PennDOT Home - District 10 2018 Outreach · 2018. 3. 15. · Clarion County Winter 2017-2018...

75
District 10 2018 Outreach Joseph P. Dubovi, III., P. E. District Executive

Transcript of PennDOT Home - District 10 2018 Outreach · 2018. 3. 15. · Clarion County Winter 2017-2018...

  • District 10 2018 Outreach

    Joseph P. Dubovi, III., P. E.District Executive

  • 2018 Outreach Agenda

    Resources

    District Profile

    Leslie S. Richards, Secretary of Transportation

    Construction Projects

    Projects in Design

    County Maintenance

    Innovation & Improvements

    Upcoming Programs

  • District 10 Profile

    INTERESTING TO KNOW:

    PA has roughly as many state-maintained miles of highway as New

    England, New York, & New Jersey combined (40,000).

    PA has the 5th largest roadway system & the 3rd largest number of

    bridges in the country.

    Back to Agenda

    Feature Armstrong Butler Clarion Indiana Jefferson Total

    Population 66,486 186,847 38,513 86,364 44,073 422,283

    -Townships 28 33 22 24 23 130

    -Boroughs 16 23 12 14 11 76

    -Cities 1 1 0 0 0 2

    State Highway

    (Linear Miles) 664 670 476 813 559 3,182

    State Highway

    (Lane Miles)1,382 1,496 1,006 1,728 1,173 6,785

    Interstate Miles 0 29 28 0 24 81

    National Highway

    System Miles68 107 45 113 39 372

    State Routes

    ADT >2000103 230 84 112 83 612

    State Routes

    ADT

  • PennDOT Vision

    PennDOT Mission

    County Accreditation

    PennDOT Connects

    Road MaP

    Diversity

    Leslie S. Richards, Secretary of Transportation

    Back to Agenda

    TOPICS

  • PennDOT Vision

    A better quality of life built on

    transportation excellence.

    Back to Agenda Back to Secretary’s Topics

  • PennDOT Mission

    To provide a sustainable transportation system and quality services that are

    embraced by our communities and add value to our customers.

    Back to Agenda Back to Secretary’s Topics

  • • Truck Skills Rodeo

    • Safety Stand Down Days

    • Training Videos

    • School Awareness

    County Accreditation – Best Practices

    Touch-A-Truck Event

    Truck Skills Rodeo

    Safety First

    Back to Agenda Back to Secretary’s Topics

  • • Safety Innovation Presentations

    • Rolling Roadblock Sign Setting

    • Cone Setting Platform

    • Seal Coat Signing Pilot

    • Flashing Yellow Arrow

    County Accreditation – Best Practices

    I-80 Rolling Roadblock

    Cone Setting Insert

    Flashing Yellow Arrow

    Safety First

    Back to Agenda Back to Secretary’s Topics

  • County Accreditation – Best Practices

    • Asset: People

    – Forming effective partnerships

    – Recruitment, training, retention

    • Asset: Roads

    – Sectional Cycle Maintenance

    – 5-year Paving Plans

    • Asset: Bridges

    – Maintenance & preservation

    – Rehabilitation or replacement of structurally-deficient (SD) bridges

    • Asset: Equipment & Materials

    – Equipment sharing between Counties and other Districts

    – Efficient procurement & use of winter supplies

    Asset Management

    Back to Secretary’s TopicsBack to Agenda

    Structurally Deficient Bridges

    2008 2018

    Statewide 6,034 3,114

    District 10 580 283

  • PennDOT Connects

    Back to Agenda Back to Secretary’s Topics

  • Road MaP

    Road Maintenance and Preservation

    ROAD MaP - Overview

    • Funding & Allocation

    – Act 89

    – Decade of Investment

    – Capital Projects

    – Preservation & Reconstruction

    • Innovation

    – RAP

    – Equipment Sharing

    Back to Agenda Back to Secretary’s Topics

  • Road MaP

    Maintenance

    • RAP (Recycled Asphalt Paving)

