipalOfficials(NEMO)representativesfromMinnesotatofacilitateawatershedinteractiveactivity,The Watershed Game.Thiscompetitiveactivityusesaboardgametoincreaseparticipants’knowledgeofwhatawatershedis,howvariouslandusesimpactwaterquality,whatdifferentbestmanagementpracticeswillhelpobtainawaterqualitygoalbyreducingcertainpollutants,andtheneedforcollaborationamonglandusestewardstoreachawaterqualitygoal.

ThegamewasthenpurchasedandpilotedbeforeDESstafftoidentifyappropriateaudiencesandtosolicitfeedbackonthegameprocess.DESstaffalsofacilitatedthegameforlakeassociationmembersattheActionWakefieldWatershedAlliancesHealthyLakeskick-offmeetingandforDPWstaffattheSeacoastStormwaterCoalitionmeeting.Bothgroupswerepositiveabouttheincreaseinawarenessaboutwaterqualitygoals,lowimpactdevelopmentBMPsandthedifferentstakeholdersinvolvedinprotectingorrestoringawaterbody.

TheNewHampshireNaturalResourceOutreachCoalitionwillassistDESinpublicizingandloaningthegametoNewHampshirestakeholders,suchaswatershedorganizations,stateandlocaldecisionmakers,andeducationalinstitutions.DESwillalsorespondtorequestsfortrainingand/orfacilitationassistance.

Municipal officials are assisted by Northland NEMO Representatives in the Watershed Game exercise.

Photo by J. Bilotta, NEMO.

The Watershed Game has options for both lake and river watersheds.

Page 12: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

8

Highlights and Overview of Completed Projects

Watershed-Based Plan for High Quality Waters in the Acton Wakefield Watershed Region - Salmon Falls Headwaters Lakes

TheSalmonFallsRiverHeadwatersLakesWatershedManagementPlanincludesthefivewatershedsofGreatEastLake,HornPond,LakeIvanhoe,LovellLakeandWilsonLake.Thisareacomprisesapproximately26squaremileswithinActon,MaineandWakefield,NewHampshire.DevelopmentintheActon-Wakefieldregionisconsideredruralwithnearly89percentoflandareaundeveloped.Theremainingdevelopedlandislargelyresidential,primarilyoccurringalongmajorroadwaysandlakeshores.Thelakesandassociatedwetlandsarehometoadiverseecologicalcommunitythatdependsoncleanwater.

ThisgrantwasawardedtotheActonWakefieldWatershedsAlliance(AWWA)todevelopawatershed-basedplanfortheSalmonFallsHeadwaterLakes.ThesepristinewaterbodiesareofsignificantvaluetothecommunitiesofActonandWakefieldandactionisneededtomaintaintheirgoodcondition.

Topromotecommunityengagementintheplanningprocess,AWWAconvenedawatershedsteeringcommitteeofstakeholdersthatincludedtownofficials,planningboardmembers,representativesoflakeassociationsandlocallandtrustsaswellasinterestedcommunitymembers.

The Problem and the Threat: PhosphorusSmallincreasesinphosphoruscanadverselyaffectlakewaterqualityleadingtodecreasedclarity,possiblealgalbloomsandacceleratedeutrophication.Thisinturncanadverselyimpactfishpopulationsandpublicusessuchasswimmingandboating.Phosphorushasthereforebeenidentifiedasthepollutantofconcernforlakemanagementintheplan.Waterqualitydataanalyses,lakeloadingmodels,andlandusemodelswereusedtodefinecurrentin-lakephosphoruslevelsforallfivelakes.Theseanalysesindicatethatallfivelakesneedphosphoruscontrol

CoastalWatershed

Watershed-BasedPlanforHighQualityWatersintheActonWakefieldWatershedRegion-SalmonFallsHeadwatersLakes

ActonWakefieldWatershedAlliance(AWWA)

2005/2007/2008Restoration

GrantAmount:$108,266

LocalMatch:$210,097

Acton Wakefield Watershed Region

Page 13: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

9

measurestomaintainorachievehighqualitywaterstatusbaseduponwaterqualitystandardssetbyDESin2010.Thisisespeciallytrueinlightofabuild-outanalysisprojectingthattheregionmaygainover4,200buildingsand9,000peoplewithinthenext44years.Ifnotcontrolled,thisincreaseingrowthcouldresultinseveralhundredmorepoundsofphosphorusenteringthelakeseachyear.

Development of the PlanOverthetwoyearprojectperiodseveralmodelswereutilizedtocharacterizecurrentwaterqualityconditionsandtoidentifyopportunitiestoimproveandprotectthelakes.TheprojectteamworkedtogetherwithMaineandNewHampshireenvironmentalagenciestoorganize,summarize,andanalyzewaterqualitydatagatheredbyvolunteersandprofessionalsovermorethanthreedecades.Theprojectteamalsoanalyzedcurrentlanduseandphosphorusinputstothewatershed.Additionally,AWWAconductedwatershedsurveysoneachlakewiththehelpofover100localvolunteerstoidentifyerosionsitescontributingexcessphosphorustotheprojectlakesandtributaries.Thesedataenabledtheprojectscientiststodeterminethecurrentin-lakestatusandsetphosphorusgoalsforeachlake.(Table1)

InJanuary2009,stakeholdersgatheredtodiscusspreliminaryresultsfromanalysesandtobrainstormwaterqualityimprovementandprotectionactionitems.Thesteeringcommitteethenusedtheseideastodevelopanactionplanwithfivekeyactionareas.(Table2)Specifictasksweredevelopedforeachkeyactionareathatidentifiedresponsibleparties,potentialfundingsources,approximatecosts,andanimplementationschedule

Next Steps Thesuccessofthiswatershedmanagementplanisdependentheavilyonthecooperationofthelocalmunicipalitiesandkeystakeholders.AWWA’sgoalistousetheplantoengageallcommunitymembersintheprotectionoftheregion’smostvaluableasset–itslakes.

