Payal Gupta

download Payal Gupta

of 17

Transcript of Payal Gupta

  • 7/31/2019 Payal Gupta

    1/17

    HOUSING LOAN

    O r i e n t a l B a n k o f c o m m e r c e

    E s t a t e P l a z a , S a h a r a E s t a t e

    J a n k i p u r a m

    L u c k n o w

    1 0 / 2 4 / 2 0 1 2

    Smt Payal Gupta

    Memorundum for sanction of housing loan of Rs Ten Lac

    Only for additional construction / top up loan on the

    existing house , to Mrs Payal Gupta

  • 7/31/2019 Payal Gupta

    2/17

    MODEL PROCESS NOTE FOR RETAIL LOANS

    MEMORANDUM FOR THE SANCTION OF LOAN FOR ADDITIONAL CONSTRUCTION / TOP UP

    LOAN ON THE EXISTING HOUSE OF RS TEN LAC ONLY TO MRS PAYAL GUPTA

    Sanctioning

    Authority

    Branch Manager

    Date:

    FOR APPROVAL

    Date of receipt of proposal 19.10.2012

    Date of receipt 19.10.2012

    Date of raising queries 20.10.2012

    Date of receipt of last reply 22.10.2012

    1. BORROWERS PROFILE

    Particulars Student/Borrower Co-Borrower- I Co-Borrower-II

    Name Payal Gupta NIL NIL

    Qualifiaction Post- graduate

    Occupation Assosiate Professor

    Net Worth as on 26.67 lac

    Address (Permanent) J-1/87 , Kanpur road ,

    Ashiana, Lucknow

    PAN NO AFBPG1882Q

    Passport No NIL

    Loan to be raised in

    names of

    Mrs Payal Gupta

    Date of Birth 19.02.1976

    Classification of Housing loan Non Priority

    ORIENTAL BANK OF COMMERCE;Branch Office, Jankipuram; Lucknow

  • 7/31/2019 Payal Gupta

    3/17

    Advance

    Asset

    Classification

    Standard

    Credit Rating OBC HL

    CIBIL Rating 648 ,

    Memorandum for The sanction of housing loan of Rs Ten Lac Only for additional construction /

    top up loan on the existing house , to Mrs Payal Gupta

    Residence J 187 , Ashiana Colony Lucknow

    Works Sri Jai Narayan PG college, Lucknow

    Banking

    arrangement

    The customer has previously taken a housing loan from our bank

    (10076011001586) of Rs 15.00 Lac , which has been running standard in our

    books. The customer is also maintaining a saving account with us.

    Besides , Mrs Payal Gupta is also enjoying a saving account with Uttar

    Pradesh Co Operative Bank Ltd in which there is a credit balance of Rs 0.87Lac

    Dealing with our

    bank since

    January 2010

    PROFILE IN BRIEFThe borrower Mrs Payal Gupta W/o Hariom Mahawar Gupta is enjoying a housing loan with us

    (10076011001586) , of Rs Fifteen Lac Only ,sanctioned under discretion of Branch Manager Mr

    Girdhar Tripathi on 12.04.2010 .The borrower herself working as an Assistant Professor at Shri Jai

    Narayan PG College , Lucknow . Mr Hariom Mahawar Gupta husband of the borrower andguarantor in the account is a qualified chartered accountant.

    As per the credit history of borrower is concerned , cibil score of the borrower is good and does not

    show any adversity The housing loan account of the borrower is running standard .Thus it lead the

    borrower with satisfactory credit history.

    VALUE OF ACCOUNTBeisded of the Housing Loan ,the borrower is maintaing a saving account with us also.

    PRESENT PROPOSAL IN BRIEFThe borrower has a need for additional construction at House No 187 Sector J, Ashiana , LDA

    Colony , Kanpur Road, Lucknow, for finishing of basement and first floor/construction ,

    construction of servant room and toilet on second floor The present proposal is for the

    construction of the same . The borrower has estimated the cost of construction upto Rs 14.47 lac

    and proposed for the loan of Rs 10.00 Lac.