    – Environmentally Conscious

    – Ideal for less-traveled roads

    • Department Force vs. Outsourcing

    • 18-year Sign Life Management

    • Sectional Cycle Maintenance

    – Increased from 4 to 5 years

    • Equipment Sharing

    Back to Agenda Back to Secretary’s Topics

  • Diversity

    • Diversity

    – All-inclusive Workforce

    – Stimulates Innovation

    – Sparks Creativity

    – Strengthens the Organization

    • Recruitment

    – Identifying Target Audiences

    – Incorporating Results-Driven Strategies

    – Participating in Community Outreach

    • Retention

    – Inclusion Committees

    – Training & Organizational Support

    Back to Agenda Back to Secretary’s Topics

  • CONSTRUCTION

    Paul F. Koza, Jr., P.E.

    Assistant District Engineer for Construction

    724-357-2812

    Back to Agenda

  • Outreach 2018 – Clarion County

    Back to Agenda

  • Callensburg Bridge #1

    • ECMS #24914

    • SR 58

    • Clarion County

    – Licking Twp.

    • Bridge Replacement

    • Francis J. Palo, Inc.

    • Cost: $5,511,019

    • Let: 6/30/16

    • Completion: Spring 2018

    Back to Agenda

  • Kissinger Mills Bridge #1

    • ECMS #83246

    • SR 3004

    • Clarion County

    – Madison Twp.

    • Bridge Replacement

    • Clearwater Const., Inc.

    • Cost: $906,000

    • Let: 5/18/17

    • Detour

    Back to Agenda

  • Kahle Bridge

    • ECMS #92664

    • SR 3020

    • Clarion County

    – Richland Twp.

    • Bridge Replacement

    • Francis J. Palo, Inc.

    • Cost: $3,383,667

    • Let:6/22/17

    • Detour

    – Open by 10/23/18

    Back to Agenda

  • Stone House Bridge #1

    • ECMS #83236

    • SR 1007

    • Clarion County

    – Clarion Twp.

    • Box Culvert

    • Francis J. Palo, Inc.

    • Cost: $1,383,670

    • Let: 7/13/17

    • Temporary Signal

    • SR 1009 Detour

    Back to Agenda

  • I-80 Emlenton PM

    • ECMS #106025

    • I-80

    • Clarion County

    – Beaver Twp.

    • Resurfacing/Overlay

    • IA Construction Corp.

    • Cost: $19,385,393

    • Let: 7/27/17

    • Lane Rental

    – Phased Long Term Lane Closures

    Back to Agenda

  • New Bethlehem North PM

    • ECMS #106381

    • SR 66

    • Clarion County

    – New Bethlehem

    • Resurfacing/Overlay

    • Cost: $1.0 to $2.5M

    • Let: 3/15/18

    Back to Agenda

  • SR 1015 Forest Road

    • ECMS #91859

    • SR 1015

    • Clarion County

    – Farmington Twp.

    • Resurfacing/Overlay

    • Cost: $1.0 to $2.5M

    • Let: 4/12/18

    Back to Agenda

  • Cooksburg North Resurfacing

    • ECMS #100144

    • SR 36

    • Clarion County

    – Farmington Twp.

    • Resurfacing/Overlay

    • Cost: $2.5 to $5.0M

    • Let: 4/12/18

    Back to Agenda

  • Reidsburg Bridge Curve

    • ECMS #75962

    • SR 68

    • Clarion County

    – Monroe Twp.

    • Bridge Replacement

    • Cost: $2.5 to $5.0M

    • Let: 6/21/18

    • Temporary Signal

    Back to Agenda

  • Fenstermaker RR Bridge Removal

    • ECMS #92622

    • SR 2005

    • Clarion County

    – Ashland Twp.

