PAST SUPPLY RECORDS - National Cables Industry · PAST SUPPLY RECORDS FOR SELECTED PROJECTS 22...

23
NO. PROJECT NAME CLIENT CONSULTANT 1 28+G+11+GYM at Dubai Silicon Oasis, Dubai Ahmed Bin Suwaidah/Bin Mohd Al Balush Dubarch 2 Carlton Residence in Sharjah ABCO Syna Engineering Consultants & Development 3 Al Hamra Palace Hotel @ RAK - UAE Al Hamra Real State Home of Architecture for Engineering Consultants 4 Five Star Hotel Mixed Use Tower & Car Parking Acico Real State Dimensions Engineering Consultants 5 Amwai Plaza 1 at Amwai Island Yateem Air Conditioning W.L.L. 6 P100 MIRDIF Villas Dubai Properties Kling Consult 7 Dubai Silicon Oasis Head Quarter Complex (Phase 2) Dubai Silicon Oasis Khatib & Alami 8 Dubai Silicon Oasis Head Quarter Complex - Phase 1 Dubai Silicon Oasis Khatib & Alami 9 PE-049 - JBR Luxury Villas 152 Nos. for Dubai Properties Dubai Properties Design & Architecture Bureau 10 Extension to Bahrain Mall LAL's Group Arif Sadiq Design Consultant 11 Dubai Health Care City Infrastructure and Roads Dubai Development and Investment Authority Cansult Limited 12 The Green Community, Phase-1A Shopping Mall & Serviced Apartments Dubai Properties Edara LLC 13 XL Tower (3B+G+4P+19) Typical Office Building on Plot No. 88, A05-010 Damac Properties Conin 14 Business Tower on Plot No. BB-A05-012 Damac Properties Archon 15 Proposed (2B+G+9) Commercial Dr. Mohammad Khalfan/Khirbash Abdullah Design & Architecture Bureau 16 The Meadows & Spring Parks Emirates Hills Development Algurg Consultants 17 (B+G+4+Roof) Residential Building on plot no. C3- F14 at International City Ghayath Mohd Gheyath ME Engineering Consultants 18 GCAA Air Navigation Service Site General Civil Aviation Authority RMJM/Derby Design Consulting Engineers 19 Madinath Jumeirah H.H. Sheikh Mohammed Bin Rashid Al Maktoum CKR Consulting 20 Express by Holiday Inn Hotel at Al - Garhoud Holiday Inn Hotel National Engineering Bureau 21 Jumeirah English Speaking School Jumeirah English Speaking School Atkins PAST SUPPLY RECORDS FOR SELECTED PROJECTS Page 1 of 23

Transcript of PAST SUPPLY RECORDS - National Cables Industry · PAST SUPPLY RECORDS FOR SELECTED PROJECTS 22...

NO. PROJECT NAME CLIENT CONSULTANT

1 28+G+11+GYM at Dubai Silicon Oasis, Dubai Ahmed Bin Suwaidah/Bin Mohd Al Balush Dubarch

2 Carlton Residence in Sharjah ABCO Syna Engineering Consultants & Development

3 Al Hamra Palace Hotel @ RAK - UAE Al Hamra Real State Home of Architecture for Engineering Consultants

4 Five Star Hotel Mixed Use Tower & Car Parking Acico Real State Dimensions Engineering Consultants

5 Amwai Plaza 1 at Amwai Island Yateem Air Conditioning W.L.L.

6 P100 MIRDIF Villas Dubai Properties Kling Consult

7 Dubai Silicon Oasis Head Quarter Complex (Phase 2) Dubai Silicon Oasis Khatib & Alami

8Dubai Silicon Oasis Head Quarter Complex - Phase

1Dubai Silicon Oasis Khatib & Alami

9PE-049 - JBR Luxury Villas 152 Nos. for Dubai

PropertiesDubai Properties Design & Architecture Bureau

10 Extension to Bahrain Mall LAL's Group Arif Sadiq Design Consultant

11 Dubai Health Care City Infrastructure and RoadsDubai Development and Investment

AuthorityCansult Limited

12The Green Community, Phase-1A Shopping Mall &

Serviced ApartmentsDubai Properties Edara LLC

13XL Tower (3B+G+4P+19) Typical Office Building

on Plot No. 88, A05-010Damac Properties Conin

14 Business Tower on Plot No. BB-A05-012 Damac Properties Archon

15 Proposed (2B+G+9) Commercial Dr. Mohammad Khalfan/Khirbash Abdullah Design & Architecture Bureau

16 The Meadows & Spring Parks Emirates Hills Development Algurg Consultants

17(B+G+4+Roof) Residential Building on plot no. C3-

F14 at International CityGhayath Mohd Gheyath ME Engineering Consultants

18 GCAA Air Navigation Service Site General Civil Aviation Authority RMJM/Derby Design Consulting Engineers

19 Madinath JumeirahH.H. Sheikh Mohammed Bin Rashid Al

MaktoumCKR Consulting

20 Express by Holiday Inn Hotel at Al - Garhoud Holiday Inn Hotel National Engineering Bureau

21 Jumeirah English Speaking School Jumeirah English Speaking School Atkins

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

Page 1 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

22 P552FZ-Light Industrial Unit - Phase 9 Jebel Ali Free Zone Authority Al Wasl Al Jadeed

23

Western Region Development Program-Ghayathi

City Sub-division 350387-G100-Site Grading &

Infrastructure Work

Parsons International Limited

24B+G+M+45+HC+SP on plot #336-228, Sheikh

Zayed Road, DubaiMr. Taweed Taher Al Mohtady Eng. Adnan Saffarini

25 Rd.-4529: Sky Gardens Tower Plot- PA 06 at DIFC Mazaya/Projacs WS Atkins and Partners Overseas

26Reemraam Community Roads and Infrastructure

servicesMIZIN DMF Engineering

273 Towers 4B+G+3P+44+1M Commercials &

OfficesMazaya National Engineering Bureau

28 Dubai Festival City Majid Alfutaim Mario & Accessories

29 Discovery Garden - Mediterranean Gardens 2A Nakheel/Turner Engineering Consultants Group

30 The Palm Jumeriah Crescent Carriageway Nakheel ACE International

31 Jumeirah Island Heights Nakheel/Turner Purt Hill

32 Uptown-Motorcity Area-1Buildings Nakheel/Edara Purt Hill

33 The Palm Jumeirah-Garden Homes JAP 006-800 Nakheel The Employer Representative's Assistant SchusterPechtold (SPP)

34 Al Barsha 1st (Metro Project)

35 Residential Building Nakheel DAR Al Handassa

36 JAP 015/3 Nakheel Shadid Engineering

37 Techno Park HQ Bldg. Techno Park Dar Consulting Architects & Engineers

38International City JAP 0154-9 Res. Com Buildings

Package 09Nakheel Ace-Associated Consulting Engineers Int'l

39 Qasr Al Sarab Resort & Spa TDIC Halcrow International Partnership

40 Proposed Construction of Logistic Facility PWC Global Logistics Ltd. Orion Engineering Consultant

41 i-Rise @ TECOM Realty Capital Khatib & Alami

42 Road 3A Ras Al Khor Crossing RTA Parsons De Leuw Cather Overseas Limited

Page 2 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

43Improvement of Al Safooh Area Road Network

Roads R1 & R2 RTA Parsons De Leuw Cather Overseas Limited

44 Jumeirah Park - Package 3 Nakheel DAR Al Handassa

45 Improvement of Several Junctions in Dubai RTA Cansult

46 Dubai Land Ring Road RTA Halcrow International Partnership

47Sharjah International Airport Expansion &

Development Sharjah Airport Authority Projacs International

48 Catering Unit - FAA/Sharjah Airport Sharjah Airport Authority Projacs International

49 Motor City-Green Community Project Union Properties/Edara Khatib & Alami

50G+6 Residential Development on Plot No. 373 - 918

, Al Barsha FirstArkiteknik International Consulting Engineers

51B+G+M+1 Residential Development @ Al

JafiliyaWSP

52 District no. 5 - Infrastracture

53 Aweer Gas Turbine Power Station -H- Phase II

54 Burj Dubai Lake Fountain Project Nakheel Turner Hyder Consultant

55 Proposed Residential Building (G+7 Floors) Arif & Binteck Consultant Architects & Engineers

56Dubai Autorome & Business Park for Track &

InfrastructureAtkins

57The Green Community, Phase 1A Commercial &

Terrace ApartmentEdara LLC

58 Sita Sports Club -Phase I

59 Houses @ Muharraq Ministry of Housing

60 Ferrari Experience, Yas Island ADDC Ian Banham Associates

61 Ibis Hotel & Offices, Al Rigga Maf Investments Atkins

62R 829/4 - Access Arrangement to Rashidiya Park &

Ride StationRTA Parsons De Leuw Cather Overseas Limited

63PGU 402 Umm Al Quwain Marina Development

Phase 1 Road & Infrastructure shallow servicesEmaar Properties PJSC Halcrow International Partnership