    CREDIT FACILITIES SANCTIONED BY OUR / OTHER BANKS

    The Credit facilities have been sanctioned to Group concern as under:(Rs in Lacs)

  • 7/31/2019 Payal Gupta

    4/17

    Name of the

    Concern/Group

    Concern

    Nature of

    Limits

    Sanctioned

    Amount

    Present

    O/s

    Rate of

    Interest

    Asset Classification

    Mrs Payal Gupta Housing Loan Rs 15.00

    Lac

    Rs 14.47

    Lac

    8.75%

    (fixed rate)

    Standard

    2. DETAILS OF FACILITYA. Housing Loan ( Additional Construction)

    (Rs. in Lacs)

    Nature of

    Facility

    Existing

    Limit

    Present

    O/S

    Proposed

    loan

    Total

    Limit

    Irregularity,

    if any

    Present

    ROI

    Proposed

    ROI

    Housing

    Loan

    Fresh

    15.00

    Lac

    Rs

    14.74Lac

    10.00 Lac Rs 25.00

    Lac

    Nil 8.75% 10.65%

    Total 10.00 lac

    DETAILS OF PROPERTY (HOUSE)The borrower has proposed to do some additional construction at House No J-187, in Ashiana

    Colony , Lucknow , measuring 247.16 Sqm , bouded by :

    North: Plot No J 186

    South: 9 Mt wide Road

    East: 9 mt wide roadWest: Plot No J 188

    ADVOCATES OPINION :The advocate Shri Arun Kumar Khare, vide its letter dated 02.04.2010 has submitted the legal

    opinion cum search report of the land and building constrcuted over plot no J-187 Situated at

    Ashiana colony , Lucknow measuring 247.16 Sqm. The advocate has given an opinion Smt Pyal

    Gupta W/o Hariom Mahawar and Shri Hariom Mahawar S/o K C Mahawar have got a valid , clear

    absolute and marketable title over the property shown above.

    VALUATION DETAILS:

    As per the estimation report of Mr A K Mukerjee dated 08.10.2012 , the cost of proposed finishing

    of basement , first floor and construction of servant room and toilet on second floor is Rupees

    Fourteen Lac Seventy Six Thousand Five Hundred Only . The valuer has taken the rates as per UP

    PWD Schedule of Rates 2012.

    On the other hand , Mr A K Mukerjee vide their valuation dated 08.10.2012 has come to the

    realisable value of the property of Rs Ninety Five Lac Only

    Details of

    property

    Area Detail of Valuer

    & valuation date

    Market value Realizable value

    Plot No J-187 , in

    Ashiana Colony ,Lucknow ,

    247.16 Sqm M/s A K Mukerjee

    dated 08.10.2012

    95.00 lac

  • 7/31/2019 Payal Gupta

    5/17

    measuring 247.16

    sqm standing in

    the name of Smt

    Pyal Gupta & Shri

    Hariom Mahawar

    , registered withsubregistrar

    pratham , srl no

    4192/04 volume

    6212 book no 1

    from page no 397-

    412 dated

    12.09.2004

    B. VEHICLE LOAN:Nature of

    Facility

    Existing

    Limit

    Present

    O/S

    Proposed

    limit

    Irregularity,

    if any

    Present

    ROI

    Proposed

    ROI

    Vehicle

    Loan -

    Fresh

    Total

    DETAILS OF MOVABLE ASSETAsset Model/Make Purchase value Seller

    C. EDUCATION LOANI. DETAILS OF THE EDUCATIONAL COURSE TO BE UNDERTAKEN

    Whether loan required for study in India or abroad

    Name and address of the Educational Institution where the study

    is to be undertaken

    Whether the Educational Institution is recognized/

    approved/affiliated/accredited to AICTE/ Government/ University.