AWWAwillconvenethewatershedsteeringcommitteeatleastannuallytoprovideperiodicupdatestotheplan,trackandrecordprogress,andensurethattheplanremainscurrentandrelevantbyaddingnewtasksasneeded.Allachievements,suchaspresscoverage,pollutantloadreductions,outreachactivities,numberofsitesrepaired,numberofvolunteers,fundingreceived,andnumberofsitesdocumented,willbetracked.Inaddition,establishedmeasureswillbeusedtodeterminetheeffectivenessoftheplanonreachingthewaterqualitygoals.

Table1.In-lakePhosphorusGoals:MaintainorImproveLakeWaterQuality

Maintain water quality at current in-lake phosphorus

level:• GreatEastLake-6.4ppb• WilsonLake-6.5ppb• HornPond-8.0ppb**FurtheranalysiswillbeconductedtoconfirmthegoalatHornPond

Improve water quality and reduce in-lake phosphorus

to 7.2 ppb:• LakeIvanhoe:reduceby

0.8ppb• LovellLake:reduceby

0.3ppb

Table2.FiveKeyActionAreastoMaintainorImproveLakeWaterQuality

Private and Public Roadway BMPs:Reducesedimentloadsthroughthestabilizationandreinforcementofroadcrossingsandroadsides.

Residential BMPs, Riparian Buffers, Low Impact Develop-ment and Septic Systems: Encouragevegetatedbuffersandlowimpactdevelopmenttechniques.Implementasepticsysteminspectionandpumpingprogram.

Community Planning:Strengthenandenforceregulationstoprotectwaterquality.

Land Conservation:Coordinatewithmunicipalities,landtrusts,regionalplanningcommissions,andlakeassocia-tionstoensurethatsomelandremainsinanundisturbedstatewhichwillhelpreducetotalphosphorusrunoff.

Education and Outreach:Workwithseasonalandfull-timeresidentstoenhancetheunderstandingoflanduse/waterqualityconnections.

Page 14: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

CoastalWatershed

WillandPondDrainageEstablishmentandPublicOutreach

CityofDover

2004-2007Restoration

GrantAmount:$68,064

LocalMatch:$58,517

10

Willand Pond and identified retrofit areas.

Willand Pond Drainage Establishment and Public Outreach

WillandPondisanatural,spring-fedkettlepondlocatedinbothSomersworthandDover.Thepondhasadrainageareaofapproximately330acres,andasurfaceareaofapproximately80acres.ThewatershedwasusedasapublicdrinkingwatersourcebythecityofDoverfrom1876until1966.Thepondhasalsoservedasapublicrecreationalareasincethe1890swhenitwasthesiteofaVictorian-stylepark.Itshistoricaluseasawatersupplyandrecreationaldestinationprotecteditfromsignificantcommercialdevelopmentpressureuntilthe1960swhenaggressivedevelopmentandlanduseconversionoccurredintheareasurroundingthepond.Thecumulativeeffectofmanyyearsofdevelopment,compoundedwithcessationofwaterwithdrawalsandthreeconsecutiveyearsofrecord-breakingprecipitationin2006-2008contributedtosustainedelevatedsurfacewaterlevels,flooding,propertydamage,andwaterqualitydegradation.

In2006WillandPondwaslistedasimpairedforAquaticLifeandPrimaryContactRecreationontheDES305(b)/303(d)SurfaceWaterQualityAssessment.Waterqualitydegradationofthepondculminatedwithalargecyanobacteriabloominthesummerof2007.Thepondwaspostedandclosedforrecreationalpurposesfrommid-Julyuntilthefallof2007.Historically,theadjacent

wetlandareahadbeenacrucialfactorinthepond’sabilitytobalanceitswaterbudget(throughfloodflowalterationandstorage).However,man-madealterationstothedischargecoupledwithincreasedinputsfromprecipitationandstormwaterhaveoverwhelmedthesystem’sabilitytoequilibrateitself.Toimprovewaterquality,immediateactionswouldbenecessarytoreducebothnutrientsourcesandsurfacewaterelevation.

ThegoalsofthisprojectweretoreviewandassessthenaturalandanthropogenicfactorscausingfloodingandwaterqualityissuesatWillandPond,andtodeveloppublicoutreachfocusedonpromotingpondstewardship.DESworkedwiththecitiesofDoverandSomersworthand

Page 15: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

11

twoprivateconsultants,S.W.ColeEngineeringInc.andHorsleyWittenGroupInc.toassesshistoricalandcurrenthydrologicandlanduseconditions.Theprojectteamworkedcloselywithneighborhoodresidentsandbusinessestodevelopandsustainthe“FriendsofWillandPond,”alocaladhocgroupdedicatedtorestoringandprotectingthepond.TheFriendscreatededucationalmaterialsandconductedworkshopsandactivitiestopromotepondrestorationincludingwaterqualitymonitoringevents,pondcleanups,trailplanningsessions,safetyplanningmeetings,landownerworkshops,andmore.Theassessmentofhistoricalandcurrentconditionsservedasthebasisforthedevelopmentofawatershedmanagementplan,whichprovidesbothstructuralandnon-structuralrestorationpracticesforaddressingwaterqualityandquantityissuesofthepond.

