PDS4 Build 3b System Readiness PDS Management Council Face-to- Face Columbia, Maryland April 2-3, 2013 Sean Hardman

description

Overview Build 3a -Delivered on September 30, Test and deployment to operations at the EN in occurred in October Have been running side-by-side with PDS3 system -Deployed and exercised the software at many of the Nodes Build 3b -Delivered on March 31, Test and deployment to operations at the EN to occur in April Deployment to the Nodes commencing in late April 2013 April 2-3, 2013PDS4 Build 3b System Readiness3

Transcript of PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3,...

Page 1: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

PDS4 Build 3bSystem Readiness

PDS Management Council Face-to-FaceColumbia, Maryland

April 2-3, 2013

Sean Hardman

Page 2: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Topics• Overviews• Build 3a

- Summary- Operational Deployment- RFA Status

• Build 3b- Summary- Planned Deployment- Search Service Status- Report Service Status

• Build 4a and Beyond• Next StepsApril 2-3, 2013 PDS4 Build 3b System Readiness 2

Page 3: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Overview

• Build 3a- Delivered on September 30, 2012- Test and deployment to operations at the EN in occurred

in October 2012- Have been running side-by-side with PDS3 system- Deployed and exercised the software at many of the

Nodes• Build 3b

- Delivered on March 31, 2013- Test and deployment to operations at the EN to occur in

April 2013- Deployment to the Nodes commencing in late April

2013April 2-3, 2013 PDS4 Build 3b System Readiness 3

Page 4: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Build 3a Summary

• Validate software in place supporting validation of PDS4 labels using XML Schema and Schematron files.

• Initial data access and transform software in place for working with PDS4 data.

• Harvest and Registry software in place to support EN and Node registration of PDS3 and PDS4 data.

• Search software in place supporting catalog-level search.

• Report software in place waiting to be populated with web logs.

April 2-3, 2013 PDS4 Build 3b System Readiness 4

Page 5: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Build 3aOperational Deployment

April 2-3, 2013 PDS4 Build 3b System Readiness 5

Page 6: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Build 3aNode Test Deployment

April 2-3, 2013 PDS4 Build 3b System Readiness 6

Page 7: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Build 3a RFA Status

• 11 Accepted- Planned for Build 4a delivery

• 11 Implemented- Included in Build 3b delivery

• 3 Requires Follow-up- Additional information required, if accepted planned

for Build 4a delivery• 3 Closed

- Questions about design approaches or software behavior, responded to in RFA document

April 2-3, 2013 PDS4 Build 3b System Readiness 7

Page 8: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Build 3b Summary

• Search added support for discovering and viewing Bundle and Collection information.

• Search was modified to address inconsistent results when specifying more than one term or parameter in the search criteria.

• Registry was modified to address performance issues.

• Validate, Harvest, Catalog and Search modified to keep pace with data model changes.

• Updates to the Data Access and Transform tools are about two weeks from being delivered.

April 2-3, 2013 PDS4 Build 3b System Readiness 8

Page 9: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Build 3b Planned Deployment

April 2-3, 2013 PDS4 Build 3b System Readiness 9

Page 10: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Search Service Status

• Added support for discovering and viewing Bundle and Collection information.- This also includes a first cut at PDS4 Context

products.• Added support for filtering search results

based on space agency and model version.- Will include ESA/PSA data sets officially with this

release.• Still working out the kinks involved with

supporting PDS3 and PDS4 data side-by-side.• Here is what it looks like …

April 2-3, 2013 PDS4 Build 3b System Readiness 10

Page 11: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

April 2-3, 2013 PDS4 Build 3b System Readiness 11

Page 12: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

April 2-3, 2013 PDS4 Build 3b System Readiness 12

Page 13: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

April 2-3, 2013 PDS4 Build 3b System Readiness 13

Page 14: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

April 2-3, 2013 PDS4 Build 3b System Readiness 14

Page 15: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

April 2-3, 2013 PDS4 Build 3b System Readiness 15

Page 16: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

April 2-3, 2013 PDS4 Build 3b System Readiness 16

Page 17: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Report Service Status

• Sawmill software installed at the EN.- Upgraded to the latest version from the vendor.

• Working with a few Nodes on interfaces for pulling web logs.

• Ready to start moving forward with population of the service.

• Planned operational phases:- Initiate population of the service and initial report

configuration (April/May 2013).- Generate PDS-wide web log reports. (June 2013)- Generate registry-based reports. (October 2013)

April 2-3, 2013 PDS4 Build 3b System Readiness 17

Page 18: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Build 4a and Beyond

• Continue to support data model changes.• Add support for content validation.• Continue to tune the search index.• Add support for product-level search.• Add support for additional transformations.• Add support for visualization.• Better integrate search results with available

tools and services.

April 2-3, 2013 PDS4 Build 3b System Readiness 18

Page 19: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Next Steps

• Work with the Nodes on Report Service population.- I promise.

• Work with the Nodes to deploy Build 3b software locally.- Start registering some stuff.

• Continue Build 4a development.- Focus on product-level support including content

validation, search, transformation and visualization.

April 2-3, 2013 PDS4 Build 3b System Readiness 19

Page 20: PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Questions/Comments