    If not, whether approved by Oriental Bank of Commerce for

    considering Education Loan

  • 7/31/2019 Payal Gupta

    6/17

    Name of the course of study for which loan applied

    Whether the course is part-time or full time

    Duration of the Course

    II. Purpose of Loan and details of expenses for the study

    Expenses (Certified by

    Institution)

    1st

    Yea

    r

    2nd

    Yea

    r

    3rdYear 4rt

    h

    Yea

    r

    5th

    Yea

    r

    Tot

    al

    % Tot

    al

    Admisssion Fees/Tution Fees

    Caution Money

    Library Security Deposit

    Lodging/ Boarding Charges

    Medical Facility

    TOTAL

    Means of Finance

    Own Sources (Margin)

    Bank Finance

    TOTAL

    4. DETAIL OF SECURITY OFFERED:Extension of Equitable Mortgage of Plot No J-187 , in Ashiana Colony , Lucknow , measuring 247.16

    sqm standing in the name of Smt Pyal Gupta & Shri Hariom Mahawar , registered with

    subregistrar pratham , srl no 4192/04 volume 6212 book no 1 from page no 397-412 dated

    12.09.2004 having realizable value of Rs

  • 7/31/2019 Payal Gupta

    7/17

    5. PERSONAL GUARANTEE:

    Personal Guarantee of Shri Hariom Mahawar having financial net worth of Rs 44.45 Lac Only . The

    guarantor is husband of Mrs Payal Gupta and is also a proprietor of M/s Hariom and Assosiates .

    He is working as Chartered Accountant in that firm.

    6.

    REPAYMENT PERIOD

    The repayment period has been computed as under:

    As per the loan policy for housing loan top up , loan period of both the housing loan should end at

    the same time which lead us to a loan period of 150 Months . But the borrower has requested us to

    increase the tenour of prevously sanctioned loan , so that there would be less stress of EMI of boththe loans .

    Maximum repayment period which could be made available to the borrower at the time of

    previous sanction dated 12.04.2010 is 300 out of which 2 years has already passed . Thus we are

    left withmaximum eligible repayment period of 246 Months. The customer has requested for the

    loan of 210 Months . Therefore, we have reached the maximum repayment period of 210 Months

    7. ASSESSMENT OF INCOMEThe details of the total income of the borrowers are as under:(As per the ITRs filed )

    (Rs. in lacs)

    Particulars of income Assessment

    Year 2012-13

    Asssessment

    Year 2011-12

    Average

    of 2 FYs.

    Income from salary 540355/- 448703/- 494529/-

    Income from Business 0/- 0/- 0/-

    Income from Capital Gain 0/- 0/- 0/-

    Total deduction 217120/- 51136/- 242688/-

    TOTAL 323235/- 21560/- 2151841

    8. MPBF CALCULATION1) On Margin criteriaTotal Cost of Asset to be bought Rs 14.76 Lac

    Margin@25% Rs 3.69 Lac

    MPBF Rs 11.07 Lac

    Loan Eligibility : Rs 11.07 Lac

    2) Gross Monthly Income Critieria:

    Date of birth 19.02.1976

    Max. Repayment period permitted up to 60 years 19.02.2036

    Residual repayment available 23 years

    Maximum permissible repayment period 25 years

    Repayment period of previous housing loan 15 Years

  • 7/31/2019 Payal Gupta

    8/17

    Name of the Borrower Gross Monthly salary

    ( As per the latest salary

    slip)

    MPBF( 60 times of gross

    salary)

    Smt Payal Gupta Rs 51860/- Rs 31.16 Lac

    Loan eligibility : Rs 31.16 Lac

    3) Net Take Home CriteriaS.No. Particulars

    Name of Borrower Smt Payal Gupta

    a. Age 36 Years

    b. Repayment Years 23 Years

    c. Gross Annual Income Rs 6.24 Lac

    d. Gross Monthly Income Rs 0.52 Lace. Net take Home(%age) 40%

    f. Net take Home Rs 0.208

    g. Monthly Net take Home (d-f) Rs 0.312

    h. Monthly Deductions* Rs 0.21 Lac

    i. Fund Available for EMI (g-h) Rs 0.102 Lac

    j. EMI per Lac Rs Lac

    MPBF Rs Lac

    * Rs.0.15 lac has been deducted against the housing loan availed by the borrower from

    our bank

    Total Loan eligibility= Rs Lacs.

