PASSIVHAUS POOL
MARK THOMAS AFLS+P ARCHITECTS
TOMAS GARTNER GALE & SNOWDEN ARCHITECTS
Passivhaus Pool and Leisure Centre for Exeter City Council
The Exeter Active project - an overview
1. The project team
2. Leisure Centre design
3. Project background
4. The Client’s Brief
5. The business case for Passivhaus pools
6. The Passivhaus pool concept
What’s this about?
Design Team
Technical advisers:
Passivhaus Institute
Building Biology
Institute IBN
Exeter University
Client
THE TEAM
Westminster Lodge, St Albans
Redcar and Cleveland Leisure and Community Heart
The Peak, Stirling
National Aquatic Centre, Dublin
Swiss Cottage Northolt Leisure Centre
Swiss Cottage
The Peak, Stirling
Basildon Sports Hub
Exeter City Council’s has been a strong supporter of Passivhaus In 2010 the council completed their first multi-residential Passivhaus scheme Since then all Exeter City’s new build residential projects have been developed to Passivhaus standard including terraced houses, flats and a care home (currently at design stage)
PASSIVHAUS IN EXETER
Journey began in 2010
TSB ‘Design 4 Future
Climate’ programme
This study also helped to
inform the client’s
performance criteria for:
- Energy/water saving
- Healthy building
- Future climate
WHERE IT STARTED
In 2011 two Passivhaus swimming pools opened in Germany: the Lippe Bad (Luenen) and the Bambados (Bamberg)
Both were developed as pilot projects with assistance from the PHI
Both were monitored by the PHI following completion and confirmed the predicted energy savings are achievable
Detailed reports on the design, construction and post completion monitoring are available from the PHI
Passivhaus Pools - Looking Abroad
Lippe Bad - Luenen
Bambados - Bamberg
High energy and water use
Range of different temperature zones in one building
High temperature levels (32 C) means pools need to be heated all year
High humidity and chemicals create challenging environment for materials and building fabric
What’s special about Pool buildings?
Lippe Bad - Luenen
Bambados - Bamberg
Cumulative costs for swimming pool building, built to 2010 Building Regulation requirements,
for heating, lighting, hot water and additional future investments required to maintain
adequate comfort conditions under future weather scenarios over the lifetime of the building.
All costs have been discounted at 5% to represent present value. A conservative annual
increase in fuel costs of 4% has been allowed for and a reduction of heating demand of 30%
from 2050 to 2080 has been included.
TSB Study - Findings Cumulative Costs for Swimming Pool Building, Built to
2010 Building Regulation Requirements
£0.00
£1,000,000.00
£2,000,000.00
£3,000,000.00
£4,000,000.00
£5,000,000.00
£6,000,000.00
£7,000,000.00
20
10
20
12
20
14
20
16
20
18
20
20
20
22
20
24
20
26
20
28
20
30
20
32
20
34
20
36
20
38
20
40
20
42
20
44
20
46
20
48
20
50
£0.00
£1,000,000.00
£2,000,000.00
£3,000,000.00
£4,000,000.00
£5,000,000.00
£6,000,000.00
£7,000,000.00
20
10
20
12
20
14
20
16
20
18
20
20
20
22
20
24
20
26
20
28
20
30
20
32
20
34
20
36
20
38
20
40
20
42
20
44
20
46
20
48
20
50
TSB Study - Findings Cumulative Costs for Climate Ready, Passivhaus Swimming
Pool Building
Cumulative costs for swimming pool building, built to Passivhaus standard, for heating,
lighting, hot water and additional future investments required to maintain adequate comfort
conditions under future weather scenarios over the lifetime of the building. All costs have
been discounted at 5% to represent present value. A conservative annual increase in fuel
costs of 4% has been allowed for and a reduction of heating demand of 30% from 2050 to
2080 has been included.
TSB Study - Findings Comparison of Cumulative Costs for a Standard Pool
(Green) Building and the Passivhaus Pool (Blue)
£0.00
£1,000,000.00
£2,000,000.00
£3,000,000.00
£4,000,000.00
£5,000,000.00
£6,000,000.00
£7,000,000.00
201
0
201
2
201
4
201
6
201
8
202
0
202
2
202
4
202
6
202
8
203
0
203
2
203
4
203
6
203
8
204
0
204
2
204
4
204
6
204
8
205
0
Gale & Snowden Design vs Standard Pool
Pa
yb
ack a
fte
r 1
0 y
ears
60% reduced
energy demand
Payback period 10 years
Energy/Water Total energy target –
70%
Water saving –
50%
Healthy
building Test to SBM 2015
For air, water quality
and radiation
2080 Climate
Ready Thermal comfort
Changes in rainfall
Increased storm
severity
Exeter City
Environmental
Factors
Brief
A Passivhaus building envelope will significantly reduce heating energy losses in pool buildings and results in the following benefits:
- Higher surface temperatures
- Minimum thermal bridging avoiding condensation risk
- Increased thermal comfort
The Passivhaus Pool Concept
100%
0%
UK Pool
PH Pool
Tota
l En
ergy
Dem
and
But these are just the starting point to open up further energy saving opportunities and benefits:
- Higher relative humidity possible throughout the year
(~64%)
- This will reduce evaporation rates from pool water and
reduce required ventilation rates (ventilation rate of 1-
1.5 ac/h with no re-circulation)
- More economic ventilation/ducting (eg glazed façade
elements don’t need to be ventilated to protect from
condensation.)
- Reduced electrical energy demand for ventilation
The Passivhaus Pool Concept
UK Pool
PH Pool
Tota
l En
ergy
Dem
and
100%
0%
The Passivhaus Pool Concept
Key elements of the Passivhaus pool concept include:
1. High performance Passivhaus building fabric
2. High performance windows and doors
3. High levels of airtightness (air permeability <0.6)
4. Compact building form
5. Optimum solar orientation ~40% south facing glazing for wet areas to maximise solar gains
6. Highly efficient ventilation heat recovery
7. Internal zoning
8. Increased relative humidity
9. Reduced ventilation rates with no re-circulation
10. Low chlorine/chemical filtration
£0.00
£10,000.00
£20,000.00
£30,000.00
£40,000.00
£50,000.00
£60,000.00
£70,000.00
£80,000.00
£90,000.00
£100,000.00
income expenses income expenses
Revenue Projections Average UK Pool and Fitness Centre
Creche
Fitness/Gym
Marketing
Energy/Water
Retail / F&B
Maintenance
Staff
Retail / F&B
Swimming
The Bigger Picture
100%
0%
£0.00
£10,000.00
£20,000.00
£30,000.00
£40,000.00
£50,000.00
£60,000.00
£70,000.00
£80,000.00
£90,000.00
£100,000.00
income expenses income expenses
Revenue Projections Average UK Pool and Fitness Centre
Creche
Fitness/Gym
Marketing
Energy/Water
Retail / F&B
Maintenance
Staff
Retail / F&B
Swimming
The Bigger Picture
100%
0%
£0.00
£10,000.00
£20,000.00
£30,000.00
£40,000.00
£50,000.00
£60,000.00
£70,000.00
£80,000.00
£90,000.00
£100,000.00
income expenses income expenses
Revenue Projections Average UK Leisure Centre vs Passivhaus Leisure
Centre
Creche
Fitness/Gym
Marketing
Energy/Water
Retail / F&B
Maintenance
Staff
Retail / F&B
Swimming
Creche
Fitness/Gym
Retail / F&B
Swimming Energy/Water
Retail / F&B
Maintenance
Staff
15% reduced
running costs
The Bigger Picture
100%
0%
Thank You !