    • Bridge Removal

    • Cost: $1.0 to $2.5M

    • Let: 6/21/18

    • Detour

    Back to Agenda

  • PA 68/Dolby Street Intersection

    • ECMS #24890

    • SR 68

    • Clarion County

    – Monroe Twp

    • Widening (Additional lanes)

    • Cost: $10.0 to $12.5M

    • Let: 8/23/18

    Back to Agenda

  • 2018 District Wide Contracts

    • 2018 RPM: ECMS #110105

    – Cost: $300,000

    – Let: 4/12/18

    • 2018 Small Paint: ECMS #110106

    – Cost: $300,000

    – Let: 6/7/18

    • Guiderail Contracts:

    – Armstrong: ECMS #110870, Cost $200,000

    – Butler: ECMS #110871, Cost $250,000

    – Clarion: ECMS #110872, Cost $225,000

    – Indiana: ECMS #110873, Cost $250,000

    – Jefferson: ECMS #110874, Cost $225,000

    – Let: 6/7/18

    Back to Agenda

  • Plenary Walsh Keystone Partners – P3 Bridges

    – Lawsonham Bridge SR 2009 Madison Twp

    • JV 383

    • Detour

    – http://parapidbridges.com

    Back to Agenda

    http://parapidbridges.com/

  • DESIGN

    James. R. Andrews, P.E.

    Assistant District Engineer for Design

    724-357-2805

    Back to Agenda

  • 2018 Clarion County Outreach

    Back to Agenda

  • Turnip Hole Bridge No. 3

    • Route 58

    • Bridge Replacement

    • Licking Twp.

    • Over McMichael Run

    • Detour

    • Construction in 2019

    • Estimate: $500,000 - $1M

    Back to Agenda

  • Leeper North PM

    • Route 36

    • Resurfacing

    • Washington & Farmington Twps.

    • Construction in 2019

    • Estimate: $1M - $2.5M

    Back to Agenda

  • Hodil Run Bridge

    • Route 58

    • Bridge Replacement

    • Sligo Twp.

    • Over Hodil Run

    • Phased Construction

    • Construction in 2020

    • Estimate: $500,000 - $1M

    Back to Agenda

  • Jack Run Bridge

    • Route 2003

    • Bridge Replacement

    • Porter Twp.

    • Over Jack Run

    • Detour

    • Construction in 2020

    • Estimate: $500,000 - $1M

    Back to Agenda

  • Catfish Run

    • Route 3006

    • Superstructure Replacement

    • Madison Township

    • Over Catfish Run

    • Detour

    • Construction in 2020

    • Estimate: $500K - $1.5M

    Back to Agenda

  • Craggs Run No. 3

    • Route 68

    • Bridge Replacement

    • Monroe Twp.

    • Over Craggs Run

    • Phased Construction

    • Construction in 2020

    • Estimate: $1M - $2.5M

    Back to Agenda

  • South Leatherwood Bridge

    • Route 861

    • Bridge Replacement

    • Porter Twp.

    • Over Leatherwood Creek

    • Phased Construction

    • Construction in 2020

    • Estimate: $1M - $2.5M

    Back to Agenda

  • Arthurs 3R

    • Route 66

    • Rehabilitation

    • Paint & Knox Twps.

    • Construction in 2020

    • Estimate: $5M - $7.5M

    Back to Agenda

  • East Brady North PM

    • Route 68 - Resurfacing

    • Bradys Bend & Madison Twps.

    • Construction in 2020

    • Estimate: $2.5M - $5M

    Back to Agenda

  • Elmo Bridge

    • Route 322

    • Bridge Replacement

    • Ashland Twp.

    • Over Tributary to Canoe Creek

    • Phased Construction

    • Construction in 2021

    • Estimate: $1M - $2.5M

    Back to Agenda

  • Leatherwood East PM

    • Route 861

    • Preventive Maintenance

    • Porter Twp.