    Hence, on the basis of whichever is less criteria the maximum permissible loan in this case shall be

    Rs. Lac

    Borrower has applied for a loan of Rs10.00 Lac

    9.

    RECOMMENDATIONS FOR MPBF

    On calculation of the MPBF of the borrower on the above three computation, the maximum

    permissible limit comes to Rs . 11.16 lacs on the basis of the income calculations . As such we may

    consider home loan limit of Rs 10.00 lac

    11. OBSERVATIONS OF THE PRE- SANCTION VISIT

    The pre-sanction visit has been conducted by the Manager (Loans) Shri Pramod Kumar Dubey. The

    detailed visit report is enclosed with the process note.

    12. RBI /BANK POLICY ON FINANCING INDUSTRY:

  • 7/31/2019 Payal Gupta

    9/17

    There are no restrictions as per RBI/Banks policy guidelines for such type of advance. Our Bankspolicy also states to consider proposed loan on usual terms and conditions and no restriction is

    imposed.

    13. ANY CONCESSION/RELIEF BY WAY OF MARGIN /COMMISSION/ INTEREST.

    Particulars Norms as per scheme Deviations / concessions sought

    14. OUR OBSERVATIONS ON RECOMMENDED DEVIATION

    a): -----------Not Applicable---------.

    b) :----------Not Applicable---------.

    RECOMMENDATIONS( Housing Loan)

    TERMS & CONDITIONS OF SANCTION

    Name of Borrower Smt Payal Gupta

    Branch/Region Jankipuram

    Memorandum for Housing Loan of Rupees Ten Lac Only for additional construction

    / Top UP

    (A) Terms of SanctionNature of Facility Housing Loan additional construction / Top UP

    Amount of Loan Rs 10.00 lacs only(Rupees fourty lacs only)

    Classification Housing Loan Non priority Sector

    Security Extension of Equitable Mortgage of Plot No J-187 , in Ashiana Colony ,

    Lucknow , measuring 247.16 sqm standing in the name of Smt Pyal Gupta

    & Shri Hariom Mahawar , registered with subregistrar pratham , srl no

    4192/04 volume 6212 book no 1 from page no 397-412 dated 12.09.2004

    having realizable value of Rs95.00 Lac as per the valuation of Mr A KMukerjee dated 18.10.2012

    Rate of Interest Base rate + 0.25% =10.65% p.a. (floating) (Present Base Rate is10.40 %)

    with monthly rests subject to changes in base rate / Spread announced by

    the Bank / RBI from time to time.

    Penal Interest@ 2.00 p.a. over & above the applicable rate shall be

    charged for irregular amount and for the period of irregularity.

    Intimation of change in Interest Rate:-

    The borrower shall be deemed to have notice of changes in the rate of

    interest whenever there are changes in Base Rate either increase or

    decrease in interest rates. By display of Base Rate on the Notice Board ofthe Branch or published in news papers or made through entries of the

  • 7/31/2019 Payal Gupta

    10/17

    interest rate charged in the passbook/statement of account furnished to

    the borrower and the borrower is liable to pay such revised rate of interest.

    Margin

    (Minimum 25_%)

    32 %. The borrower shall contribute margin / the difference of loan

    amount and purchase price, before release of the loan.

    Process Fee Nil ( As per the HO Circular No: HO/Retail/20/2012-13/398 dated

    07.09.2012)Bounced cheque/ECS

    or SI dishonours:-

    A penalty of Rs 250/- + service tax will be charged for every bounced

    cheque/ECS or SI dishonors related to payment of EMI. The rate may vary

    from time to time.