Theplan’srecommendationsincludestormwaterretrofitstoreducephosphorusloadingtothepond;conceptualdesignsforrestoringhydrologicconnectivityinthepond’soutletareatoalleviatewaterlevelissuesrelatedtoencroachmentfromdevelopment,adoptionoflocalwaterqualityprovisions,andsustainedpubliceducationandoutreacheffortssupportedbybothcitiesandtheFriendsofWillandPond.

Willand Pond. Photo by Norma Willard, Friends of Willand Pond.

Page 16: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

CoastalWatershed

HodgsonBrookRestorationYears3&4

BlueOceanSocietyforMarineConservation

2006Restoration

GrantAmount:$85,020

LocalMatch:$58,277

12

Hodgson Brook Restoration Years 3 & 4

HodgsonBrookisanurbanstreamthatisimpactedbyhighstormwaterflowsthatarecontaminatedfromparkinglotsandroads.Inaddition,overtheyearsithasbeenstraightened,channelized,andpipedunderground.Thisprojectimplementsyear3and4oftheWatershedRestorationPlanforHodgsonBrook.Theprojectgoalsincludedraisingthepublic’sawarenessofthebrook’sconditionbyconnectingwatershedresidentsandbusinessestothebrook,andbyhighlightingsolutionseachcouldtaketoimproveitscondition.

Thesupportofwatershedresidentsandbusinessesandultimatelytheiractionsarecriticaltoachievingthegoalofcleaningupthebrook.Theactivitiesconductedthroughthisprojectinitiatedtheprocessofengaginglocalresidentsandbusinessandschoolsintherestorationeffort.Capacitybuildingactivitiesincluded:

• Participationinthewaterqualitysampling,monitoringstreamflow,trashsurveysandcleanups,stormdrainstenciling,andhelpingwithinvasiveplantsurveys.

• NewFranklinSchoolstudentsandteacherscreatedandrecordedpublicserviceradioannouncementsencouragingthepublictohelp“SavetheBrook!”ThesewereintroducedbythestudentsontheEnvironmentalShowandairedonPortsmouthCommunityRadio106.1.

•Stormdrainstencilinganddistributionofinformationalflyers.

•UNHstudentsconductedstormwaterretrofitsurveystoidentifylocationsforfutureLIDinstallations.

•TheHodgsonBrookAdvisoryBoardmembershelpedboththeCityofPortsmouthandPeaseDevelopmentAuthority(PDA)evaluateand

Volunteers plant a buffer along Hodgson Brook.

Page 17: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

13

strengthentheirregulationstobetterprotectthebrookandotherwaterresources.BoardmembersalsoadvisedonamajorredevelopmentprojectalongthebrookwhichresultedinadditionalinstallationsofLIDtechnologiestoreducetheimpactofstormwaterrunofffromthesite.

• GreatBayCommunityCollegeprovidedofficespaceforprojectworkandembracedthechallengeofretrofittingitscampusgroundsforwaterqualityincludingusingperviouspavementinarecentparkinglotexpansionanddaylightingasectionofdrainage.

Amajorsuccessoftheprojectwastherestorationofapproximately150feetofstreambufferlocatedatthePortInn.Thestreambankwaserodingandunstable.Vegetationatthesiteconsistedmainlyofinvasivespecies.UNHCooperativeExtensionstaffdesignedanattractivenativeplantingplanforthebuffer.InvasivespecieswereremovedfromthesiteandvolunteersfromtheUnitedWayhelpedplantthenewbuffer.TheprojectwasfeaturedonNewHampshirePublicTelevisioninaseriesofinterviewsandsitevisits.Thebankisnowstabilizedandnativevegetationisinplacetofilterpollutantsandhelpkeepthebankintact.ThePortInnprovidedgenerousdonationsofcash,staffassistance,andservicestosupporttheproject.OwnersofthePortInnmaintainthebufferandareproudofitsnaturalbeautyandwaterqualitybenefits.

ThelocalcapacitybuiltduringthisgrantwillenablethenextphaseoftheHodgsonBrookRestorationProjecttomoveforwardwithstronglocalpartnershipsanddemonstratedsuccess!

Catch basin retrofit in Portsmouth before (above) and after (right).

Page 18: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

CoastalWatershed

CainsBrookandMillCreekRestoration

TownofSeabrook

2006Restoration

GrantAmount:$68,240

LocalMatch:$57,758

SedimentLoadReduction:1.9tons/year

Cains Brook clean-up day.

14

Cains Brook and Mill Creek Restoration

TheCainsBrookandMillCreekWatershedManagementPlanwasdevelopedbytheSeabrookConservationCommissionin2006,andrevisedin2009,toguidelocalrestorationeffortstorestoreaquatic,riverineandrecreationalusestothewatershed.ThisprojectimplementedthreeactionitemsfromtheplanincludinginstallingastructuralBMP,anoil/trash/gritseparatorchamberdevice,toreducesedimentandpollutantloadingfromtheadjacentUSRoute1roadway.TheinstallationofthisBMPwillremoveanestimated1.9tonsofsedimentannually.

Toaddressthelargevolumeoftrashdepositedinthewatershed,outreachtothecommunitywasconductedandaCainsPondclean-updaywasheldwhereparticipantsremovedoveronetonoftrashfromtheriparianarea.

AteamofvolunteermonitorswasrecruitedandtrainedbytheDESVolunteerRiverAssessmentProgramstaff.Eightsitesweresampledforvariousparametersduringtheprojectperiod.Finalreportswereproducedandsamplingresultswillbeusedtoguidefuturerestorationefforts.AssessmentworkconductedduringtheprojectalsoresultedindocumentationofanadditionalimpairmentfornavigationtoCainsPond(seeCainsPondRestorationonpage15).

Theprojectraisedlocalawarenessofthebrookandpondsinthewatershedasrecreationalresourcesworthprotecting.Italsohelpedbuildmomentumforfutureworkandimplementedkeysedimentloadreductionmeasures.

