Miaad KhayatianTim EldridgePaul Fisher
Rapid assessment of future transport needs
for Perth
![Page 2: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/2.jpg)
1. Background
2. Approach
3. Methodology
4. Outcomes
5. Summary & conclusion
6. Acknowledgement
Presentation structure
![Page 3: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/3.jpg)
Background Perth & Peel Regions
Metropolitan Region SchemeGrew out of Stephenson Hepburn Plan
Population2014: 1.8 m2031: 2.6 m2052: 3.5 m
![Page 4: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/4.jpg)
Background Scenarios
Directions 31 sets out 3 development scenarios:• Polycentric city• Development concentrated around regional
activity centres• Dispersed• Business as usual – suburban sprawl
• Semi-polycentric• Hybrid of the two
![Page 5: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/5.jpg)
Background Urban Economic Study
DoP appointed Pracsys to deliver economic study of 3 scenarios.
Main cost drivers:• Water• Energy• Transport
GHD undertook transport component
![Page 6: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/6.jpg)
Background Urban Economic Study
Study is in two phases:
1. Proof of concept (finished)
2. More detailed analysis (under way)
![Page 7: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/7.jpg)
Approach Type of model
• Time & budget constraints• Rapid, low cost, high level output required• Conventional modelling not suitable
Rapid assessment approach• Trip generation• Demand per corridor• Existing capacity• Required infrastructure
![Page 8: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/8.jpg)
Methodology Trip generation
DoP and Pracsys generated• 621 employment zones• 175 residential zones• Home – work trips (gravity model)
GHD generated• 56 zones mapped to the Pracsys zones• Total morning peak trip numbers
![Page 9: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/9.jpg)
Methodology Travel corridors
• Spiderweb diagram• Travel corridors v planning corridors• Adjust trips to corridors
![Page 10: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/10.jpg)
Methodology Screenlines
Screenlines placed strategically across corridors42 screenlines in proof of concept study140 screenlines in detailed study
![Page 11: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/11.jpg)
Methodology Capacity and shortfall
At each screenline:
a) Calculate demandFrom spiderweb diagram
b) Calculate existing capacityRoad, rail, bus
c) Shortfall = demand – existing capacity
![Page 12: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/12.jpg)
Methodology Spreadsheet model
![Page 13: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/13.jpg)
Methodology Required infrastructure
Infrastructure recommendations
informed by:• 2031 Public Transport Master Plan • Moving People• Moving Freight • Other forward planning
![Page 14: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/14.jpg)
Methodology Required infrastructure
New infrastructure suggested
1.Additional road and freeway lanes where already planned
2.Better utilisation of existing roads3.Improved heavy rail capacity4.Bus lanes and bus rapid transit5.New light rail6.New heavy rail
![Page 15: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/15.jpg)
Methodology Required infrastructure
![Page 16: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/16.jpg)
Outcomes PT mode share
Proof of concept 2011 2031 2052Current 10%Modelling outcome 40% 60%Agency target 14% 19%
![Page 17: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/17.jpg)
Outcomes Costs
Scenario
Population
Polycentric($ billion)
Semi-polycentric($ billion)
Dispersed($ billion)
Current to 2.6 million
14.86 17.01 14.18
2.6 to 3.5 million
17.90 21.60 34.84
Total 32.76 38.61 49.02
![Page 18: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/18.jpg)
Outcomes Some key points
• CBD environs will remain largest employment centre• Up to 2.6 M population, current PT
planning is adequate• After 2.6 M, new links needed rapidly• Northern suburbs railway will hit capacity
before 2031 – new East Wanneroo railway required• North / central corridor (Mirrabooka to
CBD) is a weak link
![Page 19: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/19.jpg)
Outcomes Some key points
• Legacy railways have excess capacity• Extra capacity needs to be achieved from
existing roads• Spatial location of population and
employment is key to good transport outcomes.
![Page 20: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/20.jpg)
Conclusion Proof of concept
Rapid, low cost, high level assessment of infrastructure requirement
• Three development scenarios with two population targets
• Method relies on simple arithmetic and engineering judgement – agreed with transport agencies
• Proof of concept model is coarse-grained but results pass sanity test
• Mode share skewed to PT
![Page 21: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/21.jpg)
Conclusion Next steps
• More fine-grained analysis under way• Revised population / employment
distribution• More zones, corridors and screenlines• Mode share needs attention
![Page 22: Paul Fisher Future transport needs of perth](https://reader035.fdocuments.us/reader035/viewer/2022070321/558ba0afd8b42af4798b467d/html5/thumbnails/22.jpg)
Acknowledgements
• Department of Planning, Western Australia
• Pracsys
• Department of Transport
• Public Transport Authority
• Main Roads Western Australia