    Repayment Schedule a) The loan shall be repaid in 210 EMI of Rs.10520/- each commencing

    from November months. The instalment amount may vary from time to

    time on the eventuality of changes in our base rate.

    b) The accrued monthly interest shall be served in the first week of

    following month, during the moratorium of Nil months.

    c) Moratorium period- Nil months from the date of first disbursement.

    Disbursement

    Schedule

    Disbursment shall be made available to the borrower in four

    schedule , subject to availability of completion certificate dulycertified by architect.

    Insurance The house shall be got insured under agreed bank clause. The insurance

    premium shall be borne by the party.

    Inspection The house shall be inspected by Bank Official on half-yearly or oftener on

    irregular interval with prior intimation to the party. The party will

    authorize the bank officials to conduct such inspection.

    GENERAL TERMS AND CONDITIONS

    1. Prior to release of facility branch shall ensure that a fresh search certificate cum legal opinionbe obtained from Banks panel advocate confirming that the requisite search has been made in

    the books of registrar and the builder has derived the right to sell / ownership to execute

    agreement to sale in favour of subject borrower.

    2. Prior to release of facility branch shall ensure that all the documentation formalities arecompleted and mortgage documents is obtained as per the directives of advocate. Documents

    shall be got vetted from the Bank's legal retainer. BCC shall be submitted within 15 days of

    disbursement of the credit facilities.

    3. Prior to release of facility a letters of declaration from the sellers and the borrower that thesaid property is not subject to any charge/lien to any bank/ financial institution / authority

    and the society and (i) borrower has not raised any loan against the said house, (ii) the said

    plot/house is not located in an unauthorized colony (iii) that the said plot /house is for

    residential use and shall not be used for commercial purpose.

    4. Prior to release of credit facility, the branch shall ensure that the proposed residential propertyis in conformity the applicable statutory/non statutory and regulatory guidelines applicable to

    the project. An affidavit cum undertaking be obtained from borrower that the built up

    property has been constructed as per the sanctioned plan and /or building bye laws. Architects

    Certificate in this regard shall also be obtained.

    5. The borrower during the entire currency of the loan shall maintain the house in good conditionat his own cost and keep the same free from all encumbrances, pay all taxes and other

    statutory dues and that he will permit any representative of the bank to inspect the property

    from time to time at the banks option/discretion with advance intimation to the borrower.

  • 7/31/2019 Payal Gupta

    11/17

    6. Branch shall obtain post-dated cheques (minimum 48 monthly installments at a time) along

    with undertaking from the borrower as per specimen under housing finance scheme.

    7. Pre-payment penalty of 2% shall be charged on account of shifting of loan from our bank toother Bank / Financial Institution. An undertaking to this effect be obtained and kept on

    record.

    8. All other conditions as circulated by Head Office vide its circular dated 11.4.2000, 01.07.2002 &06.07.2011 and further amendments thereon, pertaining to above scheme / loan shall strictly

    be complied with.

    9. All other undertaking as per Annexure A shall be obtained and other conditions as perAnnexure B shall be duly complied with.

    Special terms and condition:

    The borrower shall repay the existing housing loan (10076011001586) of Rupees

    Fifteen Lakh sanctioned under branch power, dated 29.03.2010 in next 210 months(after rescheduling of the loan period from existing 181 months to 240 months at

    the request of the borrower vide theire letter dated 23.10.2012) with an EMI of Rs

    15593 as per the present outstanding Of Rs 1482195- ( with interest upto date)

    Branch Manager

    Branch Office : Jankiupram

    ANNEXURE A

    VARIOUS UNDERTAKINGS TO BE OBTAINED FROM THE BORROWER ON LETTER PAD

    The branch shall obtain suitable undertakings from the borrower with regard to the following:

    1. The names of Borrowers do not figure in any list of defaulters circulated by RBI or any Bankand Financial Institution nor their names as partners/directors appear in caution list issued by

    RBI/ECGC/DGFT etc.