64 Masdar 418 Masdar Abu Dhabi Future Company MASDAR

Page 3 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

65 Tabreed Cooling Plant-Al Rashidiya (DM03) Tabreed Cooling Plant SNC-Lavalin Gulf Contractor Action

66 Paris Sorbonne University Abu Dhabi Mubadala Obermeyer

67 Post Contract Services PSUAD Obermeyer Engineering Consulting

68R842/3 Improvement of Al Khail Road Junctions

10,11 & 13RTA Cansult Limited

69B+G+2 Commercial and Office Building on Plot

nos. 353-319,169 & 358 at Al SafaDubai Real Estate Centre Dar Consulting Architects & Engineers

70

Seven Residential Towers (P-017) for Dubai Silicon

Oasis Authority on Plot Nos. 25-081, 25-082, 25-083

& 25-012, Dubai

Dubai Silicon Oasis Archgroup

71 Zayed University Zayed University Cansult Maunsell Limited

72 Utility Networks (9286-35) Palm Water KEO

73 Nad Al Sheba Skydiving Stimulator E.C. Paris Buro Happold

74Sanitary Drainage for the Development of the Area

between Al Foah & Hill Fun City Contract No. M30CAl Ain Municipality GIBB Ltd.

75Canal Residence West Plot No. P6-14 (Plot:682-1402)

in Dubai Sports City, DubaiDubai Sports City Engineering Consultants Group

76Ruwais Housing Complex Expansion Phase III,

Construction of New HospitalAdnoc Hospital

77Dubai Silicon Oasis Head Quarter Complex Data

CenterDubai Silicon Oasis Khatib & Alami

78Sulafa Tower (4B+G+4P+66

typical+2S+2PH+1HC Plot No:

Mr.Mohammed Abdulla Mohammed Al

SayyahAl Asri Engineering Consultant

79(2B+G+B) Hotel Extension on Plot No. 214-501

Block al Garhoud Dubai (Millennium Airport HotelMillennium Airport Hotel ARENCO

80 Proposed Bus Depot Al Khawaneej Phase-1 RTA Jurong

81

Mercure Grand Hotel/Residential Tower for H.H.

Shaikh Ahmed Bin Saif Al Nahyan, B+G+34+Mech.

Floor, Plot No. JLT-PH2-T3, Jumeirah Lake Towers

Mercure Grand Hotel Ian Banham Associates

82Development on Madain Al Emarat-Road &

Infrastructure WorksRTA Al Turath Engineering Consultants

83 Mall of the Emirates Extension Mall of Emirates Holfords Associates

84 1B+G+6 Jewelry Manufacturing Complex National Engineering Bureau

Page 4 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

85 R-801 Lecvelling & Roads in Al Barsha'A (South) RTA Al Burj Engineering Consultants

86New Plaster Board Factory, Industrial City Abu

DhabiSaint-Gobain GIBB Ltd.

87 Nad Al Sheba Race Course - Main Track Meydan Teo A. Khing Design Consultant Sdn. Bhd.

88 Ajman Pearl H.H Shk. Humaid Bin Rashid Al Noaimi Adnan Saffarini

89 Al Ain Mall and Resort Al Farida Investment Company Khatib & Alami

90 Carrefour at Mirdif City MAF Hypermarket JM Renault & Partners

91 PTP 003/2-Jebel Ali Industrial Bus Depot Phase 2 RTA CRHI Consulting Engineers

92Upgrading & Intersections Improvements of

Northern Ring Road in Al Ain

Municipality and Agricultural Department -

Al Ain MunicipalityEngineering Associates

93 Neima Residential Complex N-100 Al - AinAbu Dhabi Center for Housing & Facilities

Service DevelopmentDorsch Consult - Abu Dhabi

94

Contract 0-1105, Construction of Pumping Station

and Pressure Main for the Zonescorp Labourer

Houses in F2 area at Mafraq

Abu Dhabi Sewerage Services Company Cansult Maunsell Limited

95Upgrading of Mirfa, Madinat Zayed, Water

Transmission Scheme

Abu Dhabi Transmission & Despatch

Company (TRANSCO)DR. M. H. Ali El Saie

96 Qasr Al Muwaiji Atelier Ten Consulting Environmental System

97B+G+2 Theatre Building,Plot no. 226-353 at Al

Twar FirstDubai Police Headquarters Nutek Consulting Engineers

98 Street Light Cabling works RTA Systra

99 Sheikha Fatima Bint Mubarak Nursing Academy H.Q.M.W.(Institute of Applied Technology) Al Salaam Consulting Archs, Engrs. & Planners

100 MEAO Rebasing Project (Al Minhad Air Base)

101Construction of Shuwelhat Housing Complex at

RuwaisADWEA APG Consultants

102 SHJ132-Extension of Caterpillar Workshop Facilities Mazaya Consulting Engineers

103Office Building Development Plots No. C-13 & C-14,

Sector E-48H.H. SH. Saeed Bin Zayed Al Nahyan Architectural Engineering Consultants

104 Jebel Hafeet Glacier Development (Main Works) Tamouh Shnkland Cox

105Proposed Stock Warehouse at Plot. No. 597-753,

Dubai Investment Park, DubaiAccess Engineering Consultant

Page 5 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

106 Abu Dhabi Golf Club Resort HotelTourism Development Investment

CompanayGrec Architects LLC

107

Ruwais Housing Complex expansion Phase III-

Construction of Married Staff Accomodation,

facilities and related insfrastructure - Package 6

ADNOC

108 Construction of Gateway Towers 3-8 Hills International Sarouh

109

Proposed (3B+G+25) Building On Plot no. 12-017

at Dubai Silicon Oasis for Mr. Abdul Rahman

Humood Al Attar & Mr. Waleed Sulaiman Al Deraa

Hadi Consulting Engineering

110

Rehabilitation of Old Water Network & House

Connections at Hilli Power House, Sarool Zones & Al

Foah, Northern Area and Miscellaneous Works

ADWEA

111 Al Raha Beach Development Aldar-Turner Aecom Middle East Ltd.

112Jebel Hafeet Glacier Development- White Water

RaftingADDC

113 Wheatherford Manufacturing Facility ADDC specialized Engineering Consultants

114Dualling of Road from Al Suaibe Round About to Al

QisaisADDC Aecom Middle East Ltd.

