Pelton turbines –vertical
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV4i 770/200Output: 2479 kW
Replacement of 3 pcs. Head: 381 m1-jet Pelton turbines Speed: 1000 min-1
Year: 2011Country: Switzerland
RISI 3
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV6I1122/330Generator Output: 5207 kW Inlet valve Head: 207 mHydraulic and digital governor Speed: 500 min-1Electrical equipment Year: 2010Erection and commissioning Country: Turkey
AKSU
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV6c 750/260 Inlet valve Output: 1575 kW Hydraulic governor Head: 128 mErection and commissioning Speed: 600 min-1
Year: 2010Country: Greece
KARPI
VOMPERBACH
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV6i-1030/310Generator Output: 6219 kW Cooling water equipment Head: 240,88 mErection and commissioning Speed: 600 min-1
Year: 2009Country: Austria
ALPBACH
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV4i-700/200Generator Output: 2155 kW Inlet valve Head: 334 mHydraulic governor Speed: 1000 min-1Erection and commissioning Year: 2009
Country: Switzerland
ROHRWIESTEICH
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV4i-520/150Generator Output: 486 kW Inlet valve Head: 161 mHydraulic governor Speed: 1000 min-1Erection and commissioning Year: 2007
Country: Austria
STAMS
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV4c-640/150Governor Output: 968 kW Generator Head: 242 mElectrical equipment Speed: 1000 min-1Inlet valve Year: 2007Erection Country: Austria
KALEN
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: PV6i-930/295Generators Output: 7825 kW Inlet valves Head: 290 mHydraulic governors Speed: 750 min-1Erection and commissioning Year: 2007
Country: Turkey
KERASOVOSCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 1 x FSHc-4,62/38 Generators 1 x PV4c-640/200Inlet valves Output: 1 x 1770 kW / 1 x 744 kWHydraulic governors Head: 140 m / 141 mErection and commissioning Speed: 1000 min-1 / 750 min-1
Year: 2005Country: Greece
JACOBI
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV4c-780/260Inlet valve Output: 732 kW Generator Head: 100.3 mHydraulic governor Speed: 500 min-1Erection and commissioning Year: 2005
Country: Austria
LOWER ANATOLIKI
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV4c-780/260Inlet valve Output: 679 kW Hydraulic governor Head: 87 mErection and Commissioning Speed: 500 min-1
Year: 2005Country: Greece
PALIOURISCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHc-7,0/51 Generators 1 x PV4c-950/330Inlet valves Output: 2 x 3135 kW / 1 x 1298 kW Hydraulic governors Head: 106,7 m / 105 mErection and commissioning Speed: 750 min-1 / 428 min-1
Year: 2005Country: Greece
GRADENBACH
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV6c-850/200Inlet valve Output: 2602 kW Generator Head: 257 mHydraulic governors Speed: 750 min-1Steel structure Year: 2004Erection and commissioning Country: Austria
KÖTSCHACHBACH
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: PV6c-930/295Inlet valve Output: 1999 kW Generator Head: 126 mHydraulic governor Speed: 500 min-1Steel structure Year: 2001Erection and commissioning Country: Austria