Page 19: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

CoastalWatershed

CainsPondRestoration

TownofSeabrook

2006Restoration

GrantAmount:$91,800

LocalMatch:$196,300

SedimentLoadReduction:750tons/year

Cains Pond shallow depth before dredging. Photo: Duncan Mellor, Waterfront Engineers

15

Cains Pond Restoration

Formanyyears,Seabrookresidentsenjoyedskating,fishing,smallboating,andotherrecreationalactivitiesonCainsPond.However,increaseddevelopmentsurroundingthepondandthebreachoftheCainsDamduringtheMothersDaystormof2006resultedinmorerapidthannormalinfiltrationofsedimentandshallowerponddepths.Asthepond’sdepthbecameshallower,conditionsbecamemoreconducivetoinvasiveplantswhichinfestedthemarginsandsurfaceofthepond.Thisseverelylimitedrecreationalactivitiesduetosedimentdepositsanddenseplantgrowth.

CainsPondwaslistedonthe2010303(d)listforasecondarycontactrecreationimpairment.Thegoalsofthisprojectweretorestorenavigation,improvehabitat,andcreatebetterpublicaccesstothepond.InaccordancewiththeCainsBrookandMillCreekWatershedManagementPlan,lowimpactdredgingwasdeterminedtobeawaytoremoverecentlyaccumulatedmaterialsincludingsedimentanddecayedplantmaterialandrestorethepondtohistoricaldepthsthatwerepresentwhenrecreationwaspossible.Additionalrecommendationsintheplantoimprovepublicaccess,constructionofafishingplatform,andaquaticorganismpassagewerealsoimplementedduringthisproject.

Toaddressthenavigationimpairmentover7,500cubicyardsofmaterialwasremovedfromthepondand25,000squarefeetofinvasiveplants.Inaddition,“deepholes”ofuptosevenfeetweredugtoprovidehabitatforfishandotheraquaticlife.The“inlet-to-outlet”dredgepatternmakestheentirelengthofthepondnavigable.

Two“CainsBrook–KeepitClean”signswereplacedalongRoute1neartherestorationsitetoremindvisitors,residentsandmotoriststokeeptrashandotherdebrisoutofthepondandbrook.Thisisacontinuationofpreviousoutreacheffortstoreducetrashinputtothebrook.

Abathymetricsurveywasconductedtoshowpostdredgeponddepthsandprovidesacomparisontopre-dredgedepths.Pre-andpostphotodocumentationofthesitewasconductedtorecordchangesinconditionsandrecreationalactivity.

Thisprojectalsoaddressedrelatedactionitemsinthewatershedplanforimprovingpondhabitatandpublicaccess:

Page 20: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

16

• AquaticandWildlifePassageImprovementsNature-likestonerock/riffleswereconstructedtoreplaceaverticalconcreteweirstructureattheRoute1crossing/outletofCainsPondandatadjacentMary’sPondatLakeshoreDrive.Thenature-likerockrifflesallowforgreatlyimprovedaquaticorganismstreampassageandwillalsopreventculvertentrancescourandwillmaintainthepond’swaterlevelstopreserveaquatichabitat,recreationaluses,andscenicviews.Afterconstruction,wildlifewereobservedusingthenewrockriffletotravelupstreamfromthelowerreachesofthewatershedintoCainsPond.Priortoconstructionoftheberm,wildlifehadtocrossRoute1inordertoenterorleaveCainsPond.

• PublicAccessImprovementsPublicaccessimprovementsincludedconstructionofahandicappedaccessibleoverlook/fishingplatformadjacenttothepondandinstallationofacartopboatlaunch.AneasementwiththeneighboringpropertyownerwasgrantedforthecreationofapublicADAparkingareaadjacenttothepublicaccessimprovements.

Asaresultoftheseimprovements,smallboatsarenowabletonavigatethepondonceagain.AsuccessstorydetailingtherestorationworkwaspostedtotheEPA“SuccessStory”websiteinthefallof2011http://water.epa.gov/polwaste/nps/success319/nh_cain.cfm.Accordingly,thesecondarycontactrecreationuseimpairmentforCainsPondwillberemovedfromthestate’sCWAsection303(d)listin2012.

Kayaking returns to Cains Pond.Photo: Sue Foote, Seabrook Conservation Commission

Page 21: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

MerrimackRiverWatershed

HancockVillageStormwaterManagementandWaterQualityImprovement

TownofHancock

2005/2007Base

GrantAmount:$94,800

LocalMatch:$125,879

TSSReduction:8.8tons/year

PhosphorusReduction:25.9lbs/yr

NitrogenReduction:265.3lbs/yr

The town of Hancock’s road agent, Kurtis Grassett, leads DES and EPA staff on a tour of

the town’s stormwater improvements.

17

Hancock Village Stormwater Management and Water Quality Improvement

Throughthisproject,thetownofHancocktookaproactiveapproachtoprotectinglocalresources.ThoughwaterqualityintheadjacentNorwayPondandDavisBrookwerequitegood,stormwaterrunoffwascontributingpollutantsandthreateningthesevaluableresources.TheHancockMainStreetroadwayimprovementprojectrepresentedatimelyopportunitytoincorporatepracticesthatwouldimproveroaddrainageandothertraditionalgoalsforstormwaterconveyance–butwouldalsoprovideprotectionforNorwayPondandDavisBrook.

