PennDOT Home - District 10 2018 Outreach · 2018. 3. 15. · Clarion County Winter 2017-2018...
Transcript of PennDOT Home - District 10 2018 Outreach · 2018. 3. 15. · Clarion County Winter 2017-2018...
-
District 10 2018 Outreach
Joseph P. Dubovi, III., P. E.District Executive
-
2018 Outreach Agenda
Resources
District Profile
Leslie S. Richards, Secretary of Transportation
Construction Projects
Projects in Design
County Maintenance
Innovation & Improvements
Upcoming Programs
-
District 10 Profile
INTERESTING TO KNOW:
PA has roughly as many state-maintained miles of highway as New
England, New York, & New Jersey combined (40,000).
PA has the 5th largest roadway system & the 3rd largest number of
bridges in the country.
Back to Agenda
Feature Armstrong Butler Clarion Indiana Jefferson Total
Population 66,486 186,847 38,513 86,364 44,073 422,283
-Townships 28 33 22 24 23 130
-Boroughs 16 23 12 14 11 76
-Cities 1 1 0 0 0 2
State Highway
(Linear Miles) 664 670 476 813 559 3,182
State Highway
(Lane Miles)1,382 1,496 1,006 1,728 1,173 6,785
Interstate Miles 0 29 28 0 24 81
National Highway
System Miles68 107 45 113 39 372
State Routes
ADT >2000103 230 84 112 83 612
State Routes
ADT
-
PennDOT Vision
PennDOT Mission
County Accreditation
PennDOT Connects
Road MaP
Diversity
Leslie S. Richards, Secretary of Transportation
Back to Agenda
TOPICS
-
PennDOT Vision
A better quality of life built on
transportation excellence.
Back to Agenda Back to Secretary’s Topics
-
PennDOT Mission
To provide a sustainable transportation system and quality services that are
embraced by our communities and add value to our customers.
Back to Agenda Back to Secretary’s Topics
-
• Truck Skills Rodeo
• Safety Stand Down Days
• Training Videos
• School Awareness
County Accreditation – Best Practices
Touch-A-Truck Event
Truck Skills Rodeo
Safety First
Back to Agenda Back to Secretary’s Topics
-
• Safety Innovation Presentations
• Rolling Roadblock Sign Setting
• Cone Setting Platform
• Seal Coat Signing Pilot
• Flashing Yellow Arrow
County Accreditation – Best Practices
I-80 Rolling Roadblock
Cone Setting Insert
Flashing Yellow Arrow
Safety First
Back to Agenda Back to Secretary’s Topics
-
County Accreditation – Best Practices
• Asset: People
– Forming effective partnerships
– Recruitment, training, retention
• Asset: Roads
– Sectional Cycle Maintenance
– 5-year Paving Plans
• Asset: Bridges
– Maintenance & preservation
– Rehabilitation or replacement of structurally-deficient (SD) bridges
• Asset: Equipment & Materials
– Equipment sharing between Counties and other Districts
– Efficient procurement & use of winter supplies
Asset Management
Back to Secretary’s TopicsBack to Agenda
Structurally Deficient Bridges
2008 2018
Statewide 6,034 3,114
District 10 580 283
-
PennDOT Connects
Back to Agenda Back to Secretary’s Topics
-
Road MaP
Road Maintenance and Preservation
ROAD MaP - Overview
• Funding & Allocation
– Act 89
– Decade of Investment
– Capital Projects
– Preservation & Reconstruction
• Innovation
– RAP
– Equipment Sharing
Back to Agenda Back to Secretary’s Topics
-
Road MaP
Maintenance
• RAP (Recycled Asphalt Paving)
– Environmentally Conscious
– Ideal for less-traveled roads
• Department Force vs. Outsourcing
• 18-year Sign Life Management
• Sectional Cycle Maintenance
– Increased from 4 to 5 years
• Equipment Sharing
Back to Agenda Back to Secretary’s Topics
-
Diversity
• Diversity
– All-inclusive Workforce
– Stimulates Innovation
– Sparks Creativity
– Strengthens the Organization
• Recruitment
– Identifying Target Audiences
– Incorporating Results-Driven Strategies
– Participating in Community Outreach
• Retention
– Inclusion Committees
– Training & Organizational Support
Back to Agenda Back to Secretary’s Topics
-
CONSTRUCTION
Paul F. Koza, Jr., P.E.
