PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER...
-
Upload
corbin-presnell -
Category
Documents
-
view
216 -
download
1
Transcript of PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER...
![Page 1: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/1.jpg)
PELINDO III
INDONESIA PRESENTATIONON
36th ASEAN PORTS ASSOCIATION MEETING
CAMBODIA, 8 - 11 DECEMBER 2010
![Page 2: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/2.jpg)
Indonesia Port Corporation I
Indonesia Port Corporation II
Indonesia Port Corporation III
Indonesia Port Corporation IV
Jakarta
Medan
SurabayaMakassar
INDONESIA PORT CORPORATIONS
IPC I
IPC II
IPC III
IPC IV
Indonesia’s state-owned port companies:
![Page 3: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/3.jpg)
PROFILE OF INDONESIA PORT CORPORATION III
43 Ports2 Business Units
Operations area : 7 provinces out of 33
provinces in Indonesia
Total area : 248.524 KM2 (13% of total
area in Indonesia)
Serve 88.641.069 people (40.50% of total population)
IPC III
5 Subsidiary Companies
1. PT. TPS (Container Terminal)2. PT. BJTI (Logistics)3. PT. RSPS (Hospital)4. PT. Portek Indonesia (Equipment)5. PT. Ambapers (Channel Operator)
![Page 4: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/4.jpg)
IPC III IN TRANFORMATION
IPC III
Port Operating Company
Port Operating Company
Terminal Operating Company
Terminal Operating Company
![Page 5: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/5.jpg)
IPC III MAJOR PROJECTS
Surabaya Western Access Channel (SWAC)
Teluk Lamong Multipurpose Terminal
Benoa Cruise Terminal
* Notes : Usulan Rute Tol Baru Land or Mangrove Edge
New Island (marina &Fishery)
Cruise Ships
Rute Tol Awal
ANGKASA
PURA
PELINDO III
NUSA DUA TOURIST RESORTINTERNATIONAL
CONVENTION HALL
DENPASAR
SELATAN
SANUR
![Page 6: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/6.jpg)
PORT OF TANJUNG PERAK
APBS IMPROVEMENT THREATS
SHIPPING LANES • Length : 25 mil laut• Width : 100 Meter • Depth : 9,50 M LWS• Total SBN : 18 buoys + 7 (NEW)
SHIPPING LANES • Length : 25 mil laut• Width : 100 Meter • Depth : 9,50 M LWS• Total SBN : 18 buoys + 7 (NEW)
LOCATION COORDINATE IN TANJUNG PERAK :
112° 43’ 22” BT7° 11’ 54” LS
LOCATION COORDINATE IN TANJUNG PERAK :
112° 43’ 22” BT7° 11’ 54” LS
Water area : 1.547,3 HaLand area : 574,7 Ha
Water area : 1.547,3 HaLand area : 574,7 Ha
6
SURABAYA WESTERN ACCESS CHANNEL
![Page 7: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/7.jpg)
DEVELOPMENT PLAN OF SWAC
MADURA
JAVA
Pipa Gas Lama
No.1 3
5
2
7
9 4
11
Buoy MAFIA
6
13
15
8
PILOT STATION Kr. Jamuang
SWEBERCONQUEST
CHANNELWIDTH 100 mDEPTH -9,5 m
Lebar 100 mLWS 9,5 m
Lebar 150 mLWS 10 m - 11 m
Area Anchorage
Area Anchorage
Area Anchorage
Alpha DMB 88
Maspion
Smelthing
10 Rede Tg. Perak Surabaya
PORT OF TANJUNG PERAK SURABAYA
Petro Kimia
Dermaga Gresik
PLTU
Current Width : 100 Meter Depth : - 9,50 M LWS Capacities: 27.000 Moves/Years
Future Width : 200 Meter Depth : - 14 M LWS Capacities : 58.000 Moves/Years
![Page 8: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/8.jpg)
TELUK LAMONG MULTIPURPOSE TERMINAL (1)
1. Accommodate overflow of Tanjung Perak Port.
2. Increase Capacity.3. Built on an artificial island in area of 50
hectare.
4. Structures Causeway : 1.280 M Berth : 51.200 m2 (1.280 x 40m)Container Yard : 364.800 m2
(9.600 ground slots)
5. CY Capacity :1.708.200 Teus/Years
6. Support Facility :Causeway, Bridge, Gate in/out, office, road
and workshop, parking area, CFS.
![Page 9: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/9.jpg)
TELUK LAMONG MULTIPURPOSE TERMINAL (2)
9
Activities that have been done :- Feasibility study- Detailed Engineering Design- Bidding process for civil construction- Earth breaking to commence
construction
![Page 10: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/10.jpg)
BENOA AS CENTER OF CRUISE DESTINATION
CRUISE SHIP TO INDONESIA (2010)
236 CALLS
CRUISE SHIP TO INDONESIA (2010)
236 CALLS
![Page 11: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/11.jpg)
PROPOSED DEVELOPMENT OF BENOA
*
Notes : Usulan Rute Tol Baru Land or Mangrove Edge
New Island (marina &Fishery)
Cruise Ships
Rute Tol Awal
ANGKASA PURA
PELINDO III
NUSA DUA TOURIST RESORTINTERNATIONAL CONVENTION HALL
DENPASAR SELATAN
SANUR
![Page 12: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/12.jpg)
BENOA DEVELOPMENT PLAN (1)
SHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAM
![Page 13: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/13.jpg)
BENOA DEVELOPMENT PLAN (2)
I
- Deepening and widening port basin- Straightening acces channel
- Deepening and widening port basin- Straightening acces channel
SHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAM
![Page 14: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/14.jpg)
BENOA DEVELOPMENT PLAN (3)
MASTERPLANMASTERPLANMASTERPLANMASTERPLAN
![Page 15: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010.](https://reader033.fdocuments.us/reader033/viewer/2022051819/551a9472550346761a8b59bd/html5/thumbnails/15.jpg)