Realistic Small Switching...
Transcript of Realistic Small Switching...
Realistic Small Switching LayoutsLooking Beyond the Timesaver
Copyright 2013 Byron Henderson
Classic Switching Layouts
• Inglenook Sidings -- A.R. Walkley, 1926; Alan Wright, 1980s
3 cars
3 cars
5 cars3 cars + switcher
About 9” X 48” in HO
2 cars
3 cars3 cars
2 cars 2 cars
About 10” X 56” in HO
• Timesaver -- John Allen, 1966
Copyright 2013 Byron Henderson
Classic Switching Layout
About 16” X 72” in HO with # 6 turnouts
Switchman's Nightmare -- Linn Westcott, 101 Track Plans, 1958
Copyright 2015 Byron Henderson
Moving Beyond the Norm• “Best practices” design and operation
ideasApply to layouts large and small
• Staging, major industries, interchange, prototype inspiration (Four Cornerstones)
• Scenic opportunities• Fine scale operations for lasting interest
Copyright 2003 Byron Henderson
Four Cornerstones
About 18” X 72” in N scale
Staging
Major IndustriesInspired by San Jose, CA
Copyright 2013 Byron Henderson
Fine-Scale Ops Examples• Based on prototype practices & situations• Timing and sequence of moves
Shifts and access to private tracksPerishables / icingIntra-plant movesRepair-in-place (RIP)Weighing carsCleaning cars & testing ladings
• Seasonal and temporal variations
Copyright 2013 Byron Henderson
Fine-Scale Ops Examples• “Sure spots”
Positioning cars to doors, spouts, dumpsRe-spots, off-spots
• Simulating crew rolesPositions on the groundUncoupling, throwing switches
• Cutting train for grade crossings• Less time focused
Lacks competitive element
Copyright 2013 Byron Henderson
P.E. “Orphan” Spur in the ‘50sSP to S.F.
SP to L.A.
InterchangeCanneryOrange
Packing House
Orange Juice Plant
Lemon Packing
Team
Runaround
Map(after Signor)
Sepulveda Blvd.
Brand Blvd.
San FernandoRoad
MissionSan Fernando
Copyright 2013 Byron Henderson
P.E. “Orphan” Spur in the ‘50sSP to S.F.
SP to L.A.
InterchangeCanneryOrange
Packing House
Orange Juice Plant
Lemon Packing
Team
Runaround
Map(after Signor)
RunaroundSchematic
Sepulveda Blvd.
Brand Blvd.
San FernandoRoad
MissionSan Fernando
Copyright 2013 Byron Henderson
“Orphan” Spur Schematic
SP InterchangeCannery
Orange Packing House
Orange Juice Plant
Lemon Packing
Team
Runaround
Resembles “Switchman’s Nightmare”• Facing-point and trailing point spurs• Runaround• Room to work – not a puzzle
Copyright 2013 Byron Henderson
P.E. “Orphan” Spur Layout
7.5’ X 6’ X ~18” wide in HO
Cannery
Orange Packing House
Orange Juice Plant
RunaroundTeam
Interchange
Lemon Packing
Copyright 2013 Byron Henderson
West San Jose on the WP
Copyright 2013 Byron Henderson
West San Jose on the WP
Copyright 2015 Byron Henderson
WP Inglenook “Plus”
Scenery and switching variety from 2’x6’ in HO
Del Monte Plant 51 Freight House
Auto RampTeam Track/Crane
Storage space and operating space need not be the same
Hinged switch lead extended
Copyright 2013 Byron Henderson
Distilling a Prototype
Alaska PackersWharf
Del Monte
Pennzoil
SP Interchange
Yard and Car Float
Alameda Belt Line – Encinal Terminal area
Copyright 2013 Byron Henderson
ABL “Extract” in N
Approx 1’ X 6’
“Yard”Pennzoil
Del Monte Cannery SP Interchange
Team
Wharf (Alaska Packers)
Switch lead (“main”)
Removable car float (ATSF/WP)
Hinge points
Copyright 2013 Byron Henderson
ABL Storage Option
Right side is narrower to fit inside industry flat on left side when folded
M.C. Fujiwara Photo
M.C. Fujiwara’s ABL
M.C. Fujiwara Photo
M.C. Fujiwara’s ABL
Copyright 2013 Byron Henderson
Prototypical Traffic Flow
Cars arrive and depart from connections
… and are switched to- and from industries
Copyright 2013 Byron Henderson
Realistic Traffic Handling
Adequate leads …… sufficient run-around length …
… and a place to sort ‘em
Copyright 2013 Byron Henderson
Overlapping Elements
About 5’x7’ overall in HO scale
“ALCOs in the Alcove”Model-Railroad-HobbyistJuly 2009
Copyright 2013 Byron Henderson
Overlapping Elements
Overall Runaround Industries Leads
Length is precious … use it more than once
Copyright 2013 Byron Henderson
Give me the Runaround!
No runaround means that all but Mobil must be in front of engine and Interchange can’t be used except for Mobil
?!?!?