Assistant District Engineer for Construction
724-357-2812
Back to Agenda
-
Outreach 2018 – Clarion County
Back to Agenda
-
Callensburg Bridge #1
• ECMS #24914
• SR 58
• Clarion County
– Licking Twp.
• Bridge Replacement
• Francis J. Palo, Inc.
• Cost: $5,511,019
• Let: 6/30/16
• Completion: Spring 2018
Back to Agenda
-
Kissinger Mills Bridge #1
• ECMS #83246
• SR 3004
• Clarion County
– Madison Twp.
• Bridge Replacement
• Clearwater Const., Inc.
• Cost: $906,000
• Let: 5/18/17
• Detour
Back to Agenda
-
Kahle Bridge
• ECMS #92664
• SR 3020
• Clarion County
– Richland Twp.
• Bridge Replacement
• Francis J. Palo, Inc.
• Cost: $3,383,667
• Let:6/22/17
• Detour
– Open by 10/23/18
Back to Agenda
-
Stone House Bridge #1
• ECMS #83236
• SR 1007
• Clarion County
– Clarion Twp.
• Box Culvert
• Francis J. Palo, Inc.
• Cost: $1,383,670
• Let: 7/13/17
• Temporary Signal
• SR 1009 Detour
Back to Agenda
-
I-80 Emlenton PM
• ECMS #106025
• I-80
• Clarion County
– Beaver Twp.
• Resurfacing/Overlay
• IA Construction Corp.
• Cost: $19,385,393
• Let: 7/27/17
• Lane Rental
– Phased Long Term Lane Closures
Back to Agenda
-
New Bethlehem North PM
• ECMS #106381
• SR 66
• Clarion County
– New Bethlehem
• Resurfacing/Overlay
• Cost: $1.0 to $2.5M
• Let: 3/15/18
Back to Agenda
-
SR 1015 Forest Road
• ECMS #91859
• SR 1015
• Clarion County
– Farmington Twp.
• Resurfacing/Overlay
• Cost: $1.0 to $2.5M
• Let: 4/12/18
Back to Agenda
-
Cooksburg North Resurfacing
• ECMS #100144
• SR 36
• Clarion County
– Farmington Twp.
• Resurfacing/Overlay
• Cost: $2.5 to $5.0M
• Let: 4/12/18
Back to Agenda
-
Reidsburg Bridge Curve
• ECMS #75962
• SR 68
• Clarion County
– Monroe Twp.
• Bridge Replacement
• Cost: $2.5 to $5.0M
• Let: 6/21/18
• Temporary Signal
Back to Agenda
-
Fenstermaker RR Bridge Removal
• ECMS #92622
• SR 2005
• Clarion County
– Ashland Twp.
• Bridge Removal
• Cost: $1.0 to $2.5M
• Let: 6/21/18
• Detour
Back to Agenda
-
PA 68/Dolby Street Intersection
• ECMS #24890
• SR 68
• Clarion County
– Monroe Twp
• Widening (Additional lanes)
• Cost: $10.0 to $12.5M
• Let: 8/23/18
Back to Agenda
-
2018 District Wide Contracts
• 2018 RPM: ECMS #110105
– Cost: $300,000
– Let: 4/12/18
• 2018 Small Paint: ECMS #110106
– Cost: $300,000
– Let: 6/7/18
• Guiderail Contracts:
– Armstrong: ECMS #110870, Cost $200,000
– Butler: ECMS #110871, Cost $250,000
– Clarion: ECMS #110872, Cost $225,000
– Indiana: ECMS #110873, Cost $250,000
– Jefferson: ECMS #110874, Cost $225,000
– Let: 6/7/18
Back to Agenda
-
Plenary Walsh Keystone Partners – P3 Bridges
– Lawsonham Bridge SR 2009 Madison Twp
• JV 383
• Detour
– http://parapidbridges.com
Back to Agenda
http://parapidbridges.com/
-
DESIGN
James. R. Andrews, P.E.
Assistant District Engineer for Design
724-357-2805
Back to Agenda
-
2018 Clarion County Outreach
Back to Agenda
-
Turnip Hole Bridge No. 3
• Route 58
• Bridge Replacement
• Licking Twp.
• Over McMichael Run
• Detour
• Construction in 2019
• Estimate: $500,000 - $1M
Back to Agenda
-
Leeper North PM
• Route 36
• Resurfacing
• Washington & Farmington Twps.
