    1/29

    www.primeelectricltd.com

    PRIME ELECTRICLIMITED

  • 7/31/2019 PEL Presentation English

    2/29

    www.primeelectricltd.com

    PRIMEGROUP

    PrimeGroup

    Aleadingforceforover25years

    Adiversifiedgroupofcompanies

    HighTechnology

    equipment

    sand

    systems

    covering

    theentirespectrumofpowersector

    Generation,Distributionandtransmission; precisionengineeringpowerconditioning,CNCmachinetoolsetc.

  • 7/31/2019 PEL Presentation English

    3/29

    www.primeelectricltd.com

    PRIMEELECTRICLTD

    PrimeElectricLtd

    APrime

    Group

    Company

    Stateofartfacilities

    Design,Manufacturing,

    Testing

    and

    Services

    for

    Upto1000MVA/500KVPowerTransformerswithannualcapacityof10,000MVA(PhaseI)

    Willupgrade

    to

    765

    KV

    and

    above

    with

    annual

    capacity

    of

    35,000MVA(PhaseII)

    Sprawlingover100acres,locatedinaSpecialEconomicZone,AndhraPradeshhavingthreeports(Krishnapatnam,Ennore

    andChennaiPort)withinamere150kilometerradius

  • 7/31/2019 PEL Presentation English

    4/29

    www.primeelectricltd.com

    PrimeElectricLtd

    Oneofthelargest,fullyplannedandequipped

    mostmodern

    State

    of

    the

    art

    manufacturing

    facilityinthecountry.

  • 7/31/2019 PEL Presentation English

    5/29

    www.primeelectricltd.com

    PrimeElectricLtd.

    Comparabletothebest acrosstheworldwith

    thelatest

    and

    the

    most

    modern

    machines

    from

    worldleaders

    SwingSheartechnologybased,CRGOcuttingandslittingmachinesfromGeorg,Germany

    TransformertestPlantfromHighvolt,Germany

    Paperinsulated

    copper

    conductor

    for

    windings

    producedwithintheplanttomaintaincritical

    quality

    requirements.

  • 7/31/2019 PEL Presentation English

    6/29www.primeelectricltd.com

    PrimeElectricLtd

    Technology transferred and supplied by worldrenowned OSC VIT, a part of the Electrozavod

    Group, the world largest manufacturer of Power

    Transformer

    Electrostatic field distribution

    under lightening & switching impulse and induced overvoltage conditions

    Electromagnetic field distribution

    Magnetizing inrush currents

    Shortcircuit strength of windings

    Temperatures of windings and structures including hot spots.

  • 7/31/2019 PEL Presentation English

    7/29www.primeelectricltd.com

    MANUFACTURINGFLOWDIAGRAMFOR

    TRANSFORMER

  • 7/31/2019 PEL Presentation English

    8/29

    www.primeelectricltd.com

    PLANTORGANISATIONCHART

    Chief

    OperationsFinance Purchase Marketing Administration

    Production Design Quality&Testing

    CHIEFEXECUTIVE

  • 7/31/2019 PEL Presentation English

    9/29

    www.primeelectricltd.com

    ORGANIZATIONCHARTOFPRODUCTION

    DEPARTMENT

    Office

    Assistant

    InchargeFabrication InchargeProduction

    Corecutting

    CoreAssemblyWinding

    Coil

    Assembly

    Corecoil

    assembly&

    Wiring

    Final

    Assembly

    HeadProduction

    InsulationWinding

    Conductor

  • 7/31/2019 PEL Presentation English

    10/29

    www.primeelectricltd.com

    ORGANISATIONCHARTOFPRODUCTION

    DEPARTMENT(FABRICATION)

    InchargeFabrication

    Fabrication Preparation Fabrication Assembly

    HeadProduction

  • 7/31/2019 PEL Presentation English

    11/29

    www.primeelectricltd.comwww.primeelectricltd.com

    DESIGNFLOWCHART

    Design

    ELECTRICALDESIGN

    Basicdesign&issueofdocumentationto

    production

    Windingdesign

    Core

    design Corecoilassembly

    Connections

    Cooling

    DesignVerification

    Overalllayout

    Customerdrawingslikegeneralarrangement

    foundationdetails,

    shipping

    drawing,

    control

    circuitdrawingsetc.

    TestSchedule

    ExternalWiring.