115

Construction & Maintenance of Steel Factory in Abu

Dhabi Industrial City (ICAD-2) Mussafa in Plot 57 HR

11-Tiger Profiles & Insulation

ADDC Western Engineering Consultancy

116 Pakistan Airforce Shabaz Air Base, Jacob Abad

117 G+2 Winchester School Extension Winchester School ARENCO

118 Tilal Complex Project

119 R535: Grand Hyatt Dubai Grand Spa Development Grant Hyatt Dubai WSP Middle East Limited

120Infrastructure of Al-Ain International

Airport/Mubadala Strata ProjectADDC Mouchel

121 132 KV Cabling Works in Ajaman and RAK FEWA Lahmeyer International Consulting Engineers

122 Al Ain Wild Life Park & Resort AADC

123Expansion of Abu Dhabi International Airport WBS

1.13.1-T3 Business Park, Grading InfrastructureStanley Consultancy

124 Package 1 Infrastructure for Rihan Heights Atkins

125Construction, Execution, Upgrading and Dualization

of Dibba-Masafi (Stage 2) Section 1Conser Consulting Engineering

Page 6 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

126Sector 2+3 Infrastructure Works Reem Island

Development, Abu DhabiHyder Consulting Middle East

127 Shah Gas Development (SGD) Program Abu Dhabi Gas Development Company Abu Dhabi Gas Development Company Limited/ADNOC

128(G+1) Building on Plot no: KV5-005-003, Dubai

Academic City

Emirates Institutes for Banking and

Financial StudiesDAR

129SCA Proposed Building 4B+G+10TYP+HC on Plot

No. (214-741) Al Garhoud, DubaiSecuritied and Commodities Authority Archon Consultant

130Prime Tower Project in Business Bay Plot #

BB.A03.022Real Estate Solutions Engineering Consultant Group

131 Zayed Sports City ADDC WS Atkins & Partners Overseas

132Abu Dhabi Baniyas Carrefour/Bawabat Al Sharq City

CenterS.Mehboob & Company Consulting Engineers

133Motor World Development Infrastructure Works

Phase 1Aldar-Turner Aecom Middle East Ltd./RMJM

134Proposed Factory Building & Office on Plot No:

30901@JAFZA, South DubaiATARFIL Middle East FZE Archcorp/De Leeuw Middle East

135 Oud Metha Pioneers of Experts Engineering Consultants

136 Al-Sowwah District Cooling Plant Mubadala DC PRO Engineering

137Silicon Heights 1, 1B+G+8Typical+HC Residential

BuildingBDPL GULF Architects & Consultants

138

General Consultancy Services for 33kV, 11kV and LV

Distribution Network Development Work Under Abu

Dhabi Municipality and Road Works Departments

Road Projects in Abu Dhabi Emirate

Dorsch Consult - Abu Dhabi/Western Balnoona Group

139AC7-125-Al Raha Beach Development-Al Zeina

Roads & Infrastructures (WP1000)Aldar Properties PJSC Aecom Middle East Ltd.

140Mixed Use Residential and Retail Commercial

Development at Safa South (Plot A, A1)Meraas Development LLC Naga-External Architects Designers Planners

141 Al Bateen (Jumeirah Towers) H. H. Sheikh Hamdan Bin Zayed Al Nahvan National Engineering Bureau

142

ADSSC Contract No. O - 1632 Construction Work for

Upgrading Madinath Zayed Waste Water Treatment

Plant and TSE Pumping Station & Force main

ADSSC ACE International

143

Rehabilitation of Old Water and House Connection

at Zakher Zoo, Military Zones & Southern Area and

Miscellaneous Works (Zone-3) in Al Ain Region

Aecom Middle East Limited

Page 7 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

144 Abu Dhabi Future Schools Program - Package 1 Morganti

145 Burj Dubai Development Project Promenade EMMAR Hyder Consulting Middle East

146 Al Fallah Community Development Hyder Consulting Middle East

147 MCRE-District Cooling Plant for Rihan Heights Mubadala Capitaland Real State LLC WS Atkins Partners Overseas

148Al Ghadeer Development Phase1-Road &

Infrastructure Works, Abu Dhabi (MV CABLES)Dorsch Consult

149The Villas @ Dubai Land (P117) Street Lightning

Package (V2038)Dubai Properties Aecom

150Internal Roads and Infrastructure for East 48 and

West 33, Contract No 674ADDC Dorsch Group

151 Oasis Hospital Development Oasis Hospital Peddle Thorp Architects

152AC7125-Al Raha Beach Development-Al Zeina Roads

& Structures (WP1000)Aldar Properties PJSC Aecom Middle East Ltd.

153 Minor Roads & Parking's in Al Ain City Al Ain Municipality TESSCO

154

Improvement, Upgrading, Development and

Maintenance of the Infrastructure Facilities

including Minhaj & Strategic Projects-Liwa City

ADDC Eurostudios

155A 290101/2010/C-054 Development Temporary

Power Supply to Al FalahADDC Halcrow International Partnership

156 Ambulance and Rescue Centre, Baniyas-Abu Dhabi Ministry of Interior Abu Dhabi Police GHQ ECCO Consultant

157

Construction, Completion & Maintenance of Zayed

City Subdivision Contract C300-P1/P2/P3 & P4 -

Additional Works

Musanada Parsons International Limited

158 RAK 10/Carrefour at Safeer Mall Majid Alfutaim J.M. Regnault & Partners

159 Al Falah Community Development-Infrastructure 1 Hyder Consulting Middle East

160Al Markaz Development Phase -

1/WL001/201100131/INF/CADDC AECOM

161Gulf Refining Company Development-Berth Topside

Facilities,Pipelines & Storage TanksGulf Refining Company Mott MacDonald

162Ajman One Residential Towers-(Phase 1) on Plot

nos. 1,2 & 3 at Al Sawan, Area C-5, Ajman, UAEAqaar Properties LLC NEB

163Motor World Development - Phase - 1, Al Shamkha

Zone Section SH - 36, Plot No. 1 Abu DhabiHalcrow International Partnership

Page 8 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

164G+6 Lease Office Building at Hamriyah Port on Plot

No. P 565-01 at Dubai for JAFZAJAFZA Bel-Yoahah Architectural & Eng, Consultants

165Installation of LV Cables and Supply & Installation

of F.P.'s & S.T.'s.AADC

166

D-9556 Consultancy Services for Road Projects

under Abu Dhabi Municipality & Road Works

Departments Road Projects in Abu Dhabi Emirate

ADDC Parsons International Limited

167

General Consultancy Services for 33kV, 11kV and LV

Distribution Network Development Work Under Abu

Dhabi Municipality and Road Works Departments

Road Projects in Abu Dhabi Emirate

Halcrow International Partnership

168Improvement of Roads and Accesses Surrounding

Metro StationsRTA WilburSmith Associates

169 Holiday Inn Hotel Muscat, Oman Seeb Hotels Company Intersol Engineering

170 Masdar, Field Station-Infrastructure Utilities Abu Dhabi Future Energy Company Mott MacDonald

171WP-4200-Part-A Fujairah City Centre 33/11kV

Substations WorksMAP Properties Poyry Energy Limited

172 Hydra Village Al Reef Villas ADDC-HYDRA PROPERTIES NEB

173 Al Ghadeer Development Phase1 (LV CABLES) Dorsch Consult

174Marina Bay @ Plot C13, Sector RR02 Najmat, Al

Reem Island, Abu Dhabi, UAEDamac Heritage Properties Architectural Consulting Group

175

Ruwais Housing Complex Expansion-Phase III

Design and Build of New Slaughter House Project

No. 6006

ADNOC

176 Remraam Housing Community Dubai Properties Khatib & Alami

177 Proposed Ship Repair Shed Orbit Consultant

178 Roads in Al Barsha RTA Jouzy Consulting Engineer

179

Ruwais Housing Complex Expansion-phase III

Construction of Married Staff Accomodation

Facilities and Related Infrastructure-package 6B

and 6C

ADNOC

180 Abu Dhabi Golf Club Resort Hotel ADDC Halcrow Yolles

181 33kV OHL from AGP to AHPP Poyry Energy Limited

Page 9 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

182District Cooling Schemes for Malieha Military Camp

(Ryum and Darwish)Gulf Energy Systems Fittons Engineering Consultancy

183

Ruwais Housing Complex Expansion Phase III

Married Flats-Package 11 Project No. 6033

Agreement No. 116033 C1

ADNOC

184 Carrefour at FCC, Fujairah J.M. Regnault & Partners

185 Watani Residential Development - Phase (2) ADDC WSP

186Comprehensive Improvements of the Parallel

Roads (Completion Works)RTA De leuw Cather

187Proposed Staff Housing Buildings for Hyundai

Engineering & Co. Ltd at Braka, Silla Abu DhabiHyundai Engineering & Construction Hyundai Engineering & Construction

188Khalifa Port & Industrial Zone (KPIZ), Sheikh Khalifa

InterchangeADDC Mouchel International

189

Ruwais Housing Complex Expansion-Phase III

External Infrastructure Works for Package 10 and

12, Project no. 7001

ADNOC

190Enhancement/Improvement of Internal Roads @

Khattam Malaha check postMinistry of Public Works Conser Consulting Engineering Services

191Asry North Development Phase 1 Quay Wall

InfrastructureNass Corporation

192

Works Execution for Building Design and

Construction at Camp no. 141260, Zayed Militaty

City and Tawellah Camp

Stanley Consultants Inc.