Thevillagearea’supgradedstormwatermanagementsystemnowincludesseveraltreatmentdevicestoprotectwaterqualityincludingseventeendeepsumpcatchbasins,thirteenleachingcatchbasins,andtwoinfiltrationchambers.Thecatchbasinsaredesignedtoremovesedimentsuchasroadsandfromthestormwaterbyallowingittosettleinthebasinwhilethewaterflowsthrough.Thebasinscanthenbecleanedoutandthesanddiscardedorreused.Theinfiltrationchambersallowthesoiltoactasanaturalfiltertreatingstormwaterpollutantssuchasbacteriaandphosphorus.Itisestimatedthatthesetreatmentdeviceswillresultinannualpollutantloadreductionsofover8.8tonsofsediment,25.9poundsofphosphorusand265.3poundsofnitrogenthatwouldotherwisehavebeendelivereddirectlytoNorwayPondandDavisBrook.

Theprojectalsoimprovedtheboatrampandbeachareabyre-gradingtheparkingandboatrampsothatstormwaterisnowredirected,reducingbeacherosionandstormwaterrunofftothepond.Anadditionalbenefitofthisworkistheimprovedparkingareaandaccesspathsforbeachusers.Akioskwasinstalledthatprovideseducationalinformationtoresidentsandvisitorsonstormwater,theBMPsthatwereinstalledandwaysthatindividualscantakeresponsibilitytoprotectwaterquality.

Page 22: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

18

MerrimackRiverWatershed

LakeWinnipesaukeeWatershedManagementPlan:Meredith,PaugusandSaundersBays

LakesRegionPlanningCommission

2008Base

GrantAmount:$76,640

LocalMatch:$73,519

Lake Winnipesaukee Watershed Management Plan: Meredith, Paugus, and Saunders Bays

LakeWinnipesaukee,thelargestfreshwaterbodyinNewHampshire,istheprincipaleconomicandenvironmentalfeatureintheNewHampshireLakesRegion.Withasizeof44,587acresthetotalwatershedareaencompasses369squaremiles.Inlightofitssignificance,itissurprisingtonotethattheredoesnotexistacomprehensivewatershedmanagementplanforthegreaterWinnipesaukeewatershedarea.Thisprojectispartofalong-termstrategytocreateapublic,comprehensiveweb-basedwatershedmanagementplanforLakeWinnipesaukee.Duetothesizeofthewatershedandthenumberofcommunitiesinvolved,theplanwillbecompletedinsegments,usingasub-watershedapproach.Thisprojectfocusedonthesub-watershedsofMeredithBay,PaugusBayandSaundersBay.Potentialthreatstowaterqualityincludenonpointsourcedischargesasaresultoffailingsepticsystems,recreationalimpactsanddevelopmentpressures.Theprojectincludedanevaluationofthecausesandpotentialthreatstowaterquality,landusemapping,establishingin-lakephosphoruslevelsandawaterqualitygoal,developmentofawebsite,outreachandon-goingmonitoring.

In2005thecommunitiesofMeredith,LaconiaandGilfordformedanadvisorycommitteetofocusonwaterqualityprotectionofMeredithBay,PaugusBayandSaundersBay.PartneringwiththeLakeWinnipesaukeeWatershedAssociation,LakesRegionPlanningCommission,NorthCountryResourceConservationandDevelopmentAreaCouncil,UNH,PlymouthStateandDESthesuccessofthisproject

wasrealized.

Oneofthemajoroutcomesoftheprojectwasaconsensus-basedwaterqualitygoalandmissionstatementforthethreebaysstudiedunderthisphaseoftheplan.AnexcerpttakenfromthemanagementplanforthesubwatershedincludingMeredith,Paugus,andSaundersBaysincludesthefollowingsharedmissionstatement:“Thefundamentalgoalofthiswatershedmanagementplanistohaltorminimizefurtherwaterqualitydegradationattributabletonutrientinputs,primarilyphosphorusinordertomaintainourhighqualitywater.CurrenttotalphosphoruslevelsinMeredith,Paugus,andSaundersBaysarebelowthestatestandardof8.0ug/Lestablishedforhighqualitywater.WewillworktowardmaintainingLake Winnipesaukee Water Sampling Points.

Page 23: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

19

orimprovingcurrenttotalphosphoruslevelsbystabilizingnutrientinputsthroughthereductionofnutrientsources.Wewillmanagelandscapechangetolimitnutrientloadsthroughstormwatermanagement,adoptionoflowimpactdevelopmenttechniques,innovativelanduseplanning,andinstallationofbestmanagementpractices.Ourlocallyderivedstrategiesarepurposeful,considerateandcomprehensive.Ourapproachembodiesflexibilityallowingustoachieveourstatedgoalwhilemeetingthediverseneedsandcapacitiesofallwatershedstakeholders.”Thewebbasedplanknownas“WinnipesaukeeGateway”islocatedatwww.winnipesaukeegateway.org.Itisthefirstofitskindinthestateinthatratherthanastaticdocument,theweb-basedplanwillensurethattheplanisreadilyaccessibletoallstakeholdersandthegeneralpublicwiththemostcurrentinformationsothatprogresscanbetracked.Italsolaysthefoundationforfuturesub-watershedplandevelopmentthatwilleventuallyresultinacomprehensivewatershedmanagementplanfortheentireWinnipesaukeewatershed.Inrecognitionofcreatingthefirstweb-basedwatershedmanagementplantobeapprovedbyDES,theWinnipesaukeeGatewaywasselectedbytheNewHampshirePlannersAssociationasProjectoftheYearin2011.BuildingfromthesuccessfuldevelopmentoftheWinnipesaukeeGateway,theLakesRegionPlanningCommissionhasalreadyinitiatedthenextphaseofwatershedmanagementplanningforCenterHarborandhasplanstopursueadditionalfundinginthecomingyearstodevelopaplanforMoultonboroughInletaswell.