• Construction in 2019
• Estimate: $1M - $2.5M
Back to Agenda
-
Hodil Run Bridge
• Route 58
• Bridge Replacement
• Sligo Twp.
• Over Hodil Run
• Phased Construction
• Construction in 2020
• Estimate: $500,000 - $1M
Back to Agenda
-
Jack Run Bridge
• Route 2003
• Bridge Replacement
• Porter Twp.
• Over Jack Run
• Detour
• Construction in 2020
• Estimate: $500,000 - $1M
Back to Agenda
-
Catfish Run
• Route 3006
• Superstructure Replacement
• Madison Township
• Over Catfish Run
• Detour
• Construction in 2020
• Estimate: $500K - $1.5M
Back to Agenda
-
Craggs Run No. 3
• Route 68
• Bridge Replacement
• Monroe Twp.
• Over Craggs Run
• Phased Construction
• Construction in 2020
• Estimate: $1M - $2.5M
Back to Agenda
-
South Leatherwood Bridge
• Route 861
• Bridge Replacement
• Porter Twp.
• Over Leatherwood Creek
• Phased Construction
• Construction in 2020
• Estimate: $1M - $2.5M
Back to Agenda
-
Arthurs 3R
• Route 66
• Rehabilitation
• Paint & Knox Twps.
• Construction in 2020
• Estimate: $5M - $7.5M
Back to Agenda
-
East Brady North PM
• Route 68 - Resurfacing
• Bradys Bend & Madison Twps.
• Construction in 2020
• Estimate: $2.5M - $5M
Back to Agenda
-
Elmo Bridge
• Route 322
• Bridge Replacement
• Ashland Twp.
• Over Tributary to Canoe Creek
• Phased Construction
• Construction in 2021
• Estimate: $1M - $2.5M
Back to Agenda
-
Leatherwood East PM
• Route 861
• Preventive Maintenance
• Porter Twp.
• Construction in 2022
• Estimate: $3M - $5M
Back to Agenda
-
Limestone North PM
• Route 0066, Seg 0200-0310
• Resurfacing & Minor Improvements
• Limestone & Clarion Twps.
• Construction in 2022
• Estimate: $1M- $5M
Back to Agenda
-
I-80 Canoe Creek Bridges
• Interstate 80 Eastbound & Westbound
• Bridge Replacements
• Beaver Twp.
• Over Canoe Creek & Tippecanoe Road
• Construction not funded
• Estimate: $100M - $125M
Back to Agenda
-
Birch Road Bridge
• Route 2001
• Bridge Replacement
• Redbank Twp.
• Over Tributary to Piney Creek
• Detour
• Construction not funded.
• Estimate: $500k - $1M
Back to Agenda
-
Curllsville Bridge No. 2
• Route 2007
• Bridge Replacement
• Monroe Township
• Over Licking Creek
• Preliminary Engineering beginning in 2019
• Construction not funded
• Estimate: $1M - $2.5M
Back to Agenda
-
Lickingville Bridge #2
• Route 4004
• Bridge Replacement
• Farmington Twp.
• Over Licking Creek
• Preliminary Engineering beginning in 2021
• Construction not funded
• Estimate: $1.0 - $2.5M
Back to Agenda
-
Rimersburg Bridge
• Route 2009
• Bridge Replacement
• Toby Twp.
• Over Cherry Run
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $500K - $1.5M
Back to Agenda
-
Paint Creek Bridge
• Route 322
• Bridge Replacement
• Elk Twp.
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $2.0 - $3.5M
Back to Agenda
-
Little Licking Creek Bridge No. 1
• Route 68
• Bridge Replacement
• Sligo Borough
• Over Little Licking Creek
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $1M - $2.5M
Back to Agenda
-
Tylersburg Bridge #2
• Route 4004
• Bridge Replacement
• Farmington Twp.
• Over Trib. to Licking Creek
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $1.0 - $2.5M
Back to Agenda
-
Wolfs Corners Bridge
• SR 4017
• Bridge Replacement
• Washington Twp.
• Over Little Tionesta Creek
• Construction not funded
• Estimate: $500,000 - $1M
Back to Agenda
-
MAINTENANCE
Brian N. Allen, P.E.