193 Hudariyat Bateen Beach Project Phase 1, Package 2 TDIC CSA (M&E)

194D-99 International School of Choueifat DIP, Dubai

Plot No. 598-1016International School of Choueifat Dubai Arab & Turk International

195 DCC Redevelopment MAF Properties WSP

196Contract: R 881/2A Comprehensive Improvements

of the Parallel Roads-Ccompletion Works)RTA Parsons De Leuw Cather Overseas Limited

197 Abu Samra Residential Complex Musanada Dorsch Consult

198 MW-OU-O81-2010-Defense Project UAE Armed Forces Dorsch Gruppe

199 Al Ghadeer Dorsch Consult

200 GAA EWA

201 Index Building Health Club Fitout Dubai UP WSP

Page 10 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

202

Construction & Maintenance of Steel Factory in Abu

Dhabi Industrial City (ICAD-2) Mussafa in Plot 83

HR13, 84 HR13, 85 HR13 & 88 HR11-Tiger Steel

Industries

ADDC Western Engineering Consultancy

203Mizin-Arjan West Side & Sheffield Commercial and

Residential BuildingsGroup Consult International

204D-9777 Consultancy Services for Power Supply

Medium Size Projects in AD Island & ERADDC PB Power/Halcrow

205

Khalifa Port & Industrial Zone (KPIZ) Project

Industrial Zone Area A 33/11kV Electrical

Substations

ADDC AECOM

206Power Supply to Exceed Precast Factory in ICAD-2,

Plot (77, 80) GR12, (76,81) HR9ADDC

207Reem Island Development - Package II ( C ) Sectors

2 and 3 Infrastructure Works ADDC Lahmeyer International Consulting Engineers

208 Neo Pharmaceutical Facilities ADDC Poyry Energy Limited

209 DRC-Green Field Factory-DIP Dubai Refreshments (P.S.C) Arif & Bintoak

210Contract Package No. E10/23 New 11/0.4kV

Substation 739 CH-1Dubai Aluminum company Limited (Dubal)

211(3B+G+4F) Plot No. JVC 13 A MRH 200@Jumeirah

VillageNEB

212 Roads in Al Khawaneej First RTA Aqleh Consulting Engineers

213

Consultancy Services for the Design Review,

Coordination and Construction Overview of the

Wastewater Works to be Undertaken as Part of

Development Activities In Abu Dhabi Emirates with

the Exception of Al Ain-Lot1 Al Markhaz

Development Phase 1- Sewerage Pumping Station

ADSSC AECOM

214Kizad Prebuilt Warehouse Contract No. 9000-231

Abu Dhabi Port Company PJSCADPC German Gulf-WSP JV

215

Temporary 33kV/11kV Package Unit in Ghayathi

Area of WR for Catering Labour Camp at Plot No.

P1006

ADDC

216Kandahar City MV-LV Distribution Network(Islamic

Republic of Afghanistan)Ministry of Energy and Water MEW-MSU-(A. Shokoor Zeeg)

217 CMW Switching Station ADDC/CMW

218

Proposed Tea Tag/Envelope Printing Packing

Facility and Office Building on Plot No. S10814 at

JAFZA South, UAE

DMCC Chawla Architectural & Consulting Engineers

Page 11 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

219Abu Dhabi Breakwater Development-NICTC#313

Roads & Infrastructure WorksADDC Parsons International Limited

220Bright Start Beach Resort Plot 3420940 Jumeirah,

DubaiHyder Consulting Middle East

221 Plantwide Substation Refurbishment Dubal Aluminum

222Premier Inn Hotel (Plot P6-C1) Abu Dhabi

International AirportBAM International

223 Al Bustan Complex Site - 279 ADWEA AECOM

224 ANA Showroom & Workshop Facilities on Plot No. 59

225Automation of Distribution Substation in Central

Region (ABB Make)ADWEA PB Power

226R825 /1 - Improvements of Roads Network in Hatta,

Phase 1RTA CDMSmith Inc.

227

Development of 22 kv Power Distribution Network

for Marina and Cultural districts on Saadiyat Island,

Abu Dhabi

Parsons International Ltd. Mott MacDonald

228ADCOP External Infrastructure Works - MPS, MOT,

BVS (1-10) & IPSERC Advance Integrated Systems

229Construction of Al Ahli Club's Academy Building

(Phase II)Online Architects Al Naboodah Contracting Co LLC

230

Sharjah International Airport New Runway at 250m

Separation - Civil Works and Airside Systems

Package

Sharjah Airport Authority

231Saadiyat Island Infrastructure Projects, Marina

District Phase - 1ADDC Parsons Consultant, Abu Dhabi

2322012 Schools Refurbishment Program-Pack 6 Al

tafawwoq School - Al AinADEC/Musanada

233Kandahar City MV-LV Distribution Network (Material

Supply)Ministry of Energy and Water MEW-MSU-(A. Shokoor Zeeg)

234Subject: application to Register as a United Nations

VendorUnited Nations/Nations UNIES

235 Infrastructure WorksUAE Armed Forces Command of Military

Works

236 Electricity and Water Authority EWA

237 Electricity & Water Authority (EWA) British Power International (BPI)

238 South Shamkha Infrastructures LOT-2 Diecon International

Page 12 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

239RAS AL KHAIMAH INTERNATIONAL AIRPORT - POWER

UPGRADATIONPOYRY ENERGY LTD

240SUPPLY & INSTALLATION OF OUTDOOR SUBSTATIONS

(BUILDING + EQUIPEMNT)AECOM MIDDLE EAST LIMITED

241ROAD & INFRASTRUCTURE OF AL DAHER 5 CONRACT

2AECOM

242ROAD & INFRASTRUCTURE OF AL DAHER 5 CONRACT

2AECOM

2432012 - REFURBISHMENT PROGRAM PACKAGE - 2 - AL

MAFRAQ SCHOOL

244PROPOSED 2B+G+24 STOREY RESIDENTIAL

COMMERCIAL BUILDING ON PLOT NO: 231-215 Halcrow

245REEM ISLAND DEVELOPMENT PACKAGE II ( C )

SECTORS 2 AND 3 INFASTRUCTURE WORKS

246T1 - T3 BUSINESS PARK GRADING, ROADS AND

INFASTRUCTURE STANLEY CONSULTANTS INC.

247ARABIAN RANCHES II DEVELOPMENT SHALLOW

SERVICES AND INTERNATIONAL ROADS GHANTOOT ROAD CONTRACTING PARSONS

248EMARATI HOUSING DEVELOPMENT JEBEL HAFEET, AL

AIN ABU DHABI URBAN PLANNING COUNCIL TROJAN GENERAL CONTRACTING LLC ACE INTERNATIONAL CONSULTING ENGINEERS

249SUBSTATION WORK IN NORTH AND EASTERN AREAS

OF NOTHERN EMIRATESDANWAY

250 THE ROYAL BRITISH ACADEMY OF DUBAI BIN SHAFAR ELECTRO MECH ENGG LLC

251 DESIGN AND BUILD CODE - E HARDSTANDS DANWAY RME

252 DEVELOPMENTAL WORKS PHASE-2 AL HIKMA BUILDING CONTRACTORS M/S AJMAN AUTHORITY CREEK

253WATER SUPPLY SYSTEM FOR FUJAIRAH DISTRIBUTION

NETWORK LOT-ASociété Egyptienne d'Entreprises (SEDE)

254INTERNAL ROADS AND INFASTRUCTURE OF MILITARY

IN SWEIHAN AREAAECOM

255 P041-STS AL AIN

256MINOR ROADS AND PARKINGS IN AL AIN - STAGE 7,

CONT. NO 1RTA CONSECO INTERNATIONAL LTD.