Lake Winnipesaukee. Photo by Gary Tompkins.

Page 24: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

20

MerrimackRiverWatershed

Cobbett’sPondWatershedRestorationPlan

Cobbett’sPondImprovementAssociation

2004/2005/2008Restoration

GrantAmount:$83,591

LocalMatch:$61,826

Cobbett’s Pond Watershed Restoration Plan

Cobbett’sPondinWindhamislocatedinaheavilydevelopedwatershedinsoutheasternNewHampshire.VLAPmonitoringhasshownthatoverthepast19yearsthepondhasshiftedfromoligotrophictoeutrophicstatus.Diminisheddissolvedoxygenlevelsandincreasedlevelsofchlorophyll-ahaveresultedinCobbett’sPondnolongersupportingthedesignateduseforaquaticlife.Whentheprojectstarted,Cobbett’sPondwasonthe305(b)/303(d)listofimpairedwatersforadissolvedoxygensaturationimpairment.Afterthegrantaward,additionalimpairmentsforchorophyll-a,non-nativeaquaticplants,andtotalphosphorushavebeenadded.

In2008,theCobbett’sPondImprovementAssociationwasawardedSection319grantfundstocreateawatershedrestorationplan.Thegoalsfortheassociationweretoidentifypollutantsourcescausingthedissolvedoxygenimpairment,generateawatershedrestorationplantoaddressthesesources,andimplementrecommendedactionswithinthewatershedtohelprestorethepondtofullysupportingstatus.Afterthedevelopmentoftherestorationplan,theassociationcreatedateamofresidentstoreviewandprioritizesitesinthewatershedthatshouldmoveforwardwiththeimplementationofBMPs.

InAugustof2009,theCPIAwroteaWatershedProtectionOrdinanceforCobbett’sPond.InDecember,theWindhamPlanningBoardunanimouslysupportedthepetitionfortownmeeting,andinMarchof2010,townresidentsadoptedtheordinance.TheadoptionoftheseadditionalprotectionsforCobbett’sPondwillfacilitatewaterqualityimprovementpracticesinthewatershed.

AlthoughtheultimategoalofrestoringCobbett’sPondtofullysupportingdesignatedusesmaynotberealizedimmediately,therecommendedstrategiesintheplanaswellastheimplementationofpriorityNPScontrolmeasureswillactasthecatalystforchangestobemadeatboththemunicipalandindividuallandownerscalesthroughregulatoryandvolunteerinitiatives.

A stormwater generated sediment plume discharging to Cobbett’s Pond from the Fossa Road area - one of the priority sites identified for the

construction of BMPs in the Cobbett’s Pond watershed restoration plan.

Page 25: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

21

MerrimackRiverWatershed

LakeHoraceMarshRestoration

PiscataquogLandConservancy

2003/2004Restoration

GrantAmount:$64,359

LocalMatch:$42,843

Lake Horace Marsh Restoration

LakeHoraceMarshisadesignated“primewetland”inWearealongtheNorthBranchofthePiscataquogRiver.Itsecologicalfunctionswereseverelycompromisedbydownstreamdamoperations.RaisingthelevelsofLakeHoraceinthespringandloweringtheminthefalltoaccommodatewaterfrontdockprotectiononHoraceLakehaddireeffectsformostaquaticfloraandfauna.Wildlifesurveysthroughoutthemarshreflecteddrasticreductionsfromnumbersonewouldexpectofwaterfowl,amphibians,mammals,aquaticreptilesandinsects.

Thisprojectinvolvedtheconstructionofarun-of-riverecologicalwatercontrolstructure,designedbyengineersfromtheDESDamBureau,downstreamofthemarshattheconfluenceofHoraceLake.Consistingofcrushedstone,coveredbyageomembranefabricwithlargerdiameterstoneontop,theinstalledcontrolstructureextendsacrosstheriverinadownstream-facingarc.Whenthelakeisdrainedinthefall,waterlevelsdonotfallbelowthetopofthestructure,thuseliminatingthedramaticspringandfallfluctuationsthatcharacterizedthemarshsystembeforeinstallation.Atfullpondelevationinthesummermonths,theecologicalwatercontrolstructureissubmergedbyatleasttwofeetofwaterallowingpassageforcanoes,kayaksandsmallboats.Postmonitoringtodatehasshownthatmarshvegetationhasrespondedpositivelytothestabilizedwaterlevelswithdamagestonestingareasofmanymammalsbeingeliminatedaswell.

Additionalmonitoringisplannedforfiveyearspostconstructiontofurtherevaluatehowtheplantandfishpopulationsareresponding.

Lake Horace Marsh before construction of water control structure in 1998 and after construction in 2011.

Page 26: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

22

ConnecticutRiverWatershed

WarrenBrookRestorationPlanning

TownofAlstead

2007Restoration

GrantAmount:$12,600

LocalMatch:$8,600

Warren Brook Restoration Planning

AsaresultoftheOctober2005flooddisasterinAlstead,WarrenBrookwaslistedasimpairedforaquaticlifeusesupportbasedonbioassess-mentdata.InitialdisasterresponsefundingfromtheNaturalResourcesConservationServiceledtostabilizationofWarrenBrook,mostlywithstonebanking,in2006and2007.DESprovidedfundingtothetownofAlsteadin2008todeveloparestorationplan,prioritizerestorationsites,anddevelopandpermitafinaldesignforonesite

Theprojectpartners,includingtheNewHampshireFish&GameDe-partmentandthetownofAlstead,identifiedthereachofWarrenBrookbetweenstateRoute123andGriffinHillRoadasthetopprioritysiteforrestorationduetoitsgeomorphicinstabilityandthelimitednumberoflandownersthatwouldbeaffectedbyconstruction.

