Structural Element Erection Bracing 2007 Design & Bridge Conference Corpus Christi, Texas Lewis Gamboa, P.E. (BRG) Field Operations Construction & Maintenance

Transcript of Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection...

Page 1: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Structural Element Erection Bracing

2007 Design & Bridge ConferenceCorpus Christi, Texas

Lewis Gamboa, P.E.(BRG) Field Operations

Construction & Maintenance

Page 2: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Overview

Temporary Structures– Bracing– Shoring

Authority and Liabilities regarding contractor’s safety critical work– Items 5 and 441

• TxDOT Engineers• TxDOT Inspectors

Resources– Design Manuals

• TxDOT • ASSHTO

– Standards– BRG Division

Page 3: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Topics• Concrete

– Prestress “I”-Beams• Types (All)

– Prestress “U”- Beams• Types U

• Structural Steel– Rolled “W” Shape

• W18 thru W40* Plate Girders “I” - Section

Page 4: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Why?

Page 5: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Safety Concerns• Public

On the roadway.

Page 6: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Safety Concerns• Workers (TxDOT & Contractor)

On the job.

Page 7: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Safety Concerns• Workers (TxDOT & Contractor)

Page 8: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Safety Concerns• Workers (TxDOT & Contractor)

Page 9: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Concrete Beams

Page 10: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Concrete Beams

• MEBR (C) Standard– Prestress Concrete “I”-Beams

• Types A, B, C, IV, 72, Tx 28 thru Tx 70• Type A, B issues

• MEBR (U) Standard– Prestress Concrete “U”- Beams

• Types U

Page 11: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Jan. 2005

Updated Jan. 2005

Page 12: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Typical Bracing• 1998 Standard

Page 13: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

1998 Standard

Page 14: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Prestressed “U”- Beams

Page 15: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Short Span Bridges

• Short Span– Type A or B

Page 16: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Short Span Bridges

• 3’ Overhang Typ.

Page 17: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Type “IV” Beam

Type “A” Beam

36”

36”

54”

28”

Page 18: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

BID-WELL 4800≈ 14,000 Lbs.

GOMACO C-450≈ 11,000 Lbs.

8”

Before Deck Placement

Page 19: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

8” < 8”

After Deck Placement

Page 20: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Beam Rotation

Page 21: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Beam Rotation

Page 22: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Beam Rotation

Page 23: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

MEBR (C) (Rev. 6-2007)

Page 24: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

MEBR (C) (Rev. 6-2007)

Page 25: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Supplemental Horizontal Bracing

Page 26: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Supplemental Horizontal Bracing

Page 27: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Supplemental Horizontal Bracing

Note 7 “Tight fit (Typ)”

Page 28: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Structural Steel Beams

Page 29: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

• Rolled “W” Shape “I”- Beams– W18 thru W40

* Plate Girders “I” - Section

Structural Steel Beams

Page 30: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Rolled “W” Shape “I”- Beams

– Mainly Straight– W18 Thru W40– SBBR(S)

Page 31: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Steel “W” Shape Beams

• II. Structural Steel Beams• A. “W” Beams • 1. Mainly Straight• W18 Thru W40• 2. SBBR(S)

Page 32: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Steel Structures - Misc.

• May need to design supplemental temporary bracing for slab placement on steel I-girders

• Standard does not address slab placement bracing - it assumes the diaphragms will do the job

• Some bolted channel diaphragms won’t do the job

Page 33: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

66”” SlabSlab

2727”” deep beamdeep beamrotated 2rotated 2””Bolted ChannelBolted Channel

DiaphragmsDiaphragms

Page 34: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

1 1/41 1/4”” dia holes fordia holes for11”” dia boltsdia bolts

C12x 20.7C12x 20.7

Page 35: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

4x4 wedged tight4x4 wedged tight

1/2 x 2 steel bar1/2 x 2 steel bar

2020’’ O.C.O.C.