257R881/3C1 COMPREHENSIVE IMPROVEMENTS OF THE

PARALLEL ROADS PHASE-3C1RTA PARSONS OVERSEAS LIMITED

258 2 NOS. PRE-ENGINEERED STORE @ SSFC, SATRA SALEH ABDULLA KAMESHKI & SONS

259

South Airfield Development & Rehabilitation -

Construction PKG 2 Hilalco Wade Adams JV Jacobs International Holdings, Inc.

Page 13 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

260 AL HABTOOR CITY DUBAI NATIONAL INVESTMENT CO. LLC KHATIB & ALAMI

261 TAKREER CARBON BLACK & DELAYED COOKER TAKREER DANWAY

262 DXB GOLF RESIDENTIAL COMMUNITY DAMAC NAGA ARCHITECT DESIGNERS PLANNER

263ROADS AND UTILITIES INFRASTRACTURE WORKS FOR

BANIYAS RESIDENTIAL DEVELOPMENTENGINEER'S OFFICE PARSONS BRINCKERHOFF

264 EMAL ADMINISTRATIVE OFFICES AND FACILITIES EMAL DRAKE & SCULL

265

STRATEGIC TUNNEL ENHANCEMENT PROGRAMME

TUNNEL PUMPING STATION CONTRACT PS-01 (O-

1746)

STEP

266 HIDD AL SAADIYAT VILLAS DEV'T.

267 UPDRADING OF MESAIEED TOWN RPS KAHRAMAA

268IN- PARKS PRIMARY INFRASTRACTURE WORKS FOR

HOTEL 1MERAAS WME CONSULTANTS

269IN- PARKS PRIMARY INFRASTRACTURE WORKS FOR

LEGOLANDMERAAS KLING CONSULT

270J541 - 35 NOS. - SIENNA VIEWS @ JUMEIRAH GOLF

ESTATE, DUBAI, UAEEMAC ENGINEERING CONSULTANTS

271THE LUXURY RESIDENTIAL TOWER ON PLOT NO. 345-

791 AT BURJ KHALIFA DISTRICT, DUBAISIGNATURE ESTATED LIMITED ARCHGROUP ENGINEERING CONSULTANT

272G + P+ 6 TYP. + R. RESI. BLDGS. - PLOT NO. TR.006

& TR. 008RS REALTY FZ-LLC ALMAKTAB AL ASRI ENGINEERING CONSULTANT

273BAWABAT INVESTMENT AND DEVELOPMENT

COMPANY

BANIYAS INVESTMENT AND DEVELOPMENT

COMPANYAECOM

2743B+G+2P+11 RESIDENTIAL FLOOR PLOT NO.C41,

RAWDHAT, ABU DHABI, UAE

AL AMARA AL SHARQIA ARCHITECTURAL CONSULTANTS &

ENGINEERS

275 3045-DXB GOLF RESIDENTIAL COMMUNITY - DAMAC DAMAC NAGA ARCHITECT DESIGNERS PLANNER

276INFRASTRACTURE DEVELOPMENT FOR AL-TAI

RESIDENTIAL OASIS COMPOUND SHARJAH, UAE

277CULTURAL DISTRICT INFRASTRACTURE PROJECT &

DD001-CD-1001-125-C02TDIC PARSONS

278SHIEBAT AL WATAH DEVELOPMENT INFRASTRACTURE

CONSTRUCTION WORKS ZONE AAl Ain Municipality W.S ATKINS

279HILLIANA TOWER - PLOT NO. AA-T-003 AT ACACIA

AVENUES-TECOMABYAAR ESTATE DEVELOPMENT Access Engineering Consultant

Page 14 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

280 LINCOLN ACADEMY - AL BARSHA PREMIER SCHOOLS CHICAGO

281G+3 THE WINCHESTER SCHOOL -- MOTOR CITY,

DUBAIPREMIER SCHOOLS CHICAGO

282 2B+G+30 SKY CENTRAL HOTEL TOWER RCC AL HAWRAA

283

RUWAIS HOUSING COMPLEX EXPANSION - PHASE IV

CONSTRUCTION OF BACHELOR ACCOMMODATIONS

PROJECT NO. 7010

ADNOC TARGET

2843B+G+2P+11 RESIDENTIAL FLOOR PLOT NO.C41,

RAWDHAT, ABU DHABI, UAE

AL AMARA AL SHARQIA ARCHITECTURAL CONSULTANTS &

ENGINEERS

285 CMW-C012-9003-MTS-E-037 CMW INTERMASS

286REMRAAM HOUSING PROJECT AT DUBAI LAND PHASE

2MIZIN PROPERTIES KHATIB & ALAMI

287AFCTP - AL FATTAN CRYSTAL TOWERS PROJECT PLOT

392-513, DUBAI MARINA DUBAI, UAEAL FATTAN TABANLIOGLU ARCHITECTS

288REEM DEVELOPMENT PHASE 1 SHALLOW SERVICES

AND INTERNAL ROADS PACKAGE 2EMAAR PARSONS

289PT-147 D3 (BUSINESS PARK AREA) PACKAGE

REMAINING INFRASTRACTURE WORKSPARSONS

2903B + GR+ 7P +19 STOREY OFFICE BUILDING ON

PLOT D-001-004 @ TECOM DUBAILANDMARK ASSET HOLDING LIMITED ARCHGROUP CONSULTANTS

291 411 VILLAS BRD ABU DHABI MINISTRY OF PRESIDENTIAL AFFAIRS ARIF & BINTOAK

292 RAJMAHAL THEATRE AT BOLLYWOOD PARKS MERAAS KLING CONSULT

293BAWABAT INVESTMENT AND DEVELOPMENT

COMPANY

BANIYAS INVESTMENT AND DEVELOPMENT

COMPANYAECOM MIDDLE EAST LIMITED

294

CONSTRUCTION, COMPLETION & MAINTENANCE OF

TECHNOVA INDUSTRIES LLC FACTORY FOR

MANUFACTURING OF PACKAGING PRODUCTS, PAPER

AND PLASTIC BAGS

TECHNOVAA INDUSTRIES LLC AVENUE ENGINEERING CONSULTANT

295

ASGC AL SHAFAR CONTRACTING OILFIELD LLC

CONSTRUCTION OF NEW GUEST HOUSE AT RUWAIS

PROJECT NO. 7004 AGREEMENT NO. 147004C1

ADNOC ARCHITECTURE & PLANNING GROUP

296 RAK FISHERMEN'S PORT CROWN PRINCE COURT DORSCH GRUPPE-DC ABU DHABI

297 DUBAI SAFARI (SAFARI VILLAGE) DUBAI MUNICIPALITY Al Turath Engineering Consultants

298PT-121 VILLAS DEVELOPMENT FOR TECOM

INVESTMENTS ROADS & INFRASTRACTURE WORKSTECOM INVESTMENTS KHATIB & ALAMI

299CONTRACT R818 ROADS IN AL MAMZAR AND AL

NAHDA 1RTA PARSONS OVERSEAS LIMITED

Page 15 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

300 ACCESS TO MAJAN, LIWAN AND ARJAN RTA KHATIB & ALAMI

301KINDERGARTEN SCHOOLS AT AL BARSHA AND AL

WARQADUBAI MUNICIPALITY ARC INTERNATIONAL

302CONSTRUCTION OF NEW ADMIN COMPLEX & FIRE

STATION AT SHAHADCO

303 KHALIFA UNIVERSITY EXTENSION KHALIFA UNIVERSITY ELITE DESIGN ENGINEERING CONSULTANCY

304 WORK SHOP FACILITIES ON PLOT NO. 532-176 ARIF & BINTOAK

305AL FATTAN CRYSTAL TOWERS PROJECT PLOT 392-

513, DUBAI MARINA, DUBAI UAEAL FATTAN TABANLIOGLU ARCHITECTS

306 DAMAC AKOYA PARK DAMAC AECOM

307 POLO RESIDENCE29 BUILDINGS IGO Property Investment ARCHCORP

308 AMMROC - AL AIN AIRPORT AMMROC ECG ENGINEERING CONSULTANTS

309 DAR KHALIFA FOR FAMILY CAREKHALIFA BIN ZAYED AL NAHYAN

FOUNDATIONCONSULTING ARCHITECTURE & CIVIL ENGINEERING BUREAU

310INTERNAL ROAD & SERVICES IN MOHAMMED BIN

ZAYED CITY (PHASE 2) SECTOR - Z36AHALCROW INTERNATIONAL

311LANDMARK WAREHOUSE (RDC) AT DWC ON PLOT NO.