    2. That all required Statutory and/or Regulatory permissions or guidelines from local or othercompetent authorities have been obtained (as applicable).3. An undertaking shall be obtained from the borrowers (mortgager) that no dues of tax are

    outstanding against them.

    4. To issue appropriate undertaking / affidavits / certificates as the Bank may require from timeto time certifying that the funds comprising of entire amount of loan / facility / sum due /

    amount outstanding in the account have been used exclusively for the purpose for which they

    were obtained and the same have not been diverted / siphoned and no misrepresentation has

    been caused of any kind or accounts falsified/any fraudulent transaction have been carried out

    etc.

  • 7/31/2019 Payal Gupta

    12/17

    5. To keep the Bank informed of the happening of any event likely to have a substantial effect on

    their income.

    6. Not to create any further charge, lien or encumbrance over the assets and properties of thecompany to be charged to the bank in favour of any other bank, financial institution, Company,

    firm or person.

    ANNEXURE B

    OTHER GENERAL TERMS & CONDITIONS OF SANCTION

    1) Satisfactory CRs shall be obtained from other Banks from whom the borrower/ associatesare enjoying / sanctioned credit facilities and it shall be ensured that the account is a

    Standard Asset with them, before release of limit.

    2) An undertaking shall be obtained from the owners of the properties mortgaged to the Bankthat there are no arrears of tax including interest leviable thereon under various

    provisions of Income Tax Act, against them.

    3) All statutory and/or Regulatory permissions or guidelines from local or other competentauthorities shall be obtained by the branch/borrower (as applicable).

    4) Advance / Facility sanctioned shall be used for the specific purpose for which it issanctioned and not for any other purpose. End use of the funds/facility shall be ensured by

    the Branch.

    5) In terms of HO Circular No.HO/R&L/14/2001-02/355 dated 09.02.2002, an affidavitand undertaking about the names, age and address of legal heirs of the borrower /

    obligants / guarantors shall be obtained, which shall be recorded and updated

    from time to time.

    6) In terms of HO Circular No.ADV/17/2004-05 dated 29.05.2004 necessary documents/ declaration from the borrower/guarantor pertaining to Credit Information

    Bureau of India (CIBIL) shall be obtained.

    7) The credit facilities sanctioned to the borrower should be availed within a period of sixmonths of the date of sanction failing which the sanction shall lapse.

    8) Bank reserves the right to withdraw the sanction at any time in case any new facts etccome to light.

    9) It shall be ensured that all the papers obtained from the borrower / (in pre and postsanction phase) are duly signed by the authorized signatory.

    **************

  • 7/31/2019 Payal Gupta

    13/17

    SANCTION LETTER

    ORIENTAL BANK OF COMMERCE

    Branch Office, Jankiupram

    :

    Date:24.09.2012

    TERMS & CONDITIONS OF SANCTION

    Name of Borrower Smt Payal Gupta

    Branch/Region Jankipuram

    Date of sanction 23.10.2012

    Memorandum for Housing Loan of Rupees Ten Lac Only for additional construction

    / Top UP

    (B) DeviationsParticulars Norms as per scheme Deviations approved

    NIL

    (C) Terms of SanctionNature of Facility Housing Loan additional construction / Top UPAmount of Loan Rs 10.00 lacs only(Rupees fourty lacs only)

    Classification Housing Loan Non priority Sector

    Security Extension of Equitable Mortgage of Plot No J-187 , in Ashiana Colony ,

    Lucknow , measuring 247.16 sqm standing in the name of Smt Pyal Gupta

    & Shri Hariom Mahawar , registered with subregistrar pratham , srl no

    4192/04 volume 6212 book no 1 from page no 397-412 dated 12.09.2004

    having realizable value of Rs95.00 Lac as per the valuation of Mr A K

    Mukerjee dated 18.10.2012

    Rate of Interest Base rate + 0.25% =10.65% p.a. (floating) (Present Base Rate is10.40 %)

    with monthly rests subject to changes in base rate / Spread announced by

    the Bank / RBI from time to time.