Projectdesignandpermittingwerecompletedwith319fundswhich,inturn,helpedAlsteadsecure$240,000infederalstimulusmoneyfromtheU.S.FishandWildlifeServiceforconstruction,whichwascompletedin2011.

Restored channel of Warren Brook looking upstream.

Section of Warren Brook prior to restoration.

Page 27: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

23

Looking Ahead

In2012,stateswillbeworkingwithEPAtoredesignthefederal319programtoaddressconcernsde-scribedinEPA’sreporttotheOfficeofManagementandBudget.ItislikelythatNewHampshire,likemanystates,willberequiredtoupdatethestateNonpointSourceManagementPlanbytheendof2013.Thisworkwillbeginin2012andislikelytoincludeaprioritysystemforworkinginwatersheds,aswellasrecommendedchangestostatewideapproachestononpointsourcemanagement.

Weanticipateincreasedfederalscrutinyrelativetotheuseof319funds,forwhichDESiswell-pre-pared.Wearecarefultoensurethatgranteesfollowfederalfundingguidelinesandthateachprojecthasquantifiablegoalsandsystemstomeasureprogresstowardthosegoals.Itisourrecentexperi-encethatsuchanapproachimprovesthelikelihoodofsuccessforlocalwatershedpractitionersbecausewatershedstakeholdersbetterunderstandwhyspecificmeasuresarebeingproposedandimplemented.

NitrogenfrompermittedwastewaterdischargesintheGreatBaywatershedhasreceivedquiteabitofattentioninthenewsmediaduringthepastyear.Meanwhile,DEShasbeenbusyworkingtoquan-tifythenonpointsourcesofnitrogeninthewatershed.BySeptember2012,DESexpectstohavethebreakdownofNPSnitrogenfromlawnfertilizer,septicsystems,andstormwaterrunoff,whichwillguideeffortsbymanystakeholdersworkingtorestoreGreatBay.

Alongtheselines,DESwillbeparticipatinginaneffortledbytheNewEnglandgovernorstodevelopvoluntarylawnfertilizerguidelines.WithheavystakeholderparticipationandcoordinatedbytheNewEnglandInterstateWaterPollutionControlCommission,thegoalofthiseffortistocreateguide-linesforthemanufacture,saleandapplicationoflawnfertilizers.

In2012wealsohopetogainsomeclarityonhowstormwaterisaddressedwithrespecttothe319program.SincestormwaterisregulatedasapointsourceunderthefederalMS4program,and319fundscannotbeusedtoimplementprojectsrequiredbyapointsourcepermit,thedistinctionofwhatisrequiredbythepermitisanimportantone.Adraftpermitreleasedin2009byEPAincludesprovisionsrequiringmunicipalretrofitsinareasdrainingtoimpairedwaters.Severalwatershed-basedplansdevelopedbyourpartnersinMS4areasrecommendthisveryactivity.Ifthedraftpermitlanguageremainsunchanged,thiswillcurtailourabilitytoassistlocalgroupswhocontinuetoimple-menttheseplans.Buildingthecapacitytodevelopandimplementwatershed-basedplansrequiressignificantinvestmentsoftimeandmoney,anditisourhopethatthisworkcancontinue,regardlessofhowitisfundedorpermitted.

Page 28: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

24

Appendix ADESSection319WatershedAssistanceGrantsforHighQualityWatersAwardedinFFY2011

Grantee ProjectName ProjectNo.

NPSPollutantCategory

Watershed SourceofFunds(FFY)

GrantAward

LakesRegionPlanning

Commission

LakeWinnipesaukeeWatershedMgt.Plan-CenterHarbor

B-11-M-02 AllSources Merrimack 2011Baseand2010/2011

Incremental

$55,000

GreenMountainConservation

Group

OssipeeWatershedPlan-Phase1AlternativesAnalysis

B-11-S-01 AllSources Saco 2011Base $15,000

TownofWolfeboro LakeWentworthandCrescentLakeWatershedMgt.Plan

B-11-M-03 AllSources Merrimack 2011Base $67,800

TownofBrentwood

MiddleExeterRiverWatershedMgt.PlanImplementationPhase1,RowellRoadWest

B-11-C-04 UrbanRunoff/

Stormwater

Coastal 2010Incremen-tal

$49,152

UNHStormwaterCenter

UNHStormwaterCenterOnCallEngineersforSmallScale

BMPImplementation

B-11-C-01 UrbanRunoff/

Stormwater

Statewide 2010Incremen-tal

$25,000

TotalAward:$211,952

DESSection319WatershedRestorationGrantsforImpairedWatersAwardedinFFY2011Grantee ProjectName Project

