Pdms Admin Syllabus

6
PDMS ADMIN a. PDMS Admin Login (Summary). b.Make Utility c. Users Name Creation d. Database and Extracts e.MDB f.Display Mode g. Integrity Checker h. Configuring the Admin Element form i. Teams and Users j. Copy teams and users k. Databases(Creating, Modifying, Deleting) l. Multi write database and extracts m. Project Administration n. Replicating a Project o. How modules are defined p. Administrator command q. Transaction Database r. Locking the project Database Design 1. Design Templates 2. Quary data access control (i) User Right (ii) Element Access 3. Settings →Purposes 4. How to customization Commands 5. Command window 6. Settings →Check Defaults 7. Import Equipment 8. Standard Equipment Catalogue Creating

description

Pdms Admin Syllabus

Transcript of Pdms Admin Syllabus

Page 1: Pdms Admin Syllabus

PDMS ADMIN

a. PDMS Admin Login (Summary).b. Make Utilityc. Users Name Creationd. Database and Extractse. MDBf. Display Modeg. Integrity Checkerh. Configuring the Admin Element formi. Teams and Usersj. Copy teams and usersk. Databases(Creating, Modifying, Deleting)l. Multi write database and extractsm. Project Administrationn. Replicating a Projecto. How modules are defined p. Administrator commandq. Transaction Databaser. Locking the project Database

Design

1. Design Templates2. Quary data access control

(i) User Right (ii) Element Access

3. Settings →Purposes 4. How to customization Commands 5. Command window 6. Settings →Check Defaults 7. Import Equipment 8. Standard Equipment Catalogue Creating 9. Export 10. Representation. 11 .System Hierarchy

Page 2: Pdms Admin Syllabus

Lexicon

1. Starting Lexicon 2. Dictionary Explorer 3. Current Element Editer 4. Creating Element 5. Create UDA or USDA 6. Create a UDET 7. UDA Attributes 8 .Valid Values 9. Limits 10. Creating new UDAs & copying UDA Definitions 11. Use of Goto 12. Handling of UDA in Reports and Expressions 13. Handling of UDAs in data output Macros 14. Handling OUDAs in Project Reconfiguration 15 . SPEC Selection.

Paragon

1. System setting form2. Create catalogue form3. Create section form4. Create nominal bore tables form5. Create Reducer6. Create Specification world form7. Create specification form8. Create part world form9. Create family form10. Create category form11.Create DTSE form12.Catalogue property definitions form13.Text definition form14.Detail and material text

Page 3: Pdms Admin Syllabus

15.Draft symbol sets form16.Properties form17.Convert SPEC form18.Utilities19.Create, category and profiles, category for joints, category for, fitting,

category for templates20.Understanding parameters21.Nozzle Specification form22.Create specification form23.Create category for room design24.Draft symbol set25.Category

ISO Draft

1. Command Summary2. Setting UP ISO Draft3. Bolting4. Design Requirements5. Piping components in ISODRAFT6. Customising the drawing Sheet7. Material list and reports8. ISO Metric drawings9. Alphabetical Command reference10.Symbol keys11.Alternative Text12.Material Control file13.Standard ISO options creating Modifying14.Options → Plotting15.PML

Draft

1. Setting the system defaults2. Layer purpose Definitions3. Sheet size defaults4. Setting plotting options

Page 4: Pdms Admin Syllabus

5. Changing your working library6. Sheet library Administration7. Symbol library Administration8. Lab library Administration9. Style library Administration10.Representation library Administration11.Draw list library Administration12.Tag rule library Administration13. Libraries supplies with draft

PROPCON

1. Introduction2. Properties data3. Design layout data4. Material property data5. Case data6. Component data7. Constraints data8. Run data9. General commands10.Use of groups11.PROPCON syntax Graphs12.The properties database elements

SPECORN

1. Introducing SPECON2. Catalogue and specification3. How to use SPECON

i. Creating a Specificationii. Entering tabular data

iii. Editing and Existing specificationiv. Copying specificationv. Outputting a specification

vi. Using macros for SPECON Input 4. Details of typical specifications

Page 5: Pdms Admin Syllabus

5. Command syntax diagrams 6. Error Messages.

Note : Client Responsibilities: ( BEFORE DESIGN DEVELOPMENT )

1) PMS,VMS and Support Standards Docs to be given by the client.2) Specialty component list, dimensions and material weight like any control

valve, instrument, strainers, air manifold or structural section.3) User Defined Attributes for Lexicon any special temperature or pressure

that is needed to be allotted to an equipment or pipe branch.

Responsibilities: ( DURING DESIGN DEVELOPMENT )

1) Time indication for how many days they need for review and suggestion i.e after 33% and 66% and 90% design development stages as the client user will expunge after that.