    Penal Interest@ 2.00 p.a. over & above the applicable rate shall be

    charged for irregular amount and for the period of irregularity.

    Intimation of change in Interest Rate:-

    The borrower shall be deemed to have notice of changes in the rate of

    interest whenever there are changes in Base Rate either increase or

    decrease in interest rates. By display of Base Rate on the Notice Board of

    the Branch or published in news papers or made through entries of the

    interest rate charged in the passbook/statement of account furnished to

    the borrower and the borrower is liable to pay such revised rate of interest.

    Margin(Minimum 25_%)

    32 %. The borrower shall contribute margin / the difference of loanamount and purchase price, before release of the loan.

  • 7/31/2019 Payal Gupta

    14/17

    Process Fee Nil ( As per the HO Circular No: HO/Retail/20/2012-13/398 dated

    07.09.2012)

    Bounced cheque/ECS

    or SI dishonours:-

    A penalty of Rs 250/- + service tax will be charged for every bounced

    cheque/ECS or SI dishonors related to payment of EMI. The rate may vary

    from time to time.

    Repayment Schedule a) The loan shall be repaid in 210 EMI of Rs.10520/- each commencingfrom November months. The instalment amount may vary from time to

    time on the eventuality of changes in our base rate.

    b) The accrued monthly interest shall be served in the first week of

    following month, during the moratorium of Nil months.

    c) Moratorium period- Nil months from the date of first disbursement.

    Disbursement

    Schedule

    Disbursment shall be made available to the borrower in four

    schedule , subject to availability of completion certificate duly

    certified by architect.

    Insurance The house shall be got insured under agreed bank clause. The insurance

    premium shall be borne by the party.

    Inspection The house shall be inspected by Bank Official on half-yearly or oftener onirregular interval with prior intimation to the party. The party will

    authorize the bank officials to conduct such inspection.

    GENERAL TERMS AND CONDITIONS

    10.Prior to release of facility branch shall ensure that a fresh search certificate cum legal opinionbe obtained from Banks panel advocate confirming that the requisite search has been made in

    the books of registrar and the builder has derived the right to sell / ownership to execute

    agreement to sale in favour of subject borrower.

    11.Prior to release of facility branch shall ensure that all the documentation formalities arecompleted and mortgage documents is obtained as per the directives of advocate. Documentsshall be got vetted from the Bank's legal retainer. BCC shall be submitted within 15 days of

    disbursement of the credit facilities.

    12.Prior to release of facility a letters of declaration from the sellers and the borrower that thesaid property is not subject to any charge/lien to any bank/ financial institution / authority

    and the society and (i) borrower has not raised any loan against the said house, (ii) the said

    plot/house is not located in an unauthorized colony (iii) that the said plot /house is for

    residential use and shall not be used for commercial purpose.

    13.Prior to release of credit facility, the branch shall ensure that the proposed residential propertyis in conformity the applicable statutory/non statutory and regulatory guidelines applicable to

    the project. An affidavit cum undertaking be obtained from borrower that the built upproperty has been constructed as per the sanctioned plan and /or building bye laws. Architects

    Certificate in this regard shall also be obtained.

    14.The borrower during the entire currency of the loan shall maintain the house in good conditionat his own cost and keep the same free from all encumbrances, pay all taxes and other

    statutory dues and that he will permit any representative of the bank to inspect the property

    from time to time at the banks option/discretion with advance intimation to the borrower.

    15.Branch shall obtain post-dated cheques (minimum 48 monthly installments at a time) alongwith undertaking from the borrower as per specimen under housing finance scheme.

    16.Pre-payment penalty of 2% shall be charged on account of shifting of loan from our bank toother Bank / Financial Institution. An undertaking to this effect be obtained and kept onrecord.