No.NPSPollutant

CategoryWatershed Sourceof

Funds(FFY)GrantAward

BlueOceanSocietyforMarine

Conservation

HodgsonBrookWatershedRestorationPlanPhase2BMPsand

ChlorideTMDLdevelopment

R-11-C-05 UrbanRunoff/

Stormwater

Coastal 2009/2010Incremental

$104,574

CityofFranklin WebsterLake-LakeShoreDriveCommunitySepticSystemDesign

andDesign/implementationofBMPs

R-09-M-03 Stormwater/Other

Merrimack 2009Incremental

$70,000

CityofDover BerryBrookWatershedRestorationPlanPhase1Implementation

R-06-C-10 UrbanRunoff/Storm-

water

Coastal 2006Incremental

$55,000

CityofDover BerryBrookWatershedRestorationPlanImplementationPhase2,LID

Retrofits

R-11-C-02 UrbanRunoff/Storm-

water

Coastal 2008/2011Incremental

$147,200

CobbettsPondImprovement

Association

CobbettsPondWatershedRestorationPlanImplementation

Phase2,FossaRoadBMPs

R-10-M-05 UrbanRunoff/Storm-

water

Merrimack 2006/2010Incremental

$100,000

CochecoRiverWatershedCoalition

CochecoRiverWatershedRestorationPlanImplementation

Phase2,RochesterLID

R-11-C-04 UrbanRunoff/Storm-

water

Coastal 2011Incremental

$109,500

NHRiversCouncil McQuestenBrookWatershedRestorationPlanPhase1

R-11-M-01 UrbanRunoff/Storm-

water

Merrimack 2011Incremental

$17,000

TotalAwarded: $603,274

Appendix B

Page 29: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

25

Appendix CDistribution of Section 319 Grant Dollars

Awarded in FFY 2011 by Watershed

Appendix DDistribution of Section 319 Grant Dollars

Awarded in FFY 2011 by NPS Category

Statewide3%

Saco2%

Merrimack38%

Coastal57%

C. Distribution of Section 319 Grant Dollars Awarded in FFY 2011 by Watershed

Urban Runoff/Stormwater

$677,426

General NPS $137,800

D. Distribution of Section 319 Grant Dollars Awarded in FFY 2011 by NPS Category

Page 30: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

26

Appendix EDESSection319BaseProjectsCompletedinFFY2011

Grantee ProjectName FFYSourceof

Funds

Grant# DateCompleted

Watershed 319Funds

TotalCost

ActonWakefieldWatershed

Alliance

Watershed-BasedPlanforHighQualityWatersinthe

AWWARegion

2005/2007/2008

B-08-C-02 10/14/2010 Coastal $108,266 $318,363

TownofHancock HancockVillageStormwaterMgt.andWaterQuality

Improvement

2005/2007 B-07-M-04 1/18/2011 Merrimack $94,800 $220,679

LakesRegionPlanning

Commission

LakeWinnipesaukeeWatershedMgt.Plan:Meredith,Paugusand

SaundersBays

2008 B-08-M-04 3/31/2011 Merrimack $76,640 $150,159

Total $279,706 $689,201

Appendix FDESSection319RestorationProjectsCompletedinFFY2011

Grantee ProjectName FFYSource

ofFunds

Grant# DateCompleted

Watershed 319Funds TotalCost

CobbettsPondImprovement

Association

CobbettsPondWatershedRestorationPlan

2004/2005/2008

R-08-M-01 1/3/2011 Merrimack $83,591 $145,417

TownofAlstead

WarrenBrookRestorationPlanning

2007 R-07-CT-05 1/5/2011 Connecticut $12,600 $21,200

CityofDover WillandPondDrainage 2004/2007

R-07-C-02 1/31/2011 Coastal $68,064 $126,581

PiscataquogLand

Conservancy

LakeHoraceMarshRestoration

2003/2004

R-04-M-01 2/7/2011 Merrimack $64,359 $107,201

BlueOceanSociety

forMarineConservation

HodgsonBrookWatershedRestorationPlan

ImplementationYears3&4

2006 R-05-C-13 3/10/2011 Coastal $85,020 $143,297

TownofSeabrook

CainsBrookandMillCreekRestoration

2006 R-06-C-06 4/15/2011 Coastal $68,240 $125,998

TownofSeabrook

CainsPondRestoration-DredgingtoRemove

NavigationImpairment

2006 R-08-C-03 3/28/2011 Coastal $91,800 $288,100

Total $473,674 $957,794

Page 31: percent by re-allocating the funding to other programs through a maneuver called a “spending plan.” In a typical year, spending plans must be approved by Congress, but in 2011

27

Appendix G2011EstimatedPollutantLoadReductionsAchieved

Grantee ProjectName FFYSourceofFunds

319Funds

TotalCost

P(lbs/yr)

N(lbs/yr)

Sediment(tons/yr)

Other Model/Method

Notes

CochecoRiver

WatershedCoalition

IntroducingLIDinthe

WillowBrookWatershed

2005and2009-

Restoration

$84,912 $141,548 n/a n/a n/a 34lbs/yrTSS

Region5Model

projectstillin

progress

BlueOceanSociety

forMarineConserva-

tion

ReducingEf-fectiveImper-viousSurfaceintheLower

HodgsonBrookWater-shedThrough

LID

2007and2009-

Restoration

$120,416 $210,398 3 18 1.3 n/a Region5Model

projectstillin

progress

CobbettsPondIm-

provementAssocia-

tion

CobbettsPnd-WatershedRestorationPlanImple-mentation

Phase2:FossaRoadBMPs

2006and2010-

Restoration

$100,000 $173,000 12.1 n/a 4.7 n/a Physicalmeasure

NewfoundLake

RegionAs-sociation

NewfoundLakeWater-shedMasterPlanImple-mentation:

Phase1

2008and2010-Base

$127,960 $238,600 2.7 9.9 0.5 n/a Region5Model

Also43.9lbs/yrBOD,0.26lbs/yrlead,

and0.54lbs/yrzinc

CityofDover

BerryBrookWatershed

ManagementPlan-Imple-

mentationProjectsPhase

1

2006-Restoration

$55,000 $96,790 1 0.01 n/a 147.8lbs/yr

TSS

Region5Model

GraniteLakeAs-sociation

GraniteLakeWatershed

ManagementPlan

2008-Base $50,000 $83,354 0.25 n/a n/a n/a Region5Model

ActonWakefield

Water-sheds

Alliance

SalmonFallsHeadwater

LakesWater-shedManage-

mentPlan

2010-Base $107,952 $214,189 18.7 n/a 21.7 n/a Region5Model

projectstillin

progress