Assistant District Engineer for Maintenance
724-357-2809
Back to Agenda
-
2018 Clarion County Maintenance
• County ManagerJoshua Clinger
• Assistant County ManagerVern Slaugenhoup
• Assistant County Manager Adam Hennessy
• County Equipment Manager Brant Cirrincione
• Roadway Programs Coordinator Ashley Downs
• Adopt a Highway Coordinator Corri Shumaker
21057 Paint Blvd.Shippenville, PA 16254
814-226-8200
Back to Agenda
-
Clarion County Winter
2017-2018 Clarion County Winter Budget (personnel & operations) $2,776,000
Salt (5-year average in tons) 10,846
Anti-Skid (5-year average in tons) 16,154
Brine (5-year average in gallons) 189,441
Back to Agenda
-
2018 Clarion County Sectional Cycle
Summer Maintenance Cycle Activities for 2018
– Drainage
– Shoulder Cutting
– General Maintenance
– Seal Coat Surface Treatment
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Pipe Replacement / Drainage Program
2018 Planned: 590 feetof Pipe Replacement
2018 Planned: 400 feetof Parallel Pipe Installation
Completed in 2017:890 feet of cross pipe &440 feet of parallel pipe
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Underdrain Program
2018 Planned: 6,000 feet
70 feet completed in 2017
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Ditch Cleaning Program
2018 Planned: 100,000 feet
8,700 feet completed in 2017
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Shoulder Cutting Program
2018 Planned: 191 miles
212 miles completed in 2017
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Mowing Program
28 milesInterstate 80
mowed 3 times/year;193 milesMainlines
mowed 2/year
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Seal Coat Program
2018 Planned:369,000 gallons
367,500 gallons completed in 2017
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Crack Sealing Program
2018 Planned:113 miles
79 miles completed in 2017
Back to Agenda
-
2017 Department Force Bridge Replacement
SR 4005 over a tributary of Canoe Creek
Beaver Township
2018 Clarion County PennDOT Maintenance
Back to Agenda
-
2018 Department Force Bridge Replacement
SR 2005 over Jack Run
Porter Township
2018 Clarion County PennDOT Maintenance
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Completed 2017 Department Force Bridge
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
Department Force Bridge Detour
Project Location
Back to Agenda
-
2018 Clarion County PennDOT Maintenance
2017-2018 Low Cost Safety Initiative Project
• Remove trees from inside of curve and slope bank for site distance on SR 2012
• Slope bank, stabilize and add vegetative growth on SR 536 at the intersection with SR 28
Before the projectBefore the project
Back to Agenda
-
SR 2005 will be
closed in June of 2018
and reopened in August 2018
Back to Agenda
2018 Clarion County PennDOT Maintenance
-
2018 Clarion County PennDOT Maintenance
Agility ProgramAgility is a tool to build relationships with
local communities by sharing and exchanging services and resources.
Current active work plans
• Clarion County Career Center
− PennDOT –use of message boards
− Career Center – provides use of conference room with
refreshments and also provides lunches for various meetings
Back to Agenda
-
Innovation & Improvements
BUTLER VO-TECH, JUDGE’S PICK
Keystone Area (Clarion) Facebook Fan Favorite
Back to Agenda
-
Innovation & Improvement
ALL ABOUT
SAFETY• Slower Speeds• 90% Reduction in Fatal
Crashes• 75% Reduction in Injury
Crashes• 30-40% Reduction in
Pedestrian Crashes• 10% Reduction in
Bicycle Crashes
CAPACITY• Reduces Delays• 30% Increase in Vehicle
Accommodation
• Increased Traffic Flow
• Click HERE for Roundabout Video
Back to Agenda
http://www.dot.state.pa.us/public/Bureaus/design/Roundabouts/Shockwave Files/4501m001_july12th2004.swf
-
Upcoming Programs
• Rural Commercial Routes Program
– Low volume route improvements
– Pavement treatments
• Recycled asphalt
• Flexible base
• Warm mix asphalt with higher recycled asphalt percentage
• Municipal Bridge Improvement Program
– Component of Road MaP
– Bundling for cost savings
– Partnering with local government agencies
Back to Agenda
-
Resources – Customer Care Center
www.penndot.gov
Back to Agenda
-
Resources - Alerts
• Incidents
• Construction
• Winter road conditions
• Weather forecasts
• Weather alerts
• Plow truck locations
• Zoom to your region
Back to Agenda
-
Resources – Customer Surveys
www.penndot.govRegional Offices, D10
Customer Service Surveys
Winter Survey – live during the winter
storm season.
Construction Survey – live between mid-
November and the end of December.
Back to Agenda
http://www.penndot.gov/