Runaround allows us to switch Oil and Interchange with engine
Switch crew heads in
Copyright 2013 Byron Henderson
Rather Fight Than Switch(back)
Common on logging, mining branches in real life for grades in tight spots
Not uncommon in real life – often for grade or tight urban areas
Long lead allows pulling full track
Copyright 2013 Byron Henderson
Rather Fight Than Switch(back)Short lead
engine + 1 car
Industry must be emptied to switch others
Virtually unknown in real life, overused in published plans
Virtually unknown in real life, extremely overused in published plans
Copyright 2013 Byron Henderson
Rather Fight Than Switch(back)Model switchback
A B
Typical real-life approach
A B
Crossing allows independent switching
Copyright 2013 Byron Henderson
“Sure Spots”
Unloading grate or loading spout
Tank rack – loading or unloading
1 2
Numbered doors or dock spots
Dock and/or end ramp
Copyright 2003 Byron Henderson
Industry as Switching Layout
Budweiser Brewery; Van Nuys, CA
Copyright 2003 Byron Henderson
Industry as Switching Layout
Mike Osborne’s drawing of Budweiser in Van Nuys from LDN-20, Summer ‘98(served by SP / now UP)
Copyright 2003 Byron Henderson
Industry as Switching Layout
Mike Osborne’s drawing of Budweiser in Van Nuys from LDN-20, Summer ‘98(served by SP / now UP)
Beer Loading(Insul. Boxcars)
CO2
(Tanks)Beer Loading
(Reefers)Beechwood(Boxcars)
DiatomaceousEarth (Cvd Hppr)
Grain Unloading(Cvd Hoppers)
Storage SwitchLeadMain Line
Copyright 2003 Byron Henderson
Industry as Switching Module
Copyright 2013 Byron Henderson
Beer Loading on two tracks(Insul. Boxcars and Reefers)
CO2
(Tanks)
Beechwood(Boxcars)
DiatomaceousEarth (Cvd Hppr)
Grain Unloading(Cvd Hoppers)
Storage (when not used as main)
Need SwitchLead
Main Lines
Bottles, Canstock, Cartons, etc.
T-Track N scale module ~1’X4’
Copyright 2003 Byron Henderson
Industry with Support Yard
Copyright 2013 Byron Henderson
Industry Switch Lead
Yard Switch Lead
T-Track Curve Modules
Yard Switch Lead
Industry Switch Lead
Yard Office, Engine Service
Cement Plant HCD in N
N Scale 36X80” overall12” Min. Radius, PECO C55 “Small” Turnouts
Permanente Cement Plant; Cupertino, CA
Read more in Layout Design Journal #54; 1st Qtr 2015Copyright 2015 Byron Henderson
Auto Plant Shelf in HO
HO Scale 10’X12’ overall24” min. radius; PECO C83 #5 turnouts
Milpitas, CA Western Pacific Yard and Ford Plant
Read more in Layout Design Journal #54; 1st Qtr 2015
Copyright 2015 Byron Henderson
Copyright 2013 Byron Henderson
“Micro” Layouts• Around 4 square feet or less in HO• Can be more than a puzzle• “Fiddle staging”, moveable elements
Jack Trollope’s Box Street Yard in HO
Secluded Staging
Visible layout
Viewblock
Fiddle Yard
Traverser
Cassettes
Copyright 2013 Byron Henderson
Classic Switching Puzzles
• Inglenook Sidings -- A.R. Walkley, 1926; Alan Wright, 1980s
3 cars
3 cars
5 cars3 cars + switcher
About 9” X 48” in HO
2 cars
3 cars3 cars
2 cars 2 cars
About 10” X 56” in HO
• Timesaver -- John Allen, 1966
Copyright 2015 Byron Henderson
Puzzle, not Model of a Railroad
• Basically moving an empty slot• … but the prototype railroad is built to
facilitate switching, not hinder it ….
Copyright 2013 Byron Henderson
What Makes a Challenge Fun?
Game and puzzle theory
• Sequence challengeSpecific steps to reach result
• Ordering challengeMultiple paths to solution
• “Fair Test”Not frustrating or tedious
Copyright 2013 Byron Henderson
Operating Suggestions• Don’t overload the layout with cars
• Plan for seasonal or shift variation
• Maximize long-term challenge, not puzzle complexity
• Consider moveable sections if storage space is different than operating space
• Watch for scenic opportunities
Copyright 2013 Byron Henderson
Beyond the Timesaver …• Pick a theme or locale• Explore key options
StagingMajor industriesInterchangePrototype inspiration
• Fine scale operations for lasting interest
Friends don’t let friends build Timesavers …
Additional Examples
Copyright 2013 Byron Henderson
Variations in HO 2’ X 9’
Based on Westcott’s “Switchman’s Nightmare”, Walthers Kits
Designed for operating interest, specific Walthers Kits
Copyright 2013 Byron Henderson
Variations in HO 2’ X 9’
End-of-line terminus
Inspired by Shreveport, LA and Bill Baumann’s 3rd St. Industrial District
Copyright 2013 Byron Henderson
Engine Service Area
About 18” X 92” in HO scale
Based on Westcott’s “Switchman’s Nightmare”
Copyright 2013 Byron Henderson
Not Always Shelves
4’ X 4’ in HO scale
Staging/ Interchange
Major Industries
Straight turnouts (PECO C75 Small)17” Min. Radius
Copyright 2013 Byron Henderson
Erie 149th Street Station
About 6’ X 6’ in HO scale
Copyright 2013 Byron Henderson
My Next Project
2’ X 5’ in N scale
Copyright 2013 Byron Henderson
The Island Challenge
Thank you!