Multimodal Approach (Institute for Transportation and Development Policy ITDP)
CONNECTED COMMUNITIES
PREDICTORS
• Socioeconomic Information
• Crash Data (pedestrian, bicyclist and transit)
• Parks & Recreation
• Service Destinations
• Transit Route Alignments & Ridership, Headways
Inventory (Demand)
Ranking Process
• Calculate composite score of each grid cell (total demand score – total network score)
• Total the composite score within ¼ mile of each corridor
• Generate the corridor ranking by normalizing the composite score
(composite score/acreage )
Priority Corridor Ranking
Next Steps
Roadway striping
Road diets
Add paved shoulder
Add sidewalk or trail
Shared lane marking
Type of Projects/Interventions
Ranking Process (by corridor)
Performance Measures - MAP21
Safety
Infrastructure Conditions
Congestion Reduction
System Reliability
Freight Movement and Economic Vitality
Sustainability
Reduced Project Delivery Delays
Funding Strategy
Funding
Federal Funding Opportunities (MAP21)
Surface Transportation Program STP
Transportation Alternative Program TAP
NHPP
FLTP
Grants