    MECHANICALDESIGN

    Basicdesign

    Tank

    Coreframeassembly

    Conservator

    CoolerPipework

    Oilquantities

  • 7/31/2019 PEL Presentation English

    12/29

    www.primeelectricltd.com

    ORGANISATIONCHARTOF

    DESIGNDEPARTMENT

    HeadDesign

    ElectricalDesignEngineers MechanicalDesignEngineers

  • 7/31/2019 PEL Presentation English

    13/29

    www.primeelectricltd.com

    ORGANISATIONCHARTOF

    TESTINGDEPARTMENT

    Incharge

    Testing

    Testing

    Engineers

    ORGANISATIONCHARTOF

    QUALITYDEPARTMENTHeadQuality&Testing

    QA

    &

    QC

    Engineers

    Incharge

    Quality

  • 7/31/2019 PEL Presentation English

    14/29

    www.primeelectricltd.com

    FLOWCHART

    Customer Marketing

    Design

    Purchase Production

    Documentation for materialProcurement and Production

    Material

    Dispatch to customer

    Customer

  • 7/31/2019 PEL Presentation English

    15/29

    www.primeelectricltd.com

    ADVANCEDDESIGN MEETS

    INTERNATIONALSTANDARDS

    PEL range exhibits a customer-centricapproach especially in areas relating to

    usage of enhanced materials and globallylatest technologies such as

    Capability to withstand systemic short

    circuits

    Capability to withstand systemiclightning and switching surges

    Advanced user-friendly technology forkeeping the oil and windingtemperatures and hot spots undercontrol.

  • 7/31/2019 PEL Presentation English

    16/29

    www.primeelectricltd.comwww.primeelectricltd.com

    PRODUCTIONCAPACITY

    Installedcapacity10,000MVAPeryear

    FirstPhaseupto1000MVA/500KV

    Willgohigherupto765KVclass /1200KVclass

    inthe

    next

    phase

    and

    the

    production

    capacity

    willbeupgradedto35000MVA

  • 7/31/2019 PEL Presentation English

    17/29

    www.primeelectricltd.com

    HUMANRESOURCE

    Direct employment in the first phase - approximately 550 people

    150 skilled

    250 Semi - skilled

    150 for administration,Commercial,personnel, Accounts,Support services etc.

  • 7/31/2019 PEL Presentation English

    18/29

    www.primeelectricltd.com

    Majorfacilities windingshop

    WINDING SHOP

    Fully air-conditioned to avoid dust & moisture

    20 MT Vertical Winding Machines

    10 MT Horizontal Winding Machines

    5 MT Horizontal winding machines

    Coil upending Machine

    Autoclave with heating and vacuum facility

    Iso-static system of coil stabilization

    30 MT & 15 MT EOT Cranes

  • 7/31/2019 PEL Presentation English

    19/29

    www.primeelectricltd.com

    Majorfacilities Coreshop

    CORE SHOP

    Automatic Core Slitting Machine (Georg make)

    Automatic Core Cutting Machine (Georg Make)

    Core Assembly and lifting platform 150 MT Capacity

    10 MT EOT Crane

  • 7/31/2019 PEL Presentation English

    20/29

    www.primeelectricltd.com

    Majorfacilities InsulationShop

    All machines required for processing insulating wood and press-board

    INSULATION SHOP

    Press Board Taper Cutting M/C

    Press Board Cylinder Rolling

    M/C

    Running SAW

    Router M/C

    Circular Cutting M/C

    Drying Oven

    Angular Circular Saw

    Band Saw

    Shearing M/C

    Drilling M/C

    Milling M/C

    Press Board Jointing Press

    Dust Collectors

    10 MT EOT Crane

  • 7/31/2019 PEL Presentation English

    21/29

    www.primeelectricltd.com

    Majorfacilities Core coilassembly

    Fully air conditionedto avoid dust andmoisture.

    Equipped crimpingpress fromNovo press, Germany

    Water cooledbrazing machines.

  • 7/31/2019 PEL Presentation English

    22/29

    www.primeelectricltd.com

    Processing

    2nos. VaporPhaseDryingOven

    OilFiltrationPlants

    6KL

    10KL

    EOTCranes(Remote&CabinControl)

    2nos.150MT

    1no.50MT

    Major facilities Processing

  • 7/31/2019 PEL Presentation English

    23/29

    www.primeelectricltd.com

    Majorfacilities Testlaboratory

    Fullyequippedtoconductallroutinetestsandtemperature

    risetest,

    Lightening

    and

    SwitchingImpulsevoltagetests

    asperInternationalStandards.

    Equipments

    170KV,2000KW(expandableto4000KWinPhaseII)Statictesting

    systemfromHighVoltGermanyfor

    allroutinetestandtemperature

    risetest.

    70

    MVAr

    (expandable

    to

    140MVAr)capacitorbank.