    • Construction in 2022

    • Estimate: $3M - $5M

    Back to Agenda

  • Limestone North PM

    • Route 0066, Seg 0200-0310

    • Resurfacing & Minor Improvements

    • Limestone & Clarion Twps.

    • Construction in 2022

    • Estimate: $1M- $5M

    Back to Agenda

  • I-80 Canoe Creek Bridges

    • Interstate 80 Eastbound & Westbound

    • Bridge Replacements

    • Beaver Twp.

    • Over Canoe Creek & Tippecanoe Road

    • Construction not funded

    • Estimate: $100M - $125M

    Back to Agenda

  • Birch Road Bridge

    • Route 2001

    • Bridge Replacement

    • Redbank Twp.

    • Over Tributary to Piney Creek

    • Detour

    • Construction not funded.

    • Estimate: $500k - $1M

    Back to Agenda

  • Curllsville Bridge No. 2

    • Route 2007

    • Bridge Replacement

    • Monroe Township

    • Over Licking Creek

    • Preliminary Engineering beginning in 2019

    • Construction not funded

    • Estimate: $1M - $2.5M

    Back to Agenda

  • Lickingville Bridge #2

    • Route 4004

    • Bridge Replacement

    • Farmington Twp.

    • Over Licking Creek

    • Preliminary Engineering beginning in 2021

    • Construction not funded

    • Estimate: $1.0 - $2.5M

    Back to Agenda

  • Rimersburg Bridge

    • Route 2009

    • Bridge Replacement

    • Toby Twp.

    • Over Cherry Run

    • Preliminary Engineering beginning in 2022

    • Construction not funded

    • Estimate: $500K - $1.5M

    Back to Agenda

  • Paint Creek Bridge

    • Route 322

    • Bridge Replacement

    • Elk Twp.

    • Preliminary Engineering beginning in 2022

    • Construction not funded

    • Estimate: $2.0 - $3.5M

    Back to Agenda

  • Little Licking Creek Bridge No. 1

    • Route 68

    • Bridge Replacement

    • Sligo Borough

    • Over Little Licking Creek

    • Preliminary Engineering beginning in 2022

    • Construction not funded

    • Estimate: $1M - $2.5M

    Back to Agenda

  • Tylersburg Bridge #2

    • Route 4004

    • Bridge Replacement

    • Farmington Twp.

    • Over Trib. to Licking Creek

    • Preliminary Engineering beginning in 2022

    • Construction not funded

    • Estimate: $1.0 - $2.5M

    Back to Agenda

  • Wolfs Corners Bridge

    • SR 4017

    • Bridge Replacement

    • Washington Twp.

    • Over Little Tionesta Creek

    • Construction not funded

    • Estimate: $500,000 - $1M

    Back to Agenda

  • MAINTENANCE

    Brian N. Allen, P.E.

    Assistant District Engineer for Maintenance

    724-357-2809

    Back to Agenda

  • 2018 Clarion County Maintenance

    • County ManagerJoshua Clinger

    • Assistant County ManagerVern Slaugenhoup

    • Assistant County Manager Adam Hennessy

    • County Equipment Manager Brant Cirrincione

    • Roadway Programs Coordinator Ashley Downs

    • Adopt a Highway Coordinator Corri Shumaker

    21057 Paint Blvd.Shippenville, PA 16254

    814-226-8200

    Back to Agenda

  • Clarion County Winter

    2017-2018 Clarion County Winter Budget (personnel & operations) $2,776,000

    Salt (5-year average in tons) 10,846

    Anti-Skid (5-year average in tons) 16,154

    Brine (5-year average in gallons) 189,441

    Back to Agenda

  • 2018 Clarion County Sectional Cycle

    Summer Maintenance Cycle Activities for 2018

    – Drainage

    – Shoulder Cutting

    – General Maintenance

    – Seal Coat Surface Treatment

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Pipe Replacement / Drainage Program