WT-02LANDMARK GROUP AL WASL AL JADEED CONSULTANT

312Masdar Neighbourhood One

Residences (N1R)Masdar ENVIRONMENTAL SYSTEMS DESIGN

313INTERNAL ROADS & SERVICES IN MOHAMMED BIN

ZAYED CITY, ZONE (Z 36/A) PHASE 2 - CONTRACT 3ADDC HALCROW

314 ADDITIONS TO DUBAI SPECIAL SPORTS CLUB DUBAI MUNICIPALITY GULF ENGINEERING AND CONSULTANTS

315 AKOYA OXYGENFRONLINE INVESTMENT MANAGEMENT CO.

L.L.CAECOM

316AIN AL FAYDA EMARATI HOUSING PROGRAMME

PHASE-1MUSANADA ATKINS/AL SALAAM CONSULTING

317

DEVELOPMENT AND UPGRADE OF TREATMENT PLANT

AND RECYCLE WATER TRANSMISSION MAIN TO LIWA

CITY, WESTERN REGION AND CONNECTION OF

REMOTE AREAS TO THE EXISTING SEWERAGE

NETWROK

Abu Dhabi Sewerage Services Company DORSCH GRUPPE

318 B5 COMPLEX - AL NAKHEEL PALACE ABU DHABI, UAE AL AIN PROPERTIES LLC S A MIRO INC

319 CLUSTER 214 VILLAS AT AKOYA PARK DAMAC DAMAC AECOM

Page 16 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

320

GULF PRINTING & PACKAGING CO., WORKSHOP,

STORAGE & OFFICE BUILDING IN KIZAD ABU DHABI,

PLOT NO. KHIA8-88

GULF PRINTING & PACKAGING CO. AVENUE ENGINEERING CONSULTANT

321

IMPROVEMENT AND UPGRADING OF INTERSECTION

OF ETIHAD ROAD (E11) WITH FALAJ AL MUALLA-UMM

AL QUWAIN (E55) (PHASE 2 - MAIN INTERCHANGE)

Ministry of Public Works IDROESSE INFRASTRUCTURE

322

PROPOSED COMMERCIAL AND RESIDENTIAL

BUILDING ON PLOT NO. PJTRGM03, GOLDEN MILE-3

AT PALM JUMEIRAH, DUBAI

PALM JUMEIRAH CO. LLC ARIK & BINTOAK CONSULTING ARCHITECTS AND ENGINEERS

323

4201-207-IZ AREA A KIZAD PRE-BUILT WAREHOUSES

(PACKAGE 1 PHASE 2 & 3) & UPGRADE OF THE

EXISTING SHOW WAREHOUSE

ABU DHABI PORTS AMAR GOLDEN DESIGNS

324LOCAL ACCESS ROAD TO DUBAI POLICE HEAD

QUARTER IN AL AWEER-2RTA Al Turath Engineering Consultants

325AL SAJA’A INDUSTRIAL OASIS UPGRADING AND

INFRASTRACTURE WORKSSHARJAH ASSET MANAGEMENT KHATIB & ALAMI

326G+7 GOLF APARTMENTS (G19, 620 & G21- (3

CLUSTERS) @ AKOYA BY DAMACAKOYA BY DAMAC AECOM

327

B+G+7 FLOOR FOUR STAR HOTEL BUILDING ON

PLOT NO. PJCRC32E_F, PALM JUMEIRAH, DUBAI,

U.A.E.

Palm Jumeirah Co. L.L.C ERGA PROGRESS

328 AL RAHEEB VILLAS (52 VILLAS, 53 VILLAS, 56 VILLAS) MINISTRY OF PUBLIC WORKS MINISTRY OF PUBLIC WORKS

329

Improvement and upgrading of Intersection of

Etihad road(E11) with Falaj Al Mualla-Umm-al

Quwain road(E55)-Phase-2(Main Interchange)

Ministry of Public Works (MOPW) Idroesse Infrastructure

330Construction of Internal & Services in Rahba City &

Samha Area (ADM Contact 659/2)ADDC HALCROW

331

Construction of Internal & Services in Rahba City &

Samha Area (ADM Contact 659/2G+4P+14 Floors

Standard Hotel Apartment

TENCENT HOLDING LTD MIMAR ME ENGINEERING

332 AL Falah Healthcare Center-Abu Dhabi M/S. Al Falah Healthcare L.L.C Pioneer Engineering Consultancy L.L.C

333Dreams by Danube - Plot No: AFWATH001-

AFWATH047Mr. Rizwan Sajan Edmac Engineering Consultant

334

Proposed (G+5) Student Accommodation Block &

Sports Facilities at Plot No. 8120295, Dubai

Academic City

Emirates Aviation College - Aerospace &

Academic StudiesARCHGROUP CONSULTANTS

3353 Star Hotels at Plot No. CD.002D IMPZ 1&2 Dubai,

UAEM/s HH Investment and Development LLC M/s Erga Progress Engineering Consultants

336Proposed G+4 Comm. & Residential Building on

Plot No. 6183898, at Nadd Al Shiba First DubaiHE: Ahmed Humaid Al Tayer M/s DAR (Design & Architecture Bureau)

Page 17 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

337The Akoya Oxygen 902 Villas Phase 1 Zinnia, Odora

& Sycamore ClustersDamac Cresent Properties ECCE Engineering Consortium Consultant Engineers

338 Majestine Hotel Apartments Business Tower Investments LLC BH.NS Engineering Consultants

339 B+G+18MR. ALI CHALABI / MR. MOHAMMED KHAIR

ISMAIL AL SHEKHAl Khwajah Engineering

340BADR PHASE – 1 ON PLOT NO. 2615314,

MUHAISNAH-1ST, DUBAI – UAEDubai Islamic Bank Lacasa Architects & Engineering Consultants

341MAJESTINE DELUXE HOTEL APARTMENTS

G+3P+16F+RF, BUSINESS BAY, DUBAIBUSINESS TOWER INVESTMENTS LLC BH.NS ENGINEERING CONSULTANTS

342 Cables for Juraina MallSharjah Electricity & Water Authority

(SEWA)

343 Construction of 468 Villas (PK-3) Nakheel Arif & Bintoak

344Maria 3 & Al Jaddaf Residential Buildings - Plots No.