  • 7/31/2019 Payal Gupta

    15/17

    17.All other conditions as circulated by Head Office vide its circular dated 11.4.2000, 01.07.2002 &

    06.07.2011 and further amendments thereon, pertaining to above scheme / loan shall strictly

    be complied with.

    18.All other undertaking as per Annexure A shall be obtained and other conditions as perAnnexure B shall be duly complied with.

    Special terms and condition:

    The borrower shall repay the existing housing loan (10076011001586) of Rupees

    Fifteen Lakh sanctioned under branch power, dated 29.03.2010 in next 210 months

    (after rescheduling of the loan period from existing 181 months to 240 months at

    the request of the borrower vide theire letter dated 23.10.2012) with an EMI of Rs

    15593 as per the present outstanding Of Rs 1482195- ( with interest upto date)

    Branch Manager

    Branch Office : Jankiupram

    ANNEXURE A

    VARIOUS UNDERTAKINGS TO BEOBTAINED FROM THE BORROWER ON LETTER PAD

    The branch shall obtain suitable undertakings from the borrower with regard to the following:

    7. The names of Borrowers do not figure in any list of defaulters circulated by RBI or any Bankand Financial Institution nor their names as partners/directors appear in caution list issued by

    RBI/ECGC/DGFT etc.

    8. That all required Statutory and/or Regulatory permissions or guidelines from local or othercompetent authorities have been obtained (as applicable).

    9. An undertaking shall be obtained from the borrowers (mortgager) that no dues of tax areoutstanding against them.

    10.To issue appropriate undertaking / affidavits / certificates as the Bank may require from timeto time certifying that the funds comprising of entire amount of loan / facility / sum due /

    amount outstanding in the account have been used exclusively for the purpose for which they

    were obtained and the same have not been diverted / siphoned and no misrepresentation has

    been caused of any kind or accounts falsified/any fraudulent transaction have been carried out

    etc.

    11.To keep the Bank informed of the happening of any event likely to have a substantial effect ontheir income.

    12.Not to create any further charge, lien or encumbrance over the assets and properties of thecompany to be charged to the bank in favour of any other bank, financial institution, Company,firm or person.

  • 7/31/2019 Payal Gupta

    16/17

    ANNEXURE B

    OTHER GENERAL TERMS & CONDITIONS OF SANCTION

    10) Satisfactory CRs shall be obtained from other Banks from whom the borrower/ associatesare enjoying / sanctioned credit facilities and it shall be ensured that the account is a

    Standard Asset with them, before release of limit.

    11) An undertaking shall be obtained from the owners of the properties mortgaged to the Bankthat there are no arrears of tax including interest leviable thereon under various

    provisions of Income Tax Act, against them.

    12) All statutory and/or Regulatory permissions or guidelines from local or other competentauthorities shall be obtained by the branch/borrower (as applicable).

    13) Advance / Facility sanctioned shall be used for the specific purpose for which it issanctioned and not for any other purpose. End use of the funds/facility shall be ensured by

    the Branch.

    14) In terms of HO Circular No.HO/R&L/14/2001-02/355 dated 09.02.2002, an affidavitand undertaking about the names, age and address of legal heirs of the borrower /

    obligants / guarantors shall be obtained, which shall be recorded and updated

    from time to time.

    15) In terms of HO Circular No.ADV/17/2004-05 dated 29.05.2004 necessary documents/ declaration from the borrower/guarantor pertaining to Credit Information

    Bureau of India (CIBIL) shall be obtained.

    16) The credit facilities sanctioned to the borrower should be availed within a period of sixmonths of the date of sanction failing which the sanction shall lapse.

    17) Bank reserves the right to withdraw the sanction at any time in case any new facts etccome to light.

    18) It shall be ensured that all the papers obtained from the borrower / (in pre and postsanction phase) are duly signed by the authorized signatory.

    **************

  • 7/31/2019 Payal Gupta

    17/17