Page 36: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Plate Girders “I” Section

Page 37: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Plate Girders “I” Section

Page 38: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Plate Girders• Characteristics

– Tall Beams (Composite Section)• Composite Section• TxDOT (3:1)• ASSHTO up to (6:1)

– Long Span (less bents)– High in elevation (3rd, 4th level)– Curved – Ramps (Smaller Radii)– Metropolitan Areas

• Populated• High Traffic

Page 39: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Plate Girders

“Erection Issues”“Girder sections tend to be unstable during erection if the top flange plate is too narrow.Composite design tends to make the top flange narrow. Erection procedures, includingfalsework and girder support while welding or bolting splices, require close coordinationwith the contractor.Erection is especially critical for curved girder units. Accurate analysis of deflections andstresses during erection stages is very complicated and time consuming. The tendency is torely on judgment until trouble occurs. Except for a few notable mistakes, Texas hasmanaged to get its curved girders erected without significant mishap. Close coordinationbetween field and design personnel is vital.”

TxDOT “Bridge Design Manual”

Page 40: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Tall Beams• Composite Section• TxDOT (3:1)• ASSHTO up to (6:1)

Plate Girders

24” 12”

72”

Page 41: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

– Long Span (less bents)– High in elevation (3rd, 4th level)

Span

Plate Girders

Page 42: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

– Straight

Plate Girders

Page 43: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

– Curved

Plate Girders

Page 44: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

– Metropolitan Areas• Populated• High Traffic

Plate Girders

Page 45: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Plate Girders• Massive Equipment• Numerous Worker

Page 46: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

• Go home at the end of the day.

Plate Girders

Page 47: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

• Go home at the end of the day.

Plate Girders

Page 48: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

• Go home at the end of the day.

Plate Girders

Page 49: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

441.3.A.6.a. Erection Drawings.Submit 2 copies of erection drawings inaccordance with Item 5, “Control of the Work,” beforeerection of railroad underpasses, trusses, field-spliced (weldedor bolted) girders, arches, or other members for which erectiondrawings are required on the plans. Submit an additional copyof the drawings for railroad underpasses. Erection drawingsare not required for rolled I-beam units unless otherwise notedon the plans.

Structural Steel

Page 50: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

441.3.A.6.a. Erection Drawings. (Cont.)Clearly indicate at least:

• procedures;• sequence of work;• equipment to be used;• location of falsework, erection cranes, and holding cranes;• falsework design details;• girder lifting points;• adjacent structures loaded; and• requirements for releasing cranes during erection thatdiffer from the requirements of this Item or those shownon the plans.

If site conditions differ from those assumed for thesedrawings, revise the drawings to reflect the actual conditions before continuing the erection work.

Structural Steel

Page 51: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

ITEM 5CONTROL OF THE WORK5.1. Authority of Engineer. The Engineer has the authority to observe,test, inspect, approve, and accept the work. The Engineer decides allquestions about the quality and acceptability of materials, work performed,work progress, Contract interpretations, and acceptable Contract fulfillment.The Engineer has the authority to enforce and make effective thesedecisions.The Engineer acts as a referee in all questions arising under the terms of theContract. The Engineer’s decisions will be final and binding.

Structural Steel

Page 52: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

ITEM 5 CONTROL OF THE WORK (Cont.)5.2. Plans and Working Drawings. When required, provide workingdrawings to supplement the plans with all necessary details not included onthe Contract plans. Prepare and furnish working drawings in a timelymanner and obtain approval, if required, before the beginning of theassociated work. For all working drawing submittal requirements, theEngineer may allow electronic and other alternative submission procedures.Have a licensed professional engineer sign, seal, and date the workingdrawings as indicated in Table 1.

Structural Steel

Page 53: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Structural Steel

Page 54: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Steel Structures

Page 55: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Structural Steel

Page 56: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

Structural Steel

Page 57: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

– Sequence• Beams ID Numbers• Splices• Starting end

– Procedure• Number and capacity of cranes• Crane setup locations• Beam pickup points• Beam hooks capacities• False Bent locations• Etc.

– Load Calculations• Each section of beam• Shoring capacity• Crane

– Capacity– location– Boom Angles– Brand and Type

Structural Steel

Page 58: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

TxDOT - Standard Spec. 2004TxDOT - Standard MEBR (S)TxDOT - Bridge Design ManualTxDOT – BRG – Field Ops., Const. & Maint.

AASHTO - Guide Design Specifications forBridge Temporary Works, 1995AASHTO - Construction Handbook for BridgeTemporary Works, 1995 2007

Resources

Page 59: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad

The End

Page 60: Lewis Gamboa-Structural Element Erection Bracing. Erection Drawings. Submit 2 copies of erection drawings in accordance with Item 5, “Control of the Work,” before erection of railroad