326-1283 & 326-1284Al Jaddaf Real Estate Al Waha Engineering Consultants

345Centurion Residence B+G+5 Apartments, DIP-II,

Plot no. 597-4901, Dubai, U.A.EM/s Centurion M/s ADU (Architectural Design Unit)

346 Masdar Neighbourhood One Residences (N1R) MUBADALA Environmental Systems Design

347LG+UG+9+HC Floors Residential Building on Plot

No. 27-036 at Dubai Silicon OasisMr. Mohammad Ibrahim M. A. Al Darwish M/s. Mimar Emirates Engineering Consultants

348 Al Barsha 3rd Development M/s Meraas PARSONS OVERSEAS LIMITED

349Al Zorah Resort Infrastructure Package 4-

Infrastructure Works

M/s Al Zorah Development (Private)

company Ltd. P.S.CM/s Dar Al Handasah (Shair and Partners)

350PT 121/2 - Villas Development for TECOM

Investments Temporary Access Road WorksTECOM INVESTMENTS KHATIB & ALAMI

351 Al Falah Healthcare Center-Abu Dhabi M/s Al Falah Healthcare L.L.C Pioneer Engineering Consultancy L.L.C

352

Contract R 700-527

Al Qasimia University Pumping Station, Rising Main

& Temporary Sewage Treatment Plant

Government of Sharjah Directorate of

Public WorksCH2M Hill Company

353Residential Dev't at Nadd Al Shiba Third - Plot No-

6164743,Dubai/Package1/-Area1Nakheel PJSC Arif & Bintoak Cons. Arch & Eng

354

Proposed (GV-11) 5B + Service + Concourse + 8

Storey Commercial Development on Plot No. GV-01,

DIFC, Dubai, UAE

Dubai International Financial Center LACASA Architects and Engineering Consultant

355G+4P+14 FLOORS, STANDARD HOTEL APARTMENT,

JUMEIRAH VILLAGE, PLOT NO: JVC 17 TCP 003BTENCENT HOLDING LIMITED MIMAR M.E ENGINEERING CONSULTANT

Page 18 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

356

Contract No. 134/2015 – Construction of Street

Lighting Systems in Mohammed Bin Zayed City-

Zone-B, C, D & G

Abu Dhabi Municipality M/s Altorath International Transport & Infrastructure

357 B+G+4+R Residential Building Mr. Anas Omar Mohd Al Haj M/s Al Ajmi Engineering Consultants

358

R978/3A Development of Cycle & Jogging Track at

Various Locations in Dubai (Mirdif, Mushrif, Al

Khawaneej & Al Mizhar)

RTA PARSONS Overseas Limited

359

IMPROVEMENT OF MAFRAQ TO AL GHWAIFAT

BORDER POSTHIGHWAY SECTION NO. 1A: AL SILA’A

TO AL GHWAIFAT [PA107]

MUSANADA CONSER / DIWI CONSULTANT

360

IMPROVEMENT OF MAFRAQ TO AL GHWEIFAT BORDER

POST HIGHWAY SECTION NO. 1B: AL BARAKAH TO AL

SILA’A [PA099]

MUSANADA CONSER / DIWI CONSULTANT

361

IMPROVEMENT OF MAFRAQ TO AL GHWEIFAT BORDER

POST HIGHWAY SECTION NO. 3A: BAYNOUNAH

FOREST TO AL MIRFA

Musanada / Department of Transport Parsons International

362

IMPROVEMENT OF MAFRAQ TO AL GHWEIFAT BORDER

POST HIGHWAY SECTION NO. 3B: AL MIRFA TO ABU

AL ABYAD

Musanada / Department of Transport Dorsch Holding GMBH

363 Mudon Phase 3 – Arabella 1/P123 Dubai Properties James Cubitt & Partners

364Arabian Ranches Development, Infill – Area 09 –

Aseel – Construction of 55 VillasEmaar Properties PJSC Design Center Architects & Engineers Consultants

3650176 Al Khawaneej Community - Roads &

InfrastructureMERAAS AECOM Middle East Ltd.

366 Aseptic Packaging Plant Emirates Business Group M/s Sacre Davey Middle East LLC

367 The Hills - Emirates Hills, Dubai Emaar Properties PJSCDesign & Architecture Bureau (DAR) Consulting Architects &

Engineers

368

B+G+5TYP.+Roof On Plot No. 531-387

DIC - DUBAIBin Nawi General Contracting &

Transporting L.L.C.M/S Canadian Engineering Consultant

369Proposed (B+G+5TYP+HC) Residential Building at

DIP for Mr. Abdullah Ahmed Al MoosaMr. Abdulla Ahmed Al Moosa Architectural & Engineering Consultants

370The Akoya Oxygen 902 Villas Phase 1 Zinnia, Odora

& Sycamore ClustersDamac Akoya Engineering Consortium Consulting Engineers

371PROPOSED B+G+1P+16+R HOTEL BUILDING PLOT

No. 346-585 BUSINESS BAY, DUBAI

ALSAHIL AL AKHDER COMMERCIAL BROKERS

LLCAL AJMI ENGINEERING CONSULTANTS

372WARSAN VILLAGE

PHASE 2 - SOUK WARSANM/s NAKHEEL M/s AE7

Page 19 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

373Manazel Al Reef 2 Villa Development in Samha East,

Abu Dhabi U.A.EAl Manazel Real Estate Dorsch Holding GMBH

374

Ruwais Housing Complex Expansion - Phase IV

Construction of Buildings Accommodation - Package

IV

ADNOC

375Internal Roads and Infrastructure for Military in

Sweihan AreaAbu Dhabi Municipality AECOM Middle East

376 THE ADDRESS DOWNTOWN DUBAI EMAAR WME

377

IMPROVEMENT OF MAFRAQ TO AL GHWEIFAT BORDER

POST HIGHWAY SECTION NO. 3A: BAYNOUNAH

FOREST TO AL MIRFA

Musanada / Department of Transport Parsons International

378 Private Beach House Emirates Land Group (ELG) MAISAM Architects & Engineers

379

Town Square Development, Phase 1 - Proposed

Construction of Zahra Apartment Building (G+P+7)

on Plot No. 15

M/s NSHAMA Arif & Bintoak

380Improvement of Mafraq to Al Ghwaifat Border Post

Highway Section 3B: Al Mirfa to Abu Al Abyad M/s Department of Transport (DOT) Dorsch Holding GMBH

381P147-Mamsha Al Saadiyat Island, Abu Dhabi

Package - C02 Main Contract WorksTDIC DEWAN

382 Staff Accommodation Building at Hatta, Dubai DUBAI MUNICIPALITY Al Burj Engineering Consultants

383Proposed (B+G+5TYP+HC) Residential Bldg. at DIP

for Mr. Abdulla Ahmed Al MoosaMr. Abdulla Ahmed Al Moosa ARENCO

384 G+5P+25 TYP (FUTURE TOWER - 3)His Highness Sheikh Majid Bin Hamad Al

QasimiConsultair Engg Consultant

385

Zayed City Infrastructure Works - Emirati

Neighborhood, Abu Dhabi Capital District Package

2A (ADDC MV Cables)

Musanada Mouchel

386

Zayed City Infrastructure Works - Emirati

Neighborhood, Abu Dhabi Capital District Package

2A (ADDC LV Cables)

Musanada Mouchel

387(G+4) OFFICE BLDG. (PO# 3761500128), LOCATION -

AL HUDAIBA, DUBAIDubai Electricity & Water Authority (DEWA) Alturath Engineering Consultants

388

MURANO RESIDENCES - 3B+G+P+15 RESIDENTIAL

BUILDING on plot No: AFMU 0308 at AL FURJAN -

JABAL ALI 1ST, DUBAI

GPD Ghreiwati Properties Development DESIGN CENTRE ARCHITECTS AND ENGINEERING CONSULTANT

389 PULLMAN MALDIVES MAAMUTAA MALDIVES NJ CONSULTANTS

Page 20 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

390B+G+M+1 Commercial Building, Plot No.