    2018 Planned: 590 feetof Pipe Replacement

    2018 Planned: 400 feetof Parallel Pipe Installation

    Completed in 2017:890 feet of cross pipe &440 feet of parallel pipe

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Underdrain Program

    2018 Planned: 6,000 feet

    70 feet completed in 2017

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Ditch Cleaning Program

    2018 Planned: 100,000 feet

    8,700 feet completed in 2017

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Shoulder Cutting Program

    2018 Planned: 191 miles

    212 miles completed in 2017

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Mowing Program

    28 milesInterstate 80

    mowed 3 times/year;193 milesMainlines

    mowed 2/year

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Seal Coat Program

    2018 Planned:369,000 gallons

    367,500 gallons completed in 2017

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Crack Sealing Program

    2018 Planned:113 miles

    79 miles completed in 2017

    Back to Agenda

  • 2017 Department Force Bridge Replacement

    SR 4005 over a tributary of Canoe Creek

    Beaver Township

    2018 Clarion County PennDOT Maintenance

    Back to Agenda

  • 2018 Department Force Bridge Replacement

    SR 2005 over Jack Run

    Porter Township

    2018 Clarion County PennDOT Maintenance

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Completed 2017 Department Force Bridge

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    Department Force Bridge Detour

    Project Location

    Back to Agenda

  • 2018 Clarion County PennDOT Maintenance

    2017-2018 Low Cost Safety Initiative Project

    • Remove trees from inside of curve and slope bank for site distance on SR 2012

    • Slope bank, stabilize and add vegetative growth on SR 536 at the intersection with SR 28

    Before the projectBefore the project

    Back to Agenda

  • SR 2005 will be

    closed in June of 2018

    and reopened in August 2018

    Back to Agenda

    2018 Clarion County PennDOT Maintenance

  • 2018 Clarion County PennDOT Maintenance

    Agility ProgramAgility is a tool to build relationships with

    local communities by sharing and exchanging services and resources.

    Current active work plans

    • Clarion County Career Center

    − PennDOT –use of message boards

    − Career Center – provides use of conference room with

    refreshments and also provides lunches for various meetings

    Back to Agenda

  • Innovation & Improvements

    BUTLER VO-TECH, JUDGE’S PICK

    Keystone Area (Clarion) Facebook Fan Favorite

    Back to Agenda

  • Innovation & Improvement

    ALL ABOUT

    SAFETY• Slower Speeds• 90% Reduction in Fatal

    Crashes• 75% Reduction in Injury

    Crashes• 30-40% Reduction in

    Pedestrian Crashes• 10% Reduction in

    Bicycle Crashes

    CAPACITY• Reduces Delays• 30% Increase in Vehicle

    Accommodation

    • Increased Traffic Flow

    • Click HERE for Roundabout Video

    Back to Agenda

    http://www.dot.state.pa.us/public/Bureaus/design/Roundabouts/Shockwave Files/4501m001_july12th2004.swf

  • Upcoming Programs

    • Rural Commercial Routes Program

    – Low volume route improvements

    – Pavement treatments

    • Recycled asphalt

    • Flexible base

    • Warm mix asphalt with higher recycled asphalt percentage

    • Municipal Bridge Improvement Program

    – Component of Road MaP

    – Bundling for cost savings

    – Partnering with local government agencies

    Back to Agenda

  • Resources – Customer Care Center

    www.penndot.gov

    Back to Agenda

  • Resources - Alerts

    • Incidents

    • Construction

    • Winter road conditions

    • Weather forecasts

    • Weather alerts

    • Plow truck locations

    • Zoom to your region

    Back to Agenda

  • Resources – Customer Surveys

    www.penndot.govRegional Offices, D10

    Customer Service Surveys

    Winter Survey – live during the winter

    storm season.

    Construction Survey – live between mid-

    November and the end of December.

    Back to Agenda

    http://www.penndot.gov/