PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key...

12
1 PDXNext Terminal Balancing - Concourse E Extension April 19, 2017 Devon Webster Terminal Development Manager

Transcript of PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key...

Page 1: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

1

PDXNext Terminal Balancing - Concourse E Extension

April 19, 2017

Devon Webster Terminal Development Manager

Page 2: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

2

Presentation Overview

• PDXNext and project tie-in

• Terminal Balancing key changes & project facts

• Conceptual Gateway rendering

• Key benefits

• Minority contracting

• Sequence of events

• Public comment

Page 3: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

3

PDXNext and project tie-in

• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design, and construction will be carefully aligned with

other terminal area work including the Terminal Core Redevelopment (TCORE) and Parking and Car Rental (PACR) projects

Page 4: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

4

Terminal Balancing key changes

• Change in Alaska Air Group (AAG) fleet mix – Reduction in Q400 operations (ground loaded) – Increase in E175 operations (gated)

• Drove an increase in demand by AAG for mainline gates • With relocation of Southwest, allows AAG to grow into

Concourse C • The Southwest relocation balances passenger numbers and

baggage north to south

Page 5: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

5

Terminal Balancing overview GUIDING PRINCIPLES

Page 6: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

6

Terminal Balancing project facts

• Extension of Concourse E to add six mainline gates (apx. 148,000 sq. ft. addition)

• Project addresses an imbalance in passenger and baggage volumes between the north and south sides of the terminal

• Relocation of Southwest Airlines • Aesthetic improvements to Concourse B • Project budget is $215M • Anticipated completion is first half 2020 • With operational changes, serves the PDX gate requirement

through 2035

Page 7: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

7

PDX Gateway rendering GUIDING PRINCIPLES

Page 8: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

8

Public Use Bike & Pedestrian Path GUIDING PRINCIPLES

Page 9: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

9

Key Project Benefits

• Meets mainline gate requirement through 2035

• Balances passenger and baggage operations

• Improves overall level of service at PDX

• More attractive gateway to the airport

• Improvements to pedestrian and bike access to PDX

GUIDING PRINCIPLES

Page 10: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

10

Minority Contracting GUIDING PRINCIPLES

• Minority Contracting Goal: 20%

• To date, only a small amount of work has been bid, but results for minority participation appear favorable.

Page 11: PDXNext Terminal Balancing - Concourse E Extension Terminal...• Terminal Balancing is a key PDXNext project • Project remains consistent with Airport Futures • Planning, design,

11

Sequence of Events

• Design through summer 2017

• Construction start summer 2017 (apron and utilities)

• Substantial completion first half 2020

• Communications and outreach (ongoing)