  • 7/31/2019 PEL Presentation English

    24/29

    www.primeelectricltd.com

    Majorfacilities TestLaboratory

    2400KVp,240kJ(expandableto3000KVp,300kJ)Impulse

    GeneratorfromHighVolt,

    Germany.

  • 7/31/2019 PEL Presentation English

    25/29

    www.primeelectricltd.com

    QUALITYASSURANCE

    "With worldclass design technology and manufacturing facilities, PEL sets highest standards

    in quality of the transformers produced, following the best grades of materials and

    manufacturing processes and practices through standard and customized Quality Assurance

    Plans. PEL believes in the customer satisfaction through quality of products and service aftersales. PEL is committed to the concept of Total Quality Management driven from the top

    management".

  • 7/31/2019 PEL Presentation English

    26/29

    www.primeelectricltd.com

    StaticTestSystem

    We are procuring the equipment for conducting all theroutine and type tests on the transformers from HighVolt, Germany, world leaders in this field. We would beusing the static converter equipment developed by themfor carrying out the no-load loss test, load loss test andinduced over voltage test besides other routine tests.

    This equipment would also be used for conducting thetemperature rise test, a type test, which ensures that allthe parts of the transformer are within the temperaturelimits stipulated by the customer. This is the largestsystem to be supplied by them to any power transformer

    manufacturer in the world. In fact, we are the first

    company in India to use such equipment fortesting transformers in the works.

    ADVANTAGES

    Over the conventional motor-generator set is

    that the output voltages and currents are distortion-free and very near to sinusoidal waves required.

    Better control on the voltages and currents to beapplied to the transformer under test. No othermanufacturer has such facility in their works.

    PRIME ELECTRIC LIMITED

  • 7/31/2019 PEL Presentation English

    27/29

    www.primeelectricltd.comwww.primeelectricltd.com

    PRIMEELECTRICLIMITED

    ADVANTAGES

    HighqualityEHVPower

    transformerssuitablefora wide

    rangeofneeds

    Advanceddesignmeeting

    international

    standards

    Stateoftheartmanufacturing

    withsuperiorcontrol onprocesses

    Highlyskilled

    manpower

    resource

    AdvancedSchedulingfortimely

    deliveries

    PRESS REVIEWS

  • 7/31/2019 PEL Presentation English

    28/29

    www.primeelectricltd.com

    PRESSREVIEWS

    EI PEL is being much talked about these days. What areas does itaddress and where do you see it in the near-term future?

    Prime Electric Limited (PEL), is one of the most significant thrustareas of Prime Group. Backed by the rich experience of PrimeGroup in addressing the most exacting needs of the Power Sectorand through its range of eco-friendly (low noise), aestheticallydesigned Extra High Voltage power transformers up to 1000 MVA /500 KV. PEL shall address the needs of the Power ElectricityUtilities; EPC companies; Sub- station, Power generation&Transmission and Distribution companies. It shall also cater to

    large industries in various sectors such as Steel, Cement,Petroleum, Petrochemicals and others using bulk power. PEL'sproduction capability, projected to 35000 MVA, makes it one of thelargest manufacturers from India producing world-class extra highvoltage power transformers for users across the globe.PELs 100-acre manufacturing location at Nayudupet SpecialEconomic Zone in Nellore district of Andhra Pradesh has excellenttransport connectivity and three major ports within a radius of 150

    KM radius gives PEL customers - in India and overseas anadditional advantage of timely, cost effective & easy movement ofsupplies and production.

    Cover page of the magazine

    Padma Shri Surinder Mehta

    Chairmans interview

    Page No. 247

  • 7/31/2019 PEL Presentation English

    29/29

    www primeelectricltd com

    THANKYOU

    HEADQUARTER:PRIME ELECTRIC LIMITEDPRIME GROUP BUILDING11/5B, Pusa Road,New Delhi - 110005 (India).

    Phone:91-11-41 888 999 (30 lines),41 888 888, 25762562-63-64,25762552-53, 25813338,25813339

    FAX :91-11-25755815, 25821623

    Email :[email protected]

    Hyderabad Office :Contact Person :- Mr. J. S. SastrySr Vice President (Operations)Prime Electric Limited1-8-619, 1st Floor

    Sai Arcade,Prakash NagarBegumpet,Hyderabad 500016India

    Mobile :91-9848369393,Ph. :- 91-40 - 42606999,

    Fax :91-40 - 40115124,

    Email :[email protected]

    Site Address :Prime Electric LimitedMulti Product SEZMenakuru Village

    Naidupeta MandalNellore - DistrictAndhra Pradesh 524126India

    mailto:[email protected]:[email protected]:[email protected]:[email protected]