3764769, Umm Suqeim, Dubai, UAEMMS Gulf FZCO Lacasa Architects & Engineering Consultants

39118 Townhouses (G+2), on Plot no. JVC11EEFRP001

in JVC, Dubai

Mr. Mehmet Sirin Akyuz, Sabahaddin

Akyuz & Beshr Khaleel Maysher Al KubaisiDiar Consult

392PJ-10094 KENDERGARTEN AT TWAR II, PLOT NO:

227-0599, DUBAIDUBAI MUNICIPALITY ALTURATH ENGINEERING CONSULTANTS

393 DM OFFICE AT RASHIDIYA DUBAI MUNICIPALITY BDPL GULF ARCHITECT & CONSULTANTS

394B+G+M+50F+2TF+R Commercial & Residential

Building, Plot. No 140 at Al Khan, SharjahSharjah Gate Trading LLC Khatib & Alami

395Yas South Development Infrastructure and Public

RealmMIRAL ASSET MANAGEMENT LLC HYDER CONSULTING MIDDLE EAST LTD

396

UPGRADING OF AL AFLAJ ROUNDABOUT (IP-115) IN

AL AIN CITY TO TRAFFIC SIGNALIZED JUNCTION -

3Cx185 11kV - ADDC

MUSANADA ARCADIS Design & Consultancy

397

UPGRADING OF AL AFLAJ ROUNDABOUT (IP-115) IN

AL AIN CITY TO TRAFFIC SIGNALIZED JUNCTION -

3Cx240 33kV - ADDC

MUSANADA ARCADIS Design & Consultancy

398

UPGRADING OF AL AFLAJ ROUNDABOUT (IP-115) IN

AL AIN CITY TO TRAFFIC SIGNALIZED JUNCTION -

3Cx240 11kV - ADDC

MUSANADA ARCADIS Design & Consultancy

399

UPGRADING OF AL AFLAJ ROUNDABOUT (IP-115) IN

AL AIN CITY TO TRAFFIC SIGNALIZED JUNCTION - LV

Cables ( Copper & Aluminum)

MUSANADA ARCADIS Design & Consultancy

400

Wahat Al Zaweya Development - Roads and

Infrastructure Works – Phase 1, 2 & 3 – Package 1

& 2

Wahat Al Zaweya LLC Hyder Consultant Middle East LTD.

401 Oasis Mall (33/11kV Gubaiba # S/S)Sharjah Electricity & Water Authority

(SEWA)

402MUDON 2 – PHASE 3 – Neighborhood J, ARABELLA 2

- (LV Cables)DUBAI PROPERTIES ENGINEERING CONSORTIUM CONSULTING ENGINEERS (ECCE)

403MUDON 2 – PHASE 3 – Neighborhood J, ARABELLA 2

- (PVC Wires)DUBAI PROPERTIES ENGINEERING CONSORTIUM CONSULTING ENGINEERS (ECCE)

404 MUDON – PHASE 3 – Arabella 1/P123 DUBAI PROPERTIES James Cubitt & Partners

405NSHAMA TOWN SQUARE DEVELOPMENT DISTRICT

COOLING PLANT (DCP-01)EMAAR ALLIED CONSULTANT

Page 21 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

406

Construction, Completion and Maintenance of

Switching Station and Substations at AL AIN Farm

for Livestock Production

Al Ain Farm for Livestock Production, Al

Ain

407 11kV Cable Make Changes to NCI, Sharjah SEWA

408 DUBAI METRO PROJECT RTA

409DEIRA ISLANDS DEVELOPMENT, ISLAND # A DMS:

145102 – ROADS AND UTILITIES NETWORKNAKHEEL AE7

410P-147-Mamsha Al Saadiyat Island, Abu Dhabi

Package-C02 Main Contract WorksSPS MAMSHA JV DEWAN

411 12 Townhouses, JVC, Dubai, U.A.E AE JV ALPHA PROJECT LTD. Tangram Gulf Engineering Consultants

412

CONSTRUCTION OF INTERNAL ROADS AND

INFRASTRUCTURE WORKS AT BANIYAS EAST,

SECTOR EB 11 [PA106] - LV Cables (ADDC)

MUSANADA WS ATKINS & PARTNERS OVERSEAS

413

CONSTRUCTION OF INTERNAL ROADS AND

INFRASTRUCTURE WORKS AT BANIYAS EAST,

SECTOR EB 11 [PA106] - MV Cables (ADDC)

MUSANADA WS ATKINS & PARTNERS OVERSEAS

414

CONSTRUCTION FOR BUILDING (B+G+2 FLOORS) -

NEURO SPINAL HOSPITAL AND RADIOSURGERY

CENTER PLOT NO. BT-D-001-DUBIOTECH-DUBAI-UAE

DR. ABDUL KARIM MASADDI CUBIC ENGG CONSULTANTS

415AL GARHOUD MIXED-USE DEVELOPMENT - Site

646/1317HASABI REAL ESTATE ENGINEERING CONSORTIUM CONSULTING ENGINEERS (ECCE)

416Construction of (2B+G+1+R) Shopping Mall, on

Plot No. 251-4369 at Mirdif, DubaiMR. BADR ABDULLA ISMAIL AL MUTAWA ARCH DOME CONSULTING ENGINEERS

417YAS ACRES (NORTH YAS) DEVELOPMENT PHASE 1 -

YAS ISLAND ABU DHABIAL DAR PROPERTIES, PJSC AECOM MIDDLE EAST LIMITED / ABU DHABI MUNICIPALITY (ADM)

418 Al Garhoud Mixed-Use Development HASABI REAL ESTATE Engineering Consortium Consulting Engineers (ECCE)

419 323 National Housing at Seyouh (16)-Sharjah MINISTRY OF PRESIDENTIAL AFFAIRS ART of Architecture

420YAS SOUTH DEVELOPMENT INFRASTRUCTURE PUBLIC

REALMMIRAL HYDER

421SOHO SQUARE PLOT C5 SECTOR SDW4-C5 AT

SAADIYAT-ABU DHABI UAEBLOOM EMIRATES PROPERTIES LLC MZ ARCHITECTS

422R777/4B1 ENTRANCE TO THE JEWEL OF THE CREEK

DEVELOPMENTRTA PARSONS

Page 22 of 23

NO. PROJECT NAME CLIENT CONSULTANT

PAST SUPPLY RECORDS FOR SELECTED PROJECTS

423 EMIRATES HILLS DEVELOPMENT M/s EMAAR DESIGN & ARCHITECTURE BUREAU (DAR)

424Construction of Phase-1 Internal Roads and Utilities,

and Airport Access - Masdar City, Abu DhabiMasdar KEO Consultant

425PJ 30034 AL NASR CLUB STADIUM EXTENSION &

REFURBISHMENT ON PLOT 3190310, AT OUD METHADubai Municipality OBE Architects

426

DESIGN AND BUILD OF(300 VILLAS WITH 30 PLOTS)

EMIRATI HOUSING PROJECT IN AL HAYER WITH

INFRASTRUCTURE WORKS

Altorath International Consulting

427Emirati Housing Development at Jebel Hafeet, Al

Ain, UAE Musanada ACE International Consulting Engineers

428Dubai International Financial Centre District Cooling

Plant (DIFC DCP)DEWA Emirates Central Cooling Systems Corporation (EMPOWER), Dubai

429 15-034-DXB Wasl JAD - Phase 1 Villas WASL NAGA

430

PROPOSED DEPARTMENT OF PROTECTIVE SYSTEMS

BUILDING G+4+ROOF FLOOR ON PLOT NO

2641019@AL TTAY. DUBAI FOR STATE SECURITY-

DUBAI-SECURITY INDUSTRIES CORPORATION

STATE SECURITY-DUBAI-SECURITY

INDUSTRIES CORPORATION (DUBAI POLICE)BEL-YOAHAH ARCHITECTURAL & ENG.CONSULTANT

431G+7+R LABOUR ACCOMODATION ON PLOT NO: 599-

1265 AT JABAL ALI IND. FIRSTTRANSGUAURD GROUP – L.L.C. ABDULLA & ASSOCIATE CONSULTING ARCHITECTS & ENGINEERS

432Infrastructure Works for Permanent Overflow Car

Park at BIABahrain Airport Company

433Cayan Cantara Residential & Service Apartment

TowersCayan Cantara Limited DEWAN Architects & Engineers

434 JABEL ALI LABOUR CITY M/s MERAAS M/s PARSONS

435DEIRA ISLANDS DEVELOPMENT, ISLAND # A DMS:

145102 – ROADS AND UTILITIES NETWORKNAKHEEL AE7

436 Reem Central Park ALDAR AECOM

437DUBAI CREEK HARBOR PHASE 1 – UNDERGROUND

CARPARK / POP UPSEMAAR PROPERTIES PJSC BH.NS ENGINEERING CONSULTANTS

438

DESIGN AND BUILD OF (300 VILLAS WITH 30 PLOTS)

EMIRATI HOUSING PROJECT IN AL HAYER WITH

INFRASTRUCTURE WORKS

AL AIN DISTRIBUTION COMPANY (AADC) ALTORATH INTERNATIONAL CONSULTING

Page 23 of 23